You are on page 1of 424

1 2 3 4 5 6 7 8

A A

长沙长泰智能装备有限公司
Tel: +86-731-8823 8288, 8565 1518
Fax: +86-731-8823 8287, 8557 0597
Web: http://www.chaint.net CHAINT CORPORATION
B B

Customer: APRIL
BM1 Roll Handling and PE Wrapping System

Project data Electrical data

Contract No.: 2022Z004 Main power supply: 3*400VAC/N/PE/50HZ+/-10%


CHAINT Reference DWG No.: Network structure: TN-S
C C
Year of manufacturing: 2022 Electrical capacity: 200KW
Rated current: 400A
Control voltage1: 230V,50Hz
Control voltage2: 24V DC

D D
Standard list Technical data

Preparation of Documents: GB/T 6988.1-2008,IEC 61082-1:2006 Paper grade: Whiteboard


Symbols for electric diagrams: GB/T 4728.1-2018,IEC 60617 Paper roll data (diameter): φ900~2100mm
Marking of electrical equipment: GB/T 5094.2-2018,IEC81346-2 :2009 Paper roll data (width): 500~2400mm
Identification of conductors: GB/T4026-2019,IEC60445:2017 Paper roll data (weight): 500-7000kg
E E
Coding Principles for indicators: GB/T 4205-2010,IEC 60073:2002
Low-voltage switchgear and controlgear: GB/T 14048.1-2012,IEC60947-1:2011
Safety of machinery - Electrical equipment: GB 5226.1-2019,IEC60204-1:2016

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cover Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 COVER 01
APPROVED DWG. NO: PAGE : REV.
Cover Page 001-COVER-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
1 COVER 01 001-COVER-01 Cover Page 1
A A
2 M 01 001-M-01 Drawing catalogue 8
3 M1 01 001-M1-01 Specification of the marking 1
4 M1 02 001-M1-02 Specification of the installation 1
5 M2 01 001-M2-01 Device list 28
6 M4 01 001-M4-01 Cable list 15
7 M4 02 001-M4-02 Cable wiring list 71
8 01 1 001-01-1 All Cabinet arrangement 1
9 01 2 001-01-2 All Cabinet arrangement 1
B B
10 01 3 001-01-3 All Cabinet arrangement 1
11 01 4 001-01-4 CP10 Cabinet arrangement =CP10 +CP10 1
12 01 5 001-01-5 Device list (non-extended) =CP10 +CP10 1
13 01 6 001-01-6 Main power distribution =CP10 +CP10 1
14 01 7 001-01-7 External Power distribution =CP10 +CP10 1
15 01 8 001-01-8 External Power distribution =CP10 +CP10 1
16 01 9 001-01-9 External Power distribution =CP10 +CP10 1
C 17 01 10 001-01-10 External Power distribution =CP10 +CP10 1 C
18 01 11 001-01-11 External Power distribution =CP10 +CP10 1
19 01 12 001-01-12 +CP10 -X1 =CP10 +CP10 -X1 1
20 01 13 001-01-13 +CP10 -X2 =CP10 +CP10 -X2 1
21 02 1 001-02-1 1CP01 Cabinet arrangement +1CP01 1
22 02 2 001-02-2 1CP01 Parts List +1CP01 3
23 02 3 001-02-3 Main power distribution +1CP01 1
24 02 4 001-02-4 24V power +1CP01 1
D 25 02 5 001-02-5 Emergency stop +1CP01 1 D
26 02 6 001-02-6 Emergency stop +1CP01 1
27 02 7 001-02-7 900C101#Conveyer =900C101 1
28 02 8 001-02-8 900C102#Conveyer =900C102 1
29 02 9 001-02-9 900C103#Conveyer =900C103 1
30 02 10 001-02-10 900E104#Roll specification measurement =900E104 1
31 02 11 001-02-11 900E105#Automatic labeling =900E105 1
32 02 12 001-02-12 900E105#Automatic labeling =900E105 +EX900E105 1
E 33 02 13 001-02-13 900E105#Automatic labeling =900E105 +EX900E105 1 E

34 02 14 001-02-14 900C106#Rotary conveyer =900E106 1


35 02 15 001-02-15 900C107#Rotary conveyer =900E106 +EX900E106 1
36 02 16 001-02-16 900C104#Conveyer =900C104 1
37 02 17 001-02-17 900C105#Conveyer =900C105 1
1/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
38 02 18 001-02-18 900C106#Conveyer =900C106 1
A A
39 02 19 001-02-19 900C107#Conveyer =900C107 1
40 02 20 001-02-20 900C108(E110)#Inkjet Conveyer =900C108 1
41 02 21 001-02-21 900C108(E110)#Inkjet Conveyer =900C108 1
42 02 22 001-02-22 900C108(E110)#Inkjet Conveyer =900C108 1
43 02 23 001-02-23 900C108(E110)#Inkjet Conveyer =900C108 1
44 02 24 001-02-24 900E110#Inkjet =900E110 +EX900E110 1
45 02 25 001-02-25 900E108#Fixed scan =900E108 +EX900E108 1
46 02 26 001-02-26 900E109#Roll specification measurement =900E109 +EX900E109 1
B B
47 02 27 001-02-27 900C109#Conveyer =900C109 1
48 02 28 001-02-28 900C111#Conveyer =900C111 1
49 02 29 001-02-29 900E111#Rotary conveyer =900E111 1
50 02 30 001-02-30 900E111#Rotary conveyer =900E111 1
51 02 31 001-02-31 900E111#Rotary conveyer =900E111 1
52 02 32 001-02-32 900E111#Rotary conveyer =900E111 +EX900E111 1
53 02 33 001-02-33 +1CP01 -X1 +1CP01 -X1 1
C 54 02 34 001-02-34 +1CP01 -X2 +1CP01 -X2 1 C
55 02 35 001-02-35 +1CP01 -X3 +1CP01 -X3 4
56 02 36 001-02-36 +1CP01 -X4 +1CP01 -X4 1
57 02 37 001-02-37 1CP02 Cabinet arrangement +1CP02 1
58 02 38 001-02-38 1CP02 Parts List +1CP02 5
59 02 39 001-02-39 Main power distribution +1CP02 1
60 02 40 001-02-40 24V power +1CP02 1
61 02 41 001-02-41 900C110#Conveyer =900C110 1
D 62 02 42 001-02-42 900C112#Conveyer =900C112 1 D
63 02 43 001-02-43 900C113#Conveyer =900C113 1
64 02 44 001-02-44 900C114#Conveyer =900C114 1
65 02 45 001-02-45 900C115#Conveyer =900C115 1
66 02 46 001-02-46 900C116#Conveyer =900C116 1
67 02 47 001-02-47 900C117#Conveyer =900C117 1
68 02 48 001-02-48 900C118#Conveyer =900C118 1
69 02 49 001-02-49 900C118#Conveyer =900C118 1
E 70 02 50 001-02-50 900C119#Conveyer =900C119 1 E

71 02 51 001-02-51 900C301(E302)#End surface inspection Conveyer =900C301 1


72 02 52 001-02-52 900C301(E302)#End surface inspection Conveyer =900C301 1
73 02 53 001-02-53 900C301(E302)#End surface inspection Conveyer =900C301 1
74 02 54 001-02-54 900E302#End surface inspection =900E302 +EX900E302 1
2/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
75 02 55 001-02-55 900C302(E303)#End surface inspection Conveyer =900C302 1
A A
76 02 56 001-02-56 900C302(E303)#End surface inspection Conveyer =900C302 1
77 02 57 001-02-57 900C302(E303)#End surface inspection Conveyer =900C302 1
78 02 58 001-02-58 900E303#End surface inspection =900E303 +EX900E303 1
79 02 59 001-02-59 900C303#Conveyer =900C303 1
80 02 60 001-02-60 902C001#Conveyer =902C001 1
81 02 61 001-02-61 902C002#Conveyer =902C002 1
82 02 62 001-02-62 +1CP02 -1X1 +1CP02 -1X1 1
83 02 63 001-02-63 +1CP02 -1X2 +1CP02 -1X2 1
B B
84 02 64 001-02-64 +1CP02 -1X3 +1CP02 -1X3 4
85 02 65 001-02-65 1CP02 Cabinet arrangement +1CP02 1
86 02 66 001-02-66 Main power distribution +1CP02 1
87 02 67 001-02-67 24V power +1CP02 1
88 02 68 001-02-68 900E301#Rotary conveyer =900E301 1
89 02 69 001-02-69 900E301#Rotary conveyer =900E301 1
90 02 70 001-02-70 900E301#Rotary conveyer =900E301 1
C 91 02 71 001-02-71 900E301#Rotary conveyer =900E301 +EX900E301 1 C
92 02 72 001-02-72 900E304#Rotary conveyer =900E304 1
93 02 73 001-02-73 900E304#Rotary conveyer =900E304 1
94 02 74 001-02-74 900E304#Rotary conveyer =900E304 1
95 02 75 001-02-75 900E304#Rotary conveyer =900E304 +EX900E304 1
96 02 76 001-02-76 900E305#Rotary conveyer =900E305 1
97 02 77 001-02-77 900E305#Rotary conveyer =900E305 1
98 02 78 001-02-78 900E305#Rotary conveyer =900E305 1
D 99 02 79 001-02-79 900E305#Rotary conveyer =900E305 +EX900E305 1 D
100 02 80 001-02-80 900E306#Rotary conveyer =900E306 1
101 02 81 001-02-81 900E306#Rotary conveyer =900E306 1
102 02 82 001-02-82 900E306#Rotary conveyer =900E306 1
103 02 83 001-02-83 900E306#Rotary conveyer =900E306 +EX900E306 1
104 02 84 001-02-84 902E001#Rotary conveyer =902E001 1
105 02 85 001-02-85 902E001#Rotary conveyer =902E001 1
106 02 86 001-02-86 902E001#Rotary conveyer =902E001 1
E 107 02 87 001-02-87 902E001#Rotary conveyer =902E001 +EX902E001 1 E

108 02 88 001-02-88 902E003#Rotary conveyer =902E003 1


109 02 89 001-02-89 902E003#Rotary conveyer =902E003 1
110 02 90 001-02-90 902E003#Rotary conveyer =902E003 1
111 02 91 001-02-91 902E003#Rotary conveyer =902E003 +EX902E003 1
3/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
112 02 92 001-02-92 +1CP02 -2X1 +1CP02 -2X1 1
A A
113 02 93 001-02-93 +1CP02 -2X2 +1CP02 -2X2 1
114 02 94 001-02-94 +1CP02 -2X3 +1CP02 -2X3 4
115 02 95 001-02-95 1CP03 Cabinet arrangement +1CP03 1
116 02 96 001-02-96 1CP03 Parts List +1CP03 3
117 02 97 001-02-97 Main power distribution +1CP03 1
118 02 98 001-02-98 24V power +1CP03 1
119 02 99 001-02-99 900C304#Conveyer =900C304 1
120 02 100 001-02-100 900C305#Conveyer =900C305 1
B B
121 02 101 001-02-101 900C306#Conveyer =900C306 1
122 02 102 001-02-102 900C307#Conveyer =900C307 1
123 02 103 001-02-103 900C345#Conveyer =900C345 1
124 02 104 001-02-104 900C120#Conveyer =900C120 1
125 02 105 001-02-105 900C425#Conveyer =900C425 1
126 02 106 001-02-106 900C426#Conveyer =900C426 1
127 02 107 001-02-107 900C427#Conveyer =900C427 1
C 128 02 108 001-02-108 900C428#Conveyer =900C428 1 C
129 02 109 001-02-109 900C429#Conveyer =900C429 1
130 02 110 001-02-110 900E410#Rotary conveyer =900E410 1
131 02 111 001-02-111 900E410#Rotary conveyer =900E410 +EX900E410 1
132 02 112 001-02-112 900E411#Rotary conveyer =900E411 1
133 02 113 001-02-113 900E411#Rotary conveyer =900E411 +EX900E411 1
134 02 114 001-02-114 900E413#Roll specification measurement =900E413 1
135 02 115 001-02-115 900E414#Fixed scan =900E414 +EX900E414 1
D 136 02 116 001-02-116 +1CP03 -1X1 +1CP03 -1X1 1 D
137 02 117 001-02-117 +1CP03 -1X2 +1CP03 -1X2 1
138 02 118 001-02-118 +1CP03 -1X3 +1CP03 -1X3 3
139 02 119 001-02-119 1CP03 Back cabinet arrangement =1CP03.2 +1CP03 1
140 02 120 001-02-120 Main power distribution =1CP03.2 1
141 02 121 001-02-121 24V power =1CP03.2 1
142 02 122 001-02-122 DO19#Safe door =DO22 1
143 02 123 001-02-123 Packaging machine communication WS_1 1
E 144 02 124 001-02-124 Packaging machine communication WS_1 1 E

145 02 125 001-02-125 +1CP03 -2X1 +1CP03 -2X1 1


146 02 126 001-02-126 +1CP03 -2X2 +1CP03 -2X2 1
147 02 127 001-02-127 +1CP03 -2X3 +1CP03 -2X3 1
148 02 128 001-02-128 +1CP03 -2X4 +1CP03 -2X4 1
4/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
149 02 129 001-02-129 +1CP03 -2X5 +1CP03 -2X5 1
A A
150 02 130 001-02-130 +1CP03 -2X6 +1CP03 -2X6 2
151 02 131 001-02-131 +1CP03 -2X7 +1CP03 -2X7 1
152 02 132 001-02-132 1CP04 Cabinet arrangement +1CP04 1
153 02 133 001-02-133 Device list (non-extended) +1CP04 1
154 02 134 001-02-134 Main power distribution +1CP04 1
155 02 135 001-02-135 24V power =900E307.1 +1CP04 1
156 02 136 001-02-136 900E307#Lift elevator hydraulic brake =900E307.1 +1CP04 1
157 02 137 001-02-137 900E307#Lift elevator =900E307.1 1
B B
158 02 138 001-02-138 900E307#Lift elevator =900E307.1 1
159 02 139 001-02-139 900E307#Lift elevator =900E307.1 1
160 02 140 001-02-140 900E307#Lift elevator =900E307.1 +1OP1 1
161 02 141 001-02-141 900E307#Lift elevator =900E307.1 +1OP1 1
162 02 142 001-02-142 900E307#Lift elevator =900E307.1 +1OP2 1
163 02 143 001-02-143 900E307#Lift elevator =900E307.1 1
164 02 144 001-02-144 900E307#Lift elevator =900E307.1 +EX900E307.1 1
C 165 02 145 001-02-145 900E307#Lift elevator =900E307.1 +EX900E307.1 1 C
166 02 146 001-02-146 900E307#Lift elevator =900E307.1 +EX900E307.1 1
167 02 147 001-02-147 900E307#Inside Conveyer =900E307.2 1
168 02 148 001-02-148 900E307#Inside Conveyer =900E307.2 1
169 02 149 001-02-149 +1CP04 -1X1 +1CP04 -1X1 1
170 02 150 001-02-150 +1CP04 -1X2 +1CP04 -1X2 1
171 02 151 001-02-151 +1CP04 -1X3 +1CP04 -1X3 1
172 02 152 001-02-152 +1CP04 -1X4 +1CP04 -1X4 1
D 173 03 1 001-03-1 1CP20 Cabinet arrangement =1CP20 +1CP20 1 D
174 03 2 001-03-2 Device list (non-extended) +1CP20 2
175 03 3 001-03-3 Main power distribution =1CP20 +1CP20 1
176 03 4 001-03-4 24V power =1CP20 +1CP20 1
177 03 5 001-03-5 Emergency stop =1CP20 1
178 03 6 001-03-6 Emergency stop =1CP20 1
179 03 7 001-03-7 DO16#Safe door =DO16 1
180 03 8 001-03-8 DO17#Safe door =DO17 1
E 181 03 9 001-03-9 DO18#Safe door =DO18 1 E

