Village: Horawala,
Block: Vikasnagar,
District: Dehradun in Uttarakhand, India
Vision
To involve the reputed higher educational institutions of the country in the process of
indigenous development of self-sufficient and sustainable village clusters.
Mission
Select suitable rural clusters and effectively participate in the holistic development of these
clusters using eco-friendly sustainable technologies and local resources creating sufficient
employment opportunities in the process, harnessing multifarious government schemes,
customised use of existing technologies and use of knowledge as per local needs, to improve
the livelihood of rural masses will be the key intervention.
Objectives
Horawala village is a part of Chandpur cluster under UBA, IIT Roorkee. This cluster is in the
Vikasnagar block of Dehradun district in Uttarakhand. Chandpur Kala and Chandpur Khurd
come under the Gram Panchayat-Chandpur Khurd whereas Horawala is a separate Gram
Panchayat. This cluster is approximately 110 Km away from Roorkee. Chandpur is home to
700 people. Another village in the cluster, Horawala is located 30 Km towards west from
District Headquarters Dehradun. The village is home to about 1836 people, with 366
households. The village has a sex ratio of 972 females per 1000 males. The overall literacy rate
is 79.72%, with male literacy rate being 88.31% and female being 71.08%.
1. ICT (Information and Communication Technology): Students of middle school were given
the knowledge of computers under this initiative.
2. Computer Installation & School Adornment: It aims to provide the village school with
necessary equipment. Computers and projector were set up in the school despite the
online barriers.
7. Physics Lab Initiative: Physics and Chemistry labs were set up at Government Inter College,
Horawala under this initiative.
8. Mini Bank Set-up: Since the village had no banking facility, an SBI mini bank was set up at a
cyber cafe in the village.
Government Inter College or GIC, Horawala is an Uttarakhand government school set up in 1975.
The school has a campus of about 2.3 acres, 9000 square meters and a covered area of about 1543
square meters. The school has students from Class 6th up to class 12th, and the total strength is
about 300 students. The school has the facility of a Smart LED monitor, a computer lab and a newly
equipped Physics lab set up by UBA-IIT Roorkee. There are 18 teachers in the school and Mr Om
Prakash Singh is the Principal In-charge of the school whose contact number is +919410944855.
SN Appliance Quantity Average Power Average no. Total hours Total Energy
Consumption of appliance used per day Consumption
used (kWh)
1 Tube light 6 55 W 4 6 1.32
2 Fans 27 70W 10 6 4.20
3 LED bulb 16 12 W 10 6 0.72
4 Desktop 15 120 W 12 4 5.76
Computer
Total 12 units per
day
A brief overview
● On Grid Solar System: This system connects with government electricity. Solar net-
metering is applicable on this system that means balance electricity you can export to the
government. And the government will adjust the same in your upcoming electricity bill.
The disadvantage of this type of solar panel is that it does not have battery storage. Thus,
it is of no use in our school.
● Off Grid Solar System: Off grid a solar system has a battery for backup. Solar panel will run
your load directly on the first priority, if solar panel unable bear your connected load, then
battery helps you to run your connected load. Off grid solar system helps you to store
your solar power in batteries for use during the power cut and when sun is also not
available. During the rainy season and winters, the production of electricity is very less
and the disadvantage of an off grid solar system is that It cannot take electricity from the
main grid.
● Hybrid solar system: (solar battery storage with grid connection) has both the functions
of on grid solar system and off grid solar system in it. Or we can say that it has three
sources to run load (solar energy, solar battery and government electricity). This system
stays connected with batteries as well as the government grid. Hybrid solar system is
recommended for those peoples, who are facing the problem of electricity cuts and want
to export the extra electricity to grid. Thus, the advantage of a hybrid plant is that it has a
battery backup as well as it is connected to the main grid. Hence, it solves the problem
which is faced in an on grid and an off grid solar panel system. Thus, Hybrid solar panels
are the preferred choice in the school where power cut is a major issue. Each solar panel
system produces 4 units of electricity per kW capacity, thus in order to fulfil the
requirement of 12 units daily, 3 kW capacity plant would be required and enough.
The team has contacted Sanvi Solar Limited, Dehradun for solar panel quotation.
Quotation:
Price Schedule:
Detailed Quotation:
https://drive.google.com/file/d/1O5yYhVvZKFEDw1TFhFRneLeWmYGjSnMJ/view?usp=drivesdk
Setup Location
The school has a spacious roof top and that can be used for setting up of the solar panel system as
only 100 square feet area is required.
Future Aspect
The team will also try to replicate this initiative in other public places in Horawala-Chandpur and
the other villages under Unnat Bharat Abhiyan, IIT Roorkee.