Professional Documents
Culture Documents
Pola Penambangan
Pola Penambangan
WG
Working Geometry of Mining Area
MINE DESIGN
Short-term Long-term
Static Dynamics
Geo-model Unit Specification
& Reserve & Geometry
Blasting
Loading Point
Blast Material
Loading Point
WG
Longterm (Fleet Study)
PERMASALAHAN :
Analisa Longterm Working Geometry (LWG)
merekomendasikan pemakaian unit yang kecil,
tetapi TARGET PRODUKSI relatif BESAR =
crowded.
Unit yang ada, terlampau BESAR dan terpaksa
digunakan.
ALTERNATIF PEMECAHAN MASALAH :
Setting target productivity “disesuaikan” dengan
kondisi LWG dan pertimbangkan Matching Unit &
Costing.
Pola penambangan unit besar harus
(dimaksimalkan) agar “tegak lurus strike”
sehingga WG standard dapat dicapai.
?
Slope Stability
Dip of Seam
Stable Un-Stable
(0 < Dip < 300)
0
(Dip > 300)
Floor Floor
Tdk di Stripping di Stripping
to OUT DUMP
PIT BOUNDARY
Inpit Dump
125.40
Grade =8% DRAINAGE =2%
DUMP RAMP RL 0
DUMP RAMP RL 0
Inpit Dump
50m FLOOR
FLOOR
0%
DUMP RAMP RL -20
50m
0 m 0%
-10 m FLOOR
50m SD1
-20 m 0% Inpit
-30 m Dump
sump
HW
PIT BOUNDARY
MINE DESIGN LAYOUT (unstable floor)
FINAL WALL
LOW WALL
0 m
-10 m
-20mm
-20
-30
-30mm
GRADE = 8%
125.40 m 50m
GRADE = 8%
0%
125.40 m 50m
0%
50m
0%
50m
0%
HIGH WALL
FINALWALL
POLA PENAMBANGAN (TEGAK LURUS STRIKE)
1 3
EX03
EX02
EX01
EX01
RAMP RAMP
2 4
EX03
EX02
EX02
EX01
EX01
RAMP RAMP