Professional Documents
Culture Documents
TK
Technolgies
Company
1001990
5002027 24 ppm
24 ppm 11.8.2005
60189 30.11.05
Issued by KB
08/11/06
000001 of 122
Table of Contents for 15 ppm bilge separator
Cert.pdf
Certificates
6_SBG10.pdf
4
OMD2005_Conform.pdf
17
....Declartion of conformity
Template.pdf
0_Textdocument.pdf
20
Text documents
1_ManualSeparatorRev12a_1.pdf
22
Drawings
495-0415-000_0.pdf
91
....Electric heater_SEZ448920040001
489-2007-000_1.pdf
97
....Probe_SEZ448920080000
489-2010-000_0.pdf
99
....Safety_SEZ448920100000
489-2012-000_0.pdf
100
000002 of 122
489-2013-000_0.pdf
489-2039-000_1.pdf
102
489-2017-000_0.pdf
....Thermometer SEZ448920180000
489-2020-000_0.pdf
106
C_1_1_ Manual for 15pp
....Counterflanges SEZ448920200000
489-2024-000_1.pdf
107
....Sampling cockSEZ448920270000
489-2028-000_0.pdf
109
4-448-0683-000_0.pdf
111
TK
000003 of 122
Chapter 1
Certificates
000004 of 122
000005 of 122
60189
000006 of 122
000007 of 122
000008 of 122
000009 of 122
000010 of 122
000011 of 122
000012 of 122
000013 of 122
000014 of 122
000015 of 122
1001990
Datum
000016 of 122
000017 of 122
000018 of 122
000019 of 122
000020 of 122
DECKMA HAMBURG GmbH
B+V electronical copy of the masterfile
Address:
Calibration is only necessary at one point >20 ppm as unit is linear between 0 ppm and 30 ppm.
Alarm Points are factory set to 15 ppm
000021 of 122
Chapter 2
Text documents
000022 of 122
A ThyssenKrupp Blohm +Voss Industries
TK
Technolgies
Company
Revision_1.2a_1
07.06
Total 33 pages
000023 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 2/33
Blohm + Voss Industries GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Contents
000024 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 3/33
Blohm + Voss Industries GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
000025 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 4/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Explanation of symbols and notes
This symbol will be found next to danger notes which indicate direct or indirect
hazards to life and limb.
Grave or critical injuries may result if these notes are not followed. The 15 ppm
bilge separator and/or surrounding items may be damaged or destroyed, as
well.
This symbol will be found next to safety notes containing instructions or rules.
Faults and malfunctions of the 15 ppm bilge separator may result if these
notes are not followed. Damage to the seal and/or surrounding items may
occur, as well.
This symbol will be found next to a note that contains special information on
key functions, or special tips for use that help you to make optimum use of the
15 ppm bilge separator.
Turbulo
HEC = High Efficiency Coalescer
Turbulo MPB = Turbulo Mechanical Phase Breaker
HycaSep = Hydrocarbon Separator
are registered trademarks of the Blohm +Voss Industries GmbH
The common name for the separator and the monitor is in accordance with
MEPC.107(49)
15 ppm bilge separator
15 ppm bilge alarm
000026 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 5/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Explanation of symbols and notes
1.1 Definitions
The 15 ppm bilge separator is intended only for the stipulated application (e.g.
bilge water deoiling ) Any other or additional usage shall be considered not as
specified.
The specified use includes also following the operating instructions and adhering
to the inspection and maintenance conditions.
Usage not in accordance with specifications shall lead to the loss of all warranty
rights.
1.2 Copyright
These operating instructions are intended for the fitters, the operator, and the
operating personnel. The manufacturer, B+V Industrietechnik, retains the
copyright in these operating instructions.
These operating instructions may only be reproduced in the context of their
incorporation into wider documentation, just as the 15 ppm bilge separator is
incorporated into a wider installation to be documented.
Any use beyond this, whether it be partial or complete duplication, or
reproduction, requires the written consent of the manufacturer.
All rights reserved.
000027 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 6/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Safety
2 Safety
The 15 ppm bilge separator intent to the separation of oily waters mixture
which are machinery room born according to MARPOL Annex I
The frame/skit of the 15 ppm bilge separator must be welded or bolted on the
deckplates
Please note that the 15 ppm Bilge Alarm will record time, date, oil content > 15
ppm and separator status. Data will be ROM saved for 18 months.
000028 of 122
Operating manual15 ppm Bilge Separator E5170E_08_05
Type TURBULO MPB – Mechanical Phase Breaker 7/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Safety
a)Flushing of the 15 ppm Bilge Alarm will switch the 3/2 Sea Bilge valve to bilge.
b) Every access of the 15 ppm Bilge Alarm beyond the essential requirements
of paragraph 4.2.8 (MEPC.107(49)) requires the breaking of a seal.
