Control
Traceability Process
20/11/2021
Conveyors need to be in Sync
20/11/2021
Proofer settings to be within specification
30/11/2021
Engineering must ensure that chillers are working properly
30/11/2021
Preventative maintenance must be done at least once a week
Explain to the relevant operators the value proposition and create excitement. 20/11/2021
5%
5%
10%
5%
5%
10%
N/A