MAGNETIC PARTICLE INSPECTION REPORT

Client : PT. PERTAMINA HULU ROKAN


Location : LIMBAT SHOP
Report No. : OMS-PHR/MT/AS/0123/02
Charge. No : 2202I01CA1
Date : January 13, 2023

EQUIPMENT AND TECHNIQUE USED

MPI Equipment : AC Yoke Model #S/N : 43540 (Calibration due date March 11, 2023)
Lifting Power : 10 lbs
Magnetic Flux : Prepared Black Ink - Magnaflux 7HF (EXP July 2023)
Background Paint : White Contrast Paint - Magnaflux WCP-2 (EXP July 2023)
Scanning Technique : In two directions at 90o with 4" to 6" Pole Spacing
Method : Wet magnetic particle method
Surface Condition : Cleaned to base metal
Acceptance Code : ASME V ART-7, API 6A, CUSTOMER REQUIREMENTS.

SERIAL NO. ITEM DESCRIPTION OBSERVATION REMARKS

WDRS-AS- 7-1/16”- 2M / 3M x 7-1/16” - 3M ADAPTOR SPOOL


Magnetic particle ACCEPTED
4062
inspection was carried
out on Weld and Critical
Area’s

No crack or Defect
indication was detected
at the time of inspection,
and Ring Groove on the
Top and Bottom Still
Good Condition

NAME OF REPRESENTATIVE CONDUCTING

EXAMINATION / TEST REVIEWED BY REVIEWED & ACCEPTED BY

ELIEPNER SITOMPUL RENO. Z / BUDIMIN SADARINGGA


COMPANY EXAMINER QA / QC APPROVER QA / QC MAINTENANCE

PT. OMS OILFIELD SERVICES


Jl. Lintas Duri-Dumai KM. 07. RT 04 RW 07 Desa Pematang Obo, bathin Solapan, Duri, Riau 28784.
Telp 0765-560178