Professional Documents
Culture Documents
Over All PMCC Master File
Over All PMCC Master File
xlsx
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Complete the installation of new Hydraulic actuator 4-Way Diverter Valve and provide installation report-441-HOV- 1405532726 YES
4525
Instrumentatio Scope of Work , 441-A-AA-594494-
10-01624 PMCC_10-01624_003 10-01624-0003 000154 Installation Yes n Submitted 12/03/2023 002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Re-connect the existing cable and tubing after the installation of new 4-Way Diverter Valve and actuator -441-HOV- 1405532726 YES
4525
Instrumentatio Scope of Work , 441-A-AA-594494-
10-01624 PMCC_10-01624_003 10-01624-0003 000155 Installation Yes n Submitted 12/03/2023 002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Equipment ground to be provided of newly installed 4-Way Diverter Valve and actuator-441-HOV-4525 1405532726 YES
Instrumentatio Scope of Work , 441-A-AA-594494-
10-01624 PMCC_10-01624_003 10-01624-0003 000157 Installation Yes n Submitted 12/03/2023 002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct functional test of new Hydraulic actuator 4-Way Diverter Valve and provide test report -441-HOV-4525
Instrumentatio Scope of Work , 441-A-AA-594494-
10-01624 PMCC_10-01624_003 10-01624-0003 000156 Testing Yes n Submitted 12/03/2023 002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of Junction Box at main deck and provide report-441-JB-007
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000159 Installation Yes n Submitted 12/03/2023 CA-516382-003 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the weather proof compound application for ground connection for junction box-441-JB-007
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000161 Installation No n Submitted 12/03/2023 CA-516382-003 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 No Yes No
Complete the installation of MOV at main deck and provide report for 441-MOV-2006
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000164 Installation Yes n Submitted 12/03/2023 AA-594494-002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to 441-MOV-2006 side and provide
report-IC-7373
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000165 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to 441-MOV-
2006 side and provide report-IC-7373
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000166 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to 441-MOV-
2006 side and provide test report-IC-7373
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000167 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to 441-MOV-2006 side and provide
report-IC-7373
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000168 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct Loop Check and provide loop folder- 441-MOV-2006 SATIP-J-900-01/Approved Loop
Instrumentatio Testing Procedure DT029-BI1624-
10-01624 PMCC_10-01624_003 10-01624-0003 000169 Inspection Yes n Submitted 12/03/2023 HUC-015 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of instrument cable tray from 441-JB-007 to 441-MOV-2007 at main deck
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000172 Installation Yes n Submitted 12/03/2023 CA-516384 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of motor operated valve at main deck and provide report- 441-MOV-2007
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000173 Installation Yes n Submitted 12/03/2023 CA-516347-001 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to 441-MOV-2007 side and provide
report-IC-7374
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000174 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to 441-MOV-
2007 side and provide report-IC-7374
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000175 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to 441-MOV-
2007 side and provide test report-IC-7374
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000176 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to 441-MOV-2007 side and provide
report-IC-7374
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000177 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 004 Rev.No.00A Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct Loop Check and provide loop folder- 441-MOV-2007 SATIP-J-900-01/Approved Loop
Instrumentatio Testing Procedure DT029-BI1624-
10-01624 PMCC_10-01624_003 10-01624-0003 000178 Inspection Yes n Submitted 12/03/2023 HUC-015 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Complete the installation of instrument cable tray from 441-JB-007 to 441-MOV-2012 at main deck
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000181 Installation Yes n Submitted 12/03/2023 CA-516384 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of motor operated valve at main deck and provide report-441-MOV-2012
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000182 Installation Yes n Submitted 12/03/2023 CA-516347-001 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to 441-MOV-2012 side and provide
report-IC-7375
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000183 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to 441-MOV-
2012 side and provide report-IC-7375
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000184 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to 441-MOV-
2012 side and provide test report-IC-7375
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000185 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to 441-MOV-2012 side and provide
report-IC-7375
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000186 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct Loop Check and provide loop folder- 441-MOV-2012 SATIP-J-900-01/Approved Loop
Instrumentatio Testing Procedure DT029-BI1624-
10-01624 PMCC_10-01624_003 10-01624-0003 000187 Inspection Yes n Submitted 12/03/2023 HUC-015 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of instrument cable tray from 441-JB-007 to 441-MOV-2013 at main deck
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000190 Installation Yes n Submitted 12/03/2023 CA-516384 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of motor operated valve at main deck and provide report-441-MOV-2013
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000191 Installation Yes n Submitted 12/03/2023 CA-516347-001 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to 441-MOV-2013 side and provide
report-IC-7376
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000192 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to 441-MOV-
2013 side and provide report-IC-7376
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000193 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to 441-MOV-
2013 side and provide test report-IC-7376
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000194 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to 441-MOV-2013 side and provide
report-IC-7376
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000195 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct Loop Check and provide loop folder- 441-MOV-2013 SATIP-J-900-01/Approved Loop
Instrumentatio Testing Procedure DT029-BI1624-
10-01624 PMCC_10-01624_003 10-01624-0003 000196 Inspection Yes n Submitted 12/03/2023 HUC-015 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct bench calibration and provide report for pressure indicator- 441-PI-2005
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000200 Documentation Yes n Submitted 12/03/2023 SOW Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Pressure Indicator actual range not matching as per Piping and Instrument Diagram-441-PI-2005
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000202 Installation Yes n Submitted 12/03/2023 AA-594494-002 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of instrument cable tray from 441-JB-007 to control room 441-MC-1003
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000203 Installation Yes n Submitted 12/03/2023 CA-516384 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to control room 441-MC-1003 side and
provide report- IC-7385
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000204 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to control
room 441-MC-1003 side and provide report- IC-7385
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000205 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
725101176.xlsx
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to control
room 441-MC-1003 side and provide report- IC-7385
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000206 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to control room 441-MC-1003 side and
provide report- IC-7385
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000207 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of instrument cable tray from 441-JB-007 to control room 441-MC-1003
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000208 Installation Yes n Submitted 12/03/2023 CD-517474 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable laying of instrument cable connected from 441-JB-007 to control room 441-MC-1003 side and
provide report- IC-7386
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000209 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable glanding, termination and dressing of instrument cable connected from 441-JB-007 to control
room 441-MC-1003 side and provide report- IC-7386
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000210 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct insulation resistance test and continuity test of instrument cable connected from 441-JB-007 to control
room 441-MC-1003 side and provide report- IC-7386
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000211 Testing Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable sealing of instrument cable connected from 441-JB-007 to control room 441-MC-1003 side and
provide report- IC-7386
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000212 Installation Yes n Submitted 12/03/2023 CD-517474 Sheet 005 Rev.No.00C Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete covering required for all Instrument tray installed at main deck
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000213 Installation No n Submitted 12/03/2023 CA-516384 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 No Yes No
Install the calibrated 441-PZV-1505 with painted aluminum color as per SAEP-319 Para 8.7.
