You are on page 1of 3

ORO DIADEM CONSTRUCTINO CORPORATION

Unit 212 Codoy Bldg., Pabayo-Gomez Street, Cagayan de Oro City


Email: orodiadem@gmail.com | info@arkitextures.com | cdo@liteblock.ph
Mobile: (+63) 917 130 2303| (+64) 967 703 1188

Quotation ODSC-202305-0201PH Attn: MRS. JEIZEL DELOS REYES-GO


Reference Actual Measurement Company:
Address/Project Site: PRIVATE RESORT AT TIBOLOG, DAVAO DEL SUR
Date October 15, 2023 Mobile Number: +63 917 899 4305
Validity 30 Days Email:

Required
SN Desctription UNIT PRICE Unit Amount
Area/Length

1 LABOR, TOOLS, ACCOMODATION (WORKABLE AREA) - Decking ₱ 30,000.00


1.1 General Requirements (Mob/Demobilization, PPE, Tools) ₱ 30,000.00 1.00 lot 30,000.00
1.2 Labor and Installation ₱ 300.00 ₱ - sqm -
1.3 OCM ₱ 1,500.00 ₱ - lot -
1.4 Accomodation ₱ - ₱ - lot -
2 LABOR, TOOLS, ACCOMODATION (WORKABLE AREA) - Slats ₱ 103,911.68
2.1 General Requirements (Mob/Demobilization, PPE, Tools and materials) ₱ 25,000.00 1.00 lot 25,000.00
2.2 Labor and Installation ₱ 150.00 ₱ 493.09 meters 73,963.50
2.3 OCM ₱ 4,948.18 ₱ 1.00 lot 4,948.18
2.4 Accomodation ₱ - ₱ - lot -

Total Direct Cost ₱ 133,911.68


Total ₱ 133,911.68
Others ( Product Discount) -
Subtotal 133,911.68
12% Vat -
GRAND TOTAL ₱ 133,911.68

SUMMARY: NOTE: Payment upon approval

The quotaion is valid for30 Days Balance


Including Upon
delivery Delivery
&CIF BASED ON THE DRAWING SHOWED
Packing: standard package for WPC. LEAD TIME (Production + Delivery Time ) AND QTY SPECIFIED BY THE CLIENT

REMARKS Lead time: 45 days production + 15 days freight + 3 days clearing INDENT ORDER

Payment terms:
ETD: To be determined by the chosen logistics
Total Due ₱ 133,911.68

A. Payment Terms
1. Installation: Shall be quoted in a separate quotation @ 50% upon acceptance; 50% Balance - on Progress Billing

1. BANK DETAILS:
Beneficiary bank account name: ORO DIADEM CONSTRUCTION CORPORATION
Beneficiary bank: PHILIPPINE NATIONAL BANK
Beneficiary bank account number: 4105-70005578
Bank address: Cogon Branch, Cagayan De Oro City, Misamis Oriental, Philippines

We know the world is full of choices. Thank you for trusting Oro Diadem Construction Corporation and choosing ODCC.

Prepared by: Conformed by

ENGR. ANA THERESA A. FLOR


Signature over printed name
Approved by

Checked by ENGR. EDUARD AVILA MEJIA

MARK EDUARD G. MEJIA


ORO DIADEM CONSTRUCTINO CORPORATION
Unit 212 Codoy Bldg., Pabayo-Gomez Street, Cagayan de Oro City
Email: orodiadem@gmail.com | info@arkitextures.com | cdo@liteblock.ph
Mobile: (+63) 917 130 2303| (+64) 967 703 1188

Quotation ODPI-202305-0201PH_R2 Attn: MRS. JEIZEL DELOS REYES-GO


Ref. No. Company:
Address/Project Site: PRIVATE RESORT AT TIBOLOG, DAVAO DEL SUR
Date October 15, 2023 Mobile Number:
Validity 30 Days Email:

Area/Length Dimension UNIT PRICE


Section ITEM Color Code TOTAL QTY Amount
(Sq.m. / m) (mm x mm) (per m)

2nd generation
outdoor
1 DEL14023S-M Decking ₱ 775.80 1,529.11 ₱ 3,440,213.73
(Co-extrusion)
2900mmL x 139mmW x 23mmThk
MXA5030

