Project: NEWWINEPHASE2 - (*1UD-SQQT-M7Q8-9JGL)

SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C20/25 / Grade 410 (Type 2)

Slab Strip: X1 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.2Support As = 254.40/452.39 Top:Y12-250(T1)

1S1 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S2 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S3 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S4 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S5 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S6 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S7 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S8 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 10.7Support As = 264.45/452.39 Top:Y12-250(T1)

1S9 1 5.100 4000.00 0.0440 0.0335 254.4/452.39


119/150 5.000 5000.00 10.7 8.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 1.2Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y10 -- Storey: 1


----------------------------

Project: NEWWINEPHASE2
Project: NEWWINEPHASE2 - (*1UD-SQQT-M7Q8-9JGL)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S13 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 3775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S1 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y11 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S14 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 7775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S2 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y12 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S14 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 7775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S3 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y13 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S15 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 11775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S4 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 7.1Support As = 254.40/452.39 Top:Y12-250(T1)

1S10 1 5.100 1837.50 0.0860 0.0860 254.4/452.39


119/150 3.500 4000.00 3.7 3.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 15.44 < 52.0 *** Sufficient ***

Support Mc = 0.6Support As = 254.40/452.39 Top:Y12-250(T1)

Project: NEWWINEPHASE2
Project: NEWWINEPHASE2 - (*1UD-SQQT-M7Q8-9JGL)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

Slab Strip: Y14 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S15 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 11775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S5 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 7.1Support As = 254.40/452.39 Top:Y12-250(T1)

1S11 1 5.100 1837.50 0.0860 0.0860 254.4/452.39


119/150 3.500 4000.00 3.7 3.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 15.44 < 52.0 *** Sufficient ***

Support Mc = 0.6Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y15 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S15 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 11775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S6 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 7.1Support As = 254.40/452.39 Top:Y12-250(T1)

1S12 1 5.100 1837.50 0.0860 0.0860 254.4/452.39


119/150 3.500 4000.00 3.7 3.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 15.44 < 52.0 *** Sufficient ***

Support Mc = 0.6Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y16 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S16 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 7775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S7 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y17 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S16 2 5.100 1200.00 0.5000 0.0000 254.4/452.39

Project: NEWWINEPHASE2
Project: NEWWINEPHASE2 - (*1UD-SQQT-M7Q8-9JGL)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

119/150 2.000 7775.00 7.4 0.0 Bottom: Y12-250(B1)


Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S8 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: Y18 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0

1S17 2 5.100 1200.00 0.5000 0.0000 254.4/452.39


119/150 2.000 3775.00 7.4 0.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 10.08 < 14.0 *** Sufficient ***

Support Mc = 7.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S9 1 5.100 5000.00 0.0320 0.0240 254.4/452.39


107/150 5.000 4000.00 7.8 5.8 Bottom: Y12-250(B2)

Support Mc = 0.9Support As = 254.40/452.39 Top:Y12-250(T1)