WEEKLY UNSAFE ACT & CONDITIONS RE

Date 29-02-2024 To 06-03-2024


Rik Category
Sl. No. Date Name of Observer Location Contractor Photo
(L/M/H)

1 2/3/2024 Ashraf Ali PR 1 E DLCL M

2 2/3/2024 Hassim PR 1 C DLCL H

3 3/3/2024 Azaj Ali PR 1 A DLCL L

4 3/3/2024 Hassim PR 1 C DLCL M

5 4/3/2024 Hassim PR 1 C DLCL M

6 5/3/2024 Azaj Ali PR 1 A DLCL L

7 6/3/2024 Azaj Ali PR 1A DLCL L


8

9
Y UNSAFE ACT & CONDITIONS REPORT

Type
Action By
Observation Action Taken Closeout Photo (UA/UC
(Responsible)
)

Found electric cable laid on the


Re-routed and elevated Moizuddin UC
platform

Instructed to use two planks


Found using single board for
minimum as platform for scaffold Parjan Rai UA
scaffolding erection work
work

Found scattered wrapping steep


Removed and discarded Pradip Rai UC
ties at the work area

Found access blocked by the tube


and shifting activities ongoing in Cleared the access Parjan Rai UC
the same area.

The life line installed on the


Advised supervisor and reinstalled
second tire not meeting as per Parjan Rai UC
as per design
approved design

Found panel board access blocked Relocated and ensured the access
Jitendra UC
by the scaffold materials to the panel board is clear

Instruction given to all grindermen


Found grinder left on the beam Jitendra UC
and removed
Status

Closed

Closed

Closed

Closed

Closed

Closed

Closed