Quotation For Tibolog (Free Decking Installation)
Quotation For Tibolog (Free Decking Installation)
Required
SN Desctription UNIT PRICE Unit Amount
Area/Length
REMARKS Lead time: 45 days production + 15 days freight + 3 days clearing INDENT ORDER
Payment terms:
ETD: To be determined by the chosen logistics
Total Due ₱ 133,911.68
A. Payment Terms
1. Installation: Shall be quoted in a separate quotation @ 50% upon acceptance; 50% Balance - on Progress Billing
1. BANK DETAILS:
Beneficiary bank account name: ORO DIADEM CONSTRUCTION CORPORATION
Beneficiary bank: PHILIPPINE NATIONAL BANK
Beneficiary bank account number: 4105-70005578
Bank address: Cogon Branch, Cagayan De Oro City, Misamis Oriental, Philippines
We know the world is full of choices. Thank you for trusting Oro Diadem Construction Corporation and choosing ODCC.
2nd generation
outdoor
1 DEL14023S-M Decking ₱ 775.80 1,529.11 ₱ 3,440,213.73
(Co-extrusion)
2900mmL x 139mmW x 23mmThk
MXA5030
2nd generation
615.89 sqm @
2 CX2525 PL-202 - Red Cedar outdoor Lathe/Louvres ₱ 198.18 390.00 ₱ 231,870.60
7.20m/sqm 3000mmL x 25mmW x 25mmThk
2nd generation
outdoor Lathe/Louvres
3 LV25100 ₱ 420.91 165.00 ₱ 207,546.51
12mmThkx71mmWx30
00mmL
2nd generation
Outdoor
Decking
4 Edging ₱ 282.18 165.00 ₱ 139,140.14
(Co-extrusion)
Accessories
3000mL x 25mmThk x 100mmW
614.89 sqm
5 BEP4930X ₱ 228.51 684.00 ₱ 468,654.29
@ 3.33m/sqm
Outdoor
6 DA-LC-01 - ₱ 13.63 8,416.54 ₱ 114,717.39
Decking
Framing and Other Accessories
REMARKS Lead time: 45 days production + 15 days freight + 3 days clearing INDENT ORDER
Payment terms:
ETD: To be determined by the chosen logistics
Materials: Cash ₱ 4,882,988.49
A. Payment Terms
1. Materials: CASH
2. Installation: Shall be quoted in a separate quotation @ 50% upon acceptance; 50% Balance - on Progress Billing
3. 100% refundable IF the company failed to comply within the Lead Time period. However, IF the problem exists during the shipping, cause beyond the reasonable control
of the company such as Storm, Tempest, Acts of God, or any shipping and clearing crisis, the company will provide documents on such calamity and the comapny have
the right to amend the delivery period.
1. BANK DETAILS:
Beneficiary bank account name: ORO DIADEM CONSTRUCTION CORPORATION
Beneficiary bank: PHILIPPINE NATIONAL BANK
Beneficiary bank account number: 4105-70005578
Bank address: Cogon Branch, Cagayan De Oro City, Misamis Oriental, Philippines