182 03 10 001-03-10 DO19#Safe door =DO19 1


183 03 11 001-03-11 +1CP01 -X0 +1CP01 -X0 1
184 03 12 001-03-12 +1CP20 -1X1 +1CP20 -1X1 1
185 03 13 001-03-13 +1CP20 -1X2 +1CP20 -1X2 1
5/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
186 03 14 001-03-14 +1CP20 -X1 +1CP20 -X1 1
A A
187 03 15 001-03-15 +1CP20 -X2 +1CP20 -X2 1
188 03 16 001-03-16 +1CP20 -X3 +1CP20 -X3 2
189 03 17 001-03-17 +1CP20 -X4 +1CP20 -X4 2
190 03 18 001-03-18 +1CP20 -X5 +1CP20 -X5 2
191 03 19 001-03-19 +1CP20 -X6 +1CP20 -X6 1
192 04 1 001-04-1 1CD01 PLC Input +1CD01 1
193 04 2 001-04-2 1CD02 PLC Input +1CD02 1
194 04 3 001-04-3 1CP20 PLC Input +1CP20 1
B B
195 04 4 001-04-4 1CP20 PLC Input +1CP20 1
196 04 5 001-04-5 1CP03 PLC Input +1CP03 1
197 04 6 001-04-6 1CD03 PLC Input +1CD03 1
198 05 1 001-05-1 1CD01 PLC Output +1CD01 1
199 05 2 001-05-2 1CD02 PLC Output +1CD02 1
200 05 3 001-05-3 1CP20 PLC Output +1CP20 1
201 05 4 001-05-4 1CP03 PLC Output +1CP03 1
C 202 05 5 001-05-5 1CD03 PLC Output +1CD03 1 C
203 06 1 001-06-1 1CD01 PLC Group +1CD01 1
204 06 2 001-06-2 1CD02 PLC Group +1CD02 1
205 06 3 001-06-3 1CP20 PLC Group +1CP20 1
206 06 4 001-06-4 1CP03 PLC Group +1CP03 1
207 06 5 001-06-5 1CD03 PLC Group +1CD03 1
208 09 1 001-09-1 1CD01# Console layout1 =1CD01 +1CD01 1
209 09 2 001-09-2 1CD01# Console layout2 =1CD01 +1CD01 1
D 210 09 3 001-09-3 Device list (non-extended) +1CD01 3 D
211 09 4 001-09-4 1CD01 Power distribution =1CD01 +1CD01 1
212 09 5 001-09-5 1CD01 Control =1CD01 +1CD01 1
213 09 6 001-09-6 #Stop device =900E101 +1CD01 1
214 09 7 001-09-7 #Stop device =900E103 +1CD01 1
215 09 8 001-09-8 #Stop the distributor =900E102 +1CD01 1
216 09 9 001-09-9 #Stop the distributor =900E102 +1CD01 1
217 09 10 001-09-10 #Stop the distributor =900E102 +1CD01 1
E 218 09 11 001-09-11 #Stop the distributor =900E102 +1CD01 1 E

219 09 12 001-09-12 1CD01 Control =1CD01 +1CD01 1


220 09 13 001-09-13 1CD01 Control =1CD01 +1CD01 1
221 09 14 001-09-14 +1CD01 -X1 +1CD01 -X1 1
222 09 15 001-09-15 +1CD01 -X2 +1CD01 -X2 2
6/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
223 09 16 001-09-16 +1CD01 -X3 +1CD01 -X3 2
A A
224 09 17 001-09-17 +1CD01 -X4 +1CD01 -X4 1
225 09 18 001-09-18 1CB01 Control =1CB01 +1CB01 1
226 09 19 001-09-19 1CB01 Button box layout +1CB01 1
227 09 20 001-09-20 1CD02 Cabinet arrangement =1CD02 +1CD02 1
228 09 21 001-09-21 Device list (non-extended) =1CD02 +1CD02 1
229 09 22 001-09-22 1CD02 Control =1CD02 +1CD02 1
230 09 23 001-09-23 1CD02 Control =1CD02 +1CD02 1
231 09 24 001-09-24 +1CD02 -X0 +1CD02 -X0 1
B B
232 09 25 001-09-25 +1CD02 -X1 +1CD02 -X1 1
233 09 26 001-09-26 +1CD02 -X2 +1CD02 -X2 1
234 09 27 001-09-27 +1CD02 -X3 +1CD02 -X3 2
235 09 28 001-09-28 +1CD02 -X4 +1CD02 -X4 1
236 09 29 001-09-29 +1CD02 -X5 +1CD02 -X5 1
237 09 30 001-09-30 1CD03 Cabinet arrangement =1CD03 +1CD03 1
238 09 31 001-09-31 Device list (non-extended) +1CD03 1
C 239 09 32 001-09-32 1CD03 Control =1CD03 +1CD03 1 C
240 09 33 001-09-33 1CD03 Control =1CD03 +1CD03 1
241 09 34 001-09-34 +1CD03 -X0 +1CD03 -X0 1
242 09 35 001-09-35 +1CD03 -X1 +1CD03 -X1 1
243 09 36 001-09-36 +1CD03 -X2 +1CD03 -X2 1
244 09 37 001-09-37 +1CD03 -X3 +1CD03 -X3 2
245 09 38 001-09-38 +1CD03 -X4 +1CD03 -X4 1
246 09 39 001-09-39 1OP4 Cabinet arrangement =1OP4 +1OP4 1
D 247 09 40 001-09-40 Device list (non-extended) =1OP4 +1OP4 1 D
248 09 41 001-09-41 1OP4 Cabinet arrangement =1OP4 +1OP4 1
249 09 42 001-09-42 1OP4 Cabinet arrangement =1OP4 +1OP4 1
250 09 43 001-09-43 +1OP4 -X0 +1OP4 -X0 1
251 09 44 001-09-44 +1OP4 -X1 +1OP4 -X1 1
252 09 45 001-09-45 +1OP4 -X2 +1OP4 -X2 1
253 09 46 001-09-46 Interface signal schematic diagram of 1# rewinding machine =WIND1 +EXFJJ 1
254 11 1 001-11-1 +1OP1 Control Box =900E307.1 +1OP1 1
E 255 11 2 001-11-2 +1OP2 Control Box =900E307.1 +1OP2 1 E

256 11 3 001-11-3 +1OP1 -X1 +1OP1 -X1 2


257 11 4 001-11-4 +1OP2 -X1 +1OP2 -X1 1
258 11 5 001-11-5 Junction junction box =900E108 1
259 11 6 001-11-6 Junction junction box =900E414 1
7/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Group Designation Drawing No. Title Associated Function Associated Equipment Revise Index Number Of Pages
260 11 7 001-11-7 DO16_CB1 button box =DO16 1
A A
261 11 8 001-11-8 DO17_CB1 button box =DO17 1
262 11 9 001-11-9 DO18_CB1 button box =DO18 1
263 11 10 001-11-10 DO19_CB1 button box =DO19 1
264 11 11 001-11-11 DO22_CB1 button box =DO22 1
265 12 1 001-12-1 +EX900E105 -JB1 -X1 +EX900E105 -JB1 -X1 1
266 12 2 001-12-2 +EX900E105 -JB2 -X1 +EX900E105 -JB2 -X1 1
267 12 3 001-12-3 +EX900E110 -CC1 -X1 +EX900E110 -CC1 -X1 1
268 12 4 001-12-4 +EX900E110 -JB1 -X1 +EX900E110 -JB1 -X1 1
B B
269 14 1 001-14-1 Weighing principle diagram 1
270 14 2 001-14-2 Network topology 1
271 14 3 001-14-3 Grounding topology =CP10 1
272 15 1 001-15-1 Lift elevator plane arrangement =900E307.1 1
273 15 2 001-15-2 Process layout drawing1 1
274 15 3 001-15-3 Process layout drawing2 1
275 15 4 001-15-4 Process layout drawing3 1
C C

D D

E E

8/ 8
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Drawing catalogue 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M 01
APPROVED DWG. NO: PAGE : REV.
Drawing catalogue 001-M-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
marking of electrical components
Making to:GB/T 5094.2-2018、IEC81346-2 :2009

Code letter Intended purpose or task of object Examples of typical electrical components
Two or more purposes or tasks
A Touch screen, electronic device
B B
Converting an input variable (physical property, condition or
B event) into a signal for further processing
Sensor,Current transformer,Photocell,Position switch,Proximity sensor

Storing of energy, information or material


C Buffer battery,capacitors, memory device

Providing radiant or thermal energy


E lamps, heating resistor, fluorescent lamp

equipment for protective purposes


F Fuse, bimetal release,Surge arrester,Thermal overload release,Miniature circuit-breaker

Initiating a flow of energy or material Generating signals used as


G information carriers or reference source
generators, UPS

Producing a new kind of material or product


C H C
Processing (receiving,treating and providing) signals or
K information
contactor relays, relays, time-delay relay,transistors, EMC filter

Providing mechanical energy (rotational or linear mechanical


M motion) for driving purposes
Actuating coil,Actuator,Electric motor,Linear motor

Presenting information
P Optical acoustic indicators, signal lamps, LED, Voltmeter, Text display

Controlled switching or varying a flow of energy, of signals


Q Contactor, switch disconnector, motor-protective circuit-breaker, disconnect switch

Restricting or stabilizing motion or a flow of energy, information


R or material
resistor, diode, reactor coil, limiter

D S
Converting a manual operation into a signal for further
Control circuit device, push-button, control switch, keyboard D
processing
Conversion of energy maintaining the kind of energy, Conversion
T of an established signal maintaining the content of information
AC/DC converter,Aerial,Amplifier,Electrical transducer,Frequency convertor,Power transformer,Rectifier,Signal converter

Keeping objects in a defined position


U
Processing (treating) of material or products
V
Guiding or transporting energy, signals, material or products
W from one place to another
Busbar,Bushing,Cable,Conductor,Data bus,Optical fibre

Connecting objects
X Connector,Hub,Plug connector,Terminal,,Terminal block,Terminal strip

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Specification of the marking 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M1 01
APPROVED DWG. NO: PAGE : REV.
Specification of the marking 001-M1-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Electrical specification
A A
Please carry out the installation, adjustment and acceptance of all equipment involved in this design according to Code for Construction and Acceptance of Automation
Instrumentation Engineering(GB50093-2013),Electrical Device Installation Project Panel ,Cabinet and Secondary Loop Connecting Construction and Acceptance Code(GB50171-
2012), Cabling Construction and Acceptance Code of Electrical Device Installation Project (GB50168-2018). At the same time the detailed engineering shall be in line with the
requirement of this electrical specification. During construction process, this design can be properly modified according to the practical condition.
Besides, pay attention to the following items during installation and construction process:

1.All cables shall be coated by protection pipes or braced by cable tray.


B B

2.The detailed position of all control components and piping direction of the mechanical equipment have been marked out in the mechanical drawing, please refer to the mechanical
drawings during installation.

3.InstallatIOn and wiring of all control equipment requIres cooperation of mechanical equipment professionals. During commissioning period, nobody should operate any equipment
without permission of mechanical experts .

4.All wires in power distribution cabinet, PLC control cabinet, control desk and junction box shall adopt the following standards :
C C
——AC main circuit: Three phases adopt black color, with a wire size of not less than 2.5mm2;

——AC control loop: Phase line adopts red, with a wire size of 1.5 mm2;Neutral line adopts deep blue , with a size of1.5mm2; the size of wires connected to PLC is 0.75mm2;

——DC control loop: 24V anode line adopts brown, with a wire size of 1.5 mm2; 24V cathode line adopts light blue , with a size of 1.5 mm2; the size of wires connected to PLC is 0.75mm2;

——Control signal circuit : All PLC input signal lines adopt nacarat line, with a wire size of 0.75mm2; All PLC output control signal lines adopt yellow line, with a size of 0.75mm2;
D D
——All protecting earthing (PE) wires adopt yellow & green double lines,and shall be Connected directly to PE bus-bar, its size must not be less than 16mm2 (except special cases).

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Specification of the installation 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M1 02
APPROVED DWG. NO: PAGE : REV.
Specification of the installation 001-M1-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
1 +1CB01 -1CB01 Junction Box JXH-3B Reliance 09/19.A2
A A
2 +1CB01 =1CB01 -P01 Indicator Lamp #24V power XB2BVB3C SCHNEIDER 09/18.C2 09/19.B1
3 +1CB01 =1CB01 -S6 Illuminated Pushbutton #manual XB2-BW33B1C SCHNEIDER 09/18.B3 09/19.A1
4 +1CB01 =1CB01 -S7 Illuminated Pushbutton #automatic XB2-BW33B1C SCHNEIDER 09/18.B4 09/19.A2
5 +1CB01 =1CB01 -SE1 Emergency Stop Push… #Emergency XB2-BS544C SCHNEIDER 09/18.E1 09/19.A2
6 +1CB01 =900C101 -S1 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/18.B4 09/19.B2
7 +1CB01 =900C101 -S2 Pushbutton #stop XB2-BA42C SCHNEIDER 09/18.B5 09/19.B2
8 +1CB01 =900C102 -S1 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/18.B6 09/19.B1
9 +1CB01 =900C102 -S2 Pushbutton #stop XB2-BA42C SCHNEIDER 09/18.B7 09/19.B2
B B
10 +1CD01 =1CD01 -F1 Circuit Breaker iC65N,20A/1P SCHNEIDER 09/4.B2 09/1.A6
11 +1CD01 =1CD01 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/4.D2 09/1.A6
12 +1CD01 =1CD01 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/4.D3 09/1.A6
13 +1CD01 =1CD01 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 09/4.D4 09/1.A6
14 +1CD01 =1CD01 -F5 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/12.B1 09/1.A7
15 +1CD01 =1CD01 -F6 Circuit Breaker iC65N,10A/1P SCHNEIDER 09/4.D6 09/1.A7
16 +1CD01 =1CD01 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 09/5.D5 09/1.B6
C 17 +1CD01 =1CD01 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 09/5.D6 09/1.B6 C
18 +1CD01 =900E105 -K2 DRM270024L WEIDMUELLER 02/12.C5 09/1.B6
19 +1CD01 =900E105 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/12.C4 09/1.B6
20 +1CD01 =900E105 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/12.C5 09/1.B7
21 +1CD01 =WIND1 -K1 DRM270024L WEIDMUELLER 09/46.B5 09/1.B7
22 +1CD01 =WIND1 -K2 DRM270024L WEIDMUELLER 09/46.B6 09/1.B7
23 +1CD01 =WIND1 -K3 DRM270024L WEIDMUELLER 09/46.B6 09/1.B7
24 +1CD01 =WIND1 -K4 DRM270024L WEIDMUELLER 09/46.B7 09/1.B7
D 25 +1CD01 =WIND1 -K5 DRM270024L WEIDMUELLER 09/46.B8 09/1.B7 D
26 +1CD01 -JHJ SWITCH MODULE 6GK5 005-0BA00-1AB2 SIEMENS 06/1.C7
27 +1CD01 =1CD01 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B2 09/1.A7
28 +1CD01 =1CD01 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B2 09/1.A7
29 +1CD01 =1CD01 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B3 09/1.A7
30 +1CD01 =1CD01 -DI4 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B3 09/1.A7
31 +1CD01 =1CD01 -DI5 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B3 09/1.A7
32 +1CD01 =1CD01 -DI6 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B3 09/1.A7
E 33 +1CD01 =1CD01 -DI7 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B4 09/1.A7 E

34 +1CD01 =1CD01 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/1.B4 09/1.A7


