Document ID GU-929
Security Restricted
Version 1.0
Keywords: This document is the property of Petroleum Development Oman, LLC. Neither the whole nor
any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or
transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise)
without prior written consent of the owner.
Revision: 1.0
Petroleum Development Oman LLC Effective:August 2021
i Document Authorisation
Authorised For Issue
Document Authorisation
ii Revision History
The following is a brief summary of the 4 most recent revisions to this document. Details of all
revisions prior to these are held on file by the issuing department.
TABLE OF CONTENTS
i Document Authorisation ......................................................................................................... 3
ii Revision History ...................................................................................................................... 4
iii Related Business Processes .................................................................................................. 4
iv Related Corporate Management System (CMS) Documents ................................................ 4
1. Introduction ............................................................................................................................. 6
1.1 Purpose ................................................................................................................................ 6
1.2 Changes to the Specification ............................................................................................... 6
2. Scope ...................................................................................................................................... 7
2.1 PDO PQRs request and issue procedure ............................................................................ 7
2.1.1 Request and Issue process ........................................................................................... 7
2.1. 2 Document Control ......................................................................................................... 7
2.1.3 Preparation and application of WPSs............................................................................ 8
2.2 Process Deliverables ............................................................................................................ 8
2.3 Process Owner's Responsibility ........................................................................................... 8
2.4 Review and Improvement..................................................................................................... 9
Appendix A- Format for request of PDO Standard PQRs ........................................................... 10
Appendix B- Details of Standrd PQRs ......................................................................................... 11
Appendix C - Glossary of Definitions, Terms and Abbreviations ................................................. 12
1. Introduction
1.1 Purpose
This document describes the scope and the procedures to be followed for issue, application
and control of the Company’s standard welding procedure qualification records specific to
the fabrication of Class 2/3 pipelines.
This document is may be used by those Contractors registered by the Company ,for the
preparation of Welding Procedure Specifications that are required to the execution of field
fabrication of flowlines ( class 2/3 pipelines) for the Company
2. Scope
The PDO standard PQRs listed in appendix B of this guideline were qualified in
accordance with API 1104 and SP-1174(SP 1174 is withdrawn by Part II of SP 2318), in
order to provide verified data for the development of WPSs. Their use is confined to
Company-registered Contractors for applicable work carried out within the Sultanate of
Oman. Applicable work is defined as the field welding of Class 2/3 pipelines* (flowlines)
and associated equipment for PDO service where the applicable design code is ASME
B31.4 / ASME B31.8. The PQRs should be used preferentially for such work wherever the
essential material, process and dimensional ranges permit.
The PQRs may be applied in special circumstances to designs based on other codes or
specifications, provided the qualification parameters are fully compatible. However, they
shall not be used for welding on to live lines ( Hot tap) and other equipment.
Available Company standard procedures for on-plot piping and for welding on to
pressurised lines (hot tapping) are covered under separate documents, GU-928 and GU-
930 respectively.
* Refer SP 1211 for definition of classification of pipelines class 2/3.
The contractor shall verify the applicability of pipelines material grade and dimensions
related to scope of fabrication.If deemed applicable, issue process defined in 2.1 shall be
executed.
The format of Appendix A shall be completed and signed by the Contractor’s corporate
management.All PQRs listed in Appendix B are maintained with UEC1
2.1.1.2 The Manger ,Material corroison and Inspection (UEC) or Welding Technical Authority
(TA 2) nominated by the CFDH shall produce verified copies of the requested PQRs and
append them to a copy of this guidline for issue to the Contractor.
The Contractor, upon receipt of the PQR package, shall incorporate the PQRs into an approved
Quality Assurance system, using the system’s document control procedure. The contractor
shall assign Contractor PQR number as specified in Appendix A of this GU. The PQRs shall be
referenced within the appropriate sections of the Contractor’s Quality Plans for relevant
contracts or purchase orders, using the document reference assigned by the document control
procedure.
The Company shall not supply WPSs to the Contractor. It is the responsibility of the Contractor
to produce WPSs supported by the PQR data. WPSs shall be prepared in accordance with the
requirements of API 1104, as amended and supplemented by SP 2318.
The Contractor shall submit the following documents for review and approval to the Company
Welding TA-2 nominated for the project:
Project specific WPSs
Verified copies of the PQRs
Verified copy of the PQR register
Role Responsibility
Manager , Material corrosion As Owner of this guidline, responsible for periodic revision/updating
and Insppection and for authorising step-out or variation proposals.
Authorising release of PQRs requested by the Contractor.
Production of verified copies of PQRs for release to the Contractor
(may be delegated to TA-2).
Maintenance of PQR issue register (may be delegated to TA-2).
Nominated Welding TA-2 When so delegated by CFDH, production of verified copies of PQRs for
release to the Contractor and maintenance of PQR issue register
Review and approval of WPS/PQR packages submitted by the
Contractor
Hard copies of original PQR ( MTC, Test reports, Welding parameters)
are maintained by UEC1 Department, Welding TA2.
Company Contract Holder When Company PQRs are requested for an established contract, acting
as focal point to route documentation between Contractor and CFDH.
I the undersigned on behalf of *............................................acknowledge the receipt of the below listed Procedure Qualification
Records, and agree to control the documents as per the conditions specified below and further stipulated in PR-1274
1. The Contractor will take full responsibility for the control and use of the PQRs.
2. Fully accept the data in the PQRs as Contractor’s own.
3. The PQRs will be incorporated into the Contractor’s Document Control System.
4. PQRs shall only be used in conjunction with a WPS approved by Company Welding TA-2
Issued by Accepted by
Signature Signature
Name Name
Ref. Ind. Designation
Date Date
To be Completed By GU Custodian
Contractor The party, which carries out all or part of the design, engineering,
procurement, construction, commissioning or management of a
project, or operation or maintenance of a facility. The Company
may undertake all or part of the duties of the Contractor.
Company Contract The person assigned by the Company and named in the Contract
Holder Document having single point responsibility for the activity
management of the contract.
Corporate Functional The person responsible for the discipline to which the
Discipline Head standard belongs. Manger ,Material corroison and
Inspection ( UEC), who is CFDH for MCI.
shall Indicates a requirement. Any deviation to the requirement shall
be approved by the Material & Corrosion CFDH
should Indicates a recommendation. Any deviation to the
recommendation shall be approved by Company welding TA 2.
may Indicates a possible course of action
Specific Definitions
Abbreviations