Activity Group Sub Group SL No.Drawing/Document No.

Type Drawing Name Priority Status Category


S.No Description Rate (Rs.)
1 Boundary fencing 10000
2 Main gate, Wicket gate foundations 7500
3 Inverter Station foundation and design report 15000
4 Internal Yard Fencing 10000
5 Transformer Foundation 7500
6 Aux Transformer Foundation 7500
7 ICOG Foundation GA drawing with design calculation 7500
8 33 KV Pooling HT Panel Foundation 7500
9 NIFPS Foundation 7500
10 Main control room 30000
11 SCB foundation 7500
12 Lightning Arrestor foundation 7500
13 Weather Monitoring Station foundation 7500
14 Road - Layout, Sections and details 15000
15 Drainage - Layout, Sections and details 20000
16 RO/Softener Plant foundation and canopy 10000
17 security room-1 10000
18 security room-2 10000
19 Storage water tank 25000
20 Pump room 10000
TOTAL 232500