35 +1CD01 =1CD01 -DO2 DO Module 1W 6ES7 132-6BH00-0BA0+BU15-P16… SIEMENS 06/1.B4 09/1.A7
36 +1CD01 =1CD01 -DO3 DO Module 1W 6ES7 132-6BH00-0BA0+BU15-P16… SIEMENS 06/1.B5 09/1.A7
37 +1CD01 =1CD01 -DO4 DO Module 1W 6ES7 132-6BH00-0BA0+BU15-P16… SIEMENS 06/1.B5 09/1.A7
1 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
38 +1CD01 =1CD01 -DO5 DO Module 1W 6ES7 132-6BH00-0BA0+BU15-P16… SIEMENS 06/1.B5 09/1.A7
A A
39 +1CD01 =1CD01 -DO6 DO Module 1W 6ES7 132-6BH00-0BA0+BU15-P16… SIEMENS 06/1.B6 09/1.A7
40 +1CD01 =1CD01 -IM1 ET200SP Interface Mo… 6ES7 155-6AA01-0BN0 SIEMENS 06/1.B1 09/1.A7
41 +1CD01 =1CD01 -G1 24VDC Power Supply NDR-480-24 MEAN WELL 09/4.D4 09/1.A7
42 +1CD01 =1CD01 -P01 Indicator Lamp External power XB2BVM4C SCHNEIDER 09/4.E3 09/2.B3
43 +1CD01 =1CD01 -P02 Indicator Lamp 24V power XB2BVB3C SCHNEIDER 09/5.C2 09/2.B3
44 +1CD01 =1CD01 -S1 Illuminated Pushbutton #manual XB2-BW33B1C SCHNEIDER 09/5.A3 09/2.B4
45 +1CD01 =1CD01 -S2 Illuminated Pushbutton #automatic XB2-BW33B1C SCHNEIDER 09/5.A4 09/2.B4
46 +1CD01 =1CD01 -S01 Emergency Stop Push… #Emergency XB2-BS544C SCHNEIDER 09/5.E1 09/2.B3
B B
47 +1CD01 =1CD01 -S12 Selector Switch #reserve XB2-BD53C SCHNEIDER 09/2.B6
48 +1CD01 =1CD01 -X1 Terminal Block 220 09/1.A6
49 +1CD01 =1CD01 -X2 Terminal Block 24 09/1.B7
50 +1CD01 =1CD01 -X3 Terminal Block 09/1.B6
51 +1CD01 =1CD01 -X4 Terminal Block 09/1.B7
52 +1CD01 =1CD01 -XB1 Power Socket Three hole socket Three hole socket 09/4.E2 09/1.A8
53 +1CD01 =900C101 -S3 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/12.B2 09/2.B5
C 54 +1CD01 =900C101 -S4 Pushbutton #stop XB2-BA42C SCHNEIDER 09/12.B3 09/2.B5 C
55 +1CD01 =900C102 -S5 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/12.B4 09/2.B6
56 +1CD01 =900C102 -S6 Pushbutton #stop XB2-BA42C SCHNEIDER 09/12.B5 09/2.B6
57 +1CD01 =900C103 -S7 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/13.B2 09/2.B4
58 +1CD01 =900C203 -S11 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/13.B7 09/2.B6
59 +1CD01 =900E101 -S1 Selector Switch #1 up / down XB2-BD21C SCHNEIDER 09/6.A2 09/2.C3
60 +1CD01 =900E101 -S2 Selector Switch #2 up / down XB2-BD21C SCHNEIDER 09/6.A3 09/2.C3
61 +1CD01 =900E102 -S1 Selector Switch #1 up/ down XB2-BD21C SCHNEIDER 09/8.A3 09/2.C5
D 62 +1CD01 =900E102 -S2 Selector Switch #2 up / down XB2-BD21C SCHNEIDER 09/8.A4 09/2.C5 D
63 +1CD01 =900E102 -S3 Selector Switch #3 up / down XB2-BD21C SCHNEIDER 09/8.A5 09/2.C6
64 +1CD01 =900E102 -S4 Selector Switch #4 up / down XB2-BD21C SCHNEIDER 09/8.A5 09/2.C6
65 +1CD01 =900E102 -S5 Selector Switch #5 up / down XB2-BD21C SCHNEIDER 09/8.A6 09/2.C7
66 +1CD01 =900E102 -S6 Selector Switch #6 up / down XB2-BD21C SCHNEIDER 09/8.A7 09/2.C7
67 +1CD01 =900E102 -S7 Selector Switch #7 up / down XB2-BD21C SCHNEIDER 09/8.A7 09/2.C3
68 +1CD01 =900E102 -S8 Selector Switch #8 up / down XB2-BD21C SCHNEIDER 09/8.A8 09/2.C3
69 +1CD01 =900E102 -S9 Selector Switch #9 up / down XB2-BD21C SCHNEIDER 09/9.A1 09/2.C3
E 70 +1CD01 =900E102 -S10 Selector Switch #10 up / down XB2-BD21C SCHNEIDER 09/9.A2 09/2.C4 E

71 +1CD01 =900E102 -S11 Selector Switch #11 up / down XB2-BD21C SCHNEIDER 09/9.A2 09/2.C4
72 +1CD01 =900E102 -S12 Selector Switch #12 up / down XB2-BD21C SCHNEIDER 09/9.A3 09/2.C5
73 +1CD01 =900E102 -S13 Selector Switch #13 up / down XB2-BD21C SCHNEIDER 09/9.A4 09/2.C5
74 +1CD01 =900E102 -S14 Selector Switch #14 up / down XB2-BD21C SCHNEIDER 09/9.A4 09/2.C6
2 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
75 +1CD01 =900E102 -S15 Selector Switch #15 up / down XB2-BD21C SCHNEIDER 09/9.A5 09/2.C6
A A
76 +1CD01 =900E102 -S16 Selector Switch #16 up / down XB2-BD21C SCHNEIDER 09/9.A5 09/2.C7
77 +1CD01 =900E102 -S17 Selector Switch #17 up / down XB2-BD21C SCHNEIDER 09/9.A6 09/2.C7
78 +1CD01 =900E102 -S18 Selector Switch #18 up / down XB2-BD21C SCHNEIDER 09/9.A7 09/2.D3
79 +1CD01 =900E102 -S19 Selector Switch #19 up / down XB2-BD21C SCHNEIDER 09/9.A7 09/2.D3
80 +1CD01 =900E102 -S20 Selector Switch #20 up / down XB2-BD21C SCHNEIDER 09/9.A8 09/2.D3
81 +1CD01 =900E102 -S21 Selector Switch #21 up / down XB2-BD21C SCHNEIDER 09/10.A1 09/2.D4
82 +1CD01 =900E102 -S22 Selector Switch #22 up / down XB2-BD21C SCHNEIDER 09/10.A2 09/2.D4
83 +1CD01 =900E102 -S23 Selector Switch #23 up / down XB2-BD21C SCHNEIDER 09/10.A3 09/2.D5
B B
84 +1CD01 =900E102 -S24 Selector Switch #24 up / down XB2-BD21C SCHNEIDER 09/10.A3 09/2.D5
85 +1CD01 =900E102 -S25 Selector Switch #25 up / down XB2-BD21C SCHNEIDER 09/10.A4 09/2.D6
86 +1CD01 =900E102 -S26 Selector Switch #26 up / down XB2-BD21C SCHNEIDER 09/10.A4 09/2.D6
87 +1CD01 =900E102 -S27 Selector Switch #27 up / down XB2-BD21C SCHNEIDER 09/10.A5 09/2.D7
88 +1CD01 =900E102 -S28 Selector Switch #28 up / down XB2-BD21C SCHNEIDER 09/10.A6 09/2.D7
89 +1CD01 =900E102 -S101 Illuminated Pushbutton #Stop first XB2-BW33B1C SCHNEIDER 09/8.A2 09/2.B3
90 +1CD01 =900E102 -S102 Illuminated Pushbutton #Stop second XB2-BW33B1C SCHNEIDER 09/8.A2 09/2.B3
C 91 +1CD01 =900E102 -S103 Pushbutton #Stop reset XB2-BA61C SCHNEIDER 09/8.A3 09/2.B3 C
92 +1CD01 =900E103 -S1 Selector Switch #1 up / down XB2-BD21C SCHNEIDER 09/7.A2 09/2.C3
93 +1CD01 =900E103 -S2 Selector Switch #2 up / down XB2-BD21C SCHNEIDER 09/7.A3 09/2.C4
94 +1CD01 =900E105 -S8 Selector Switch # up / down XB2-BD53C SCHNEIDER 09/13.B3 09/2.B4
95 +1CD01 =900E106 -S9 Selector Switch #Forward / backward XB2-BD53C SCHNEIDER 09/13.B4 09/2.B5
96 +1CD01 =900E106 -S10 Selector Switch # cw / ccw XB2-BD53C SCHNEIDER 09/13.B6 09/2.B5
97 +1CD01 =WIND1 -X5 09/1.B7
98 +1CD02 -1CD02 940X600X300
D 99 +1CD02 =1CD02 -F1 Circuit Breaker iC65N,20A/1P SCHNEIDER 09/22.B2 09/20.C6 D
100 +1CD02 =1CD02 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/22.C2 09/20.C6
101 +1CD02 =1CD02 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/22.C3 09/20.C6
102 +1CD02 =1CD02 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 09/22.C4 09/20.C6
103 +1CD02 =1CD02 -F6 Circuit Breaker iC65N,10A/1P SCHNEIDER 09/22.C6 09/20.C6
104 +1CD02 =900E110 -F5 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/24.A6 09/20.C6
105 +1CD02 =1CD02 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 09/23.E4 09/20.D6
106 +1CD02 =1CD02 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 09/23.E5 09/20.D6
E 107 +1CD02 =1CD02 -CPU 2 CPU 6ES7 211-1AE40-0XB0 SIEMENS 06/2.C6 09/20.C6 E

108 +1CD02 =1CD02 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/2.B2 09/20.C6
109 +1CD02 =1CD02 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/2.B3 09/20.C6
110 +1CD02 =1CD02 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/2.B3 09/20.C6
111 +1CD02 =1CD02 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/2.B3 09/20.C6
3 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
112 +1CD02 =1CD02 -HMI1 HMI KTP700 BASIC 6AV2 123-2GB03-0AX0 SIEMENS 09/20.B4
A A
113 +1CD02 =1CD02 -IM2 ET200SP Interface Mo… 6ES7 155-6AA01-0BN0 SIEMENS 06/2.B2 09/20.C6
114 +1CD02 =1CD02 -JHJ SWITCH MODULE 6GK5 008-0BA10-1AB2 SIEMENS 06/2.B5 09/20.C6
115 +1CD02 =1CD02 -G1 24VDC Power Supply NDR-240-24 MEAN WELL 09/22.D4
116 +1CD02 =1CD02 -P1 Indicator Lamp #External power XB2BVM4C SCHNEIDER 09/22.E3 09/20.B5
117 +1CD02 =1CD02 -P02 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 09/20.C3,09/23…
118 +1CD02 =1CD02 -S01 Emergency Stop Push… #Emergency XB2-BS544C SCHNEIDER 09/23.E1 09/20.B5
119 +1CD02 =1CD02 -S02 Pushbutton #Run XB2-BA31C SCHNEIDER 09/23.C3 09/20.B5
120 +1CD02 =1CD02 -X0 Terminal Block ES 09/20.D6
B B
121 +1CD02 =1CD02 -X1 Terminal Block 220 09/20.D6
122 +1CD02 =1CD02 -X2 Terminal Block 24 09/20.D6
123 +1CD02 =1CD02 -X3 Terminal Block 09/20.D6
124 +1CD02 =1CD02 -X4 Terminal Block ES 09/20.D6
125 +1CD02 =1CD02 -X5 Terminal Block 09/20.D6
126 +1CD02 =1CD02 -XB1 Power Socket Three hole socket Three hole socket 09/22.E2 09/20.D6
127 +1CD03 -1CD03 940X600X300
C 128 +1CD03 =1CD03 -F1 Circuit Breaker iC65N,20A/1P SCHNEIDER 09/32.B2 09/30.C6 C
129 +1CD03 =1CD03 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/32.D2 09/30.C6
130 +1CD03 =1CD03 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/32.D3 09/30.C6
131 +1CD03 =1CD03 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 09/32.D4 09/30.C6
132 +1CD03 =1CD03 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 09/33.E4 09/30.D6
133 +1CD03 =1CD03 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 09/33.E5 09/30.D6
134 +1CD03 WS_1 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/123.B1 09/30.C8
135 +1CD03 WS_1 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/123.B2 09/30.C8
D 136 +1CD03 WS_1 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/123.B3 09/30.C8 D
137 +1CD03 WS_1 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/123.B4 09/30.D8
138 +1CD03 WS_1 -K5 Auxiliary Relay DRM270024L WEIDMUELLER 02/124.B1 09/30.D8
139 +1CD03 WS_1 -K6 Auxiliary Relay DRM270024L WEIDMUELLER 02/124.B2 09/30.D8
140 +1CD03 WS_1 -K7 Auxiliary Relay DRM270024L WEIDMUELLER 02/124.B3 09/30.D8
141 +1CD03 WS_1 -K8 Auxiliary Relay DRM270024L WEIDMUELLER 02/124.B4 09/30.D8
142 +1CD03 =1CD03 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B2 09/30.C6
143 +1CD03 =1CD03 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B3 09/30.C6
E 144 +1CD03 =1CD03 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B3 09/30.C6 E

145 +1CD03 =1CD03 -DI4 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B3 09/30.C6
146 +1CD03 =1CD03 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B4 09/30.C6
147 +1CD03 =1CD03 -DO2 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/5.B4 09/30.C6
148 +1CD03 =1CD03 -HMI1 HMI KTP700 BASIC 6AV2 123-2GB03-0AX0 SIEMENS 09/30.B4
4 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
149 +1CD03 =1CD03 -IM4 ET200SP Interface Mo… 6ES7 155-6AA01-0BN0 SIEMENS 06/5.B2 09/30.C6
A A
150 +1CD03 =1CD03 -JHJ SWITCH MODULE 6GK5 008-0BA10-1AB2 SIEMENS 06/5.B6 09/30.C6
151 +1CD03 =1CD03 -G1 24VDC Power Supply NDR-240-24 MEAN WELL 09/32.D4 09/30.C6
152 +1CD03 =1CD03 -P1 Indicator Lamp #External power XB2BVM4C SCHNEIDER 09/32.E4 09/30.B5
153 +1CD03 =1CD03 -P02 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 09/30.C3,09/33…
154 +1CD03 =1CD03 -S01 Emergency Stop Push… #Emergency XB2-BS544C SCHNEIDER 09/33.E1 09/30.B5
155 +1CD03 =1CD03 -S02 Pushbutton #Run button XB2-BA31C SCHNEIDER 09/33.C3 09/30.B5
156 +1CD03 =1CD03 -X0 Terminal Block ES 09/30.C6
157 +1CD03 =1CD03 -X1 Terminal Block 220 09/30.D6
B B
158 +1CD03 =1CD03 -X2 Terminal Block 24 09/30.D6
159 +1CD03 =1CD03 -X3 Terminal Block 09/30.D6
160 +1CD03 =1CD03 -X4 09/30.D7
161 +1CD03 =1CD03 -XB1 Power Socket Three hole socket Three hole socket 09/32.E2 09/30.D6
162 +1CP01 -F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 02/3.B4 02/1.A4
163 +1CP01 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/3.C1 02/1.A4
164 +1CP01 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/3.C2 02/1.A4
C 165 +1CP01 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/3.C2 02/1.A5 C
166 +1CP01 -F5 Circuit Breaker iC65N,20A/1P SCHNEIDER 02/3.C3 02/1.A5
167 +1CP01 -F6 Circuit Breaker iC65N,20A/1P SCHNEIDER 02/3.C4 02/1.A5
168 +1CP01 =900C101 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/7.A2 02/1.B4
169 +1CP01 =900C102 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/8.A1 02/1.B4
170 +1CP01 =900C103 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/9.A1 02/1.B4
171 +1CP01 =900C104 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/16.A2 02/1.B4
172 +1CP01 =900C105 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/17.A1 02/1.B4
D 173 +1CP01 =900C106 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/18.A2 02/1.B4 D
174 +1CP01 =900C107 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/19.A2 02/1.B4
175 +1CP01 =900C108 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER 02/20.A2 02/1.B5
176 +1CP01 =900C109 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/27.A2 02/1.B4
177 +1CP01 =900C111 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/28.A2 02/1.B4
178 +1CP01 =900E105 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/11.A1 02/1.B5
179 +1CP01 =900E106 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/14.A1 02/1.B5
180 +1CP01 =900E106 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/14.A6 02/1.B5
E 181 +1CP01 =900E111 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/29.A2 02/1.A5 E

182 +1CP01 =900E111 -Q3 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/30.D2


