Project Name: Project Phase: Site Engineer: Weather Condition
Project Name: Project Phase: Site Engineer: Weather Condition
Manpower Allocation
Sr. No. Task Name: Masonry Carpentry Rebar Concrete
M H M H M H M
5 - - - - - - -
6 - - - - - - -
7 - - - - - - -
8 - - - - - - -
9 - - - - - - -
10 - - - - - - -
TOTAL MANPOWER COUNT: 6 4 0 0 0 0 0
#Special Instructions:
Dismantling Work
- - - - -
Exterior Wall Plastering
- - - - -
Electrical Work
- - - - -
Thai-Aluminum
- - - - -
Tiles
- - - - -
Louver
- - - - -
Parapet Wall-B/W
- - - - -
B/W in Washroom (North)
- - - - -
B/W in Main Staircase
- - - - -
0 0 0 0 0 Steel Shed Installtion
Comments
Wooden Chowkhat
reached at site