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000215 Installation Yes n Submitted 12/03/2023 SAEP-319 Para 8.7 / CA-516347-001 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Install the calibrated 441-PZV-1506 with painted aluminum color as per SAEP-319 Para 8.7.
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000218 Installation Yes n Submitted 12/03/2023 SAEP-319 Para 8.7 / CA-516347-001 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Red sticker to be attached on each individual instrument after conducting the loop check
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000221 Insbetion No n Submitted 12/03/2023 SATR-J-6502 / SATIP-J-900-01 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 No Yes No
Pressure Relief Valve Authorization and test record Form 3099A to be submitted to Company for Approval-441-PZV-
1505/1506
Instrumentatio
10-01624 PMCC_10-01624_003 10-01624-0003 000222 Installation Yes n Submitted 12/03/2023 SOW Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of FRP/GRP Cable Tray and provide cable tray installation report- MOV-2006
10-01624 PMCC_10-01624_003 10-01624-0003 000223 Installation Yes Electrical Submitted 12/03/2023 441-P-DA-822989-002-00J Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of FRP/GRP Cable Tray and provide cable tray installation report- MOV-2007
10-01624 PMCC_10-01624_003 10-01624-0003 000224 Installation Yes Electrical Submitted 12/03/2023 441-P-DA-822989-002-00J Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of FRP/GRP Cable Tray and provide cable tray installation report- MOV-2012
10-01624 PMCC_10-01624_003 10-01624-0003 000225 Installation Yes Electrical Submitted 12/03/2023 441-P-DA-822989-002-00J Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of FRP/GRP Cable Tray and provide cable tray installation report- MOV-2013
10-01624 PMCC_10-01624_003 10-01624-0003 000226 Installation Yes Electrical Submitted 12/03/2023 441-P-DA-822989-002-00J Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000227 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-046012-003-00 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000228 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-046012-003-00 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000229 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-046012-003-00 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000230 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-046012-003-00 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of outdoor Lighting fixture and provide installation report-LG-014
10-01624 PMCC_10-01624_003 10-01624-0003 000231 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
725101176.xlsx
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Complete the installation of outdoor Lighting fixture and provide installation report-LG-015
10-01624 PMCC_10-01624_003 10-01624-0003 000232 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of outdoor Lighting fixture and provide installation report-LG-016
10-01624 PMCC_10-01624_003 10-01624-0003 000233 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of Lighting Junction Box and provide installation report- JB-084
10-01624 PMCC_10-01624_003 10-01624-0003 000234 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of Lighting Junction Box and provide installation report- JB-085
10-01624 PMCC_10-01624_003 10-01624-0003 000235 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the installation of Lighting Junction Box and provide installation report- JB-086
10-01624 PMCC_10-01624_003 10-01624-0003 000236 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516418-002-00D Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000237 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000238 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000239 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000240 Installation No Electrical Submitted 12/03/2023 SOW Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 No Yes No
10-01624 PMCC_10-01624_003 10-01624-0003 000241 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000242 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000243 Installation Yes Electrical Submitted 12/03/2023 SAES-P-111 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000244 Installation No Electrical Submitted 12/03/2023 SOW Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 No Yes No
10-01624 PMCC_10-01624_003 10-01624-0003 000245 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of power cable and provide report-PC-9244
10-01624 PMCC_10-01624_003 10-01624-0003 000246 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9244
10-01624 PMCC_10-01624_003 10-01624-0003 000247 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9244
10-01624 PMCC_10-01624_003 10-01624-0003 000248 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000249 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of power cable and provide report-PC-9245
10-01624 PMCC_10-01624_003 10-01624-0003 000250 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9245
10-01624 PMCC_10-01624_003 10-01624-0003 000251 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9245
10-01624 PMCC_10-01624_003 10-01624-0003 000252 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000253 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of power cable and provide report-PC-9246
10-01624 PMCC_10-01624_003 10-01624-0003 000254 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9246
10-01624 PMCC_10-01624_003 10-01624-0003 000255 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9246
10-01624 PMCC_10-01624_003 10-01624-0003 000256 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000257 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
725101176.xlsx
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Complete the cable gland and seal installation of of power cable and provide report-PC-9247
10-01624 PMCC_10-01624_003 10-01624-0003 000258 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9247
10-01624 PMCC_10-01624_003 10-01624-0003 000259 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9247
10-01624 PMCC_10-01624_003 10-01624-0003 000260 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000261 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-9248
10-01624 PMCC_10-01624_003 10-01624-0003 000262 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9248
10-01624 PMCC_10-01624_003 10-01624-0003 000263 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9248
10-01624 PMCC_10-01624_003 10-01624-0003 000264 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000265 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-9249
10-01624 PMCC_10-01624_003 10-01624-0003 000266 Installation Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for-PC-9249
10-01624 PMCC_10-01624_003 10-01624-0003 000267 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-9249
10-01624 PMCC_10-01624_003 10-01624-0003 000268 Testing Yes Electrical Submitted 12/03/2023 441-P-CA-516420-001-00E Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000269 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 006 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-7292
10-01624 PMCC_10-01624_003 10-01624-0003 000270 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 006 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report forPC-7292
10-01624 PMCC_10-01624_003 10-01624-0003 000271 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 006 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-7292
10-01624 PMCC_10-01624_003 10-01624-0003 000272 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 006 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000273 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 007 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-7187
10-01624 PMCC_10-01624_003 10-01624-0003 000274 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 007 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report forPC-7187
10-01624 PMCC_10-01624_003 10-01624-0003 000275 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 007 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-7187
10-01624 PMCC_10-01624_003 10-01624-0003 000276 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 007 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000277 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-7287
10-01624 PMCC_10-01624_003 10-01624-0003 000278 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for PC-7287
10-01624 PMCC_10-01624_003 10-01624-0003 000279 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable termination and torque testing of power cable and provide report-PC-7287
10-01624 PMCC_10-01624_003 10-01624-0003 000280 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000281 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Complete the cable gland and seal installation of of power cable and provide report-PC-7215
10-01624 PMCC_10-01624_003 10-01624-0003 000282 Installation Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
Conduct continuity and insulation resistance for power cable and provide test report for PC-7215
10-01624 PMCC_10-01624_003 10-01624-0003 000283 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
725101176.xlsx
BI * Reference Number * JO * Item No. Item Title Item Description Start-Up (Initiator) Category Status Status Date Initiator Justification Contractor Scope Initiator Organization Description Last Modified By Created Date Modified Date Start up (PMT) Project Scope Start up (Chairman) RFI Reference No: CTR QC Closeout