183 +1CP01 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/5.E7 02/1.D4
184 +1CP01 -Q1 Contactor LC1-N65M5N SCHNEIDER 02/6.D2 02/1.A4
185 +1CP01 =900C101 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/7.D3 02/1.D4
5 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
186 +1CP01 =900C102 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/8.D3 02/1.D4
A A
187 +1CP01 =900C103 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/9.D3 02/1.D4
188 +1CP01 =900C105 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/17.D3 02/1.D4
189 +1CP01 =900C106 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/18.D3 02/1.D4
190 +1CP01 =900C108 -F2 Thermal Overload Relay LRN05N SCHNEIDER 02/21.C6 02/1.D5
191 +1CP01 =900C108 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/22.B2 02/1.D4
192 +1CP01 =900C108 -K2 Auxiliary Relay DRW270024LT WEIDMUELLER 02/22.B3 02/1.D4
193 +1CP01 =900C108 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/22.B4 02/1.D4
194 +1CP01 =900C108 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/22.B5 02/1.D4
B B
195 +1CP01 =900C108 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/22.E6 02/1.D5
196 +1CP01 =900C108 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/22.E7 02/1.D5
197 +1CP01 =900E105 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/11.D6 02/1.D4
198 +1CP01 =900E106 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/14.D3 02/1.D4
199 +1CP01 =900E111 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/30.B2 02/1.D5
200 +1CP01 =900E111 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/29.D3 02/1.D4
201 +1CP01 =900E111 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/31.B3 02/1.D4
C 202 +1CP01 =900E111 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/31.B4 02/1.D4 C
203 +1CP01 =900E111 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/31.E6 02/1.D5
204 +1CP01 =900E111 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/31.E7 02/1.D5
205 +1CP01 =900C101 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/7.C1 02/1.B4
206 +1CP01 =900C102 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/8.C1 02/1.B4
207 +1CP01 =900C103 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/9.C1 02/1.B4
208 +1CP01 =900C104 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/16.C1 02/1.B4
209 +1CP01 =900C105 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/17.C1 02/1.B4
D 210 +1CP01 =900C106 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/18.C1 02/1.B5 D
211 +1CP01 =900C107 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/19.C1 02/1.B5
212 +1CP01 =900C108 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS 02/20.C2 02/1.C4
213 +1CP01 =900C109 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/27.C1 02/1.C4
214 +1CP01 =900C111 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/28.C1 02/1.C4
215 +1CP01 =900E105 -T1 Frequency Inverter 6SL3210-1KE13-2UF2 SIEMENS 02/11.C1 02/1.C5
216 +1CP01 =900E106 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/14.C1 02/1.C4
217 +1CP01 =900E106 -T2 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/14.C5 02/1.C4
E 218 +1CP01 =900E111 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/29.C2 02/1.C5 E

219 +1CP01 =900C101 -R1 Braking Resistor 400W,100Ω 02/7.C3


220 +1CP01 =900C102 -R1 Braking Resistor 400W,100Ω 02/8.C2
221 +1CP01 =900C103 -R1 Braking Resistor 160Ω,200W EAGTOP 02/9.C2
222 +1CP01 =900C104 -R1 Braking Resistor 160Ω,200W EAGTOP 02/16.C3
6 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
223 +1CP01 =900C105 -R1 Braking Resistor 400W,100Ω 02/17.C2
A A
224 +1CP01 =900C106 -R1 Braking Resistor 400W,100Ω 02/18.C3
225 +1CP01 =900C107 -R1 Braking Resistor 160Ω,200W EAGTOP 02/19.C3
226 +1CP01 =900C108 -R1 Braking Resistor 160Ω,200W EAGTOP 02/20.C3
227 +1CP01 =900C109 -R1 Braking Resistor 160Ω,200W EAGTOP 02/27.C3
228 +1CP01 =900C111 -R1 Braking Resistor 160Ω,200W EAGTOP 02/28.C3
229 +1CP01 =900E105 -R1 Braking Resistor 390Ω,100W 02/11.C2
230 +1CP01 =900E106 -R1 Braking Resistor 390Ω,100W 02/14.C2
231 +1CP01 =900E106 -R2 Braking Resistor 160Ω,200W EAGTOP 02/14.C7
B B
232 +1CP01 =900E111 -R1 Braking Resistor 160Ω,200W 02/29.C3
233 +1CP01 -JHJ SWITCH MODULE 6GK5 005-0BA00-1AB2 SIEMENS 02/4.D7
234 +1CP01 -G1 24VDC Power Supply NDR-240-24 MEAN WELL 02/3.D2 02/1.D4
235 +1CP01 -E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/3.E1
236 +1CP01 -L1 Terminal UTD-300I/18×6 02/3.C4 02/1.A4
237 +1CP01 -L2 Terminal UTD-300I/18×6 02/3.C5 02/1.A4
238 +1CP01 -L3 Terminal UTD-300I/18×6 02/3.C5 02/1.A4
C 239 +1CP01 -X0 Terminal Block ES 02/1.D5 C
240 +1CP01 -X1 Terminal Block 220 02/1.A5
241 +1CP01 -X2 Terminal Block 24 02/1.D4
242 +1CP01 -X3 Terminal Block 02/1.E5
243 +1CP01 -X4 Terminal Block 02/1.E5
244 +1CP01 =1CP01 -P01 Indicator Lamp #Control power XB2BVB3C SCHNEIDER 02/6.C5 02/1.B2
245 +1CP01 =1CP01 -P02 Indicator Lamp #System operation XB2BVB3C SCHNEIDER 02/6.C6 02/1.B2
246 +1CP01 =1CP01 -S01 Pushbutton #System 1 operation XB2-BA31C SCHNEIDER 02/5.A2 02/1.B2
D 247 +1CP01 =1CP01 -S02 Pushbutton #System 1 stop XB2-BA42C SCHNEIDER 02/5.C2 02/1.B2 D
248 +1CP02 Air Conditioner Air Conditioner SK 3370.520 RITTAL 02/39.E2
249 +1CP02 -1CP02 Cabinet 2000X1000X600 02/37.C4
250 +1CP02 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 02/39.B4 02/37.A4
251 +1CP02 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/39.C1 02/37.A5
252 +1CP02 -1F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/39.C2 02/37.A5
253 +1CP02 -2F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 02/66.B4 02/65.A6
254 +1CP02 -2F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/66.C1 02/65.A7
E 255 +1CP02 =900C110 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER 02/41.A2 02/37.B4 E

256 +1CP02 =900C112 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/42.A2 02/37.B4
257 +1CP02 =900C113 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/43.A2 02/37.B5
258 +1CP02 =900C114 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/44.A2 02/37.B5
259 +1CP02 =900C115 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/45.A2 02/37.B5
7 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
260 +1CP02 =900C116 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/46.A2 02/37.B5
A A
261 +1CP02 =900C117 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/47.A1 02/37.B5
262 +1CP02 =900C118 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/48.A1 02/37.B5
263 +1CP02 =900C119 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/50.A1 02/37.A6
264 +1CP02 =900C301 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/51.B2 02/37.B5
265 +1CP02 =900C302 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/55.A2 02/37.B5
266 +1CP02 =900C303 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER 02/59.A2 02/37.B5
267 +1CP02 =900E301 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/68.A2 02/65.B6
268 +1CP02 =900E304 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/72.A2 02/65.B6
B B
269 +1CP02 =900E305 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/76.A2 02/65.B6
270 +1CP02 =900E306 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/80.A2 02/65.B6
271 +1CP02 =902C001 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/60.A1 02/37.B6
272 +1CP02 =902C002 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/61.A1 02/37.B6
273 +1CP02 =902E001 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/84.A2 02/65.B6
274 +1CP02 =902E003 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/88.A2 02/65.B6
275 +1CP02 -1Q1 Contactor LC1-N65M5N SCHNEIDER 02/39.B7 02/37.A5
C 276 +1CP02 -2Q1 Contactor LC1-N65M5N SCHNEIDER 02/66.B6 02/65.A6 C
277 +1CP02 =900C113 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/43.D3 02/37.D5
278 +1CP02 =900C114 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/44.D3 02/37.D5
279 +1CP02 =900C115 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/45.D3 02/37.D5
280 +1CP02 =900C116 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/46.D3 02/37.D5
281 +1CP02 =900C118 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/48.D3 02/37.D5
282 +1CP02 =900C301 -F2 Thermal Overload Relay LRN06N SCHNEIDER 02/52.B6 02/37.D5
283 +1CP02 =900C301 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/53.B2 02/37.D5
D 284 +1CP02 =900C301 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/53.B3 02/37.D5 D
285 +1CP02 =900C301 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/53.B4 02/37.D5
286 +1CP02 =900C301 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/53.B5 02/37.D5
287 +1CP02 =900C301 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/53.E6 02/37.D5
288 +1CP02 =900C301 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/53.E7 02/37.D5
289 +1CP02 =900C302 -F2 Thermal Overload Relay LRN06N SCHNEIDER 02/56.B6 02/37.D5
290 +1CP02 =900C302 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/57.B2 02/37.D5
291 +1CP02 =900C302 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/57.B3 02/37.D5
E 292 +1CP02 =900C302 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/57.B4 02/37.D5 E

293 +1CP02 =900C302 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/57.B5 02/37.D5
294 +1CP02 =900C302 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/57.E6 02/37.D5
295 +1CP02 =900C302 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/57.E7 02/37.D5
296 +1CP02 =900E301 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/69.B2 02/65.D6
8 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
297 +1CP02 =900E301 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/68.E3 02/65.D6
A A
298 +1CP02 =900E301 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/70.B3 02/65.D6
299 +1CP02 =900E301 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/70.B4 02/65.D6
300 +1CP02 =900E301 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/70.E6 02/65.D6
301 +1CP02 =900E301 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/70.E7 02/65.D6
302 +1CP02 =900E304 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/73.B2 02/65.D6
303 +1CP02 =900E304 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/72.D3 02/65.D6
304 +1CP02 =900E304 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/74.B3 02/65.D6
305 +1CP02 =900E304 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/74.B4 02/65.D6
B B
306 +1CP02 =900E304 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/74.E6 02/65.D6
307 +1CP02 =900E304 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/74.E7 02/65.D6
308 +1CP02 =900E305 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/77.B2 02/65.D6
309 +1CP02 =900E305 -F3 Thermal Overload Relay LRN01N SCHNEIDER 02/77.B7 02/65.D6
310 +1CP02 =900E305 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/76.E3 02/65.D6
311 +1CP02 =900E305 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/78.B2 02/65.D6
312 +1CP02 =900E305 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/78.B3 02/65.D6
C 313 +1CP02 =900E305 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/78.B3 02/65.D6 C
314 +1CP02 =900E305 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/78.E6 02/65.D6
315 +1CP02 =900E305 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/78.E7 02/65.D6
316 +1CP02 =900E305 -Q3 Contactor LC1-N1201M5N SCHNEIDER 02/78.E7 02/65.D6
317 +1CP02 =900E306 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/81.B2 02/65.D6
318 +1CP02 =900E306 -F3 Thermal Overload Relay LRN01N SCHNEIDER 02/81.B7 02/65.D6
319 +1CP02 =900E306 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/80.E3 02/65.D6
320 +1CP02 =900E306 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/82.B2 02/65.D6
D 321 +1CP02 =900E306 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/82.B3 02/65.D7 D
322 +1CP02 =900E306 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/82.B3 02/65.D7
323 +1CP02 =900E306 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/82.E6 02/65.D6
324 +1CP02 =900E306 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/82.E7 02/65.D6
325 +1CP02 =900E306 -Q3 Contactor LC1-N1201M5N SCHNEIDER 02/82.E7 02/65.D6
326 +1CP02 =902E001 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/85.B2 02/65.D7
327 +1CP02 =902E001 -F3 Thermal Overload Relay LRN01N SCHNEIDER 02/85.B7 02/65.D7
328 +1CP02 =902E001 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/84.E3 02/65.D7
E 329 +1CP02 =902E001 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/86.B2 02/65.D7 E

330 +1CP02 =902E001 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/86.B3 02/65.D7
331 +1CP02 =902E001 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/86.B3 02/65.D7
332 +1CP02 =902E001 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/86.E6 02/65.D7
333 +1CP02 =902E001 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/86.E7 02/65.D7
9 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
334 +1CP02 =902E001 -Q3 Contactor LC1-N1201M5N SCHNEIDER 02/86.E7 02/65.D7
A A
335 +1CP02 =902E003 -F2 Thermal Overload Relay LRN08N SCHNEIDER 02/89.B2 02/65.D6
336 +1CP02 =902E003 -F3 Thermal Overload Relay LRN01N SCHNEIDER 02/89.B7 02/65.D6
337 +1CP02 =902E003 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/88.E3 02/65.D7
338 +1CP02 =902E003 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/90.B2 02/65.D7
339 +1CP02 =902E003 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/90.B3 02/65.D7
340 +1CP02 =902E003 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/90.B3 02/65.D7
341 +1CP02 =902E003 -Q1 Contactor LC1-N1201M5N SCHNEIDER 02/90.E6 02/65.D6
342 +1CP02 =902E003 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/90.E7 02/65.D6
B B
343 +1CP02 =902E003 -Q3 Contactor LC1-N1201M5N SCHNEIDER 02/90.E7 02/65.D6
344 +1CP02 =900C110 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS 02/41.C1 02/37.B4
345 +1CP02 =900C112 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/42.C1 02/37.B5
346 +1CP02 =900C113 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/43.C1 02/37.B5
347 +1CP02 =900C114 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/44.C1 02/37.B5
348 +1CP02 =900C115 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/45.C1 02/37.B5
349 +1CP02 =900C116 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/46.C1 02/37.B5
C 350 +1CP02 =900C117 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/47.C1 02/37.B5 C
351 +1CP02 =900C118 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/48.C1 02/37.C4
352 +1CP02 =900C119 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/50.C1 02/37.C5
353 +1CP02 =900C301 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/51.C2 02/37.C5
354 +1CP02 =900C302 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/55.C2 02/37.C5
355 +1CP02 =900C303 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS 02/59.C1 02/37.C5
356 +1CP02 =900E301 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/68.C2 02/65.B6
357 +1CP02 =900E304 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/72.C2 02/65.B6
D 358 +1CP02 =900E305 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/76.C2 02/65.B6 D
359 +1CP02 =900E306 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/80.C2 02/65.B6
360 +1CP02 =902C001 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/60.C1 02/37.C5
361 +1CP02 =902C002 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/61.C1 02/37.C5
362 +1CP02 =902E001 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/84.D2 02/65.B6
363 +1CP02 =902E003 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/88.C2 02/65.B7
364 +1CP02 =900C110 -R1 Braking Resistor 160Ω,200W EAGTOP 02/41.C3
365 +1CP02 =900C112 -R1 Braking Resistor 390Ω,100W EAGTOP 02/42.C3
E 366 +1CP02 =900C113 -R1 Braking Resistor 390Ω,100W 02/43.C3 E

367 +1CP02 =900C114 -R1 Braking Resistor 390Ω,100W EAGTOP 02/44.C3


368 +1CP02 =900C115 -R1 Braking Resistor 390Ω,100W EAGTOP 02/45.C3
369 +1CP02 =900C116 -R1 Braking Resistor 390Ω,100W EAGTOP 02/46.C3
370 +1CP02 =900C117 -R1 Braking Resistor 390Ω,100W EAGTOP 02/47.C2
10 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
371 +1CP02 =900C118 -R1 Braking Resistor 390Ω,100W EAGTOP 02/48.C2
A A
372 +1CP02 =900C119 -R1 Braking Resistor 390Ω,100W EAGTOP 02/50.C2
373 +1CP02 =900C301 -R1 Braking Resistor 160Ω,200W EAGTOP 02/51.C3
374 +1CP02 =900C302 -R1 Braking Resistor 160Ω,200W EAGTOP 02/55.C3
375 +1CP02 =900C303 -R1 Braking Resistor 160Ω,200W EAGTOP 02/59.C3
376 +1CP02 =900E301 -R1 Braking Resistor 160Ω,200W 02/68.C3
377 +1CP02 =900E304 -R1 Braking Resistor 160Ω,200W 02/72.C3
378 +1CP02 =900E305 -R1 Braking Resistor 160Ω,200W 02/76.C3
379 +1CP02 =900E306 -R1 Braking Resistor 160Ω,200W 02/80.C3
B B
380 +1CP02 =902C001 -R1 Braking Resistor 160Ω,200W EAGTOP 02/60.C2
381 +1CP02 =902C002 -R1 Braking Resistor 160Ω,200W EAGTOP 02/61.C2
382 +1CP02 =902E001 -R1 Braking Resistor 160Ω,200W 02/84.C3
383 +1CP02 =902E003 -R1 Braking Resistor 160Ω,200W 02/88.C3
384 +1CP02 -1E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/39.E1
385 +1CP02 -1L1 Terminal UTD-300I/18×6 02/39.C4 02/37.A5
386 +1CP02 -1L2 Terminal UTD-300I/18×6 02/39.C4 02/37.A5
C 387 +1CP02 -1L3 Terminal UTD-300I/18×6 02/39.C4 02/37.A5 C
388 +1CP02 -1X1 Terminal Block 220 02/37.A5
389 +1CP02 -1X2 Terminal Block 24 02/37.D5
390 +1CP02 -1X3 Terminal Block 02/37.E5
391 +1CP02 -2E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/66.E1
392 +1CP02 -2L1 Terminal UTD-300I/18×6 02/66.C4 02/65.A6
393 +1CP02 -2L2 Terminal UTD-300I/18×6 02/66.C4 02/65.A6
394 +1CP02 -2L3 Terminal UTD-300I/18×6 02/66.C4 02/65.A6
D 395 +1CP02 -2X1 Terminal Block 220 02/65.A6 D
396 +1CP02 -2X2 Terminal Block 24 02/65.B7
397 +1CP02 -2X3 Terminal Block 02/65.E7
398 +1CP03 Air Conditioner Air Conditioner SK 3370.520 RITTAL 02/97.E1
399 +1CP03 -1CP03 Cabinet 2000X1000X600 02/95.C4
400 +1CP03 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 02/97.B4 02/95.A4
401 +1CP03 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/97.C1 02/95.A5
402 +1CP03 -1F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/97.C2 02/95.A5
E 403 +1CP03 =1CP03.2 -2F1 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/120.C2 02/119.A6 E

