Job Safety Analysis

Date: 06-Dec-22 Rev - 0 Location: KDF Yard Task: Use of Hand Tools Document Code: STI-JSA-01
SL No. Activity Hazards / Aspects Control Measures Action By
1 Mobilization & Job Preparation a) Lack of Communication 1. Plan the work involving permit applicant, permit issuer & Supervisor
b) Lack of Pre-check of Tools worksite supervisor
2. Physically check all equipment tools and tackles by a
competent foreman or Supervisor
3. A pre-job briefing shall be conducted prior to the start of
the job
4. Ensure the worksite is free from flammable/toxic vapor or
liquid by safe preparation (isloation, depressurizing, draining,
venting, flushing, purging as required)
5. Keep the fire extinguisher in ready condition
6. Use of standard PPE
Page 2 of 3

Job Safety Analysis

Date: 06-Dec-22 Rev - 0 Location: KDF Yard Task: Use of Hand Tools Document Code: STI-JSA-01
SL No. Activity Hazards / Aspects Control Measures Action By
2 Using Power generated Tools a) Defective tools 1. Complete all required ispection for the tools Supervisor
b) Electric shock and electrocution 2. Carryout physical checks and maintenance regularly
c) Trips/Slips/Falls 3. Use certified electrical tools to perform the elctrical works
d) Heat Stress (Working under direct sunlight) 4. Check for loose cable connection or poor insulation
5. Keept the power supply cable secured and properly routed
6. Minimize length of power cable to join location
7. Use only industrial poratable type plug socket for all
electric connections
8. Use double insulated cables for portable powered tools, as
required
9. Make sure cables are dry and free of greese and soil
10. Maintain good cale management and avoid cable on
walkways
11. Adequate amounts of drinking water facility needs to be
arranged
12. Proper rest and rest area facility for workers to be
provided
13. Wear Standard PPE
Page 3 of 3

Job Safety Analysis

Date: 06-Dec-22 Rev - 0 Location: KDF Yard Task: Use of Hand Tools Document Code: STI-JSA-01
SL No. Activity Hazards / Aspects Control Measures Action By
3 Post Work House Keeping a) Poor House Keeping 1. Reinstate and do proper housekeeping when job is Supervisor
completed
2. Maintain good cable management
3. Keept the area clean
4. Provision of first aid facilities
5. Use of Standard PPE
* Standard PPE includes Safety Helmet, Safety Goggles, Ear Plugs/muff, Gloves, Safety Boot and Coveralls
Note:
1. Tool Box Meeting is to be held on site. At the meeting JSA will be reviewed and any additional hazards observed will be added to this JSA

Name Designation Signature Date

Prepared By: Mishad MP HSE Coordinator

Reviewed By: Sanal Jose Project Manager

Approved By: Sujith Kanjirathinkal Operations Manager