challenges to develop myself and contribute to the Email: Vo.an92@gmail.com growing company HP: (+84)97.885.64.25 Add: A1.01.04 Becamex Building, WORK EXPERIENCE TC1 Street, Thoi Hoa Ward, Ben Cat Town, Binh Duong Province, 06/2021- 2024; BINH MINH PAPER Co.,LTD Vietnam ⮚ Position: Head of Electrical - Automation Department and Maintenance 5 factories small in group. ⮚ Job description: ACHIEVEMENTS 1. I have returned to support the factory owner, when there is a problem to change both the personnel system, try to maintain the operation Education: Electric Power University of the electrical department and the 01 paper VIET NAM – Bachelor machine system to avoid shutdowns Hung Vuong Tehnology Vocation 2. Rebuild the entire operation of the electrical School - Mechatronics. department, into the process of management of First prize in the National Skills equipment and materials, periodic maintenance, Competition: Mechatronics 7/2012 and emergency maintenance according to the (Viet Nam) application of CMMS (computer maintenance Silver Medal in Asean Skills: management system). Application of RCM Mechatronics 11/2012(Indonesia) (Reliability-centered maintenance) and RCA (Root Skilled Young Workmanship title Cause Analysis) methodology to ensure the most 2012 efficient operation of the system, avoiding World Excellent Workmanship stopping emergency incidents. Certificate: Mechatronics 7/2013 3. Plan and inspect preventive maintenance jobs (Leipzig-Germany) 4. Train for technical to be competent in handling Personal Achievement Merit from incidents during machine operation shifts Prime Minister 2013 Third Prize: Engineering Innovation ❖ Project management and construction of electrical Ideas National Military Medical systems for 3 factory expansion projects at the same Hospital 2015 time First Prize: Engineering Innovation Ideas Open National Military 5. Project manager-Electrical the construction of the Medical Hospital 2017 Fourdrinier paper machine 02 And Pulp Production project a power capacity of 8.5 Megawatt-hour power electric consumption. output 300,000 Tons/year speed 650m / min, Controlled by DCS system of SIEMENS AG PCS7- V9.0. PLC S7-400, with 500 Input /Output, Full automation, Inverter controller ABB ACS-880, DC control Siemen, Inverter Xivew, communication Profibus, Profinet. SKILLS 6. Project manager-Electrical the construction of Planning and organizing department Paper machine 03 of a Small factory in the Leadership and team leading skills group. project to expand the power capacity of Technical training skills 4.0 Megawatt-hour power electric consumption. Effective time management output 15,000 Tons/year speed 150m / min Research the system, find optimal Paperweight 100- 600grams, Controlled by PLC solutions for operation, energy saving, Mitsubishi FX3U, Inverter controller ABB ACS- Etc… 580, Inverter controller INVT GD200A, Modbus Strengths in management and RTU (485) communication. construction supervision of electrical 7. Corrugated Cardboard Production Line (Carton): systems - Automation, large capacity 3- 5-7 Layer, 2200mm (The factory Owner bought the old system from China to Vietnam to for the factory, maximum 20.5MW reassemble) Responsible for restoring the total factory capacity, number of electrical system, installing control signals, and automatic control connection points programming the system to run it back into 1500 Input/output production Strong in programming Siemens PLC 8. Guide technicians of 5 small factories in the Automation systems S7 200, S7-300, system, Repair Support specializing in electrical S7-400, S7-1200, S7- 1500, PCS7, TIA automation systems can directly intervene to Mitsubishi PLC programming Etc… troubleshoot when necessary Installing inverters in almost all brands such as ABB, Siemens, Yaskawa, Emerson-Nidec, INVT, LS, Hope, 04/2019-06/2021; SYMC VIETNAM CO., LTD Mitsubishi, Etc... ⮚ Position: Automation Project Manager Install the servo driver yaskawa, delta, ⮚ Job description:
Etc 2. Specializing in designing and constructing
Repair damaged hardware of inverter, electrical system projects, automation, electrical PLC, HMI, Etc... cabinet installation, meeting all technical Strong in diagnosing and fixing system requirements given by customers errors, finding solutions, and 3. Remote technical support for Binh Minh paper optimizing factory Design electrical systems, electrical panels, and distribution for the entire 4/2018- 3/2019: BINH MINH PAPER Co.,LTD factory ⮚ Position: Automation Project Managerr Maintain mechanical equipment, ⮚ Job description: bearings, and mechanical alignment 1. Supervise the construction of the Fourdrinier when operating ineffectively paper machine 01 And Pulp Production project Welding machines, grinding machines, with a 12.5 Megawatt-hour power electric and handheld cutting machines can be consumption capacity. output 200,000 Tons/year used speed 350m / min, just allocated personnel to Shop drawing Auto CAD 2D maintain Paper machine 01 in production. Controlled by DCS system of Siemen PCS7-V8.1. PLC S7-400, PLC S7-300, PLC S7 1500, with 1500 Input /Output, Full automation, Inverter controller ABB ACS-880, DC control Siemen, Inverter Xivew 09/2017- 3/2018: DAO HEUANG GROUP – DAO COFFEE - LAOS OTHER ACTIVITIES ⮚ Position: Process Automation Supervisor ⮚ Job description: 1. Manage preventive maintenance activities in the Organizing Technical team and being in area in charge (Utility & Process) charge of the execution of 2. constructions as well as installation of 3. Planning and tracking the factory's maintenance Control Box Systems in large factories: activities and maintenance back-up activities. Can Tho seafood processing plant, , Executing the improvements and other projects Hai Sang seafood processing plant, regarding electric automation in the factory. Starlight Bridge HCMC, Quantitative 4. Responsible for analyzing electric-automation- Scale Systems, etc. related damages, and providing short-term and System maintenance: AHU, chiller, long-term solutions to these issues water supply treatment, sewage 5. Composing technical manuals related to electric treatment, quantitative scale system, automation job tasks in the factory. extracting system, boiler, RO treatment 6. Creating training plans regarding electric-automation station, etc. job tasks for the department. Technical training for engineers in large 7. Forming reports regarding maintenance backup Factories: status monthly. + Hung Vuong Vocational Training 8. Forming reports on team monthly activities. School for Engineering 9. Forming yearly targets on KPI, Resources, Budgets, + PEPSICO Company (Dong Nai) and Projects. + UNILEVER Company (Cu Chi) 10.Evaluating the performance of employees and from that
6/2014- 2/2017: MILITARY MEDICAL 7A
HOSPITAL ⮚ Position: Electric technical ⮚ Job description: 1. Maintenance and repair of all medical equipment and machinery in the hospital 2. Repair of sterilization steamers, pasteurizers, and industrial washing machines 3. Basic repair of x-ray machine, CT machine 4. Basic repair of ventilators, electrocardiography,