Professional Documents
Culture Documents
2. A worker seated at the tabel performs a REACH. The sought after is jumbled with
other objects in a tote pan, and the distances of the reach is 18in. Determine the
MTM 1 symbol and normal time in TMU for this motion elements.
4. What is the MTM1 normal time that should be allowed an operator who must
read an instruction set before proceeding to perform a processing task, in which
the instruction document contains 150 word? How many second is this?
5. For safety reasons, a worker’s eye travel time in a certain operation must be
separated form the manual element that follow. The distance the worker’s eye
must travel is 20in. The perpendicular distance from her syes to the line of travel is
12 ft. No refocus is required. What is the MTM-1 normal time in TMU that should
be allowed for the eye travel elements.
MOST
1. Develop the activity sequences model and determine the normal time for the
following activity. An assembly workers obtain 4 bolts in one hand from a bin
located 10 in away on his worktable and puts one bolts each into four holes in the
basket with easy reach in front of him.
2. Develop the activity sequences model and determine the normal time for the
following activity.A material handling worker grasp a carton weighting 20Ib on a
counter and slide it along the countertop a distance of 2ft.
3. Develop the activity sequences model and determine the normal time for the
following activity.an assembly worker on a production line obtain an Allen key
within reach positions it 15 cm onto a bolt head, crank it 7 time to seat the bolt,
and then set the key aside.