000029 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S8/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Important notes for new building installation
000030 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S9/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Airborne noise_ Structure borne_Shock _Vibration_electromagnetic compatibility
K ö r p e r s c h a l l d e s S e p e r a t o r s
M e s s u n g 2 7 . 0 6 . 0 2
u n t e r - / o b e r h a lb d e r F u n d a m e n t la g e r u n g d e s S e p e r a to r s
( e i n / a u s )
8 0
7 0
6 0
5 0
m/s
-8
Terzpegel, dB rel. 5*10
4 0
3 0
u n t e r h . , 2
2 0 u n t e r h . , 3
u n t e r h . , 4
o b e r h . , 1
o b e r h . , 2
o b e r h . , 3
o b e r h . , 4
o b e r h . , e n e r g . g e m it t e lt
1 0 u n t e r h . , e n e r g . g e m it t e lt
G r e n z k u r v e I I
u n t e r h . , 2 ( a u s )
u n t e r h . , 3 ( a u s )
u n t e r h . , 4 ( a u s )
u n t e r h . , e n e r g . g e m it t e lt ( a u s )
0
8 1 6 3 1 , 5 6 3 1 2 5 2 5 0 5 0 0 1 0 0 0 2 0 0 0 4 0 0 0 8 0 0 0
F r e q u e n z [ H z ]
The real structure borne noise can be investigated on the final equipment if
required
The airborne noise is less then 70 dB(A) in a distance of 1 m
4.2 Shock
4.3 Vibration/climate
000031 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S10/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Description of functions
5 Description of functions
5.1 Description
100 200
125
245
The water with the low oil content will be passed to the HycaSep housing
(200). The oil droplets with the finest diameters will be separated in the
HycaSep elements (245). The HycaSep elements works in the principle of
coalescence. The treated water leaves the housing via the sea bilge valve and
the oil content of the discharged water will be measured by the 15 ppm bilge
alarm.
000032 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S11/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Transport
6 Transport
The 15 ppm bilge separator is equipped with lifting eyes. The precise center of
gravity is marked on the drawing.
The 15 ppm bilge separator is standard packed (H). Optional spare parts/ are
packed separately in a carton.
000033 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S12/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Installation
7 Installation
a) The space for dismounting of the heater must be taken into consideration.
b) The oil discharge line should be arranged sloping down
c) Earthing connections are to be fitted to the OWS, if required.
d) Front access for servicing must be ensured.
e) The total suction height is 6 m.
f) The total differential pressure is approx. 39 m (100% throughput)
g) No needless reduction of the cross section in the suction pipe and no installation of
spring loaded valves etc.
h)The housings have a limited overpressure of 2.5 bar
i)The useable pressure difference in the HycaSep Elements are approx 1.4 bar
j) New HycaSep elements have a pressure loss of 0.1bar
k) For a economical operating of the HycaSep elements, the useable pressure
difference should be exploited.
Information:
The housings are designed as pressure vessels. The calculation was verified
by a classification society. Cover flange seals are made out of elastomer. Bolts
and flanges are calculated according to AD_guidelines
The inner coating is a two component epoxy alkyd system, color gray or black.
000034 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S13/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Commissioning
8 Commissioning
Item Installation Y N
Item Electric
Activating the plant: Turn switch S1 from 0 to 1: Signal lamp "POWER ON"
lights up (white)
Starting the Pump: Press push-button S3 "PUMP ON" : Signal lamp HS3
"PUMP 0N" lights up (green)
Manual oil discharge: Press push-button S4 "OIL OUTLET MANUAL" : Signal
lamp H4 "OIL OUTLET" lights up (red) Oil discharge valve opened
Ready for operation lamp indicates that the separator is in good conditions
Pump rotates in direction of arrow
000035 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S14/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Commissioning
Operating Testing
Item Separator
000036 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S15/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Checking the 15 ppm bilge alarm
000037 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S16/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Operating
10 Operating
10.3 Limitations
Suction high max - 0.6 bar. Pressure head of the pump 3.3 bar
Delta p = 3.9 bar (100% throughput).
If pump draw against higher counter pressure (e.g. 4 bar) the throughput is
92%
Voltage tolerance +/- 10 %
The temperature in the separator should not exceed > 60°C.
Holding tank temperatures up to 45 °C.
10.4 Start up
If the 15 ppm bilge separator was filled and the bilge wells and for the bilge
water holding tank are filled with bilge water, the plant can be started
Heating
Normally the separator is fitted with an electric heating. The heater is not used
for heating up the mixture to be separated, but for reducing the viscosity of the
already separated oil in the upper section of the separator. If heavy fuel is used
a heated bilge water holding tank is recommended .
Automatically oil discharge
000038 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S17/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Operating
A probe monitors the oil level in the separator. The length of the probe
electrode determines the operating range. Whilst the oil is being discharged,
the pump is running .
To assess the separation of oil and cold solvent cleaner mixtures, a number of
cold solvent cleaners have been tested in the separator.
000039 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S18/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Operating
10.7 Sampling
To determine the purity of the deoiled water, samples can be taken at the 15
ppm bilge alarm pipe to the funnel. Then, the sample has to be sealed airtight.
It is useful for laboartory analysis, to take also a sample of the bilge water. For
sampling purposes, the use of 1-liter glass bottles is recommended.
