Technical requirements
The technical requirements detailed below are specifically
for an automatic palletizing line.

1. Electrical installation
• Hose: 5x10 mm.

• MAGNETOTHERMAL protection: “SIEMENS 5SL6640-7, 40A 3 + N

• DIFFERENTIAL protection: "SIEMENS 5SV3646-6KK01,63A 300Ma"

https://translate.googleusercontent.com/translate_f 1/11
17/12/21 13:47 Technical requirements

• Installed power: 25kW

► The total distance of the electric hose must be to the cabinet


main machine, plus 5 extra meters to be able to connect the
cables inside the cabinet.

one

Page 2

2. Internet installation

• CAT6 “shielded” internet cable

with crimp "RJ-45 type B"

• High speed Internet, minimum 10 Mb / s

• Dedicated IP address for INTEC machinery.

► You cannot disconnect or change the IP's without prior notice to IN-tec.

► The total distance of the internet cable has to be up to the closet


main machine plus 5 extra meters to connect the cable

https://translate.googleusercontent.com/translate_f 2/11
17/12/21 13:47 Technical requirements

inside the closet.

3. Connection of external equipment

• Existing Bagger / Weigher operating permit cable


Cable type: 2x1mm.

• Immediate availability of the technical service of the manufacturer of the Bagger /


Weigher

• Pneumatic and electrical diagrams of the Baggers / Weighers

► The total distance of the connection cable must be up to the start of the
ribbed tape / honeycomb plus 5 meters plus extra to connect
the cable to the relevant junction box.

two

Page 3

4. Compressed air installation:

• Clean and dry compressed air (3-4-4 according to ISO 8573-1: 2010)

• Quick connection for Ø16 mm PU tube.

https://translate.googleusercontent.com/translate_f 3/11
17/12/21 13:47 Technical requirements

• The general pipe must be greater than or equal to DN15 (1/2 ”).

• Ø16mm PU tube to connect from the main air intake to the


palletizer.

• Air pressure: 8 bars.

Page 4

5. Existing customer facilities


• All the machines that will have to be handled by IN-tec will have
to be disconnected and prepared for handling previously.

https://translate.googleusercontent.com/translate_f 4/11
17/12/21 13:47 Technical requirements

• The horizontal floor must be level, clean and free of obstacles.

• The accesses to the work area must be correctly


enabled.
• Height necessary to lift the machinery (this height must be
enough for the main body of the palletizer + sinchas + arm of the
crane ).

https://translate.googleusercontent.com/translate_f 5/11
17/12/21 13:47 Technical requirements

Page 5

6. General conditions before commissioning


running and mounting.
• Send the documentation with the electrical and pneumatic diagrams of the
baggers, weighers, balers and other possible devices that
have to be handled by IN-tec staff.

• If necessary. If in doubt, the presence of a


technician of the company of said machines to support our technicians.
• The client will have to provide the mosaics, layers and productions of all
The sacks.
• During the transport of the machinery, the client will have to hire a
safe for this one.
• To adjust the machinery the customer will have to send when IN-tec
I requested:

7. General conditions during commissioning


running and mounting.
• A complete pallet of each format to be made, these pallets will have to
be available to IN-tec technicians at any time.

• Personnel to dispense sacks in IN-tec machinery.


• Personnel for the physical support of IN-tec technicians.

• You can only use the machines with the permission of the technicians
by IN-tec.
• The handling of all machinery external to IN-tec will be the responsibility
the client's.

https://translate.googleusercontent.com/translate_f 6/11
17/12/21 13:47 Technical requirements

Page 6

• Boom truck (minimum 8000kg) with 3 axles. Except for the exclusive request of IN-tec, the truck
The boom may not be a "self-supporting crane".

• 1 und: 5000Kg telescopic handler

• 2 und: 2500Kg forklift trucks with driver.

https://translate.googleusercontent.com/translate_f 7/11
17/12/21 13:47 Technical requirements

Page 7

• 2 und: Stringers for forklifts from 2.5 to 3 meters.

• 2 und: Manual pallet trucks

https://translate.googleusercontent.com/translate_f 8/11
17/12/21 13:47 Technical requirements

• 1 unit. Scissor-type folding ladder (minimum 3 meters); with CE EN131

Page 8

• 1 unit: Safety cage and all necessary PPE.

• The unloading of the merchandise can only be done by IN-tec staff.


https://translate.googleusercontent.com/translate_f 9/11
17/12/21 13:47 Technical requirements

• In the event of a need for a replacement, the customer must provide the necessary contacts
to locate them and if necessary the transport would also be in charge of the client.

8. General conditions after commissioning


running and mounting.
• Contact person with access to the WhatsApp mobile application.
• In the event of a breakdown or modification, the customer must send videos
and / or photos to the responsible technician of IN-tec.
• In the event of a breakdown, the customer must provide a person
qualified to communicate with IN-tec.
• If you have any problem or doubt, call the IN-tec technician before
manipulate the machine, never carry out tests without supervision.
• The client must provide the necessary material for the packaging of
all tools and tools for shipment to IN-tec.

9. Penalties
• In the case of not complying with any of the points stated above,
all expenses will be invoiced by administration.
• In the event that the assembly is not carried out in a period of one week per
reasons external to IN-tec, the expenses will be invoiced by administration.

Page 9

The seller, The buyer,

https://translate.googleusercontent.com/translate_f 10/11
17/12/21 13:47 Technical requirements

GERARD SALVIA

https://translate.googleusercontent.com/translate_f 11/11

You might also like