NOTIFICATION OF INSPECTION - NOI

CLIENT PROJECT EPC CONTRACTOR


COMPANY
PROJECT Proj. nº: WT2201
Zuluf Water NOI nº: 0340
WT2201-FIS-QA-NOI-A00-0339
Treatment Plant
Rev 0

Date 08-Jan-2024

INSPECTION DATE AND TIME 09-Jan-2024 At 09:00 AM SUB CONTRACTOR NAME:- Rawad Al Biniah Cont.Est

AREA/LOCATION:- Box 15 Phase 01 ITP No AND PHASE No WT2201-FIS-QA-ITP-A00-0001 & Phase 3.5

Discipline -- Civil Mechanical Electrical Instrumentation Electrical Others


EPC Contractor- Witness point HOLD point Surveillance Doc review
Consortium Witness point HOLD point Surveillance Doc review
Appropriate column

REFERENCE DOCUMENT
DRAWING No.: PE_ZULUF_DRA-0020-01, 171-230004-DC

SPECIFICATION No.: WT2201-FIT-CW-TSP-A00-002-03


ITEM TO BE INSPECTED – Field Density Test
nd
Job Description: Deep dynamic compaction _Field Density test for box 15 Phase 01 of structural backfill material. 2 layer.
Thickness of layer 20cm. Number of test 03.

Requested By EPC Contractor Consortium

Name
Abdul Rehman Name Name

Company: Rawad Al Biniah Cont.Est Company: Fisia Italimpianti Company

Signature Signature Signature

Date
08-Jan-23 Date Date

Inspection remarks:-
☐ Accepted

☐ Not Accepted

Sub Contractor/Construction EPC Contractor Consortium Others (if Applicable)


Contractor

Name Name Name Name

Company: Rawad Al Biniah Cont.Est Company: Fisia Italimpianti Company Company

Signature Signature Signature Signature

Date Date Date Date

NOTE:
This document shall not be used to specify acceptance of the aspects of test; this can only be achieved by sign off appropriate inspection report
which shall be attached hereto.