If a laboratory is used, the following items should be tested:
pH:
Solid content: mg/l
Free and dissolved oil content: mg/l (ppm)
Anionic tensides content: mg/l
Cationic tensides content: mg/l
Measuring method: GC ISO 9377-2
000040 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S19/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Break downs and their possible causes
The plant starts up, but Pump malfunction Check direction of pump
pressure is not generated Pump rotating wrong direction See pump faults 600
The oil is not being
a) Pilot valve does not work a)Check accessibility of air and
discharged, although the
voltage
maximum oil level has b)Oil discharge valve do not work
been reached and the oil c)Additionally valves closed b)Exchange or clean, check
discharge valve indicator direction of flow
lamp is on. d)Viscosity of oil to high
c)Open valves
f)Heater not active d) Switch on the heater or repair ,
defective heater to be exchanged
The integrated heater a)Fuses are defective a)Check the possible short circuit, 500
does not warm up the oil b)No steam check fuses
c)The thermo contactor activated b)Check Condensate trap if
d)Oil throughput to high installed
c)Press button in the heater switch
unit.
d)Reduce oil throughput ,by means
batch operating
The monitor indicates Dessicator Exchange or dry the dessicator 400
increased values See monitor faults
a)Pilot valve does not function a)Check accessibility of air, check
The sea / bilge valve
b)Air supply interrupted of burned coil, piping,voltage,
discharges only into the
c)Valve sticks exchange the valve if it is defective;
bilge
d)Discharge valve closed b)Check accessibility of air )
e)Remaining oil content > 15 ppm c)Exchange possible broken spring
f)Piping wrong d)Open it
e) B+V service
f)Check flow direction
High pressure loss at Elements are clogged Exchange elements
elements
The ppm value is high Elements damaged or Check elements of intact state
after elements were
not correct fitted See Exchange of HycaSep
changed
Faulty Analysis a)Measure free hydrocarbons at a B+V
Chemical analysis shows
Cleaner components too high lab
the oil content to high.
OtherEmulsions b)Correct wrong cleaners,reduce
concentration of wrong cleaners,
e.g. emulsifying cleaner chemicals
agents
c)Correct process management
000041 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S20/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Maintenance
12 Maintenance
Weekly
15 ppm bilge alarm Glass cell-tube to be cleaned internally by using the bottle brush
supplied. Oil monitor to be flushed with clearn water. The
desiccator colour to be checked: blue, bluish or lightpink indicates
a satisfactory condition. If pink or white colour is noted a change of
desiccator cartridge is required.
Monthly
Switchbox Check the electric function. The safety rules are to be considered.
000042 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S21/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Maintenance
Close the valve - respectivley switch 3/2 valve in direction to drain.- in the
connection pipe between housings. Drain water out of HEC housing.
Dismantle heater and probe. Dismantle the cover. Dismantle the oil discharge
pipe (850) and inlet distributor (820) .
Loosen of the eye bold (801) and take out inlet distributor (820).
Screw in again eye bold (801). Use a strap and slide out the coalescer tray
(826). Loosen lever (825) and remove hole plate to take out the coalescer
inserts.
Internal parts of the separator housing could be cleaned with warm water up to
60 °C
For cleaning the coalescer see chapter 14.
000043 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S22/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Maintenance
Fig 10-2: Cross section of the upper part of the HycaSep housing
The HycaSep elements to be inserted dry.
000044 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_08_05
Type TURBULO Mechanical Phase Breaker -TMPB S23/33
Blohm + Voss Industries _P.O.Box 112289, D-20422 Hamburg Rev 1.2a_1
Maintenance
12.2.3 Lubrication
12.3 Disposal
000045 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S24/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Repair
13 Repair
13.2 Valves
The valves are designed for a long lifetime. It is in general not worthwhile to
repair these valves. Therefore a repair set is not offered
13.3 Pump
000046 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S25/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Spares
14 Spares
14.1 To class
000047 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S26/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Oil mixtures and dirt
000048 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S27/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Cleaning of the HEC
000049 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S28/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Rules
17 Rules
The importants rules for 15 ppm bilge separator are the
Helcom Recommendations 24/6
MEPC.107(49)
MEPC. 235 and the IBTS
Memorandum Of Understanding of Ports State Contol
000050 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S29/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Instruction label
18 Instruction label
L K
000051 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S30/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Drawing_cross sections
19 Drawing_cross sections