Complete the cable termination and torque testing of power cable and provide report-PC-7215
10-01624 PMCC_10-01624_003 10-01624-0003 000284 Testing Yes Electrical Submitted 12/03/2023 441-P-CC-517491 Sheet 008 Rev.00B Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000285 Testing Yes Electrical Submitted 12/03/2023 SAES-P-123 Table 4 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000286 Testing Yes Electrical Submitted 12/03/2023 SAES-P-123 Table 4 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
10-01624 PMCC_10-01624_003 10-01624-0003 000287 Testing Yes Electrical Submitted 12/03/2023 SAES-P-123 Table 4 Yes JUAINIAG Onshore Proj Insp Unit JUAINIAG 12/03/2023 12/03/2023 Yes Yes Yes
725101176.xlsx
YES 15-Jan-24
YES 15-Jan-24
YES 15-Jan-24
725101176.xlsx
Start-Up Organization
BI * Reference Number * JO * Item No. Item Description Category Status Date Initiator RFI Reference No: CTR QC Closeout SAPID Closeout Date Closeout
(Initiator) Description
10-01624 PMCC_10-01624_005 10-01624-0001 000256 441-PLC-001- Panel key to be keep safe and provide spare No Instrumentation 01/03/2024 JUAINIAG Onshore Proj Insp Unit
10-01624 PMCC_10-01624_005 10-01624-0001 000284 441-FC-002- Panel key to be keep safe and provide spare No Instrumentation 01/03/2024 JUAINIAG Onshore Proj Insp Unit
10-01624 PMCC_10-01624_005 10-01624-0001 000295 441-SVR-002- Panel key to be keep safe and provide spare No Instrumentation 01/03/2024 JUAINIAG Onshore Proj Insp Unit
Item Title
Logbook Entry
Logbook Entry
INCR
INCR
INCR
INCR
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Testing
Testing
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Testing
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Installation
Termination
Testing
Installation
Testing
Installation
Installation
Installation
Testing
Testing
Testing
Installation
Termination
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Item Description
LBE-041-Standard Violation- completed the cable pulling, termination and testing of 18 Nos. of Instrument Cables inside s from
cabinet (049D-SRV-002) To Ethernet Switch PIB Room (049D-COMM-0001) without completion of cable tray installation inspe
LBE-042-Standard Violation-18 Nos. of Data Link Cables routed from new server cabinet 049D-SRV-002 To Ethernet Switch PIB
COMM-0001 are installed in the same cable trays together with 7 Nos. of instrument cables.
BI1624-INCR-075-E&I construction team installed four (4) - Network Cables, Tag No. IC-8311, IC-8312, IC-8369, IC-8370 withou
BI1624-INCR-076-E&I construction team installed four (4) - Network Cables, Tag No. IC-8311, IC-8312, IC-8369, IC-8370 withou
Cable Transit.
BI1624-INCR-077- E&I construction team had installed Liquid tight flexible conduit and pulled Network Cables without approve
drawings located in RTSI-2, RTSI-3 and RTSI-4.
BI1624-INCR-079-E&I construction team had started installation of barrier-type cable gland for 24 pair instrument cable at the
Marshalling Cabinet, Tag No. 049D-MC-004 without approved cable gland Technician
IC-8105-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-003) to PIB ROOM (049D-PLC-00
3) and provide report.
IC-8105-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-003
ROOM (049D-PLC-001 CABINET # 3) and provide report.
IC-8105-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-003)
(049D-PLC-001 CABINET # 3) and provide report.
IC-8105-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-003) to PIB ROOM (049D-PLC-0
3)and provide report.
IC-8106-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-003) to PIB ROOM (049D-PLC-00
3) and provide report.
IC-8106-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-003
ROOM (049D-PLC-001 CABINET # 3) and provide report.
IC-8106-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-003)
(049D-PLC-001 CABINET # 3) and provide report.
IC-8106-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-003) to PIB ROOM (049D-PLC-0
3)and provide report.
IC-8107-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-00
3) and provide report.
IC-8107-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-PLC-001 CABINET # 3) and provide report.
IC-8107-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-PLC-001 CABINET # 3) and provide report.
IC-8107-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-0
3)and provide report.
IC-8108-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-00
3) and provide report.
IC-8108-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-PLC-001 CABINET # 3) and provide report.
IC-8108-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-PLC-001 CABINET # 3) and provide report.
IC-8108-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-0
3)and provide report.
IC-8109-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-00
3) and provide report.
IC-8109-Complete the cable glanding, termination and dressing of instrument cable connected from PIB ROOM (049D-MC-004
ROOM(049D-PLC-001 CABINET # 3) and provide report.
IC-8109-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-PLC-001 CABINET # 3) and provide report.
IC-8109-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-PLC-0
3)and provide report.
IC-8114-Complete the cable Installation of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATIO
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8114-Complete the cable termination of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATIO
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8114-Complete the cable testing of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATION (C
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8115-Complete the cable Installation of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATIO
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8115-Complete the cable termination of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATIO
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8115-Complete the cable testing of Data Link cable (CAT-6) connected from A ENG. STATION (RTSI-ES-001) ENG.STATION (C
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8116-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.ST
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8116-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.S
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8116-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.STATI
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8117-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.ST
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8117-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.S
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8117-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA ENG. STATION (RTSI-ES-001) ENG.STATI
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8118-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A to SRVC01
049D-SRV-002 and provide report.
IC-8118-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A to SRVC0
P)
049D-SRV-002 and provide report.
IC-8118-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A to SRVC01 (CP
049D-SRV-002 and provide report.
IC-8119-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SRVC0
P) and provide report.
IC-8119-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SRVC0
P)and provide report.
IC-8119-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SRVC02 (CP
andprovide report.
IC-8120-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SS-01 a
report.
IC-8120-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SS-01
report.
IC-8120-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to SS-01 and p
report.
IC-8121-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to GPS-01
providereport.
IC-8121-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to GPS-0
report.
IC-8121-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to GPS-01 and
report.
IC-8122-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to CPU-01
providereport.
IC-8122-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to CPU-0
report.
IC-8122-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3A) to CPU-01 and
report.
IC-8123-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC01
P) and provide report.
IC-8123-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC0
P)and provide report.
IC-8123-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC01 (CP
andprovide report.
IC-8124-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC02
P) and provide report.
IC-8124-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC0
P)and provide report.
IC-8124-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SRVC02 (CP
andprovide report.
IC-8125-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SS-02 a
report.
IC-8125-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SS-02
report.
IC-8125-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to SS-02 and p
report.
IC-8126-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to GPS-01
providereport.
IC-8126-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to GPS-0
report.
IC-8126-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01B (ETHERNET SWITCH 3B) to GPS-01 and
report.
IC-8135-Complete the cable Installation of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3B) to CPU-02
providereport.
IC-8135-Complete the cable termination of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3B) to CPU-0
report.
IC-8135-Complete the cable testing of Data Link cable (CAT-6) connected from PSW01A (ETHERNET SWITCH 3B) to CPU-02 and
report.
