Professional Documents
Culture Documents
INCEPTION REPORT
Client Consultant
Jan, 2024
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
Table of Contents
1.0 INTRODUCTION..................................................................................................................................2
2.0 OBJECTIVES..........................................................................................................................................6
Submission of Proposal.................................................................................................................................8
3.1 Negotiation...........................................................................................................................................8
4.1 Mobilization.........................................................................................................................................10
APPENDICES.................................................................................................................................................13
ABP Consult
1 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
1.0 INTRODUCTION
This Inception report is hereby issued by the Consultant, ABP Consult Ltd., in
fulfilment of its obligations under Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project
The report gives a brief outline of the background, objectives, scope of the project,
commencement and mobilisation of the assignment by the Consultant.
The works include the supply and laying of Transmission mains, construction of
intake pump station, water treatment plant, storage tanks and any other facilities
required to ensure that water reaches targeted Dawa Industrial Zone (DIZ).
Contract for construction were awarded to the following Contractor for the area
indicated below;
Messrs John Murphy Construction Company Ltd. – Intake Pump Station, Raw
Water Pipeline, Water Treatment plant, Treated Water Pipeline, Elevated Water
Tank, Mechanical and Electrical installations.
The Consultant was notified of the award of the contract for construction
supervision on 11th September, 2023 and accepted on 13th September, 2023.
ABP Consult
2 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
The Dawa Industrial Zone (DIZ) Water Supply Project is being developed by LMI
Holdings and will be operated by its subsidiary Southern Water Company Ltd
(SWCL).
To ensure that LMI Holdings can operate and grow their industrial park (2,000 acres)
and offer a reliable and sustainable water supply to future tenants within the DIZ it
is essential to develop the Dawa Water Supply Project. To achieve this, based on a
Technical Feasibility Study, SWCL plan to construct a Water Treatment Plant (WTP)
with initial capacity of 4,000m3 / day located on the outskirts of the DIZ. Raw water
will be abstracted from the Volta River and conveyed to WTP through a 16.5 km
transmission main. Following treatment water will be stored prior to onward
distribution to clients in the DIZ and surrounding areas.
Raw water will be abstracted from the Volta River which flows from downstream of
the Kpong Hydropower Dam through Aveyime Area and finally discharges into the
sea at Ada, approximately 45km south-east of the Park. Abstraction of water will be
by an intake structure to be constructed at a location off the river near Tokpo
Community which is approximately 15 km north of the DIZ. The intake will comprise
a channel through which the water is drawn into a sump.
Raw water will be pumped from a pumping station, comprising Raw Water Pumps
installed in a pump control room, will be constructed close to the intake sump.
Transmission of Raw
Water to Treatment Plant. Abstracted raw water will be pumped through a Raw
Water Transmission Main, approximately 17.8 km long to the water treatment plant
which will be sited in the north-western portion of the DIZ. Power supply to the
station will be by extension from the High Voltage national grid line running about
100m from the station site.
ABP Consult
3 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
ABP Consult
4 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
ABP Consult
5 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
2.0 OBJECTIVES
To ensure that the contractor(s) execute all work under the project in
accordance with the drawings and specifications, in a safe and
environmentally acceptable manner as specified, and in conformity with the
requirement of the contract.
In order to facilitate the execution of the project JMC requires Messrs. ABP Consult
Ltd to provide engineering consultancy services for the following Scope of Works:
2. Site monitoring of all elements of works including all civil, structural, electrical
and mechanical engineering works, quantity surveying services and environmental
monitoring to assist JMC to comply with the Contractual obligations in relation to:
ABP Consult
6 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
Supply and Installation of Chemical Preparation and Dosing Units for Lime
and Alum Dosing together with associated accessories;
Supply and Installation of Laboratory Equipment;
Supply and Installation of Hybrid Treated Water Pumping Systems, 3 No. 180
m3/hr, together with associated accessories;
Laying of supplementary Treated Water Transmission Pipeline, HDPE OD 450
mm PN 10 approx. 9.5 km;
Supply and Installation of Steel (2,300 m3 capacity) Elevated Storage Tank;
Construction of Raw Water Receiving Tank;
Construction of Rapid Mixing and Flocculation Tanks;
Construction of Sedimentation Tanks;
Construction of Rapid Gravity Filter;
Construction of Reinforced Concrete (250 m3 capacity) Backwash and
Headworks Service Tank;
Construction of Laboratory Building;
Construction of Sludge Detention Basin;
Construction of Sites External Works
Testing and Commissioning of Works
ABP Consult
7 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
Submission of Proposals
The Consultant was short-listed and advised to submit Technical and Financial
Proposals to John Murphy Construction Limited not later than 9 th August, 2023 at
12:00 GMT.