000052 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S31/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Drawing_cross sections
HEC housing
Pos Bezeichnung Name
100 1 Entölergehäuse,1.Stufe Separatorhousing,1.stage
110 1 Ölstanssonde Probe for oil level
115 1 Deckeldichtung Cover sealing
125 1 Coalescer Koaleszer
135 1 Sicherheitsventil Safety valve
140 1 Manometer Pressure gauge
150 1 Ölstandsniveauhahn hoch Oil level control cock high
155 1 Ölstandsniveauhahn niedrig Oil level control cock low
160 1 Einschraubheizkörper 1/2Electric heating
165 1 Ölablaßventil Oil discharge valve
609 1 Sechskantmutter Hexagon nut
800 1 Aufnahme Supporting
801 1 Ringschraube Eye-screw
820 1 Eintrittsrohr Inlet pipe
821 1 Kunststoffbuchse Plastic bush
822 2 Sechskantschraube Hexagon screw
823 1 Kunststoffbuchse Plastic bush
824 1 Scheibe Washer
825 1 Haltestift Stop pin
830 1 Halterung Mounting bracket
840 1 Set Koaleszer - HEC Set Coalescer - HEC
850 1 Öl-Austrittsrohr Oil-outlet pipe
000053 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S32/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Drawing_cross sections
HycaSep Housing
Pos Bezeichnung Name
91 - Querträger Cross bar
200 1 HycaSep Gehäuse HycaSep Housing
205 1 Entlüftungsventil Vent valve
215 1 Dichtung Sealing
225 1 Sicherheitsventil Safety valve
235 1 Manometer Pressure gauge
240 1 Manometer Pressure gauge
245 5 HycaSep-Element HycaSep-element
246 5 Abschlußsegment End cover
247 5 Gelenkfuß Levelling feet
248 5 Sechskantschraube Hexagon screw
249 5 Sechskantmutter Hexagon nut
000054 of 122
Operating manual for the 15 ppm Bilge Separator E5170E_02_05
Typ TURBULO Mechanical Phase Breaker -TMPB S33/33
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.2
Contact
20 Contact
Department Short Name Phone Fax X.Y@thyssenkrupp.com
* 40 3011 * 40 3011
Sales MS 12 Guss 1560 1950 Paul.Guss
Pflüger 1567 Peter.Pflueger
Williams 1573 Sam.Williams
Brager 1587 Matthias.Brager
Hawer 1392 Uwe.Hawer
000055 of 122
A ThyssenKrupp Blohm + Voss Industries
TK
Technolgies
Company
Version 20.09.2005
000056 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 2/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
a) For simulating of the alarm condition "max. value exceeded" by "optical plugging" of the
glass tube in the 15 ppm bilge alarm unit, use the cleaning brush, supplied with the unit, being
inserted into the glass tube (pump to be shut-off first).
b) It is not required by Marpol to demonstrate the 15 ppm simulation with a test fluid etc. The
monitor is approved by MEPC.107(49) . Cleaning the glas measurement cell of the monitor in
the case that a hard scaling occurs at the surface of measurement cell – fresh water cannot
adjusted to zero ppm – using a glas cleaner or a small amount of citrid acid to eleminate.
000057 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 3/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
IMPORTANT NOTICE
General
All monitors are inspected and tested to the related I.M.O. requirements .
In normal use the units should operate correctly and without fault over a long period of
time requiring only small amounts of maintenance to be carried out as outlined in the
instruction manuals.
Remark:
According the MEPC.107(49) § 4.2.11 the unit has to be checked at IOPP Certificate
renewal survey by the manufacturer or persons authorized by the manufacturer.
Alternatively the unit may be replaced by a calibrated 15 ppm Bilge Alarm. The OMD-
2005 is designed in that way, that only the measuring cell needs to be changed, as this
unit carry the calibration onboard. The Calibration Certificate with the date of the last
calibration check should be retained onboard for inspection purposes.
If for some reasons the computer unit needs to be changed, it has to make sure, that
the memory card will remain on board for at least 18 month. The new computer unit will
carry its own memory card. The old card can be insert into the new unit only for reading.
Writing is only possible with the card delivered with the new computer unit. For details
see section 13.1.
000058 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 4/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
CONTENTS
SECTION TITLE PAGE
1.0 Introduction 4
2.0 Important Notes 4
3.0 Principle of Operation 4
3.1 Measuring Principle 4
3.2 Features 5
3.3 Adjustment 5
3.4 Displays and Alarms 5
4.0 Specification 7
5.0 Construction 8
6.0 Installation 9
7.0 Piping 10
8.0 Wiring 11
8.1 Typical Control System 13
9.0 Power Supply 13
10.0 Commissioning 13
10.1 Electrical 13
10.2 Piping 13
10.3 Functional Tests 14
10.4 Programming Mode 15
11.0 Operating Instructions 17
11.1 Operator Notes 18
12.0 Operator Maintenance 18
12.1 Manual Cell Clean Unit 19
13.0 Fault Finding 20
13.1 Memory Card 21
14.0 Calibration 22
14.1 Calibration and Repeatability Check 22
000059 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 5/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
1.0 INTRODUCTION
The OMD-2005 Bilge Alarm Unit has been designed specifically for use in
conjunction with 15 ppm oil-water separator units and has a specification and
performance which exceeds the requirements of the International Maritime
Organization specifications for 15ppm Bilge Alarms contained in Resolution
MEPC. 107 (49).
The unit is supplied with 2 works-adjusted alarms at 15 ppm. Other set points
(10 ppm or 5 ppm) are possible and can be adjusted on site at any time by using
the buttons at the front panel.