IC-8136-Complete the cable Installation of Data Link cable (CAT-6) connected from METERING SWTICH - A (1ESW1) to PSW01A
SWITCH 3A) and provide report.
IC-8136-Complete the cable termination of Data Link cable (CAT-6) connected from METERING SWTICH - A (1ESW1) to PSW01
SWITCH 3A) and provide report.
IC-8136-Complete the cable testing of Data Link cable (CAT-6) connected from METERING SWTICH - A (1ESW1) to PSW01A (ET
SWITCH3A) and provide report.
IC-8137-Complete the cable Installation of Data Link cable (CAT-6) connected from Metering Switch B (1ESW2) 049D FC-0002
PSWO1A (ETHERNET SWITCH 3B) 049DCOMM-001 and provide report.
IC-8137-Complete the cable termination of Data Link cable (CAT-6) connected from Metering Switch B (1ESW2) 049D FC-0002
toPSWO1A (ETHERNET SWITCH 3B) 049DCOMM-001 and provide report.
IC-8137-Complete the cable testing of Data Link cable (CAT-6) connected from Metering Switch B (1ESW2) 049D FC-0002 PIB-R
PSWO1A (ETHERNET SWITCH 3B) 049DCOMM-001 and provide report.
IC-8305-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-0
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8305-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-
ETHERNET SWTICH - TPSW-04 A and provide report.
IC-8305-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-004)
SWTICH - TPSW-04 A and provide report.
IC-8306-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-0
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8306-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-
ETHERNET SWTICH - TPSW-04 B and provide report.
IC-8306-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STAND BY STATION (RTSI-OP-004)
SWTICH - TPSW-04 B and provide report.
IC-8307-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to E
SWTICH - TPSW-04 A and provide report.
IC-8307-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to E
SWTICH - TPSW-04 A and provide report.
IC-8307-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to ETHER
- TPSW-04 A and provide report.
IC-8308-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to E
SWTICH - TPSW-04 B and provide report.
IC-8308-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to E
SWTICH - TPSW-04 B and provide report.
IC-8308-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-3 (RTSI-OP-003) to ETHER
- TPSW-04 B and provide report.
IC-8309-Complete the cable Installation o fData Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to E
SWTICH - TPSW-04 A and provide report.
IC-8309-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to E
SWTICH - TPSW-04 A and provide report.
IC-8309-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to ETHER
- TPSW-04 A and provide report.
IC-8310-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to E
SWTICH - TPSW-04 B and provide report.
IC-8310-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to E
SWTICH - TPSW-04 B and provide report.
IC-8310-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-2 (RTSI-OP-002) to ETHER
- TPSW-04 B and provide report.
IC-8311-Complete the cable Installation of Data Link cable (CAT-6) connected from METERING SUPERVISORY COMPUTER to M
SWTICH - A (1ESW1) and provide report.
IC-8311-Complete the cable termination of Data Link cable (CAT-6) connected from METERING SUPERVISORY COMPUTER to M
SWTICH -A (1ESW1) and provide report.
IC-8311-Complete the cable testing of Data Link cable (CAT-6) connected from METERING SUPERVISORY COMPUTER to METER
- A (1ESW1) and provide report.
IC-8312-Complete the cable Installation of Data Link cable (CAT-6) connected METERING SUPERVISORY COMPUTER from to M
SWTICH - B (1ESW2) and provide report.
IC-8312-Complete the cable termination of Data Link cable (CAT-6) connected METERING SUPERVISORY COMPUTER from to M
SWTICH -B (1ESW2) and provide report.
IC-8312-Complete the cable testing of Data Link cable (CAT-6) connected METERING SUPERVISORY COMPUTER from to METER
- B (1ESW2) and provide report.
IC-8313-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to E
SWTICH - TPSW-04 A and provide report.
IC-8313-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to E
SWTICH - TPSW-04 A and provide report.
IC-8313-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to ETHER
- TPSW-04 A and provide report.
IC-8314-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to E
SWTICH - TPSW-04 B and provide report.
IC-8314-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to E
SWTICH - TPSW-04 B and provide report.
IC-8314-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA OPR. STATION-1 (RTSI-OP-001) to ETHER
- TPSW-04 B and provide report.
IC-8315-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA ALARM PRINTER (RTSI-LP-001) to ET
SWTICH - TPSW-04 A and provide report.
IC-8315-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA ALARM PRINTER (RTSI-LP-001) to E
SWTICH - TPSW-04 A and provide report.
IC-8315-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA ALARM PRINTER (RTSI-LP-001) to ETHER
-TPSW-04 A and provide report.
IC-8316-Complete the cable Installation of Data Link cable (CAT-6) connected from SCADA REPORT PRINTER (RTSI-LP-002) to E
SWTICH - TPSW-04 B and provide report.
IC-8316-Complete the cable termination of Data Link cable (CAT-6) connected from SCADA REPORT PRINTER (RTSI-LP-002) to E
SWTICH - TPSW-04 B and provide report.
IC-8316-Complete the cable testing of Data Link cable (CAT-6) connected from SCADA REPORT PRINTER (RTSI-LP-002) to ETHE
- TPSW-04 B and provide report.
IC-8317-Complete the cable Installation of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ET
SWTICH - TPSW-04 A and provide report.
IC-8317-Complete the cable termination of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ET
SWTICH - TPSW-04 A and provide report.
IC-8317-Complete the cable testing of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ETHER
TPSW-04 A and provide report.
IC-8318-Complete the cable Installation of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ET
SWTICH - TPSW-04 B and provide report.
IC-8318-Complete the cable termination of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ET
SWTICH - TPSW-04 B and provide report.
IC-8318-Complete the cable testing of Data Link cable (CAT-6) connected from OPR. STATION-9 (SHIFT SUPERVISOR) to ETHER
TPSW-04 B and provide report.
IC-8319-Complete the cable Installation of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH - T
andprovide report.
IC-8319-Complete the cable termination of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH -
and provide report.
IC-8319-Complete the cable testing of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH - TPSW
provide report.
IC-8320-Complete the cable Installation of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH - T
andprovide report.
IC-8320-Complete the cable termination of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH -
and provide report.
IC-8320-Complete the cable testing of Data Link cable (CAT-6) connected from PI WORKSTATION to ETHERNET SWTICH - TPSW
provide report.
IC-8352-Complete the cable Installation of Data Link cable (CAT-6) connected from SRVC01 PIB ROOM (NEW SERVER CABINET
002) to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8352-Complete the cable termination of Data Link cable (CAT-6) connected from SRVC01 PIB ROOM (NEW SERVER CABINET
002)to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8352-Complete the cable testing of Data Link cable (CAT-6) connected from SRVC01 PIB ROOM (NEW SERVER CABINET (049
to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8353-Complete the cable Installation of Data Link cable (CAT-6) connected from SRVC02 PIB ROOM (NEW SERVER CABINET
002) SRVCOPC01 to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8353-Complete the cable termination of Data Link cable (CAT-6) connected from SRVC02 PIB ROOM (NEW SERVER CABINET
002)SRVCOPC01 to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8353-Complete the cable testing of Data Link cable (CAT-6) connected from SRVC02 PIB ROOM (NEW SERVER CABINET (049
SRVCOPC01 to ETHERNET SWTICH - TSW01A (ETHERNET SW 2A) PIB ROOM (049D-COMM-001) and provide report.