404 +1CP03 =1CP03.2 -2F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/120.C3 02/119.A7
405 +1CP03 =1CP03.2 -2F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/120.C4 02/119.A7
406 +1CP03 =1CP03.2 -2F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/120.C4 02/119.A7
407 +1CP03 =900C120 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/104.A2 02/95.B5
11 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
408 +1CP03 =900C304 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/99.A2 02/95.B4
A A
409 +1CP03 =900C305 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/100.A2 02/95.B4
410 +1CP03 =900C306 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/101.A2 02/95.B4
411 +1CP03 =900C307 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/102.A2 02/95.B5
412 +1CP03 =900C345 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/103.A2 02/95.A6
413 +1CP03 =900C425 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/105.A2 02/95.B5
414 +1CP03 =900C426 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 02/106.A2 02/95.B5
415 +1CP03 =900C427 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/107.A2 02/95.B5
416 +1CP03 =900C428 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/108.A2 02/95.B5
B B
417 +1CP03 =900C429 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/109.A1 02/95.B5
418 +1CP03 =900E410 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/110.A2 02/95.B5
419 +1CP03 =900E410 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/110.A6 02/95.B6
420 +1CP03 =900E411 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/112.A1 02/95.B5
421 +1CP03 =900E411 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER 02/112.A6 02/95.B5
422 +1CP03 -1Q1 Contactor LC1-N65M5N SCHNEIDER 02/97.B6 02/95.A5
423 +1CP03 =900C120 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/104.D3 02/95.D5
C 424 +1CP03 =900C305 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/100.D3 02/95.D4 C
425 +1CP03 =900C306 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/101.D3 02/95.D4
426 +1CP03 =900C307 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/102.D3 02/95.D5
427 +1CP03 =900C426 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER 02/106.D3 02/95.D5
428 +1CP03 =900E410 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/110.D3 02/95.D5
429 +1CP03 =900E411 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/112.D3 02/95.D5
430 +1CP03 =900C120 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/104.C1 02/95.C5
431 +1CP03 =900C304 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/99.C1 02/95.B4
D 432 +1CP03 =900C305 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/100.C1 02/95.B4 D
433 +1CP03 =900C306 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/101.C1 02/95.B5
434 +1CP03 =900C307 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/102.C1 02/95.B5
435 +1CP03 =900C345 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/103.C1 02/95.C6
436 +1CP03 =900C425 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/105.C1 02/95.C5
437 +1CP03 =900C426 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS 02/106.C1 02/95.C4
438 +1CP03 =900C427 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/107.C1 02/95.B5
439 +1CP03 =900C428 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/108.C1 02/95.B5
E 440 +1CP03 =900C429 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/109.C1 02/95.B5 E

441 +1CP03 =900E410 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/110.C1 02/95.C5
442 +1CP03 =900E410 -T2 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/110.C5 02/95.C5
443 +1CP03 =900E411 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS 02/112.C1 02/95.C5
444 +1CP03 =900E411 -T2 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS 02/112.C5 02/95.C5
12 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
445 +1CP03 =900C120 -R1 Braking Resistor 390Ω,100W EAGTOP 02/104.C3
A A
446 +1CP03 =900C304 -R1 Braking Resistor 160Ω,200W EAGTOP 02/99.C3
447 +1CP03 =900C305 -R1 Braking Resistor 400W,100Ω 02/100.C3
448 +1CP03 =900C306 -R1 Braking Resistor 400W,100Ω 02/101.C3
449 +1CP03 =900C307 -R1 Braking Resistor 160Ω,200W EAGTOP 02/102.C3
450 +1CP03 =900C345 -R1 Braking Resistor 160Ω,200W EAGTOP 02/103.C3
451 +1CP03 =900C425 -R1 Braking Resistor 390Ω,100W EAGTOP 02/105.C3
452 +1CP03 =900C426 -R1 Braking Resistor 400W,100Ω 02/106.C3
453 +1CP03 =900C427 -R1 Braking Resistor 390Ω,100W EAGTOP 02/107.C3
B B
454 +1CP03 =900C428 -R1 Braking Resistor 390Ω,100W EAGTOP 02/108.C3
455 +1CP03 =900C429 -R1 Braking Resistor 390Ω,100W EAGTOP 02/109.C2
456 +1CP03 =900E410 -R1 Braking Resistor 390Ω,100W 02/110.C3
457 +1CP03 =900E410 -R2 Braking Resistor 390Ω,100W 02/110.C7
458 +1CP03 =900E411 -R1 Braking Resistor 390Ω,100W 02/112.C2
459 +1CP03 =900E411 -R2 Braking Resistor 160Ω,200W 02/112.C7
460 +1CP03 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B2 02/119.B6
C 461 +1CP03 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B3 02/119.B7 C
462 +1CP03 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B3 02/119.B7
463 +1CP03 -DI4 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B3 02/119.B7
464 +1CP03 -DI5 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B4 02/119.B7
465 +1CP03 -IM3 ET200SP Interface Mo… 6ES7 155-6AA01-0BN0 SIEMENS 06/4.B1 02/119.B6
466 +1CP03 -JHJ SWITCH MODULE 6GK5 008-0BA10-1AB2 SIEMENS 06/4.B6 02/119.B7
467 +1CP03 =1CP03.2 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B4 02/119.B7
468 +1CP03 =1CP03.2 -DO2 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/4.B4 02/119.B7
D 469 +1CP03 =900E307.1 -CP… CPU 6ES7 211-1AE40-0XB0 SIEMENS 06/4.D6 02/119.B7 D
470 +1CP03 =1CP03.2 -2G1 24VDC Power Supply NDR-240-24 MEAN WELL 02/120.C4 02/119.B6
471 +1CP03 -1L1 Terminal UTD-300I/18×6 02/97.C4 02/95.A5
472 +1CP03 -1L2 Terminal UTD-300I/18×6 02/97.C4 02/95.A5
473 +1CP03 -1L3 Terminal UTD-300I/18×6 02/97.C4 02/95.A5
474 +1CP03 -1X1 Terminal Block 220 02/95.A5
475 +1CP03 -1X2 Terminal Block 24 02/95.D5
476 +1CP03 -1X3 Terminal Block 02/95.E5
E 477 +1CP03 -E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/97.E1 E

478 +1CP03 =1CP03.2 -2E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/120.D2
479 +1CP03 =1CP03.2 -2X1 Terminal Block 220 02/119.A7
480 +1CP03 =1CP03.2 -2X2 Terminal Block 24 02/119.B7
481 +1CP03 =1CP03.2 -2X3 Terminal Block 02/119.D6
13 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
482 +1CP03 =1CP03.2 -2X4 Terminal Block 02/119.D7
A A
483 +1CP03 =1CP03.2 -2X5 02/119.D7
484 +1CP03 =1CP03.2 -2XB1 Power Socket Three hole socket Three hole socket 02/120.D3 02/119.B7
485 +1CP03 =1CP03.2 -2XB2 Power Socket Three hole socket Three hole socket 02/120.D4 02/119.B8
486 +1CP03 =900E307.1 -2X6 02/119.D7
487 +1CP03 =900E307.1 -2X7 02/119.D7
488 +1CP04 -1CP04 Cabinet 2000X1000X600
489 +1CP04 -1F1 Circuit Breaker NSC160S3100N SCHNEIDER 02/134.C1 02/132.B4
490 +1CP04 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 02/134.C3 02/132.B5
B B
491 +1CP04 =900E307.1 -F1 Circuit Breaker NSC100S3075N SCHNEIDER 02/137.A2 02/132.B5
492 +1CP04 =900E307.1 -F3 Circuit Breaker GV2-ME07C SCHNEIDER 02/136.B2 02/132.B5
493 +1CP04 =900E307.2 -F2 Circuit Breaker iC65N-C,16A/3P SCHNEIDER 02/147.A2 02/132.B5
494 +1CP04 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/139.E8 02/132.B5
495 +1CP04 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 02/138.B6 02/132.D4
496 +1CP04 -K3 Auxiliary Relay DRM270024L WEIDMUELLER 02/138.B7 02/132.D4
497 +1CP04 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/138.B8 02/132.D4
C 498 +1CP04 -Q1 Contactor LC1-N80M5N SCHNEIDER 02/137.D6 02/132.B5 C
499 +1CP04 -Q2 Contactor LC1-N1201M5N SCHNEIDER 02/137.D7 02/132.D4
500 +1CP04 -Q3 Contactor LC1-N1201M5N SCHNEIDER 02/137.D8 02/132.D4
501 +1CP04 =900E307.1 -K6 Auxiliary Relay DRM270024L WEIDMUELLER 02/136.B4 02/132.D4
502 +1CP04 =900E307.1 -Q4 Contactor Hydraulic Brake Open LC1-N1201M5N SCHNEIDER 02/136.C4 02/132.D4
503 +1CP04 =900E307.2 -K5 Auxiliary Relay DRW270024LT WEIDMUELLER 02/147.D3 02/132.D4
504 +1CP04 -T1 PM240-2 Power Module 6SL3210-1PE31-1UL0 SIEMENS 02/137.C1 02/132.D5
505 +1CP04 =900E307.2 -T2 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS 02/147.C1 02/132.C4
D 506 +1CP04 =900E307.1 -R1 Braking Resistor 12000W,15Ω 02/137.C3 D
507 +1CP04 =900E307.2 -R3 Braking Resistor 160Ω,200W 02/147.C3
508 +1CP04 -1E1 Control cabinet lighting Set of factory orders - cabinet lighting 02/134.D3
509 +1CP04 -1X1 Terminal Block 220 02/132.B5
510 +1CP04 -1X2 Terminal Block 24 02/132.B5
511 +1CP04 -1X3 02/132.E4
512 +1CP04 -1X4 02/132.E4
513 +1CP20 =1CP20 -1CP20 Cabinet 2000X600X600
E 514 +1CP20 =1CP20 -F1 Circuit Breaker iC65N,6A/1P SCHNEIDER 03/3.C2 03/1.A6 E

515 +1CP20 =1CP20 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 03/3.C3 03/1.A6
516 +1CP20 =1CP20 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 03/3.C4 03/1.A6
517 +1CP20 =1CP20 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 03/3.C4 03/1.A6
518 +1CP20 =1CP20 -1Q1 Contactor LC1-N1201M5N SCHNEIDER 03/6.D2 03/1.B6
14 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
519 +1CP20 =1CP20 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 03/5.E7 03/1.B6
A A
520 +1CP20 =1CP20 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 03/6.D7 03/1.B6
521 +1CP20 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B3 03/1.C6
522 +1CP20 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B3 03/1.C6
523 +1CP20 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B4 03/1.C6
524 +1CP20 -DI4 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B4 03/1.C6
525 +1CP20 -DI5 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B4 03/1.C6
526 +1CP20 -DI6 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B5 03/1.C6
527 +1CP20 -DI7 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B5 03/1.C6
B B
528 +1CP20 -DI8 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B5 03/1.C6
529 +1CP20 -DI9 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B6 03/1.C6
530 +1CP20 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B6 03/1.C6
531 +1CP20 -DO2 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16… SIEMENS 06/3.B6 03/1.C6
532 +1CP20 MMC, 12 MB, S… Micro Memory Card 700-954-8LE03 Helmholz
533 +1CP20 RACK 160mm -… MOUNTING RAIL 700-590-1AB60 Helmholz
534 +1CP20 =1CP20 -AI1 AI Module 6ES7 134-6HD01-0BA1 SIEMENS 06/3.B6 03/1.C6
C 535 +1CP20 =1CP20 -IM0 ET200SP Interface Mo… 6ES7 155-6AA01-0BN0 SIEMENS 06/3.B2 03/1.C6 C
536 +1CP20 =1CP20 -JHJ SWITCH MODULE 6GK5 008-0BA10-1AB2 SIEMENS 06/3.C7 03/1.C6
537 +1CP20 =1CP20 -PLC CPU 6ES7 511-1AK02-0AB0 SIEMENS 06/3.B1 03/1.C6
538 +1CP20 =1CP20 -G1 24VDC Power Supply NDR-240-24 MEAN WELL 03/3.D4 03/1.B6
539 +1CP20 =1CP20 -1X1 Terminal Block 220 03/1.A6
540 +1CP20 =1CP20 -1X2 Terminal Block ES 03/1.B6
541 +1CP20 =1CP20 -E1 Control cabinet lighting Set of factory orders - cabinet lighting 03/3.E2
542 +1CP20 =1CP20 -P01 Indicator Lamp #Control power XB2BVB3C SCHNEIDER 03/6.C5 03/1.B2
D 543 +1CP20 =1CP20 -P02 Indicator Lamp #System operation XB2BVB3C SCHNEIDER 03/6.C6 03/1.B2 D
544 +1CP20 =1CP20 -S01 Pushbutton #System 2 operation XB2-BA31C SCHNEIDER 03/5.A2 03/1.B2
545 +1CP20 =1CP20 -S02 Pushbutton #System 2 stop XB2-BA42C SCHNEIDER 03/5.C2 03/1.B2
546 +1CP20 =1CP20 -X1 Terminal Block 220 03/1.A6
547 +1CP20 =1CP20 -X2 Terminal Block 24 03/1.B6
548 +1CP20 =1CP20 -X3 Terminal Block 03/1.C6
549 +1CP20 =1CP20 -X4 Terminal Block 03/1.D6
550 +1CP20 =1CP20 -X5 Terminal Block 03/1.D6
E 551 +1CP20 =1CP20 -X6 Terminal Block 03/1.D6 E

