No. 01
METHOD Page 1
STATEMENT AND Issue date: of
No31 Idoluwo Street, Lagos.
RISK ASSESSMENT 17/08/2021 9
Site Safety
Representative Tel
Spanners, Screw drivers, Megger Tester, Multimeter,
Key Plant & Tools Shovel, Pickaxe and hacksaw
(Attach
Certification)
Key Materials
Specific Identified
Residual Hazards: N/A
(or refer to the
task specific risk
assessment(s))
Specific Staff
Training
Classification: Internal
Name Issue
No. 01
METHOD Page 2
STATEMENT AND Issue date: of
No31 Idoluwo Street, Lagos.
RISK ASSESSMENT 17/08/2021 9
1. Mobilize work men, equipment, work tools and other accessories to work location.
2. Made a trench along with cable route and laid 100mm PVC conduit as per requirement.
Detailed Step by 5. Iinstall 2 no’s of 600Amp distribution boards with 7 by 100A out goings on each
Step Sequence of
Operations: Distribution board IP67 to locations as per requirement.
(include sketches
if required) 6. Power Personnel De-energize the DB containing the 2 by 400A breaker in the Sub Station.
7. At point of isolation, Power Personnel lock off and tag out breakers where necessary.
(i.e. Ladders / MEWPS / Scaffold / Trestles / Step Ladder, etc) Ladders may only be used as a last resort and must be for
short duration only.
Method of
Access and
Egress to the
N/A
work area:
(i.e. Guard Rails / Toe Boards/Brick Guard / Safety Harnesses / Exclusion Zones, etc.)
Fall Protection
Measures:
(Where work at height N/A
cannot be eliminated –
consider both
Personnel & Materials)
Hazardous
Substances:
(Attach MSDS if
Very Toxic Harmful/ Corrosive Dangerous Oxidising Highly Explosives
required) For the
Irritant flammable
environment
Applicable: No No No No No No No
Classification: Internal
Name Issue
No. 01
METHOD Page 3
STATEMENT AND Issue date: of
No31 Idoluwo Street, Lagos.
RISK ASSESSMENT 17/08/2021 9
Discharging /Dewatering from excavation / No
Discharges to the Sewer No
site
Noise and Vibration Renewable & Non-renewable Resource No
No
Generation Consumption
Environmental: Emission to Atmosphere No Transport No
Discovery of Discovery of previously unknown No
No
Archaeological Features contaminated ground
Working on a site of value to Wildlife and No
Litter No
Natural Features
Storage of hazardous
No Contamination from firewater No
resources on site
Odour and Dust No Contractor Activity No
Control Measures:
Storage
Arrangements: To be agreed with the client / site manager. Prior to works
Details of Permits
to Work:
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements
SWL’s: of the structure where the work is taking place)
none
Other:
Required
Personnel 1. Hi - Viz
Protective Equip.:
2.
Safety Boots Hard Hats Safety Gloves Hearing Eye Respiratory
Protection Protection Protection 3.
Applicable Y/N: Y Y Y N Y Y Y
Classification: Internal
Risk Assessments- These are the risk assessments which
are applicable to works onsite.
Category Definitions
1 First Aid, Near Miss
2 LTA (1 Day), Medical Treatment
3 LTA (3 Day), Dangerous Occurrence
4 Single Fatality
5 Multiple Fatality
Category Definitions
1 Release which has only a minor impact
2 Release, which has a moderate (short duration) impact
3 Release, which has a significant impact
4 Major environmental release which has a significant (long term) impact
5 Damage is major and permanent
Risk Matrix
PROBABILITY
1 2 3 4 5
Acceptable level of risk. Risk is
controlled as far as reasonably
5 LOW MED HIGH HIGH HIGH LOW
practicable. Existing Controls to
be continuously monitored.
Classification: Internal
Medium
Medium
Risk
High
High
Hazard HAZARD POTENTIAL
Low
Low
Ref. PRECAUTIONARY MEASURES AND SAFEGUARDS.
Identification AND CONSEQUENCES.
No:
Manual handling/ Personnel can suffer X Personnel should always observe rest when
repetitive hand injury, fatigued and tired. X
movement MSDs
2-3-man support should be adopted for tasks
requiring light lifting
Indiscriminate Personnel may be run X All personnel working in the power station must stay X
movement within over by heavy duty within the confinement of their work zone
the facility equipment working in the
yard
Lifting operations Poor lifting plan can X Adequate lifting plan to be in place. X
result in personnel injury
All lifting accessories must be inspected and
certified by a competent person
Classification: Internal
Medium
Medium
Risk
High
High
Hazard HAZARD POTENTIAL
Low
Low
Ref. PRECAUTIONARY MEASURES AND SAFEGUARDS.
Identification AND CONSEQUENCES.
No:
Cable Installation
- Hand injury X Use of safety hand gloves
Classification: Internal
Medium
Medium
Risk
High
High
Hazard HAZARD POTENTIAL
Low
Low
Ref. PRECAUTIONARY MEASURES AND SAFEGUARDS.
Identification AND CONSEQUENCES.
No:
- Dust, Heat, noise and X Proper PPE to be used (safety goggles, dust
vibration can lead to mask, Earplug, Earmuffs)
Injury to personnel
Classification: Internal
Classification: Internal