IC-8354-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8354-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8354-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8355-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8355-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8355-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8356-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001) and provide report.
IC-8356-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001) and provide report.
IC-8356-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001) and provide report.
IC-8357-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8357-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8357-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8360-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8360-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8360-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8361-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8361-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8361-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8362-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8362-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8362-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8363-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8363-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIBROOM (049D-COMM-001)and provide report.
IC-8363-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-0
ROOM (049D-COMM-001)and provide report.
IC-8364Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SR
PIBROOM (049D-COMM-001)and provide report.
IC-8364Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-S
PIB ROOM (049D-COMM-001)and provide report.
IC-8364Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV-00
ROOM(049D-COMM-001)and provide report.
IC-8365-CComplete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-
PIB ROOM (049D-COMM-001)and provide report.
IC-8365-CComplete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D
PIB ROOM (049D-COMM-001)and provide report.
IC-8365-CComplete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (NEW SERVER CABINET (049D-SRV
ROOM (049D-COMM-001)and provide report.
IC-8367-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (04
001)and provide report.
IC-8367-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (0
001)and provide report.
IC-8367-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (049D-C
001)and provide report.
IC-8368-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (04
001)and provide report.
IC-8368-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (0
001)and provide report.
IC-8368-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-FC-002 (PIB ROOM) to PIB ROOM (049D-C
001)and provide report.
IC-8369-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING
CABINET (049D-SRV-001) and provide report.
IC-8369-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING
CABINET (049D-SRV-001) and provide report.
IC-8369-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING SER
(049D-SRV-001) and provide report.
IC-8370-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING
CABINET (049D-SRV-001) and provide report.
IC-8370-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING
CABINET (049D-SRV-001) and provide report.
IC-8370-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-COMM-001) to EXISTING SER
(049D-SRV-001) and provide report.
IC-8323-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8323-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8323-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8324-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8324-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8324-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8325-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8325-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8325-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8326-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8326-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8326-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8327-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8327-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8327-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8328-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-COMM-001 to 049D-COMM-001 and
report.
IC-8328-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-COMM-001 to 049D-COMM-001 and
report.
IC-8328-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-COMM-001 to 049D-COMM-001 and pro
IC-8329-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8329-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8329-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8330-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8330-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8330-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8338-Complete the cable Installation of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pro
IC-8338-Complete the cable termination of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and pr
IC-8338-Complete the cable testing of Data Link cable (CAT-6) connected from 049D-SRV-002 to 049D-COMM-001 and provide
IC-8339-Complete the cable Installation of Data Link cable (CAT-6) connected from 49D-SRV-002 to 049D-COMM-001 and prov
IC-8339-Complete the cable termination of Data Link cable (CAT-6) connected from 49D-SRV-002 to 049D-COMM-001 and pro
IC-8339-Complete the cable testing of Data Link cable (CAT-6) connected from 49D-SRV-002 to 049D-COMM-001 and provide
SS-05-Serial Server Permanent identification tag to be provided inside 049C-FC-001 at RTSI-3 Control room.
SS-06-Serial Server Permanent identification tag to be provided inside 049C-FC-001 at RTSI-3 Control room.
SS-03-Serial Server Permanent identification tag to be provided inside 049B-FC-001 at RTSI-2 Control room.
SS-04-Serial Server Permanent identification tag to be provided inside 049B-FC-001 at RTSI-2 Control room.
SS-06-Serial Server Permanent identification tag to be provided inside 049C-FC-001 at RTSI-3 Control room.
SS-03-Serial Server Permanent identification tag to be provided inside 049B-FC-001 at RTSI-2 Control room.
SS-04-Serial Server Permanent identification tag to be provided inside 049B-FC-001 at RTSI-2 Control room.
Approved Site Acceptance Test Procedure for SCADA and PLC to be provided
Forward all completed test documentation and as-built drawings for Instrument scope of works via transmittal to Saudi ARAM
Provide Stencils or labels on all newly installed Instrument Cable trays at PIB room RTSI 4
Complete the installation of vertical drop instrument fiber glass cable tray routed from Control room to Process Interface Build
and provide report.
049D-SRV-002Complete the grounding installation of safety and instrument grounding busbars connections for SCADA Sytsem
Complete the installation of Industrial Ethernet Switch at PIB Room RTSI No.04
Provide phenolic name plate for Industrial Ethernet Switch at PIB Room RTSI No.04
Provide the IFC Rackface Elevation drawing showing the slot allocation intended for Industrial Ethernet device Inside PIB Room
COMM-0001 Cabinet
049C-COM-001, Complete Tag installation for Fiber optic Patchcode cable at RTSI-3 Control room
049B-COM-001, Complete Tag installation for Fiber optic Patchcode cable at RTSI-2 Control room
049D-PLC-001 CABINET #1 Complete CPU (PLC-410-5H) Replacement in the existing cabinet at RTSI-4 PIB Room.
049C-PLC-001 CABINET #1 Complete CPU (PLC-410-5H) Replacement in the existing cabinet at RTSI-3 Control Room.
049B-PLC-001 CABINET #1 Complete CPU (PLC-410-5H) Replacement in the existing cabinet at RTSI-2 Control Room.
Complete the Redline drawing for the additional Cat-6 cable installed from 049D-COM-001 to 049D-PLC-001 during Pre-comm
atRTSI-4 PIB Room.
Complete the Redline drawing for the additional Cat-6 cable installed from 049C-COM-001 to 049C-PLC-001 during Pre-comm
atRTSI-3 Control Room.
Complete the Redline drawing for the additional Cat-6 cable installed from 049B-COM-001 to 049B-PLC-001 during Pre-comm
atRTSI-2 Control Room.
049D-COM-001, Complete installation for new Ethernet switch TSW-01A,TSW-01B,PSW-01A,PSW-01B at RTSI-4 PIB Room.
049C-COM-001, Complete installation for new Ethernet switch TPSW-03A,TPSW-03B at RTSI-3 Control Room.
049B-COM-001, Complete installation for new Ethernet switch TPSW-03A,TPSW-03B at RTSI-2 Control Room.
049D-COM-001, Complete Tag installation for installed Ethernet switch TSW-01A,TSW-01B,PSW-01A,PSW-01B at RTSI-4 PIB Ro
049C-COM-001, Complete Tag installation for new Ethernet switch TPSW-03A,TPSW-03B at RTSI-3 Control Room.
