Professional Documents
Culture Documents
M&R QCP (Itp) Sappi Saiccor Vulindela Project
M&R QCP (Itp) Sappi Saiccor Vulindela Project
Drawing No:
Inspection & Testing Plan (ITP)
MRPE : 2101021
CONTRACT NO :
SAPPI : 180920ME053
Drawing No:
Inspection & Testing Plan (ITP)
1 Documentation Check
EN 13480-4
WPS
Welding Procedure EN ISO 15614-1 X H H
1.1 EN ISO 15613 PQR
EN ISO 9606-1:2013 WELDER
Welders qualification EN ISO 14732:2013 X H H
1.2 S LIST
1.3 Nde Personnel EN ISO 9712 X R R LEVEL II
EN 13480-4
1.4 Heat Treatment Personnal X R R
EN ISO 17663:2009
2 Fabrication Checks
Drawing No:
Inspection & Testing Plan (ITP)
REMARKS 1)PARAGRAGH 4.3 PIPING: PS>0.5 bar - 2% NDT`S required, PS<0.5 bar NO NDT`s required
Document No: 0834-Q2_ _ _ _ _ _ _ _ _ _ _
Drawing No:
Inspection & Testing Plan (ITP)
•SURVEILLANCE : “S”
The erection contractor’s QC Inspector shall perform daily surveillance and spot checks.
Document No: 0834-Q2_ _ _ _ _ _ _ _ _ _ _
Drawing No:
Inspection & Testing Plan (ITP)
Drawing No:
Inspection & Testing Plan (ITP)
Drawing No:
Inspection & Testing Plan (ITP)