552 +1CP20 =1CP20 -XB1 Power Socket Three hole socket Three hole socket 03/3.E3 03/1.D6
553 +1CP20 =1CP20 -XB2 Power Socket Three hole socket Three hole socket 03/3.E4 03/1.B6
554 +1OP1 -1OP1 1300X500
555 +1OP1 =900E307.1 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/141.E5 11/1.E5
15 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
556 +1OP1 =900C307 -S1 #Forward / backward XB2-BD53C SCHNEIDER 02/148.B2 11/1.B3
A A
557 +1OP1 =900E307.1 -P1 #power input XB2BVB3C SCHNEIDER 02/141.E2 11/1.A3
558 +1OP1 =900E307.1 -P2 #manual XB2BVB3C SCHNEIDER 02/141.E3 11/1.A3
559 +1OP1 =900E307.1 -P3 #automatic XB2BVB3C SCHNEIDER 02/141.E4 11/1.A3
560 +1OP1 =900E307.1 -P4 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 02/141.E6 11/1.A4
561 +1OP1 =900E307.1 -P7 #Automatic export XB2BVB3C SCHNEIDER 02/141.E3 11/1.A3
562 +1OP1 =900E307.1 -S1 #1: manual 2: automatic … K1C-003QLHC SCHNEIDER 02/139.B2 11/1.A3
563 +1OP1 =900E307.1 -S4 #power off XB2-BA42C SCHNEIDER 02/139.A4 11/1.A3
564 +1OP1 =900E307.1 -S5 #Power input XB2-BA31C SCHNEIDER 02/139.A7 11/1.A3
B B
565 +1OP1 =900E307.1 -S6 #Alarm acknow XB2-BA61C SCHNEIDER 02/140.B1 11/1.A3
566 +1OP1 =900E307.1 -S7 #Resume operation XB2-BA61C SCHNEIDER 02/140.B2 11/1.A3
567 +1OP1 =900E307.1 -S8 #Open / close in door se… XB2-BD53C SCHNEIDER 02/140.B3 11/1.A3
568 +1OP1 =900E307.1 -S8.1 #Open / close out door s… XB2-BD53C SCHNEIDER 02/140.B4
569 +1OP1 =900E307.1 -S9 # up XB2-BA11C SCHNEIDER 02/140.B5 11/1.A3
570 +1OP1 =900E307.1 -S01 #Emergency XB2-BS544C SCHNEIDER 02/139.B7 11/1.A3
571 +1OP1 =900E307.1 -S10 # down XB2-BA21C SCHNEIDER 02/140.B6 11/1.A3
C 572 +1OP1 =900E307.1 -S11 # stop XB2-BA41C SCHNEIDER 02/140.B7 11/1.A3 C
573 +1OP1 =900E307.1 -S12 #Roll merge XB2-BD21C SCHNEIDER 02/140.B7 11/1.B3
574 +1OP1 =900E307.1 -S13 #spare XB2-BA31C SCHNEIDER 11/1.B3
575 +1OP1 =900E307.1 -X1 11/1.E5
576 +1OP1 =900E307.2 -S1 #Forward / backward XB2-BD53C SCHNEIDER 02/148.B1 11/1.B3
577 +1OP2 -1OP2 1300X500
578 +1OP2 =900E307.1 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 02/143.E3 11/2.E5
579 +1OP2 =900C001 -S1 #Forward / backward XB2-BD53C SCHNEIDER 02/148.B5 11/2.A3
D 580 +1OP2 =900E307.1 -P5 #Automatic XB2BVB3C SCHNEIDER 02/143.E1 11/2.A3 D
581 +1OP2 =900E307.1 -P6 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 02/143.D4 11/2.A4
582 +1OP2 =900E307.1 -S02 #Emergency XB2-BS544C SCHNEIDER 02/139.C5 11/2.A3
583 +1OP2 =900E307.1 -S14 #up XB2-BA11C SCHNEIDER 02/142.B1 11/2.A3
584 +1OP2 =900E307.1 -S15 #down XB2-BA21C SCHNEIDER 02/142.B2 11/2.A3
585 +1OP2 =900E307.1 -S16 #stop XB2-BA41C SCHNEIDER 02/142.B3 11/2.A3
586 +1OP2 =900E307.1 -S17 #open / close Out door first XB2-BD53C SCHNEIDER 02/142.B3 11/2.A3
587 +1OP2 =900E307.1 -S18 Export manual XB2-BW33B1C SCHNEIDER 02/142.B5 11/2.A3
E 588 +1OP2 =900E307.1 -S19 Export automatic XB2-BW33B1C SCHNEIDER 02/142.B5 11/2.A3 E

589 +1OP2 =900E307.1 -X1 11/2.E5


590 +1OP2 =900E307.2 -S2 #Forward / backward XB2-BD53C SCHNEIDER 02/148.B4 11/2.A3
591 +1OP4 -1OP4 1300X500
592 +1OP4 =1OP4 -F1 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/41.B2 09/39.E5
16 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
593 +1OP4 =1OP4 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/41.D2 09/39.E5
A A
594 +1OP4 =1OP4 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER 09/41.B5 09/39.E5
595 +1OP4 =1OP4 -K1 Auxiliary Relay DRM270024L WEIDMUELLER 09/42.E4 09/39.E5
596 +1OP4 =1OP4 -K2 Auxiliary Relay DRM270024L WEIDMUELLER 09/42.E5 09/39.E5
597 +1OP4 =1OP4 -HMI1 HMI KTP700 BASIC 6AV2 123-2GB03-0AX0 SIEMENS 09/39.A2
598 +1OP4 =1OP4 -P1 Indicator Lamp #External power XB2BVM4C SCHNEIDER 09/41.E3 09/39.A3
599 +1OP4 =1OP4 -P02 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 09/39.A4,09/42…
600 +1OP4 =1OP4 -S01 Emergency Stop Push… #Emergency XB2-BS544C SCHNEIDER 09/42.E1 09/39.A3
601 +1OP4 =1OP4 -S02 Pushbutton #Run XB2-BA31C SCHNEIDER 09/42.C3 09/39.B3
B B
602 +1OP4 =1OP4 -X0 Terminal Block ES 09/39.E4
603 +1OP4 =1OP4 -X1 Terminal Block 220 09/39.E4
604 +1OP4 =1OP4 -X2 Terminal Block 24 09/39.E4
605 +1OP4 =1OP4 -XB1 Power Socket Three hole socket Three hole socket 09/41.E2 09/39.E5
606 +CP10 -CP10 Cabinet 2000X600X600
607 +CP10 =CP10 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/7.B1 01/4.C6
608 +CP10 =CP10 -1F2 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/7.B3 01/4.C6
C 609 +CP10 =CP10 -1F3 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/7.B4 01/4.D6 C
610 +CP10 =CP10 -1F4 Circuit Breaker NSC100S3100N SCHNEIDER 01/7.B6 01/4.D5
611 +CP10 =CP10 -1F5 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/7.B7 01/4.D5
612 +CP10 =CP10 -1F6 Circuit Breaker NSC100S3080N SCHNEIDER 01/8.C1 01/4.D5
613 +CP10 =CP10 -1F7 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/8.C3 01/4.D5
614 +CP10 =CP10 -1F8 Circuit Breaker NSC160S3160N SCHNEIDER 01/8.C4 01/4.D5
615 +CP10 =CP10 -1F9 Circuit Breaker NSC100S3100N SCHNEIDER 01/8.C6 01/4.D6
616 +CP10 =CP10 -1F10 Circuit Breaker NSC100S3100N SCHNEIDER 01/8.C7 01/4.D6
D 617 +CP10 =CP10 -1F11 Circuit Breaker iC65N-C,20A/3P SCHNEIDER 01/9.C1 01/4.D5 D
618 +CP10 =CP10 -1F12 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/9.C3 01/4.D5
619 +CP10 =CP10 -1F13 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/9.C4 01/4.D5
620 +CP10 =CP10 -1F14 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/9.B6 01/4.D6
621 +CP10 =CP10 -1F15 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/9.B7 01/4.D6
622 +CP10 =CP10 -1F16 Circuit Breaker iC65N-C,63A/3P SCHNEIDER 01/10.B1 01/4.D6
623 +CP10 =CP10 -2F1 Circuit Breaker iC65N,10A/1P SCHNEIDER 01/11.B1 01/4.C6
624 +CP10 =CP10 -2F2 Circuit Breaker iC65N,10A/1P SCHNEIDER 01/11.B2 01/4.C6
E 625 +CP10 =CP10 -2F3 Circuit Breaker iC65N,10A/1P SCHNEIDER 01/11.B3 01/4.C6 E

626 +CP10 =CP10 -2F4 Circuit Breaker iC65N,10A/1P SCHNEIDER 01/11.B3 01/4.C6
627 +CP10 =CP10 -F1 Circuit Breaker NSC630K3630K SCHNEIDER 01/6.C1 01/4.B5
628 +CP10 =CP10 -E1 Control cabinet lighting Set of factory orders - cabinet lighting 01/11.C1
629 +CP10 =CP10 -X1 Terminal Block 220 01/4.C5
17 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
630 +CP10 =CP10 -X2 Terminal Block 220 01/4.C5
A A
631 +EX900C… -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/7.C6
632 +EX900C… -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/7.C7
633 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
634 +EX900C… NLB-P09B
635 +EX900C… NLB-P09B
636 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
637 +EX900C… NLB-P09B
638 +EX900C… NLB-P09B
B B
639 +EX900C… =1CD01 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/8.C6
640 +EX900C… =1CD01 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/8.C7
641 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
642 +EX900C… NLB-P09B
643 +EX900C… NLB-P09B
644 +EX900C… =1CD01 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/9.C7
645 +EX900C… =900C103 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/9.C6
C 646 +EX900C… -X1 Junction Box P03603-CT001 TYBOX C
647 +EX900C… NLB-P09B
648 +EX900C… NLB-P09B
649 +EX900C… =900E104 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/16.C6
650 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
651 +EX900C… NLB-P09B
652 +EX900C… NLB-P09B
653 +EX900C… -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/17.C6
D 654 +EX900C… -X1 Junction Box P03603-CT001 TYBOX D
655 +EX900C… NLB-P09B
656 +EX900C… NLB-P09B
657 +EX900C… =900C106 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/18.C7
658 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
659 +EX900C… NLB-P09B
660 +EX900C… NLB-P09B
661 +EX900C… -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/19.C6
E 662 +EX900C… -X1 Junction Box P03603-CT001 TYBOX E

663 +EX900C… NLB-P09B


664 +EX900C… NLB-P09B
665 +EX900C… =900C108 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/23.C4
666 +EX900C… =900C108 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/23.C3
18 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
667 +EX900C… =900C108 -B3 Photoelectric Sensor Inkjet ET5.3/4P Leuze 02/23.C5
A A
668 +EX900C… =900C108 -B4 Photoelectric Sensor Inkjet slow ET5.3/4P Leuze 02/23.C6
669 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
670 +EX900C… -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/27.C6
671 +EX900C… -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/27.C7
672 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
673 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
674 +EX900C… -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/41.C6
675 +EX900C… -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/41.C7
B B
676 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
677 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
678 +EX900C111 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/28.C6
679 +EX900C111 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/28.C7
680 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
681 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
682 +EX900C… =900C112 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/42.C6
C 683 +EX900C… =900C112 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/42.C7 C
684 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
685 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
686 +EX900C… =900C113 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/43.C6
687 +EX900C… =900C113 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/43.C7
688 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
689 +EX900C… =900C114 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/44.C6
690 +EX900C… =900C114 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/44.C7
D 691 +EX900C… -X1 Junction Box P03603-CT001 TYBOX D
692 +EX900C… =900C115 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/45.C6
693 +EX900C… =900C115 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/45.C7
694 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
695 +EX900C… =900C116 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/46.C7
696 +EX900C… =900C116 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/46.C6
697 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
698 +EX900C… =900C117 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/47.C6
E 699 +EX900C… =900C117 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/47.C7 E

700 +EX900C… -X1 Junction Box P03603-CT001 TYBOX


701 +EX900C… =900C118 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/48.C6
702 +EX900C… =900C118 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/48.C7
703 +EX900C… =900C118 -B3 Encoder Measurement of width RI50-0/1000ES.12KA Hengstler 02/49.B2
19 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
704 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
A A
705 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
706 +EX900C… =900C119 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/50.C5
707 +EX900C… =900C119 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/50.C6
708 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
709 +EX900C… =900C120 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/104.C6
710 +EX900C… =900C120 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/104.C7
711 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
712 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
B B
713 +EX900C… -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/54.C1
714 +EX900C… -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/54.C3
715 +EX900C… -B3 Photoelectric Sensor End surface inspection ET5.3/4P Leuze 02/54.C2
716 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
717 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
718 +EX900C… =900E303 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/58.C1
719 +EX900C… =900E303 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/58.C2
C 720 +EX900C… =900E303 -B3 Photoelectric Sensor End surface inspection ET5.3/4P Leuze 02/58.C3 C
721 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
722 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
723 +EX900C… =900C303 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/59.C6
724 +EX900C… =900C303 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/59.C7
725 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
726 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
727 +EX900C… -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/99.C6
D 728 +EX900C… -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/99.C7 D
729 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
730 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
731 +EX900C… =900C305 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/100.C6
732 +EX900C… =900C305 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/100.C7
733 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
734 +EX900C… =900C306 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/101.C6
735 +EX900C… =900C306 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/101.C7
E 736 +EX900C… -X1 Junction Box P03603-CT001 TYBOX E

737 +EX900C… =900C307 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/102.C6
738 +EX900C… =900C307 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/102.C7
739 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
740 +EX900C… =900C345 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/103.C6
20 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
741 +EX900C… =900C345 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/103.C7
A A
742 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
743 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
744 +EX900C… =900C425 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/105.C6
745 +EX900C… =900C425 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/105.C7
746 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
747 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
748 +EX900C… =900C426 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/106.C6
749 +EX900C… =900C426 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/106.C7
B B
750 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
751 +EX900C… =900C427 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/107.C6
752 +EX900C… =900C427 -B2 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/107.C7
753 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
754 +EX900C… -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/108.C5
755 +EX900C… =900C428 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/108.C6
756 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
C 757 +EX900C… -X1 Junction Box P03603-CT001 TYBOX C
758 +EX900C… =900C429 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/109.C7
759 +EX900C… =900C429 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/109.C6
760 +EX900C… -X1 Junction Box P03603-CT001 TYBOX
761 +EX900E1… =900E104 -B1 Encoder Measurement of width RI50-0/1000ES.12KA Hengstler 02/10.B2
762 +EX900E1… =900E104 -B2 Diameter measurement UC2000-30GM-IUR2-V15 P+F 02/10.B4
763 +EX900E1… -X1 Junction Box P03603-CT001 TYBOX
764 +EX900E1… -X2 Junction Box P03603-CT001 TYBOX
D 765 +EX900E1… =900E105 -B1 Proximity Sensor Upper limit Bi8-M18-AP6X-7m TURCK 02/13.C2 D
766 +EX900E1… =900E105 -B2 Proximity Sensor Drop limit Bi8-M18-AP6X-7m TURCK 02/13.C2
767 +EX900E1… =900E105 -B3 Photoelectric Sensor Drop to label position ph… E3JK-DP11-C 2M OMRON 02/13.C3
768 +EX900E1… =900E105 -B4 Photoelectric Sensor Labeling protection 1 E3JK-DP11-C 2M OMRON 02/13.C4
769 +EX900E1… =900E105 -B5 Photoelectric Sensor Labeling protection 2 E3JK-DP11-C 2M OMRON 02/13.C4
770 +EX900E1… =900E105 -B6 Photoelectric Sensor Roll detection 1 ET5.3/4P Leuze 02/13.C5
771 +EX900E1… =900E105 -B7 Photoelectric Sensor Roll detection 2 ET5.3/4P Leuze 02/13.C6
772 +EX900E1… =900E105 -B8 Encoder Measurement of width RI50-0/1000ES.12KA Hengstler 02/13.B6
E 773 +EX900E1… =900E105 -P1 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 02/12.E2 E

774 +EX900E1… JXH-1B Junction Box JXH-1B Reliance


775 +EX900E1… M25*1.5 M25*1.5
776 +EX900E1… M32*1.5 M32*1.5
777 +EX900E1… M25*1.5 M25*1.5
21 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
778 +EX900E1… -X1
A A
779 +EX900E1… JXH-1B Junction Box JXH-1B Reliance
780 +EX900E1… M32*1.5 M32*1.5
781 +EX900E1… M32*1.5 M32*1.5
782 +EX900E1… -X1 Terminal Block
783 +EX900E1… M20*1.5 M20*1.5
784 +EX900E1… M20*1.5 M20*1.5
785 +EX900E1… -X1 Junction Box P03603-CT001 TYBOX
786 +EX900E1… =900E106 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/14.D1
B B
787 +EX900E1… =900E106 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/15.C1
788 +EX900E1… =900E106 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/15.C2
789 +EX900E1… =900E106 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/15.C3
790 +EX900E1… =900E106 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/15.C4
791 +EX900E1… =900E106 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/15.C5
792 +EX900E1… =900E106 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/15.C5
793 +EX900E1… -X Terminal Block
C 794 +EX900E1… -X1 Junction Box C
795 +EX900E1… -X2 Junction Box
796 +EX900E1… AJB-005 AJB-005 METTLER TOL…
797 +EX900E1… Double shielded… METTLER TOL…
798 +EX900E1… MM S2 Weighing Module MM-4.4T METTLER TOL…
799 +EX900E1… RS232 RS232 Cable METTLER TOL…
800 +EX900E1… TOLEDO Weighing LCD IND231 METTLER TOL…
801 +EX900E1… =900E108 -B1 Photoelectric Sensor scan ET5.3/4P Leuze 02/25.C2
D 802 +EX900E1… =900E108 -P1 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 02/25.D3 D
803 +EX900E1… =900E108 JXH-3B Junction Box JXH-3B Reliance 11/5.C1
804 +EX900E1… =900E108 -F1 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/25.B3 11/5.C1
805 +EX900E1… =900E108 -K2 DRM270024L WEIDMUELLER 02/25.C5 11/5.C1
806 +EX900E1… M16*1.5 M16*1.5 11/5.A2
807 +EX900E1… M25*1.5 M25*1.5 11/5.A1
808 +EX900E1… M16*1.5 M16*1.5 11/5.A2
809 +EX900E1… =900E108 -X2 11/5.C2
E 810 +EX900E1… =900E109 -B1 Encoder Measurement of width RI50-0/1000ES.12KA Hengstler 02/26.B2 E