049B-COM-001, Complete Tag installation for new Ethernet switch TPSW-03A,TPSW-03B at RTSI-2 Control Room.
Complete Redline drawings for installed RGS conduit at RTSI-2 and RTSI-3 Control room
Complete Redline drawings for installed LT Flexible Conduit at PIB Room, Control room (RTSI-4,RTSI-3 and RTSI-2)
049D-COM-001, Complete Permenant Tag for installed Desktop Monitor and Network Printer located at Control Room, RTSI-4
049C-COM-001, Complete Permenant Tag for installed Desktop Monitor and Network Printer located at Control Room, RTSI-3
049B-COM-001, Complete Permenant Tag for installed Desktop Monitor located at Control Room, RTSI-2.
049D-COM-001, Complete Tag installation for Fiber optic Patch Cord Cable at PIB, RTSI-4.
049C-COM-001, Provide approved Redline drawing for Fiberoptic Patch Cord cable installation at RTSI-3 control room (049C-C
049B-COM-001,Provide approved Redline drawing for Fiberoptic Patch Cord cable installation at RTSI-2 control room (049B-CO
Complete the cable Installation of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049D-COM-001 and
report.
Complete the cable termination of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049D-COM-001 and
report.
Complete the cable testing of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049D-COM-001 and prov
Complete the cable Installation of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049C-COM-001 and
report.
Complete the cable termination of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049C-COM-001 and
report.
Complete the cable testing of Single Mode Fiber Optic Patch Cord connected from 049C-COM-001 to 049C-COM-001 and prov
Complete the cable Installation of Single Mode Fiber Optic Patch Cord connected from 049B-COM-001 to 049B-COM-001 and
report.
Complete the cable termination of Single Mode Fiber Optic Patch Cord connected from 049B-COM-001 to 049B-COM-001 and
report.
Complete the cable testing of Single Mode Fiber Optic Patch Cord connected from 049B-COM-001 to 049B-COM-001 and prov
Provide approved redline drawings for Armoured network cable routing from RTSI-4 Control room to RTSI-4 PIB Room.
Provide ductseal inside all the cabinet for Flexible conduit entry in RTSI-4 PIB Room and control room (RTSI-4,RTSI-3 and RTSI-
Provide redline drawing for GPS-01 installation inside 049D-SRV-001 at RTSI-4 PIB Room.
Provide Tag for installed GPS-01 inside 049D-SRV-001 at RTSI-4 PIB Room.
properly secure the cat-6 cable loop connected to operator station-5 and operator station -6 at RTSI-3 Control room
properly secure the cat-6 cable loop connected to operator station-7 and operator station -8 at RTSI-2 Control room
Provide support to fix the CPU at Control Rooms (RTSI-3 and RTSI-2)
Provide redline drawing for Modbus gateway-3 installation inside 049C-FC-001 at RTSI-3 Control Room.
Provide Tag for installed Modbus gateway-3 inside 049C-FC-001 at RTSI-3 Control Room.
Provide redline drawing for Modbus gateway-2 installation inside 049C-FC-001 at RTSI-3 Control Room.
Provide Tag for installed Modbus gateway-2 inside 049B-FC-001 at RTSI-3 Control Room.
Install the updated redline drawing inside the cabinet pocket at RTSI-4 PIB Room and control room (RTSI-4,RTSI-3 and RTSI-2)
Provide the source and destination information in the Cat-6 ferrule tag PIB Room and control room (RTSI-4,RTSI-3 and RTSI-2)
PC-7832-Complete the cable laying of power cable connected from 049D-DB-A JB (NEW) INTERMEDIATE GUAT JB FOR 120VAC
to049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7832-Complete the cable glanding, termination and dressing of power cable connected from 049D-DB-A JB (NEW) INTERM
JBFOR 120VAC SUPPLY to049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7832-Conduct insulation resistance test and continuity test of power cable connected from 049D-DB-A JB (NEW) INTERME
JB FOR 120VAC SUPPLY to049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7832-Complete the cable sealing of power cable connected from 049D-DB-A JB (NEW) INTERMEDIATE GUAT JB FOR 120VA
to049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7833-Complete the cable laying of power cable connected from 049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-002NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7833-Complete the cable glanding, termination and dressing of power cable connected from 049D-RC-001 NEW WOKSTAT
RECEPTACLE (CONTROL ROOM) to 049D-RC-002 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7833-Conduct insulation resistance test and continuity test of power cable connected from 049D-RC-001 NEW WOKSTATIO
RECEPTACLE (CONTROL ROOM) to 049D-RC-002 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7833-Complete the cable sealing of power cable connected from 049D-RC-001 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-002 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7834-Complete the cable laying of power cable connected from 049D-RC-002 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-003NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7834-Complete the cable glanding, termination and dressing of power cable connected from 049D-RC-002 NEW WOKSTAT
RECEPTACLE (CONTROL ROOM) to 049D-RC-003 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7834-Conduct insulation resistance test and continuity test of power cable connected from 049D-RC-002 NEW WOKSTATIO
RECEPTACLE (CONTROL ROOM) to 049D-RC-003 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7834-Complete the cable sealing of power cable connected from 049D-RC-002 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-003 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7835-Complete the cable laying of power cable connected from 049D-RC-003 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-004NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7835-Complete the cable glanding, termination and dressing of power cable connected from 049D-RC-003 NEW WOKSTAT
RECEPTACLE (CONTROL ROOM) to 049D-RC-004 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7835-Conduct insulation resistance test and continuity test of power cable connected from 049D-RC-003 NEW WOKSTATIO
RECEPTACLE (CONTROL ROOM) to 049D-RC-004 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7835-Complete the cable sealing of power cable connected from 049D-RC-003 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-004 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7836-Complete the cable laying of power cable connected from 049D-RC-004 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-005NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7836-Complete the cable glanding, termination and dressing of power cable connected from 049D-RC-004 NEW WOKSTAT
RECEPTACLE (CONTROL ROOM) to 049D-RC-005NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7836-Conduct insulation resistance test and continuity test of power cable connected from 049D-RC-004 NEW WOKSTATIO
RECEPTACLE (CONTROL ROOM) to 049D-RC-005NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7836-Complete the cable sealing of power cable connected from 049D-RC-004 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-005NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7837-Complete the cable laying of power cable connected from 049D-RC-005 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-006NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7837-Complete the cable glanding, termination and dressing of power cable connected from 049D-RC-005 NEW WOKSTAT
RECEPTACLE (CONTROL ROOM) to 049D-RC-006 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7837-Conduct insulation resistance test and continuity test of power cable connected from 049D-RC-005 NEW WOKSTATIO
RECEPTACLE (CONTROL ROOM) to 049D-RC-006 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7837-Complete the cable sealing of power cable connected from 049D-RC-005 NEW WOKSTATION RECEPTACLE (CONTROL
049D-RC-006 NEW WOKSTATION RECEPTACLE (CONTROL ROOM) and provide report.
