You are on page 1of 11

POLA PENAMBANGAN

WG
Working Geometry of Mining Area

MINE DESIGN

Short-term Long-term

Static Dynamics
Geo-model Unit Specification
& Reserve & Geometry

Mine Infrastructure Stripping Mining

Ramp Preparing Coal Exposed


for Drilling Unit
Required
Sump Drilling Cleaning

Blasting
Loading Point
Blast Material

Loading Point
WG
Longterm (Fleet Study)
PERMASALAHAN :
 Analisa Longterm Working Geometry (LWG)
merekomendasikan pemakaian unit yang kecil,
tetapi TARGET PRODUKSI relatif BESAR =
crowded.
 Unit yang ada, terlampau BESAR dan terpaksa
digunakan.
ALTERNATIF PEMECAHAN MASALAH :
 Setting target productivity “disesuaikan” dengan
kondisi LWG dan pertimbangkan Matching Unit &
Costing.
 Pola penambangan unit besar harus
(dimaksimalkan) agar “tegak lurus strike”
sehingga WG standard dapat dicapai.
?
Slope Stability

Dip of Seam

Stable Un-Stable
(0 < Dip < 300)
0
(Dip > 300)

Floor Floor
Tdk di Stripping di Stripping

Dip <17 0 (?) 170 < Dip <30 0

Able for Un-able for


Floor Inpit Dump Floor Inpit Dump

Progressive Ramp Constant Ramp


MINE DESIGN LAYOUT (stable floor)

to OUT DUMP
PIT BOUNDARY

Inpit Dump
125.40
Grade =8% DRAINAGE =2%
DUMP RAMP RL 0
DUMP RAMP RL 0
Inpit Dump
50m FLOOR
FLOOR
0%
DUMP RAMP RL -20
50m
0 m 0%

-10 m FLOOR
50m SD1
-20 m 0% Inpit
-30 m Dump
sump
HW

PIT BOUNDARY
MINE DESIGN LAYOUT (unstable floor)
FINAL WALL

LOW WALL

0 m
-10 m
-20mm
-20
-30
-30mm

GRADE = 8%

125.40 m 50m
GRADE = 8%
0%
125.40 m 50m
0%
50m
0%
50m
0%

HIGH WALL
FINALWALL
POLA PENAMBANGAN (TEGAK LURUS STRIKE)
1 3

EX03

EX02

EX01
EX01

RAMP RAMP

2 4
EX03

EX02

EX02
EX01

EX01

RAMP RAMP