811 +EX900E1… =900E109 -B2 Diameter measurement UC2000-30GM-IUR2-V15 P+F 02/26.B4


812 +EX900E1… -X1 Junction Box P03603-CT001 TYBOX
813 +EX900E1… -X2 Junction Box P03603-CT001 TYBOX
814 +EX900E110 =900E110 -B1 Photoelectric Sensor Protection of entrance PRK5.M3/4P Leuze 02/24.C2
22 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
815 +EX900E110 =900E110 -B2 Photoelectric Sensor Protection of export PRK5.M3/4P Leuze 02/24.C3
A A
816 +EX900E110 =900E110 -B5 Proximity Sensor Upper limit Bi8-M18-AP6X-7m TURCK 02/24.C4
817 +EX900E110 =900E110 -B6 Proximity Sensor Drop limit Bi8-M18-AP6X-7m TURCK 02/24.C5
818 +EX900E1… =900E110 -K4 Auxiliary Relay DRM270024L WEIDMUELLER 02/24.E6
819 +EX900E1… =900E110 -X1 Terminal Block
820 +EX900E1… Junction Box -JB1 JXH-1B-CT001 Reliance
821 +EX900E1… =900E110 -X1 Terminal Block
822 +EX900E111 =900E111 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/32.C1
823 +EX900E111 =900E111 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/32.C2
B B
824 +EX900E111 =900E111 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/32.C3
825 +EX900E111 =900E111 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/32.C4
826 +EX900E111 =900E111 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/32.C5
827 +EX900E111 =900E111 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/32.C5
828 +EX900E111 =900E111 -B7 Proximity Sensor 270 proximity switch Bi8-M18-AP6X-7m TURCK 02/32.C6
829 +EX900E111 -X Terminal Block
830 +EX900E1… -X1 Junction Box
C 831 +EX900E1… -X2 Junction Box C
832 +EX900E1… -X2 Terminal Block
833 +EX900E1… -X5 Terminal Block
834 +EX900E3… =900E301 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/69.D2
835 +EX900E3… =900E301 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/71.C2
836 +EX900E3… =900E301 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/71.C2
837 +EX900E3… =900E301 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/71.C3
838 +EX900E3… =900E301 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/71.C4
D 839 +EX900E3… =900E301 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/71.C5 D
840 +EX900E3… =900E301 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/71.C5
841 +EX900E3… -X Terminal Block
842 +EX900E3… -X1 Junction Box
843 +EX900E3… -X2 Junction Box
844 +EX900E3… =900E302 -B1 Photoelectric Sensor Protection of entrance PRK5.M3/4P Leuze 02/54.C4
845 +EX900E3… =900E302 -B2 Photoelectric Sensor Protection of export PRK5.M3/4P Leuze 02/54.C5
846 +EX900E3… =900E302 -B3 Proximity Sensor Upper limit Bi8-M18-AP6X-7m TURCK 02/54.C6
E 847 +EX900E3… =900E302 -B4 Proximity Sensor Drop limit Bi8-M18-AP6X-7m TURCK 02/54.C6 E

848 +EX900E3… =900E302 -B5 Laser Measuring Sensor End surface inspection OD2-P120W60U0 SICK 02/54.A7
849 +EX900E3… Junction Box -JB1 JXH-1B-CT001 Reliance
850 +EX900E3… =900E302 -X1 Terminal Block
851 +EX900E3… =900E303 -B1 Photoelectric Sensor Protection of entrance PRK5.M3/4P Leuze 02/58.C4
23 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
852 +EX900E3… =900E303 -B2 Photoelectric Sensor Protection of export PRK5.M3/4P Leuze 02/58.C5
A A
853 +EX900E3… =900E303 -B3 Proximity Sensor Upper limit Bi8-M18-AP6X-7m TURCK 02/58.C6
854 +EX900E3… =900E303 -B4 Proximity Sensor Drop limit Bi8-M18-AP6X-7m TURCK 02/58.C6
855 +EX900E3… =900E303 -B5 Laser Measuring Sensor End surface inspection OD2-P120W60U0 SICK 02/58.A7
856 +EX900E3… Junction Box -JB1 JXH-1B-CT001 Reliance
857 +EX900E3… =900E303 -X1 Terminal Block
858 +EX900E3… =900E304 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/73.D2
859 +EX900E3… =900E304 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/75.C1
860 +EX900E3… =900E304 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/75.C2
B B
861 +EX900E3… =900E304 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/75.C3
862 +EX900E3… =900E304 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/75.C4
863 +EX900E3… =900E304 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/75.C5
864 +EX900E3… =900E304 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/75.C5
865 +EX900E3… -X Terminal Block
866 +EX900E3… -X1 Junction Box
867 +EX900E3… -X2 Junction Box
C 868 +EX900E3… =900E305 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/77.D2 C
869 +EX900E3… =900E305 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/79.C1
870 +EX900E3… =900E305 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/79.C2
871 +EX900E3… =900E305 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/79.C3
872 +EX900E3… =900E305 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/79.C4
873 +EX900E3… =900E305 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/79.C5
874 +EX900E3… =900E305 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/79.C5
875 +EX900E3… -X Terminal Block
D 876 +EX900E3… -X1 Junction Box D
877 +EX900E3… -X2 Junction Box
878 +EX900E3… =900E306 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/81.D2
879 +EX900E3… =900E306 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/83.C1
880 +EX900E3… =900E306 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/83.C2
881 +EX900E3… =900E306 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/83.C3
882 +EX900E3… =900E306 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/83.C4
883 +EX900E3… =900E306 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/83.C5
E 884 +EX900E3… =900E306 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/83.C5 E

885 +EX900E3… -X Terminal Block


886 +EX900E3… -X1 Junction Box
887 +EX900E3… -X2 Junction Box
888 +EX900E3… =900E307.1 -B1 Photoelectric Sensor Entrance transition is pro… PRK5.M3/4P Leuze 02/144.C1 15/1.C3
24 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
889 +EX900E3… =900E307.1 -B2 Photoelectric Sensor Protection under the entr… PRK5.M3/4P Leuze 02/144.C2 15/1.C3
A A
890 +EX900E3… =900E307.1 -B3 Photoelectric Sensor Upper limit PRK5.M3/4P Leuze 02/144.C3 15/1.C1
891 +EX900E3… =900E307.1 -B4 Upper Ack NBN40-L2-E2-V1 P+F 02/144.C4 15/1.C1
892 +EX900E3… =900E307.1 -B5 Photoelectric Sensor Drop limit PRK5.M3/4P Leuze 02/144.C5 15/1.D4
893 +EX900E3… =900E307.1 -B6 Drop Ack NBN40-L2-E2-V1 P+F 02/144.C6 15/1.E4
894 +EX900E3… =900E307.1 -B7 Photoelectric Sensor Exit transition protection PRK5.M3/4P Leuze 02/144.C7 15/1.E1
895 +EX900E3… =900E307.1 -B8 Photoelectric Sensor Protection under exit door PRK5.M3/4P Leuze 02/144.C8 15/1.E1
896 +EX900E3… =900E307.1 -B9 Inlet pneumatic door ope… Ni15-M30-AP6X-5m TURCK 02/145.C1 15/1.B3
897 +EX900E3… =900E307.1 -B10 Inlet pneumatic door clos… Ni15-M30-AP6X-5m TURCK 02/145.C2 15/1.B3
B B
898 +EX900E3… =900E307.1 -B11 Exit pneumatic doors ope… Ni15-M30-AP6X-5m TURCK 02/145.C6 15/1.D1
899 +EX900E3… =900E307.1 -B12 Exit pneumatic door clos… Ni15-M30-AP6X-5m TURCK 02/145.C6 15/1.D1
900 +EX900E3… =900E307.1 -B13 Encoder Lift elevator Operation de… RI50-0/1000ES.12KA Hengstler 02/143.A6
901 +EX900E3… =900E307.1 -B14 Inlet pneumatic door ope… Ni15-M30-AP6X-5m TURCK 02/145.C4
902 +EX900E3… =900E307.1 -B15 Inlet pneumatic door clos… Ni15-M30-AP6X-5m TURCK 02/145.C4
903 +EX900E3… =900E307.1 -K3 Proximity Sensor Hydraulic brake wear det… LG18A3-8-G/E2 02/136.C6
904 +EX900E3… =900E307.1 -K1 Limit Switch -Bak1 GLXK1-414 02/136.C7
C 905 +EX900E3… =900E307.1 -S2 Upper limit LXP1 120-1R LONGJING 02/139.C3 C
906 +EX900E3… =900E307.1 -S3 Drop limit LXP1 120-1R LONGJING 02/139.C4
907 +EX900E3… 15/1.B3
908 +EX900E3… M12*1.5
909 +EX900E3… M25*1.5 M25*1.5
910 +EX900E3… M12*1.5
911 +EX900E3… =900E307.1 -X1
912 +EX900E3… =900E307.1 -Y1 Close 02/146.D2
D 913 +EX900E3… =900E307.1 -Y2 Open 02/146.D3 D
914 +EX900E3…
915 +EX900E3… M25*1.5 M25*1.5
916 +EX900E3… M12*1.5
917 +EX900E3… M12*1.5
918 +EX900E3… -X1
919 +EX900E3… =900E307.1 -Y1 Close 02/146.D4
920 +EX900E3… =900E307.1 -Y2 Open 02/146.D5
E 921 +EX900E3… 15/1.D2 E

922 +EX900E3… M12*1.5


923 +EX900E3… M12*1.5
924 +EX900E3… M25*1.5 M25*1.5
925 +EX900E3… =900E307.1 -X1
25 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
926 +EX900E3… =900E307.1 -Y3 Close 02/146.D7
A A
927 +EX900E3… =900E307.1 -Y4 Open 02/146.D8
928 +EX900E3… -JB1 Junction Box JXH-1B-CT004 Reliance
929 +EX900E3… -X1
930 +EX900E3… =900E307.1 -JB2 Junction Box JXH-1B-CT003 Reliance 15/1.D3,15/1.D7
931 +EX900E3… =900E307.1 -X2
932 +EX900E3… =900E307.2 -JB3 Junction Box JXH-1B-CT002 Reliance
933 +EX900E3… =900E307.2 -X3
934 +EX900E3… =900E307.1 -JB4 Junction Box JXH-1B-CT002 Reliance 15/1.C1
B B
935 +EX900E3… =900E307.1 -X4
936 +EX900E3… =900E307.1 -JB5 Junction Box JXH-1B-CT002 Reliance 15/1.E4
937 +EX900E3… =900E307.1 -X5
938 +EX900E3… =900E307.1 -X6 Junction Box P03603-CT001 TYBOX 15/1.E1
939 +EX900E3… -X7 Junction Box P03603-CT001 TYBOX
940 +EX900E3… -X1 Junction Box P03603-CT001 TYBOX
941 +EX900E3… =900E307.2 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/148.C7 15/1.E6
C 942 +EX900E3… =900E307.2 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/148.C7 15/1.E7 C
943 +EX900E3… =900E307.2 -B3 Photoelectric Sensor Allowed to fall ET5.3/4P Leuze 02/148.C8
944 +EX900E4… =900E410 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/110.D2
945 +EX900E4… =900E410 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/111.C2
946 +EX900E4… =900E410 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/111.C2
947 +EX900E4… =900E410 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/111.C3
948 +EX900E4… =900E410 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/111.C4
949 +EX900E4… =900E410 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/111.C5
D 950 +EX900E4… =900E410 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/111.C6 D
951 +EX900E4… -X Terminal Block
952 +EX900E4… -X1 Junction Box
953 +EX900E4… -X2 Junction Box
954 +EX900E411 =900E411 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/112.D1
955 +EX900E411 =900E411 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/113.C2
956 +EX900E411 =900E411 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/113.C2
957 +EX900E411 =900E411 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/113.C3
E 958 +EX900E411 =900E411 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/113.C4 E

959 +EX900E411 =900E411 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/113.C5
960 +EX900E411 =900E411 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/113.C6
961 +EX900E411 -X Terminal Block
962 +EX900E4… -X1 Junction Box
26 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
963 +EX900E4… -X2 Junction Box
A A
964 +EX900E4… =900E413 -B1 Encoder Measurement of width RI50-0/1000ES.12KA Hengstler 02/114.B2
965 +EX900E4… =900E413 -B2 Diameter measurement UC2000-30GM-IUR2-V15 P+F 02/114.B4
966 +EX900E4… -X1 Junction Box P03603-CT001 TYBOX
967 +EX900E4… -X2 Junction Box P03603-CT001 TYBOX
968 +EX900E4… =900E414 -B1 Photoelectric Sensor scan ET5.3/4P Leuze 02/115.C2
969 +EX900E4… =900E414 -P1 Alarm Lamp-Buzzer #Alarm Lamp XVGB2SM SCHNEIDER 02/115.D3
970 +EX900E4… =900E414 JXH-3B Junction Box JXH-3B Reliance 11/6.C1
971 +EX900E4… =900E414 -F1 Circuit Breaker iC65N,10A/1P SCHNEIDER 02/115.B3 11/6.C1
B B
972 +EX900E4… =900E414 -K2 DRM270024L WEIDMUELLER 02/115.C5 11/6.C2
973 +EX900E4… M16*1.5 M16*1.5 11/6.A2
974 +EX900E4… M16*1.5 M16*1.5 11/6.A2
975 +EX900E4… M25*1.5 M25*1.5 11/6.A1
976 +EX900E4… =900E414 -X2 11/6.C2
977 +EX902C… =902C001 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/60.C5
978 +EX902C… =902C001 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/60.C6
C 979 +EX902C… -X1 Junction Box P03603-CT001 TYBOX C
980 +EX902C… -X1 Junction Box P03603-CT001 TYBOX
981 +EX902C… =902C002 -B1 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/61.C5
982 +EX902C… =902C002 -B2 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/61.C6
983 +EX902C… -X1 Junction Box P03603-CT001 TYBOX
984 +EX902C… -X1 Junction Box P03603-CT001 TYBOX
985 +EX902E0… =902E001 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/85.D2
986 +EX902E0… =902E001 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/87.C1
D 987 +EX902E0… =902E001 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/87.C2 D
988 +EX902E0… =902E001 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/87.C3
989 +EX902E0… =902E001 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/87.C4
990 +EX902E0… =902E001 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/87.C5
991 +EX902E0… =902E001 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/87.C5
992 +EX902E0… -X Terminal Block
993 +EX902E0… -X1 Junction Box
994 +EX902E0… -X2 Junction Box
E 995 +EX902E0… =902E003 -Q1 Switch-Disconnector JFD11-32/310111 25A JUCHE 02/89.D2 E