If an alarm set point is exceed, the alarms are visible at the front panel and the
appropriate relays are switched. In case of malfunction the System LED at the
front panel will change from blinking green to permanent red and the appropriate
relay will switch the contacts.
For the data logging function the unit requires an status input from the separator
and a feedback signal from the valve position limit switch. (See Fig. 1, Pos.6)
Furthermore a 0(4) - 20 mA (equal to 0 - 30 ppm) signal output is available for
driving a recorder or external meter.
000060 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 6/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
3.2 Features
• Robust construction
• Automatic voltage selection
• Solid suppression capability
• Low maintenance
• Easy installation
• Constant readiness
• Low spare part stock holding
• Watertight Housing
• Works adjustment
• Easy settings via menu
3.3 Adjustment
The unit is delivered with a works calibration according the IMO-requirements.
The alarm points are set to 15 ppm.
The "Zero" point is also works calibrated and can be re-adjusted on site by using
the programming mode and clean water. See Section 10.4 “Service-Offset”. A
calibration is not permitted. This has to be done according IMO Regulations by
the manufacturer or persons authorized by the manufacturer.
000061 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 7/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
Both alarm circuits are also related to an alarm LED on the front panel.
In case of malfunction the “System” LED will indicate any type of internal fault of
the unit. This LED is flashing green in normal conditions and is red in alarm
conditions. Also this alarm is related to an relay output.
Additional to the alarm LED's each alarm circuit is equipped with a relay with
potential free alarm contacts. These contacts can be used for external processing
of the signal or for control of further functions.
If a malfunction or failure of the power supply occurs, all 3 relays will switch to
alarm condition.
000062 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 8/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
000063 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 9/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
5.0 CONSTRUCTION
There are 3 main parts which contained in an OMD-2005:
The computer unit is mounted into an epoxy powder painted steel housing
to protect the electronics of the display PCB with the data logger and the
main board PCB with the terminals for external connections.
The measuring cell is built out of an anodized all-aluminium body with inlet
and outlet block in stainless steel. This rugged cell contains the optical
electronic and correspond with the computer unit via a plugged data cable.
The valve assembly contains a special handle to sense the position of the
valve. This assembly is connected to the measuring cell by an easy to
handle fitting to enable the exchange of the cell for frequently adjustment
according the IMO requirements.
All components are mounted to a stainless steel mounting plate for easy wall or
bulkhead installation. It is also possible to split the computer unit from the
measuring cell if the available space is not sufficient. For this version divided
mounting plates are available.
OUT 1/4"
OK
DECKMA HAMBURG
www.deckma.com
SAMPLE 1/4"
Fig. 1
000064 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 10/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
OUT 1/4"
OK
DECKMA HAMBURG
www.deckma.com
SAMPLE 1/4"
Fig. 2
000065 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 11/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
Automatic Recirculating
Stopping Device Facilities
Overboard discharge
To Bilge To Bilge
Outlet *
OK
DECKMA HAMBURG
www.deckma.com
DH 7 5 4 5 0
D EC K M A H AM B U RG
Separator 10 X 1mm
Copper Tube
Clean Water
Supply (Option)
Outlet Separator
To Bilge
000066 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 12/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
Fig. 4
Precise wiring details will vary dependent upon the control system to be
employed but the most frequently used systems employ alarm relay 1 for alarm
only and alarm relay 2 for control purposes.
Electrical connections are made to the terminal blocks inside the computer
housing. Wires are connected to the terminals by pushing a suitable screwdriver
into the clamp holes to release the internal spring loaded clamps. After the wire is
inserted to the terminal and the screwdriver is removed, the wire is fixed.
If the instrument is operated at high voltages, additional care has to be taken to
provide reliable ground connections. Ground (PE) can be connected direct to the
terminal or, if this is not sufficient according local rules, to the computer housing
left side. In this case the plug needs to be replaced by a M6 screw with nut and
related washers.
The instrument provides a pilot voltage output at terminals 4&5. This is internally
connected to the power supply input (Terminals 1&2), but is fused by Fuse F1 (2
A). The pilot voltage can be used to supply additional external circuitry, e.g. alarm
lamps or electrical valves.
Please note: any device connected to the pilot voltage output must be rated for
the voltage the instrument is supplied with. Do not use the pilot voltage for driving
motors, heaters or other high load devices. The pilot voltage is intended for alarm
purposes only.
000067 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 13/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
To Alarmsystem To Alarmsystem
(optional) EXAMPLE
Contacts shown
in Alarm condition Connections may vary
(de-energised) with different separator
control boxes
Solenoid Valve
Fig. 5
Close front door complete after electrical installation. Water inside the instrument
may result in corrosion and malfunction.
000068 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 14/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
10.0 COMMISSIONING
See Section 2 for important notes.
On completion of the installation, wiring and piping carry out the following checks:
10.1 Electrical
a) Check that the power supply is connected to the terminals 1 + 2 of the
terminal block.
b) Check the wiring of the automatic stopping device and to the alarm system is
according the IMO Requirements.
c) Check that the grounding has been made according to the relevant
regulations.