2nd generation
615.89 sqm @
2 CX2525 PL-202 - Red Cedar outdoor Lathe/Louvres ₱ 198.18 390.00 ₱ 231,870.60
7.20m/sqm 3000mmL x 25mmW x 25mmThk

2nd generation
outdoor Lathe/Louvres
3 LV25100 ₱ 420.91 165.00 ₱ 207,546.51
12mmThkx71mmWx30
00mmL

2nd generation
Outdoor
Decking
4 Edging ₱ 282.18 165.00 ₱ 139,140.14
(Co-extrusion)
Accessories
3000mL x 25mmThk x 100mmW

614.89 sqm
5 BEP4930X ₱ 228.51 684.00 ₱ 468,654.29
@ 3.33m/sqm

Outdoor
6 DA-LC-01 - ₱ 13.63 8,416.54 ₱ 114,717.39
Decking
Framing and Other Accessories

7 DA-LC-02 24 sets/sqm ₱ 19.00 14,781.36 ₱ 280,845.84

Total Direct Cost ₱ 4,882,988.49


Total ₱ 4,882,988.49
Others ( 5% Product Discount) (244,149.42)
Subtotal 4,638,839.07
12% Vat -
Delivery Charge (Free)
GRAND TOTAL ₱ 4,638,839.07

SUMMARY: NOTE: Payment upon approval

The quotaion is valid for30 Days Balance


Including Upon
delivery Delivery
&CIF BASED ON THE DRAWING SHOWED
Packing: standard package for WPC. LEAD TIME (Production + Delivery Time ) AND QTY SPECIFIED BY THE CLIENT

REMARKS Lead time: 45 days production + 15 days freight + 3 days clearing INDENT ORDER

Payment terms:
ETD: To be determined by the chosen logistics
Materials: Cash ₱ 4,882,988.49

A. Payment Terms
1. Materials: CASH
2. Installation: Shall be quoted in a separate quotation @ 50% upon acceptance; 50% Balance - on Progress Billing
3. 100% refundable IF the company failed to comply within the Lead Time period. However, IF the problem exists during the shipping, cause beyond the reasonable control
of the company such as Storm, Tempest, Acts of God, or any shipping and clearing crisis, the company will provide documents on such calamity and the comapny have
the right to amend the delivery period.

1. BANK DETAILS:
Beneficiary bank account name: ORO DIADEM CONSTRUCTION CORPORATION
Beneficiary bank: PHILIPPINE NATIONAL BANK
Beneficiary bank account number: 4105-70005578
Bank address: Cogon Branch, Cagayan De Oro City, Misamis Oriental, Philippines

B. Delivery Lead Time


1. Packaging Standard (carton package); WITHOUT PALLET
2. With Stocks: 7 to 15 working days upon clearing of payment and the availablity of the trucking services.
Delivery can also be arranged by the client upon clearing of payment. (Please coordinate with the company's representative)
3. No Stocks: 45 - 60 working days upon receipt of downpayment.
ORO DIADEM CONSTRUCTINO CORPORATION
Unit 212 Codoy Bldg., Pabayo-Gomez Street, Cagayan de Oro City
Email: orodiadem@gmail.com | info@arkitextures.com | cdo@liteblock.ph
Mobile: (+63) 917 130 2303| (+64) 967 703 1188

Quotation ODPI-202305-0201PH_R2 Attn: MRS. JEIZEL DELOS REYES-GO


Ref. No. Company:
Address/Project Site: PRIVATE RESORT AT TIBOLOG, DAVAO DEL SUR
Date October 15, 2023 Mobile Number:
Validity 30 Days Email:

C. Terms and Condition


1. This quoatation is based on the drawings or information provided by the costumer or their representative. (Please view the quotation before confirming the
2. The company is not liable to any shortage of quantity due to insufficient information or discrepancy provided to us.
3. Delivery cost shall to be shouldered by the costumers.
4. Installation INCLUDED.
We know the world is full of choices. Thank you for trusting Oro Diadem Construction Corporation and choosing ODCC.

Prepared by: Conformed by

ENGR. ANA THERESA A. FLOR


Signature over printed name
Approved by

Checked by ENGR. EDUARD AVILA MEJIA

MARK EDUARD G. MEJIA

You might also like