Work site
50 − 75 mm, or Minimu Flow control berm incorporated
m leng into the rock pad if the pad
100 − 150 mm th 15 m
(min) receives runoff from the soil
crushed rock 300 mm (min)
15 m (min)
disturbance (location may vary) Land slope
200 mm (min)
(a) Rock entry/exit pad for construction sites (b) Rock pad sloping away from road
(refer to Standard Drawing Exit-03 for building sites)
3 m (min)
4 m (min) Work site
15 m (min)
Note; alternative locating systems vibration grid
Sediment fence
ROADWAY
Typically 750 x 450 RCBC
Catchments & Creeks Pty Ltd