Professional Documents
Culture Documents
NOTE:
AS THE LOAD DEVELOPS IN PHASE1 AND
KM GRID KM GRID
REACHES THE CAPACITY OF 12 FEEDERS
GOLF
310
DISTRICT
GDW-01
GOLF
580.326
COURSE
WEST
213593.8
GCR-01
RESIDEN
06
TIAL
T 1/6 R50
T 1/6 R50
FUTURE WFR-03
WATERFRONT
212097.142
RESIDENTIAL
T 1/6 R50
T 1/6 R50
WATERFRONT092.967
211
WFR-02
RESIDENTIAL
EXISTING PRIMARY SUBSTATION 66/11kV - LDS-2 PSS-ND-01 SHALL BE ENERGIZED AND PSS-ND-01
GSD-03
T 1/6 R50
GOLF
DISTRICT
GSD-03
612
030.712
T 1/6 R50
GOLF
611GDS-02
DISTRICT
233.550
T 1/6 R50
FOX
412
FXH-05
HILLS
321.987
WATERFRONT
MDL=0.9x ΣFMDL = 82.82x0.9= 74.54MVA
210046.655
WFR-01
RESIDENTIAL
GOLF
610 DISTRIC
GDS-01
485.738
T
T 1/6 R50
R50
1/6
T
EDUCATION
LOOPED IN TO THE NETWORK AS PER
510 844.130
EDD-03
MEDICAL
DISTRICT
WITHIN PROJECT
312 728.251
MEC-01
DISTRICT
T 1/6 R50
R50
1/6
T
T 1/6 R50
T 1/6 R50
FOX
411
FXH-04
HILLS
843.970
T 1/6 R50
DISTRICT
EDUCATION
EDD-02
313 342.335
WATERFR
112 WFC-04
ONT
416.575
T 1/6 R50
COMMER
T 1/6 R50
CIAL
411
FOX
FXH-03
337.899
HILLS
ELECTRICAL DISTRIBUTION 11kV NETWORK SLD THE SCHEME.
05R 6/1 T
BOUNDARY
EDUCATION
T 1/6 R50
314 176.193
EDD-01
05R 6/1 T
DISTRICT
WATERFRONT
111 799.483
WFC-03
CENTRAL
810 000.000
COMMERCIAL
PZC-01
PZC-01
PLAZA
NORTH
BLN-01
BOULEVARD
810 921.731
T 1/6 R50
T 1/6 R50
410 850.520
FOX HILLS
FXH-02
NORTH
BLN-02
BOULEVARD
264.678
811
810 911.858
BLS-01
SOUTH
BOULEVARD
T 1/6 R50
811 254.805
T 1/6 R50 BLS-02 SOUTH
BOULEVARD
T 1/6 R50
T 1/6 R50 T 1/6 R50
05R 6/1 T
05R 6/1 T
T 1/6 R50
T 1/6 R50
R50
1/6
T
WATER
T
1/6
R50
T
6/
1
05R 6/1 T
05
R
T 1/6 R50
FRONT
111
WFC-02
COMME
196.254
RCIAL
05R 6/1 T
410 355.752
FOX HILLS
FXH-01
05R 6/1 T
WATERF
ENERGY
RONT
512 678.033
EC2-01
110
WFC-01
COMME
786.935
CITY
RCIAL
QATAR
ENTERTAINMEN
110
QEC-02
231.879
T CITY
EXISTING LDS-2 SUPER SS
40 T1 40 T2 40 T3 40 T1 40 T2 40 T3
MVA 66/11kV MVA 66/11kV MVA 66/11kV MVA 66/11kV MVA 66/11kV MVA 66/11kV
Z=16.00% Z=16.00% Z=16.00% Z=16.00% Z=16.00% Z=16.00%
B1 (11kV, 3150A, 31.5kA/3 Sec) B2 (11kV, 3150A, 31.5kA/3 Sec) B3 (11kV, 3150A, 31.5kA/3 Sec) B1 B2 B3 (11kV, 3150A, 31.5kA/3 Sec) NOTES:
- THE LOCATION OF PRIVATE SUBSTATIONS ARE
A150 A130 A110 A90 A70 A50 A30 A10 A20 A40 A60 A80 A100 A120 A140 A160 A170 A190 A210 A270 A290 A310 A330 A350 INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
FINALIZED DURING RESPECTIVE BP PROCESSING.
CL= 15290, MDL=9724
CL=15902, MDL=10175
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
CL=15369, MDL=9758
CL=11309, MDL=7168
CL=11272, MDL=7252
CL=12803, MDL=8130
CL=15735, MDL=9987
CL=12948, MDL=8190
CL=11584, MDL=7325
CL=12257, MDL=7766
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
50CM THUS REDUCING THE CURRENT CARRYING
FMDL= 3072 kVA
FMDL=3316 kVA
FMDL=3379 kVA
FMDL=3658 kVA
FMDL=4203 kVA
CAPACITY TO THAT OF 3C-240mm².
- IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
SHALL BE PROVIDED WITH DIRECTIONAL
OVER CURRENT AND DIRECTIONAL EARTH FAULT
PROTECTION (TYPE4).
- THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH
AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,
CE CE CE CE CE CE CE CE CE CE PSS-ND-01 MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
PLOT BOUNDARY
LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.
PHASE-1 LOW - IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
(PLOT BOUNDARY) CONTRADICT WITH KM STANDARDS AND
SPECIFICATION, THEN THE LATER SHALL PREVAIL.
- COMPLETE DISTRIBUTION DESIGN RESPONSIBILITY TO
THE INFRASTRUCTURE CONSULTANT.
- CLIENT TO APPOINT A KM APPROVED
CONTRACTOR TO EXECUTE WORK AT SITE.
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
THE LV SIDE, EXCEPT OTHERWISE STATED.
ALL THESE CONNECTIONS TO BE - LV CABLES ARE LAID AT A SPACING OF 40CM.
TRANSFERRED TO - ALL PERMANENT SECONDARY SUBSTATIONS ARE
PRIMARY S/S PSS-ND-01(FUTURE) INDOOR TYPE.
ONCE CONSTRUCTED - ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
WITH 31.5 KA/3SEC FAULT RATING.
- THIS SCHEME IS SUBJECT TO ALL CONDITIONS
MENTIONED IN THE APPROVAL LETTER REF.NO.
EP/MO/3378/2023. DATED: 24-09-2023.
- ALL DISTRIBUTION SUBSTATIONS ARE STANDARD
NOTES: DOUBLE INDOOR TYPE WITH 4x 1600 KVA OIL TYPE Tx,
1. ALL LOADS ARE IN kVA. 4x 6W FSFP, WITH NATURAL VENTILATION,
SS.40477 SS.40463 SS.40464 STANDALONE AT GROUND FLOOR.
SS.40474
3312kVA 3212kVA 3355kVA 3469kVA 3474kVA 3444kVA 3124kVA 3384kVA 6. ALL SUBSTATIONS (EXCEPT SS.40485-PRIVATE) SHOWN HERE ARE LUS-CP28B-QDSBG-DWG-EL-01302-001
DESIGNED TO SUPPLY RESIDENTIAL LOADS BY CONSIDERING LESS
THAN 50% MOTOR LOAD CONTRIBUTION.
SS.40469 SS.40475 SS.40482 7. SS.40485 IS PRIVATE INDOOR SS SUPPLYING UTILITY PUMP STATION LOADS DIVERSITY
SS.40470
FACTOR 1.0.
3780kVA 3474kVA 4044kVA 3596kVA 3258kVA (NO) 3236kVA 4041kVA 4090kVA 8. ALL RESIDENTIAL PLOTS ARE LOCALLY COOLED.
DESIGN.
SS.40466 SS.40462 SS.40483 SS.40481
TABLE-1: DIVERSITY FACTORS APPLICABLE FOR PLOT LOAD CALCULATION
Sc e e LUSAIL 4-415-2023 4-415-2023-P3-P4.
P D c C ( A/C L e 50% T M De )
3908kVA 4368kVA 4095kVA 4095kVA 2918kVA 3521kVA 4300kVA 4148kVA
D e Re ec e D e D e Ne D e D e Ne D e
L e 11kV LV T e S/S 11kV Fee e 11kV Fee e P
S e
Re e 0.70 0.85 0.80 0.48 0.90 0.43
PRIVATE SS.40485 SS.40461 SS.40478 SS.40480
S M e 0.75 0.85 0.80 0.51 0.90 0.46
Re S 0.80 0.85 0.80 0.54 0.90 0.49
814kVA 3780kVA 4095kVA 3636kVA 3532kVA 3996kVA 3770kVA O e ce 1.00 0.85 0.80 0.68 0.90 0.61
Ve c e C 1.00 0.85 0.80 0.68 0.90 0.61
U e 1.00 0.85 0.80 0.68 0.90 0.61
SS.40484
TABLE-2: DIVERSITY FACTORS APPLICABLE FOR PSS LOAD CALCULATION
SUPPLY TO HUZOOM DISTRCIT PHASE 1
3818kVA 3837kVA HUZOOM PH.1 PROJECT IN LUSAIL CITY
TCL MDL PL 11 FMDL PSS 11 KV SCHEMATIC FOR INTERIM SUPPLY
01 R
CP / AREA
(kVA) (kVA) (kVA) (kVA) (kVA) (FROM LDS2 PRIMARY)
AN/SSS 26-09-2023 N.T.S
DIVERSITY FACTOR - - 0.85 0.80 0.90
CAD Re : e ec
YA HW
CP28B 271524 172732 103534 82827 74544 AA For/ MM
ZONE: 69
4-415-2023
0 3/158