10.2 Piping
a) Check all piping connections for leaks and rectify as appropriate.
000069 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 15/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
000070 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 16/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
To get into the menu press the At the service menu the alarms, To change the value, press
tool button. Select the required time delays, the Offset and the the “+” or “-“ button. Confirm
point by using the „+“ or „-„ output signal can be modified with “OK”.
button. Press the „OK“ button. within the limitations. Select the
required point by using the „+“
or „-„ button. Press the „OK“
button.
000071 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 17/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
To get into the menu press the The display will show the actual
tool button. Select the required status of the data logger. To get
point by using the „+“ or „-„ back to the standard display
button. Press the „OK“ button. press the tool button or the OK
button.
Function of the scrolling buttons Press the “Enter” button to get The detailed information of
for both operation time history into the history. Select the the selected date and time
displays: required date and time by using will be displayed. To get
the buttons. back to the history graph,
> 15 sec Forward The dotted vertical line shows press the “Enter” Button
the actual position. again. To get back to the
> and + 2 min Forward start display, press the “OK”
>> Fast Forward Press the “Enter” button to button.
show details
>> and + Very Fast Forward
- 15 sec Backward
- and + 2 min Backward
<< Fast Backward
<< and + Very Fast Backward
000072 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 18/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
To get into the menu press the The details of the measuring
tool button. Select the required cell will be shown.
point by using the „+“ or „-„
button. Press the „OK“ button.
To get into the menu press the Information about the software
tool button. Select the required version and the web address
point by using the „+“ or „-„ will be shown.
button. Press the „OK“ button.
NB: All changed values have to be confirmed by pressing the " OK " button.
Otherwise the existing values are valid.
000073 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 19/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
000074 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 20/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
000075 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 21/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
000076 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 22/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Measuring Logger /
F1 F2 PE PE PE + - PE PE
POWER PILOT VOLT. FLOW STATUS RES OUTPUT CLEAN Cell Display
24-240V IN PILOT OUT RES ALARM 1 ALARM 2 SYSTEM FAULT
L N PE L N PE A B PE NO COM NC NO COM NC NO COM NC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Fig. 6
000077 of 122
15
15ppm
ppmBilge
BilgeAlarm
Alarm E5172E1104
E5172E_11_04
Type:OMD 2005 23/23
Type: OMD 2005
Blohm + Voss Industries -P.O. Box 112289 D-20422 Hamburg Rev 1.01
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev 1.00
DECKMA HAMBURG GmbH
14.0 CALIBRATION
15 ppm Bilge Alarms built according MEPC.107(49) have to be protected against
access beyond the checks of instrument drift, repeatability of the instrument
reading and zero adjustment. For this reason the instrument is electronically
sealed, so that only the manufacturer or his authorized persons, equipped with
the related tools, are able to get access for changing the calibration.
To provide a simple procedure for check the instrument aboard ship, the OMD-
2005 is constructed in that way, that the zero check also confirms the instrument
drift within the specifications.
000078 of 122
A ThyssenKrupp B+V Industrietechnik GmbH
TK
Technolgies
Company
000079 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 2/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
TURBULO Separator Pumpe TSP
Content
000080 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 3/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
TURBULO Separator Pumpe TSP
1.1.1 Safety
000081 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 4/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
TURBULO Separator Pumpe TSP
Mechanical properties
Type ------ ------ Nord/Siemens
Frame IEC34/7 ------ ILA5Alu.alloy
Mode of DIN57350 ------ S1
operation
Type of -- IM V1/B5
construction
Protection DINVDE0530 IP 55
Cooling IEC34 Radial-flow fan
Insulation ------ Max.permissible temperature rise 105 K
Class Max.permissible cont. temperature 155
deg C
Standard ------ Triangle
connection
Phases ------ 3
Ambient ------ deg C 40 deg C = 100% rated value
temperature 60 deg = 82%C rated value
Terminal box DIN40050 PG 13,5
000082 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 5/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
TURBULO Separator Pumpe TSP
NPSH = net positive suction head, value for the prevention of vapour
bubbles.The pumps are designed to be basically wear-free.The rpm, and the
axial velocity resulting from the from rotor/stator geometry, are designed to be
moderate.The NPSH have been taken into concederation.The pump stages are
adapted to the pressure requirements.The stator is of an NBR material which
resists the contents of the bilge water under normal conditions. The rotor is of
1.4571 steel (stainless steel) . All pumps are fitted with cardan joint. The gear
wheel bodies are of mild-steel parts.The gear teeth are hardened and
ground.The teeth are durable in accordance with DIN 39990.The housing
consists of the material GG20 (cast iron).
000083 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 6/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Starting-up
2 Starting-up
Check direction of rotation of the pump and drive engine by switching on the e-motor for a
short time. See arrow of direction of rotation on the motor lantern of the eccentric helicall
rotor pump.
Check position of gear venting screw. Gear venting screw must always be at the highest
point of the spur gear.
Remove plug of the venting screw. In case of non-observance there will be a leak at the
shaft seals due to overpressure in the spur gear.
