Professional Documents
Culture Documents
NOI 0339 - Removed
NOI 0339 - Removed
Date 08-Jan-2024
INSPECTION DATE AND TIME 09-Jan-2024 At 09:00 AM SUB CONTRACTOR NAME:- Rawad Al Biniah Cont.Est
AREA/LOCATION:- Box 15 Phase 01 ITP No AND PHASE No WT2201-FIS-QA-ITP-A00-0001 & Phase 3.5
REFERENCE DOCUMENT
DRAWING No.: PE_ZULUF_DRA-0020-01, 171-230004-DC
Name
Abdul Rehman Name Name
Date
08-Jan-23 Date Date
Inspection remarks:-
☐ Accepted
☐ Not Accepted
NOTE:
This document shall not be used to specify acceptance of the aspects of test; this can only be achieved by sign off appropriate inspection report
which shall be attached hereto.