This document contains test results for an adhesive tape from True Tape Technology for a customer job. It lists the customer, job name, tape thickness, ball tack, and date. The results include the maximum, minimum, and average peel forces in kilograms for 3 intervals when peeling the tape from a hard surface using a Dyson box tester.
This document contains test results for an adhesive tape from True Tape Technology for a customer job. It lists the customer, job name, tape thickness, ball tack, and date. The results include the maximum, minimum, and average peel forces in kilograms for 3 intervals when peeling the tape from a hard surface using a Dyson box tester.
This document contains test results for an adhesive tape from True Tape Technology for a customer job. It lists the customer, job name, tape thickness, ball tack, and date. The results include the maximum, minimum, and average peel forces in kilograms for 3 intervals when peeling the tape from a hard surface using a Dyson box tester.
The Construction, Commissioning and Maintenance of Infrastructure Works For Electrified Double Track Project Between Seremban and Gemas - Package Ii (KM 502.600 - KM 535.500)