PC-7838-Complete the cable laying of power cable connected from 49D-PP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-S
SERVER CABINET (002) and provide report.
PC-7838-Complete the cable glanding, termination and dressing of power cable connected from 49D-PP-001 120 VAC UPS DIS
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7838-Conduct insulation resistance test and continuity test of power cable connected from 49D-PP-001 120 VAC UPS DISTR
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7838-Complete the cable sealing of power cable connected from 49D-PP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-S
SERVER CABINET (002) and provide report.
PC-7839-Complete the cable laying of power cable connected from 49D-PP-002 120 VAC UPS DISTRIBUTION PANEL to 049D-S
SERVER CABINET (002) and provide report.
PC-7839-Complete the cable glanding, termination and dressing of power cable connected from 49D-PP-002 120 VAC UPS DIS
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7839-Conduct insulation resistance test and continuity test of power cable connected from 49D-PP-002 120 VAC UPS DISTR
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7839-Complete the cable sealing of power cable connected from 49D-PP-002 120 VAC UPS DISTRIBUTION PANEL to 049D-S
SERVER CABINET (002) and provide report.
PC-7840-Complete the cable laying of power cable connected from 49D-LP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-SV
SERVER CABINET (002) and provide report.
PC-7840-Complete the cable glanding, termination and dressing of power cable connected from 49D-LP-001 120 VAC UPS DIS
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7840-Conduct insulation resistance test and continuity test of power cable connected from 49D-LP-001 120 VAC UPS DISTR
PANEL to 049D-SVR-002 NEW SERVER CABINET (002) and provide report.
PC-7840-Complete the cable sealing of power cable connected from 49D-LP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-S
SERVER CABINET (002) and provide report.
Forward all completed test documentation and as-built drawings for electrical scope of works via transmittal to Saudi ARAMCO
Provide phenolic name plate for PDU Power Socket in Existing Telecom Cabinet, Tag No. 049D-COM-001 located at Control Ro
Provide phenolic name plate for PDU Power Socket in Existing Communication Cabinet, Tag No. 049C-COM-001 located at Con
RTSI-3
Provide phenolic name plate for PDU Power Socket in Existing Telecom Cabinet, Tag No. 049B-COM-001 located at Control Ro
Complete installation of Grounding Bonding Jumper at one end in cable gland located at Panelboard side for cable Tag No. PC-
Complete installation of Grounding Bonding Jumper at one end in cable gland located at Panelboard side for cable Tag No. PC-
Complete installation of Grounding Bonding Jumper at one end in cable gland located at Panelboard side for cable Tag No. PC-
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-7838.
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-7839.
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-7840.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-7838.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-7839.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-7840.
Complete the Torquing in both ends of 25mm2 grounding cables located at Server Cabinet, Tag No. 049D-SRV-002 in Structura
Complete the Torquing in both ends of 25mm2 grounding cables located at Server Cabinet, Tag No. 049D-SRV-002 in AC Safet
Instrument DC & Shield Ground.
Complete the Polarity Test for Receptacle Outlets located at the Control Room, RTSI-4
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-PP-001
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-PP-002
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-LP-001
Provide updated Panel Directory for Panel Board Tag No. 049D-PP-001
Provide updated Panel Directory for Panel Board Tag No. 049D-PP-002
Provide updated Panel Directory for Panel Board Tag No. 049D-LP-001
Provide grounding for flexible conduit connected to RGS conduit at RTSI-3 and RTSI-2.
IC-8111-Complete the cable Installation of Data Link cables (CAT-6) connected from MSC TREND PRINTER to METERING SWTIC
(1ESW1)and provide report.
IC-8111-Complete the cable termination of Data Link cables (CAT-6) connected from MSC TREND PRINTER to METERING SWTI
(1ESW1) and provide report.
IC-8111-Complete the cable testing of Data Link cables (CAT-6) connected from MSC TREND PRINTER to METERING SWTICH - A
and provide report.
IC-8321-Complete the cable Installation of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-COM
provide report.
IC-8321-Complete the cable termination of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-CO
provide report.
IC-8321-Complete the cable testing of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-COMM-
provide report.
IC-8322-Complete the cable Installation of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-COM
provide report.
IC-8322Complete the cable termination of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-COM
provide report.
IC-8322Complete the cable testing of Single Mode Fiber Optic Patch Cord connected from 049D-COMM-001 to 049D-COMM-0
provide report.
IC-7113-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (0
001) and provide report.
IC-7113-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (
001) and provide report.
IC-7113-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (049D
and provide report.
IC-7114-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (0
001) and provide report.
IC-7114-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (
001) and provide report.
IC-7114-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (049D
and provide report.
IC-7135-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (0
002)and provide report.
IC-7135-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (
and provide report.
IC-7135-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (049D
provide report.
IC-7136-Complete the cable Installation of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (0
002)and provide report.
IC-7136-Complete the cable termination of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (
002)and provide report.
IC-7136-Complete the cable testing of Data Link cable (CAT-6) connected from PIB ROOM (049D-ESD-001) to PIB ROOM (049D
provide report.
IC-8331-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-8331-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002)and provide report.
IC-8331-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002)and provide report.
IC-8331-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-8332-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-8332-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-8332-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-8332-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-8333-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-8333-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-8333-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-8333-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-8334-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-8334-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-8334-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-8334-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-8335-Complete the cable laying of instrument cable connected from PIB ROOM (049D-PLC-001 CABINET # 3) to PIB ROOM
002) and provide report.
IC-8335-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-PLC-001
3)to PIB ROOM (049D-FC-002) and provide report.
IC-8335-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-PLC-001 C
to PIB ROOM (049D-FC-002) and provide report.
IC-8335-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-PLC-001 CABINET # 3) to PIB ROOM
002)and provide report.
IC-8336-Complete the cable laying of instrument cable connected from PIB ROOM (049D-PLC-001 CABINET # 3) to PIB ROOM
002) and provide report.
IC-8336-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-PLC-001
3)to PIB ROOM (049D-FC-002 and provide report.
IC-8336-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-PLC-001 C
to PIB ROOM (049D-FC-002) and provide report.
IC-8336-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-PLC-001 CABINET # 3) to PIB ROOM
002)and provide report.
IC-7001-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-7001-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-7001-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-7001-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-7007-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-7007-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-7007-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-7007-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
IC-7065-Complete the cable laying of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-002
report.
IC-7065-Complete the cable glanding, termination and dressing of instrument cableconnected from PIB ROOM (049D-MC-004
ROOM (049D-FC-002) and provide report.
IC-7065-Conduct insulation resistance test and continuity test of instrument cable connected from PIB ROOM (049D-MC-004)
(049D-FC-002) and provide report.