3.1 NEGOTIATION
Technical Proposal
After negotiation meeting between John Murphy Construction (the Employer) and
ABP Consult Ltd (the Consultant), the following were agreed between the Employer
and the Consultant:
All key experts shall be physically present to carry out their specific tasks.
The Employer has no objection to the use of supporting staff but consultant
must show evidence of them being deployed during the project duration.
ABP Consult
8 Inception Report, January,
Design Review and Construction Supervision of the Dawa
Industrial Zone (DIZ) Water Supply Project
Financial
Phase 1-
Planning,
Mobilization,
Construction 491,380.00 77,725.00 12,100.00 581,205.00 581,205.00
Supervision
and Contract
Management
Phase 2 –
Defects 21,625.00.00 2,120.00 800.00 24,545.00 24,545.00
Liability
Period
ABP Consult
9 Inception Report, January,
Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project
The Consultant will notify John Murphy Construction Limited of any occurrence of
additional services and additional cost will be at the contract rates.
The Employer warrants that only VAT, GETFund, NHIL and Covid Levy on
Consultant’s Remuneration will be paid by the Employer on behalf of the Consultant
to Government of Ghana’s Tax authorities.
The Consultant shall maintain a permanent supervising staff on site comprising the
Resident Engineers, Civil Engineer, Clerks of Works, Surveyor, Quantity Surveyor.
Additionally, professionals from the Head Office of ABP Consult Ltd. shall have short-
term inputs into the project both on site and Head office.
The following staffs shall be involved in the execution of the assignment as indicated
in their tasks below:
ProjectManager–AlbertA.Ogyiri
The Project Manager shall take responsibility for the management and
administration of the project.
He shall ensure that the works proceed in accordance with schedule.
He shall liaise with the Employer on all aspects of the project
He is in charge of quality control.
ResidentEngineer/WaterEngineer–NanaO.A.Takyi
StructuralEngineer–SolomonN.T.K.Oguah
Responsible for the review of all structural engineering design and shall assist the RE
in the supervision of construction of all structural elements on site.
MechanicalEngineer–K.Amoah
ABP Consult
1 Inception Report, January,
Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project
ElectricalEngineer–J.Ainguah
ESIAExpert–B.K.Adjei
QuantitySurveyor–M.OAgyemanDuah
GeodeticEngineer–G.Agyekum
Responsible for reviewing of all surveying drawings and data and shall assist
the RE in the supervision of surveying works on site.
Name Designation
ABP Consult
1 Inception Report, January,
Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project
In accordance with the Agreement, the Employer shall supply the following to the
Consultant for site supervision:
Office, kitchenette and washroom with total floor area of not less than 15m²
with ceiling height not less than 2.75m
It shall be well ventilated with through ventilation to all main rooms, air-
conditioned and properly weather proofed with the eaves extending a
minimum of 2m;
All windows shall be glazed, burglar and mosquito proofed and fitted with
sun shades of an approved pattern
The type and location of lighting and power points and switches shall be
approved by the Consultant. All fittings shall be to British Standard
Specifications.
2 No. Office desk with chairs;
4 No. Additional chairs;
1 No. lockable filing cabinet
1 No. table top refrigerator
Immediately upon signing the Agreement, the Consultant requested for all relevant
documents pertaining to the project from the Employer. These are the documents
from the Employer:
The Consultant shall commence work 7 days after the advance payment is
made .The Advance payment representing 15% of the total fee shall be deducted in
12 equal monthly instalments commencing from month 4 of the assignment.
ABP Consult
1 Inception Report, January,
Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project
A reconnaissance survey was conducted on 6th December, 2023 from the Dawa
Industrial Zone entrance to the site designated for the treatment plant and
continued to the Intake Pump Station by the Volta River. This survey was to
determine and familiarise ourselves with the route for the pipeline and identify
obstruction on the right of way of the pipeline route.
4.6 Constraints
As of the report's submission, the Employer had not provided the Consultant the
2No. project vehicles needed for site mobilization.
ABP Consult
1 Inception Report, January,
Design Review and Construction Supervision of the
Dawa Industrial Zone (DIZ) Water Supply Project