DRAFT INQUIRY REPORT
To probe into the Facts & Figures mentioned in the Consumer complaint
lodged by Mr. Raja Waseem and checking the documentation of the said pole cases as
well.
PROCEEDINGS
The date of Inquiry was fixed on 26.12.2023 in the office of SDO IESCO Sub
Division Dina-II. The undersigned summoned the individual involved in this case. I being the
Convener of Inquiry Committee along with Mr. Ameer Muavia SDO IESCO Operation Sub
Division Dina City and Mr. Umair Ahmed SDO IESCO Operation Sub Division G-9 for
Inquiry proceedings. The individual involved in the inquiry case was questioned in respect of
different aspects of consumer complaint. Mr. Muhammad Rizwan LS-I was quizzed
regarding documentation related to number of illegal poles installed at Noshahi Hotel and
Kotli Behram respectively as claimed by complainant. To the question of feeder incharge,
Mr. Rizwan LS-I said that due to suspension of then feeder incharge Mr. Khan Badshah LS-
II, the SDO instructed him to look after the feeders until further orders. The LS Mr. Rizwan
stated that one number of dismantled HT pole was installed near Noshahi Hotel under as
per the instructions of SDO. It was claimed by him that area lineman also indicated the poor
and rusty condition of old LT pole, which resulted in tilting of pole and creation of loose sag
in LT span leading to frequent outage of supply in the vicinity of said area. Mr. Rizwan LS-I
also declared that LT pole was replaced with dismantled HT pole on the issuance of SJO by
concerned SDO with the instructions to restore the electricity of said area. On question
regarding installation of pole in Kotli Behram, Mr. Rizwan LS-I claimed that he did not install
the pole in said area. However, he stated that a SDG work was done by the ELR
subdivision of Construction formation of Jhelum Division and poles were installed in said
village. On further investigation, it was determined that the LT pole was installed in the Kotli
Behram village under the category of approved works which cannot be claimed illegal.
FINDINGS / CONCLUSIONS.
Member Member
( ) ( )
Mr. Ameer Muavia Mr. Umair Ahmed
SDO (E) IESCO SDO (E) IESCO
OPERATION SUB DIVISION OPERATION SUB DIVISION
DINA CITY (THEN SDO DINA-I) G-9 (THEN SDO DOMELI)
Convener
( )
Mr. Abdul Rehman
SDO (E) IESCO
OPERATION SUB DIVISION
RURAL