Completely open the shut-off valves in the suction and discharge line.
2.2 Maintenance
The spur gear is filled with a transmission lubricant. There should be a lubricant exchange
every 10 000 working hours. See recommendation of lubricant
A slight leakage of the stuffing box packing is to be regarded as normal. In case of heavy
leakage slightly tighten the gland by hand.
2.3 Lubrication
3
Pump m /h 0.25/05 1 2.5 5 10
3
Cardan ----- cm 8 8 8 26 26 x
3
Gear Vertical ----- cm 400 400 400 400 1000 xx
3
Gear Horizonatal cm 250 250 250 250 700 xx
3
Motor ----- cm 4 6 11 11 17 x
x = Maintenance free
XX = > 10000 h using mineral oil
XX = 18000 h using synthetic oils
000084 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 7/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Starting-up
000085 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 8/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Break downs and their possibilities
Possible causes 9
Leaky sealing Fig I/56 X X X X
Appearance of caviation: X X X X
verify pressure in the suction
branch, increase possibly
cross-section of line, check
suction line. Check viscosity.
Wrong direction of rotation X
000086 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 9/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Break downs and their possibilities
222 214
31 14 24 3 56 44 4 45
215
272
221
214
220
D
56
5 20 22 10 11 1 E 25 12 35
Fig . I Pump
000087 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 10/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Repair of the pump
4.1 Dismounting
Take off safety rings (31) and joint sleeves (14) of the cardan joint on the eccentric side.
Push joints sleeve (24) over the cardan joint on the joint shaft (11).
Knock clamping sleeve (219) out of the cardan joint, then press out joint bolt (17).Pull rotor
out of cardan joint.
Bore a hole of 5 mm diameter in the lock washer (214) (“A”-Side”).Knock the tapered pins
(272) with the Zyko-sleeve (215).Pull rotor out of the cardan.
4.4 Assembly
000088 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 11/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Repair of the pump
4.5 Motor
Fig 3 Motor
000089 of 122
Manual for TURBULO Pumps E5171E_12_04
Type TSP S 12/12
B+V Industrietechnik GmbH _P.O.Box 112289, D-20422 Hamburg Rev. 1.00
Repair of the pump
Fig. 4 Gear
4.6 Gear
Pump_Getriebe/Gear
Pos Qu Discription: Beschreibung
G1 1 Drive Shaft Antriebswelle
000090 of 122
Chapter 3
Drawings
000091 of 122
000092 of 122
Einzelteilliste
PARTS LIST
Turbulo Entöler Größe: 10t Zeichnungs-Nr. SED:3-495-0415-000.0
TURBULO SEPARATOR SIZE B+V Industrietechnik
DRAWING-N°
Page 1 of 2
Pos. Anzahl Benennung Zeichnungs-Nr./DIN Werkstoff
POS. NO. NAME DRAWING-N° MATERIAL
98 1 Kabelbahnprofil A50 St-TZN
Cableholder SAP: 124392 Steel
100 1 Entölergehäuse,1.Stufe St
Separator housing,1.stage Steel
105 1 Restölhahn G3/4 SEZ:4-489-2007-000. CuZn 39
Rest oil drain SAP: 164133 Brass
110 1 Ölstandssonde G1 SEZ:4-489-2008-000. Messing/1.4571
Probe for oil level SAP: 163808 Brass/stainless steel
115 1 Deckeldichtung SAP: 163675 NBR70 Sh
Cover sealing Perbunan
125 4 Koaleszer Typ HEC SAP: 163646
Coalescer Type HEC
126 1 Einschraubverschraubung G1/8-Ø8 DIN 2553 2.0540
Connection SAP: 109559 Copper
135 1 Sicherheitsventil G1 1/4 SEZ:4-489-2010-000. Messing
Safety valve SAP: 163832 Brass
136 1 Füllhahn G3/4 SEZ:4-489-2007-000. CuZn 39
Filling cock SAP: 164133 Brass
140 1 Manometer G1/4-Ø63 SAP: 163709 Messing
Manometer Brass
145 1 Trichter G1 1/2 SAP: 104627 NDPE
Funnel Plastic
150 1 Ölstandsniveauhahn G3/4 SEZ:4-489-2007-000. CuZn 39
Oil level control cock SAP: 164133 Brass
160 1 Einschraubheizkörper G1 1/2 SEZ:4-489-2004-000. 1.4571
Electic heating SAP: 163508 Stainless steel
165 1 Ölablaßventil DN 65 SEZ:4-489-2012-000. EN-GJL-250