IC-7065-Complete the cable sealing of instrument cable connected from PIB ROOM (049D-MC-004) to PIB ROOM (049D-FC-00
provide report.
049D-FC-002-Complete the installation of Flow Computer cabinet Located at RTSI-4 PIB room and provide report
049D-FC-002-Conduct Pre-energization and Functional Testing for Flow Control Cabinet at RTSI-4 PIB Room and provide test R
441-FC-002-Complete the grounding installation of safety and instrument grounding busbars connections inside Instrument Pa
002 located at (PIB ROOM)
049D-FC-002 Complete SS Tag installation for installed Cables on both ends at RTSI-4 PIB room.
Complete the installation of Neoprene insulation between the Flow Computer Cabinet, Tag No. 049D-FC-0002 and its Sructura
049C-FC-001 Complete Tag installation for installed Serial Server SS-05 at RTSI-3 Control room.
049C-FC-001 Complete Tag installation for installed Serial Server SS-06 at RTSI-3 Control room.
049B-FC-001 Complete Tag installation for installed Serial Server SS-03 at RTSI-2 Control room.
049B-FC-001 Complete Tag installation for installed Serial Server SS-04 at RTSI-2 Control room.
PC-8401-Complete the cable laying of power cable connected from 49D-LP-001 120 VAC DISTRIBUTION PANEL (NON-UPS) to 0
NEWFLOW COMPUTER (PIB ROOM) and provide report.
PC-8401-Complete the cable glanding, termination and dressing of power cable connected from 49D-LP-001 120 VAC DISTRIBU
(NON-UPS) to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM) and provide report.
PC-8401-Conduct insulation resistance test and continuity test of power cable connected from 49D-LP-001 120 VAC DISTRIBUT
(NON-UPS) to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM) and provide report.
PC-8401-Complete the cable sealing of power cable connected from 49D-LP-001 120 VAC DISTRIBUTION PANEL (NON-UPS) to
0002 NEW FLOW COMPUTER (PIB ROOM) and provide report.
PC-7830-Complete the cable laying of power cable connected from 49D-PP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-F
FLOW COMPUTER (PIB ROOM and provide report.
PC-7830-Complete the cable glanding, termination and dressing of power cable connected from 49D-PP-001 120 VAC UPS DIS
PANEL to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM and provide report.
PC-7830-Conduct insulation resistance test and continuity test of power cable connected from 49D-PP-001 120 VAC UPS DISTR
PANEL to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM and provide report.
PC-7830-Complete the cable sealing of power cable connected from 49D-PP-001 120 VAC UPS DISTRIBUTION PANEL to 049D-F
FLOWCOMPUTER (PIB ROOM and provide report.
PC-7831-Complete the cable laying of power cable connected from 49D-PP-002 120 VAC UPS DISTRIBUTION PANEL to 049D-F
FLOW COMPUTER (PIB ROOM) and provide report.
PC-7831-Complete the cable glanding, termination and dressing of power cable connected from 49D-PP-002 120 VAC UPS DIS
PANEL to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM) and provide report.
PC-7831-Conduct insulation resistance test and continuity test of power cable connected from 49D-PP-002 120 VAC UPS DISTR
PANEL to 049D-FC-0002 NEW FLOW COMPUTER (PIB ROOM) and provide report.
PC-7831-Complete the cable sealing of power cable connected from 49D-PP-002 120 VAC UPS DISTRIBUTION PANEL to 049D-F
FLOWCOMPUTER (PIB ROOM) and provide report.
Forward all completed test documentation and as-built drawings for electrical scope of works via transmittal to Saudi ARAMCO
Provide Phenolic Name Plate for PDU Power Socket inside Existing Flow Computer Cabinet, Tag No. 049C-FC-001 located at Co
RTSI-3
Provide phenolic name plate for PDU Power Socket in Existing Flow Computer Cabinet, Tag No. 049B-FC-001 located at Contro
2
Complete installation of 25mm2 grounding cables from Flow Computer Cabinet, Tag No. 049D-FC-002 in Structural Support.
Conduct continuity test of grounding cable connection from AC Existing ground bus to Flow Computer Cabinet, Tag No. 049D-F
structural support.
Conduct continuity test of grounding cable connection from AC Existing ground bus to Flow Computer Cabinet, Tag No. 049D-F
Safety Ground Bar.
Conduct continuity test of grounding cable connection from AC Existing ground bus to Flow Computer Cabinet, Tag No. 049D-F
Instrument DC and Shield Ground Bar.
Complete installation of 25mm2 grounding cables from Flow Computer Cabinet, Tag No. 049D-FC-002 in structural support.
Complete the grounding cable 25mm2 termination for Flow Computer Cabinet, Tag No. 049D-FC-002 in AC Safety Ground Bar
Complete installation of Grounding Bonding Jumper at both ends in cable glands for cable Tag No. PC-7830.
Complete installation of Grounding Bonding Jumper at both ends in cable glands for cable Tag No. PC-7831.
Complete installation of Grounding Bonding Jumper at both ends in cable glands for cable Tag No. PC-8401.
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-7830.
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-7831.
Provide Identification Tag SS316 at both ends of Power Cable, Tag No. PC-8401.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-7830.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-7831.
Provide ferrules Tagging at both ends of Power Cable, Tag No. PC-8401.
Complete the Torquing in both ends of 25mm2 grounding cables located at Server Cabinet, Tag No. 049D-FC-002 in Structural
Complete the Torquing in both ends of 25mm2 grounding cables located at Server Cabinet, Tag No. 049D-FC-002 in AC Safety
andInstrument DC & Shield Ground.
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-PP-001
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-PP-002
Re-instate the Bolt for the LV Panel Board, Tag No. 049D-LP-001
Provide updated Panel Directory for Panel Board Tag No. 049D-PP-001
Provide updated Panel Directory for Panel Board Tag No. 049D-PP-002
Provide updated Panel Directory for Panel Board Tag No. 049D-LP-001
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Instrumentation Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
No Electrical Submitted
12/11/2023 SAES-J-902, Sec.17.2.1 & Sec.17.3.2 and NEC Article 250 Yes
12/11/2023 SAES-J-902, Sec.17.2.1 & Sec.17.3.2 and NEC Article 250 Yes
Contractor Justification
Initiator Owned By
Organizational
Organization Description
Last Modified
Created
By Date
Modified Date
Start up (PMT)
PMT Justification
Discrepancy
Discrepancy Reason
ProjectPMT
Scope
Last
Reference
Modified
Reference
Drawing
by Standard-1
Reference
Drawing Standard-2
Drawing
Reference
Standard-3
to Latest
Item No.
Comments
Initiator Remarks
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
PMT Remarks
Chairman Start
Remarks
up (Chairman)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
Yes
Yes
No
No
Yes
Yes
Yes
No
No
No
No
Yes
Yes
Yes
No
No
No
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No