PT.

TRANS PACIFIC PETROCHEMICAL INDOTAMA


RELITA DEPT - INSPECTION SECTION

VIBRATION INSPECTION REPORT


Plant / Area PLATFORMING Report.No IR-RU-VIB-23-036
Item .No 204-K-003 Inspected Date 31/05/2023
Item Name Regen Blower Inspected By ARY

Subject Regen Blower Severity Level 1

Overall vibrasi tertinggi sebesar 4,315 mm/sec disisi Fan IB Vertical


Finding
Peakvue tertinggi sebesar 2,50 G's

Ditemukan Peak pada frequency synchronous dan non-synchronous (238,27 Hz) dari turning speed fan
Analisa
Berdasarkan spectrum vibrasi kemungkinan adanya rotating looseness dan bearing defect sisi BPFI dan BPFO

Rekomendasi penggantian bearing fan IB dan OB


Overall Vibration

Spektrum Fan IB Axial


Note : Prepared by Reviewed by Approved By

Tutur Dwi P. Aryo A. A. S. Wachid Basuki