Oil discharge valve SAP: 164198 Cast iron
170 1 Gegenflansch DN 65 SEZ:4-489-2020-000. 1.0038
Counter flange SAP: 109956 steel
175 1 Pilotventil SEZ:4-489-2028-000. Messing
Solenoid valve SAP: 164200 Brass
200 1 Entölergehäuse,2.Stufe St
Separator housing,2.stage Steel
205 1 Entlüftungsventil G3/8 SEZ:4-489-2013-000. Messing
Vent valve SAP: 164214 Brass
210 1 Restölhahn obere Section G3/4 SEZ:4-489-2007-000. CuZn 39
Rest oil drain upper section SAP: 164133 Brass
215 1 Deckeldichtung SAP: 163675 NBR70 Sh
Cover sealing Perbunan
220 1 Restölhahn untere Section G3/4 SEZ:4-489-2007-000. CuZn 39
Rest oil drain lower section SAP: 164133 Brass
225 1 Sicherheitsventil G1 1/4 SEZ:4-489-2010-000. Messing
Safety valve SAP: 163832 Brass
230 1 Trichter G1 1/2 SAP:104627 NDPE
Funnel Plastic
235 1 Manometer G1/4-Ø63 SAP: 163709 Messing
Manometer Brass
240 1 Manometer G1/4-Ø63 SAP: 163709 Messing
Manometer Brass
245 9 HycaSep Element SAP:160711
HycaSep element
255 1 Gegenflansch DN40 SEZ:4-489-2020-000. 1.0038
Counterflange SAP: 109957 Steel
260 1 Gewindeflansch DN40 SEZ:4-489-2021-000. 1.0038
Threadedflange SAP: 153952 Steel
270 1 Entleerung G1 1/2 SEZ:4-489-2035-000. Messing
Drain SAP: 165614 Brass
300 1 3/2-Wegeventil DN50 SEZ:4-489-2038-000. Messing/1.4571
Three way valve bilge-sea SAP: 164113 Brass/stainless steel
000093 of 122
Einzelteilliste
PARTS LIST
Turbulo Entöler Größe: 10t Zeichnungs-Nr. SED:3-495-0415-000.0
TURBULO SEPARATOR SIZE B+V Industrietechnik
DRAWING-N°
Page 2 of 2
Pos. Anzahl Benennung Zeichnungs-Nr./DIN Werkstoff
POS. NO. NAME DRAWING-N° MATERIAL
305 1 Pilotventil SEZ:4-489-2028-000. Messing
Solenoid valve SAP: 164200 Brass
310 1 Druckhalteventil DN50 SEZ:4-489-2039-000. Messing/1.4571
Pressure retaining valve SAP: 149002 Brass/stainless steel
316 1 Belüftungsventil SEZ:4-489-2051-000. Messing
Vent valve SAP: 105341 Brass
320 1 Recirculationeinheit nach MEPC G2 SEZ:4-489-2017-000. Messing/1.4571
Recirculation facility/MEPC SAP: 163837 Brass/stainless steel
330 3 Gegenflansch DN50 SEZ:4-489-2020-000. 1.0038
Counter flange SAP: 109958 Steel
340 2 Gewindeflansch DN50 SEZ:4-489-2021-000. 1.0038
Threaded flanges SAP: 153953 Steel
400 1 Ölgehaltmessgerät 15ppm SAP:163201
Oil monitor
403 1 Vakuum-Brecher Ø10x1 SAP: 106507 Cu
Vacuum breaking pipe Copper
404 1 Probeentnahmehahn SEZ:3-489-2027-000. Messing
Sampling cock SAP: 105257 Brass
405 1 Spülwasseranschluß Meßgerät G1/4-Ø10 SAP: 115467 Messing
Flushing water connection Brass
500 1 Schaltkasten SEZ:4-448-0683-000. St
Switchbox SAP: 163139 Steel
600 1 Exzenterschneckenpumpe TSP10 SED:4-495-0415-600. Messing/1.4571
Eccentric helical rotor pump Brass/stainless steel
605 1 Manometer-Druckseite G1/4-Ø63 SAP: 163710 Messing
Manometer-discharge flange Brass
606 1 Gegenflansch DN65 SEZ:4-489-2020-000. 1.0038
Counter flange SAP: 109956 Steel
610 1 Trockenlaufschutzventil G1/2 SEZ:4-489-2024-000. Messing/1.4571
Protection valve against dry running SAP: 164259 Brass/stainless steel
615 1 Manometer-Saugseite G1/4-Ø63 SAP: 164275 Messing
Manometer-suction flange Brass
616 2 Gegenflansch DN80 SEZ:4-489-2020-000. 1.0038
Counter flange SAP: 109938 Steel
630 1 Gegenflansch DN15 SEZ:4-489-2020-000. 1.0038
Counterflange SAP: 110245 Steel
635 1 Gewindeflansch DN15 SEZ:4-489-2021-000. 1.0038
Threadedflange SAP: 153949 Steel
700 1 Thermometer G1/2 SEZ:4-489-2018-000. St
Thermometer SAP: 107491 Steel
000094 of 122
000095 of 122
000096 of 122
000097 of 122
000098 of 122
000099 of 122
000100 of 122
000101 of 122
000102 of 122
000103 of 122
000104 of 122
000105 of 122
000106 of 122
000107 of 122
000108 of 122
000109 of 122
000110 of 122
000111 of 122
000112 of 122
000113 of 122
000114 of 122
000115 of 122
000116 of 122
000117 of 122
000118 of 122
000119 of 122
000120 of 122
000121 of 122
000122 of 122