This document is a bill of quantities for a carpentry and finishing works project containing 5 items: mobilization/demobilization, a canopy, a bunk bed with desk, a closet and drop ceiling, and washer/dryer shelves. It lists the description, unit, quantity, unit cost, and total cost for each item, with a total project cost of 448,915.18.
This document is a bill of quantities for a carpentry and finishing works project containing 5 items: mobilization/demobilization, a canopy, a bunk bed with desk, a closet and drop ceiling, and washer/dryer shelves. It lists the description, unit, quantity, unit cost, and total cost for each item, with a total project cost of 448,915.18.
This document is a bill of quantities for a carpentry and finishing works project containing 5 items: mobilization/demobilization, a canopy, a bunk bed with desk, a closet and drop ceiling, and washer/dryer shelves. It lists the description, unit, quantity, unit cost, and total cost for each item, with a total project cost of 448,915.18.