996 +EX902E0… =902E003 -B1 Photoelectric Sensor Inspection of entry ET5.3/4P Leuze 02/91.C1
997 +EX902E0… =902E003 -B2 Photoelectric Sensor Protection of entrance ET5.3/4P Leuze 02/91.C2
998 +EX902E0… =902E003 -B3 Photoelectric Sensor Inspection for export ET5.3/4P Leuze 02/91.C3
999 +EX902E0… =902E003 -B4 Photoelectric Sensor Protection of export ET5.3/4P Leuze 02/91.C4
27 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer Circuit diagrams Layout diagram Installation Drawing
1000 +EX902E0… =902E003 -B5 Proximity Sensor 0 proximity switch Bi8-M18-AP6X-7m TURCK 02/91.C5
A A
1001 +EX902E0… =902E003 -B6 Proximity Sensor 90 proximity switch Bi8-M18-AP6X-7m TURCK 02/91.C5
1002 +EX902E0… -X Terminal Block
1003 +EX902E0… -X1 Junction Box
1004 +EX902E0… -X2 Junction Box
1005 +EX.DO16 =DO16 -B6 Proximity Sensor The safety door is opene… Bi8-M18-AP6X-7m TURCK 03/7.C3
1006 +EX.DO16… =DO16 -CB1 Control Box XKB-2 APT 11/7.B2
1007 +EX.DO16… =DO16 -S01 Illuminated Pushbutton #safety door closed XB2-BW34B1C SCHNEIDER 03/7.C2 11/7.B2
1008 +EX.DO16… =DO16 -S02 Emergency Stop Push… #emergency XB2-BS544C SCHNEIDER 03/7.C2 11/7.B3
B B
1009 +EX.DO16… -X1 Junction Box P03603-CT001 TYBOX
1010 +EX.DO17 =DO17 -B6 Proximity Sensor The safety door is opene… Bi8-M18-AP6X-7m TURCK 03/8.C3
1011 +EX.DO17… =DO17 -CB1 Control Box XKB-2 APT 11/8.B2
1012 +EX.DO17… =DO17 -S01 Illuminated Pushbutton #safety door closed XB2-BW34B1C SCHNEIDER 03/8.C2 11/8.B2
1013 +EX.DO17… =DO17 -S02 Emergency Stop Push… #emergency XB2-BS544C SCHNEIDER 03/8.C2 11/8.B3
1014 +EX.DO17… -X1 Junction Box P03603-CT001 TYBOX
1015 +EX.DO18 =DO18 -B6 Proximity Sensor The safety door is opene… Bi8-M18-AP6X-7m TURCK 03/9.C3
C 1016 +EX.DO18… =DO18 -CB1 Control Box XKB-2 APT 11/9.B2 C
1017 +EX.DO18… =DO18 -S01 Illuminated Pushbutton #safety door closed XB2-BW34B1C SCHNEIDER 03/9.C2 11/9.B2
1018 +EX.DO18… =DO18 -S02 Emergency Stop Push… #emergency XB2-BS544C SCHNEIDER 03/9.C2 11/9.B3
1019 +EX.DO18… -X1 Junction Box P03603-CT001 TYBOX
1020 +EX.DO19 =DO19 -B6 Proximity Sensor The safety door is opene… Bi8-M18-AP6X-7m TURCK 03/10.C3
1021 +EX.DO19… =DO19 -CB1 Control Box XKB-2 APT 11/10.B2
1022 +EX.DO19… =DO19 -S01 Illuminated Pushbutton #safety door closed XB2-BW34B1C SCHNEIDER 03/10.C2 11/10.B2
1023 +EX.DO19… =DO19 -S02 Emergency Stop Push… #emergency XB2-BS544C SCHNEIDER 03/10.C2 11/10.B3
D 1024 +EX.DO19… -X1 Junction Box P03603-CT001 TYBOX D
1025 +EX.DO22 =DO22 -B6 Proximity Sensor The safety door is opene… Bi8-M18-AP6X-7m TURCK 02/122.C3
1026 +EX.DO22… =DO22 -CB1 Control Box XKB-2 APT 11/11.B2
1027 +EX.DO22… =DO22 -S01 Illuminated Pushbutton #safety door closed XB2-BW34B1C SCHNEIDER 02/122.C2 11/11.B2
1028 +EX.DO22… =DO22 -S02 Emergency Stop Push… #emergency XB2-BS544C SCHNEIDER 02/122.C2 11/11.B3
1029 +EX.DO22… -X1 Junction Box P03603-CT001 TYBOX

E E

28 / 28
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M2 01
APPROVED DWG. NO: PAGE : REV.
Device list 001-M2-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
1 +1CB01 =1CD01 -W1 ZR-RVVP 16*0.5 20.00 m =1CD01 +1CD01 +1CB01
A A
2 +1CD01 =1CD01 -P1-W1 ZR-RVV-500V 3*0.5 5.00 m =1CD01 +1CD01 -X4 =1CD01 +1CD01 -P02
3 +1CD01 =1CD01 -W1 ZR-VV-1KV 3*1.5+1*1.0 50.00 m +1CP01 =1CD01 +1CD01
4 +1CD01 =1CD01 -W2 ZR-VV-1KV 3*1.5+1*1.0 5.00 m =1CD01 +1CD01 =1CD01 -1WS01
5 +1CD02 =1CD02 -P1-W1 ZR-RVV-500V 3*0.5 5.00 m =1CD02 +1CD02 -X0 =1CD02 +1CD02 -P02
6 +1CD02 =1CD02 -W1 ZR-VV-1KV 3*1.5+1*1.0 30.00 m +1CP01 -F6 =1CD02 +1CD02 -F1
7 +1CD02 =900C108 -W2 ZR-RVVP 16*0.5 30.00 m +1CP01 -X4 =1CD02 +1CD02 -X5
8 +1CD02 =1CD02 -W3 ZR-VV-1KV 3*1.5+1*1.0 5.00 m +1CD02
9 +1CD03 =1CD03 -P1-W1 ZR-RVV-500V 3*0.5 5.00 m =1CD03 +1CD03 -X0 =1CD03 +1CD03 -P02
B B
10 +1CD03 =1CD03 -W1 ZR-VV-1KV 3*2.5+1*1.5 40.00 m =1CP03.2 +1CP03 -2X1 +1CD03
11 +1CD03 WS_1 -W1 ZR-RVVP 10*0.5 50.00 m =1CD03 +1CD03 -X4
12 +1CD03 WS_1 -W2 ZR-RVVP 10*0.5 50.00 m =1CD03 +1CD03 -X4
13 +1CP01 -W1 ZR-RVV-500V 3*1 45.00 m +1CP01 -X0
14 +1CP01 -W2 ZR-RVV-500V 3*1 30.00 m +1CP01 -X0
15 +1CP01 =1CB01 -W3 ZR-RVV-500V 3*1 60.00 m +1CP01 -X0
16 +1CP02 -1W3 ZR-VV-1KV 3*2.5+1*1.5 15.00 m =1CP20 +1CP20 -1X1 +1CP02 -1Q1
C 17 +1CP02 -2W3 ZR-VV-1KV 3*2.5+1*1.5 15.00 m =1CP20 +1CP20 -1X1 +1CP02 -2Q1 C
18 +1CP03 -W3 ZR-VV-1KV 3*2.5+1*1.5 80.00 m =1CP20 +1CP20 -1X1 +1CP03 -1Q1
19 +1CP04 =900E307.1 -1W1 ZR-VV-1KV 3*2.5+1*1.5 80.00 m =1CP20 +1CP20 -1X1 =900E307.1 +1CP04 -K1
20 +1CP20 =1CP20 -W1 ZR-RVV-500V 3*1 35.00 m =1CP20 +1CP20 -1X2
21 +1CP20 =1CP20 -W2 ZR-RVV-500V 3*1 50.00 m =1CP20 +1CP20 -1X2
22 +1CP20 =1CP20 -W3 ZR-RVV-500V 3*1 85.00 m =1CP20 +1CP20 -1X2
23 +1CP20 =1CP20 -W4 ZR-RVV-500V 3*1 115.00 m =1CP20 +1CP20 -1X2
24 +1CP20 =1CP20 -W5 ZR-RVV-500V 3*1 45.00 m =1CP20 +1CP20 -1X2
D 25 +1OP1 =900E307.1 -P4-W1 ZR-RVVP 3*0.5 5.00 m =900E307.1 +1OP1 -X1 D
26 +1OP1 =900E307.1 -W1 ZR-RVVP 7*0.5 25.00 m =900E307.1 +1OP1 -X1 =900E307.1 +1CP03 -2X7, +1CP04 -1X2
27 +1OP1 =900E307.1 -W2 ZR-RVVP 10*0.5 25.00 m =900E307.1 +1CP03 -2X7 =900E307.1 +1OP1 -X1
28 +1OP1 =900E307.1 -W3 ZR-RVVP 10*0.5 25.00 m =900E307.1 +1CP03 -2X7 =900E307.1 +1OP1 -X1
29 +1OP1 -W4 ZR-RVVP 7*0.5 25.00 m +1CP04 -1X4 =900E307.1 +1OP1 -X1
30 +1OP2 =900E307.1 -P6-W1 ZR-RVVP 3*0.5 5.00 m =900E307.1 +1OP2 -X1 =900E307.1 +1OP2 -P6
31 +1OP2 =900E307.1 -W1 ZR-RVVP 3*0.5 30.00 m =900E307.1 +1OP2 -X1 +1CP04 -1X2
32 +1OP2 -W2 ZR-RVVP 10*0.5 30.00 m =900E307.1 +1CP03 -2X7 =900E307.1 +1OP2 -X1
E 33 +1OP2 -W3 ZR-RVVP 10*0.5 20.00 m =900E307.1 +1OP1 -X1 =900E307.1 +1OP2 -X1 E

34 +1OP2 -W4 ZR-RVVP 3*0.5 20.00 m =900E307.1 +1OP2 -X1 =900E307.1 +1OP1 -X1
35 +1OP4 =1OP4 -P1-W1 ZR-RVV-500V 3*1 5.00 m =1OP4 +1OP4 -X0 =1OP4 +1OP4 -P02
36 +1OP4 =1OP4 -W1 ZR-VV-1KV 3*2.5+1*1.5 45.00 m +1OP4 =1CD03 +1CD03 -X1, =1OP4 +1OP4 PE
37 +1OP4 =1OP4 -W2 ZR-RVV-500V 3*1 45.00 m +1OP4 =1CD03 +1CD03 -X2
1 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
38 +1OP4 =1OP4 -W3 ZR-RVVP 4*0.5 45.00 m =1OP4 +1OP4 -X0 =1CD03 +1CD03 -X0
A A
39 +CP10 =CP10 -W1 ZR-YJV-1KV 4*25 90.00 m =CP10 +CP10
40 +CP10 =CP10 -W2 BVR 16 (YE/GN) 90.00 m =CP10 +CP10 PE
41 +CP10 =CP10 -W3 ZR-YJV-1KV 4*25 15.00 m =CP10 +CP10
42 +CP10 =CP10 -W4 BVR 16 (YE/GN) 15.00 m =CP10 +CP10 PE
43 +CP10 =CP10 -W5 ZR-YJV-1KV 4*25 15.00 m =CP10 +CP10
44 +CP10 =CP10 -W6 BVR 16 (YE/GN) 15.00 m =CP10 +CP10 PE
45 +CP10 =CP10 -W7 ZR-YJV-1KV 4*35 80.00 m =CP10 +CP10
46 +CP10 =CP10 -W8 BVR 16 (YE/GN) 80.00 m =CP10 +CP10 PE
B B
47 +CP10 =CP10 -W9 ZR-YJV-1KV 4*25 95.00 m =CP10 +CP10
48 +CP10 =CP10 -W10 BVR 16 (YE/GN) 95.00 m =CP10 +CP10 PE
49 +CP10 =CP10 -W11 ZR-YJV-1KV 4*35 110.00 m =CP10 +CP10
50 +CP10 =CP10 -W12 BVR 16 (YE/GN) 110.00 m =CP10 +CP10 PE
51 +CP10 =CP10 -W13 ZR-YJV-1KV 4*25 110.00 m =CP10 +CP10
52 +CP10 =CP10 -W14 BVR 16 (YE/GN) 110.00 m =CP10 +CP10 PE
53 +CP10 =CP10 -W15 ZR-YJV-1KV 4*70 160.00 m =CP10 +CP10
C 54 +CP10 =CP10 -W16 BVR 16 (YE/GN) 160.00 m =CP10 +CP10 PE C
55 +CP10 =CP10 -W17 ZR-YJV-1KV 4*50 155.00 m =CP10 +CP10
56 +CP10 =CP10 -W18 BVR 16 (YE/GN) 155.00 m =CP10 +CP10 PE
57 +CP10 =CP10 -W19 ZR-YJV-1KV 4*50 150.00 m =CP10 +CP10
58 +CP10 =CP10 -W20 BVR 16 (YE/GN) 150.00 m =CP10 +CP10 PE
59 +CP10 =CP10 -W21 ZR-VV-1KV 3*2.5+1*1.5 30.00 m =CP10 +CP10
60 +CP10 =CP10 -W22 BVR 6 (YE/GN) 30.00 m =CP10 +CP10 PE
61 +CP10 =CP10 -W23 ZR-YJV-1KV 4*16 35.00 m =CP10 +CP10
D 62 +CP10 =CP10 -W24 BVR 6 (YE/GN) 35.00 m =CP10 +CP10 PE D
63 +CP10 =CP10 -W25 ZR-YJV-1KV 4*16 50.00 m =CP10 +CP10
64 +CP10 =CP10 -W26 BVR 6 (YE/GN) 50.00 m =CP10 +CP10 PE
65 +CP10 =CP10 -W27 ZR-YJV-1KV 4*16 45.00 m =CP10 +CP10
66 +CP10 =CP10 -W28 BVR 6 (YE/GN) 45.00 m =CP10 +CP10 PE
67 +CP10 =CP10 -W29 ZR-YJV-1KV 4*16 95.00 m =CP10 +CP10
68 +CP10 =CP10 -W30 BVR 6 (YE/GN) 95.00 m =CP10 +CP10 PE
69 +CP10 =CP10 -W31 ZR-YJV-1KV 4*10 185.00 m
E 70 +CP10 =CP10 -W32 BVR 6 (YE/GN) 185.00 m E

71 +EX900C101 =1CD01 -B1-W1 Sensor cable GSEE 2.00 m +EX900C101 -JB1 -X1 +EX900C101 -B1
72 +EX900C101 =1CD01 -B2-W1 Sensor cable GSEE 2.00 m +EX900C101 -JB2 -X1 +EX900C101 -B2
73 +EX900C101 -JB1 =1CD01 … ZR-RVVP 4*0.5 30.00 m +EX900C101 -JB1 -X1 =1CD01 +1CD01 -X3
74 +EX900C101 -JB2 =1CD01 … ZR-RVVP 4*0.5 20.00 m +EX900C101 -JB2 -X1 =1CD01 +1CD01 -X3
2 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
75 +EX900C101 =900C101 -M… ZR-VV-1KV 3*2.5+1*1.5 65.00 m =900C101 +EX900C101 -M1 +1CP01 -X3
A A
76 +EX900C101 -M1-W2 ZR-RVV-500V 2*0.75 65.00 m
77 +EX900C102 =1CD01 -B1-W1 Sensor cable GSEE 2.00 m =1CD01 +EX900C102 -B1 +EX900C101 -JB2 -X1
78 +EX900C102 =1CD01 -B2-W1 Sensor cable GSEE 2.00 m +EX900C102 -JB1 -X1 =1CD01 +EX900C102 -B2
79 +EX900C102 -JB1 =1CD01 … ZR-RVVP 4*0.5 15.00 m +EX900C102 -JB1 -X1 =1CD01 +1CD01 -X3
80 +EX900C102 =900C102 -M… ZR-VV-1KV 3*2.5+1*1.5 55.00 m =900C102 +EX900C102 -M1 +1CP01 -X3
81 +EX900C102 =900C102 -M… ZR-RVV-500V 2*0.75 55.00 m =900C102 +EX900C102 -M1 +1CP01 -X3
82 +EX900C103 =900C103 -B… Sensor cable GSEE 2.00 m =900C103 +EX900C103 -B1 +EX900C102 -JB1 -X1
83 +EX900C103 =1CD01 -B2-W1 Sensor cable GSEE 2.00 m +EX900C103 -JB2 -X1 =1CD01 +EX900C103 -B2
B B
84 +EX900C103 -JB2 =1CD01 … ZR-RVVP 4*0.5 20.00 m +EX900C103 -JB2 -X1 =1CD01 +1CD01 -X3
85 +EX900C103 =900C103 -M… ZR-VV-1KV 3*2.5+1*1.5 45.00 m =900C103 +EX900C103 -M1 +1CP01 -X3
86 +EX900C103 =900C103 -M… ZR-RVV-500V 2*0.75 45.00 m =900C103 +EX900C103 -M1 +1CP01 -X3
87 +EX900C104 =900C104 -B… Sensor cable GSEE 2.00 m +EX900C104 -JB1 -X1 =900E104 +EX900C104 -B1
88 +EX900C104 -JB1 -W1 ZR-RVVP 3*0.5 55.00 m +EX900C104 -JB1 -X1 =1CD02 +1CD02 -X3
89 +EX900C104 =900C104 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C104 +EX900C104 -M1 +1CP01 -X3
90 +EX900C105 -B1-W1 Sensor cable GSEE 2.00 m +EX900C105 -JB1 -X1 +EX900C105 -B1
C 91 +EX900C105 -JB1 -W1 ZR-RVVP 3*0.5 40.00 m +EX900C105 -JB1 -X1 =1CD02 +1CD02 -X3 C
92 +EX900C105 =900C105 -M… ZR-VV-1KV 3*2.5+1*1.5 15.00 m =900C105 +EX900C105 -M1 +1CP01 -X3
93 +EX900C105 =900C105 -M… ZR-RVV-500V 2*0.75 15.00 m =900C105 +EX900C105 -M1 +1CP01 -X3
94 +EX900C106 =900C106 -B… Sensor cable GSEE 2.00 m +EX900C106 -JB1 -X1 =900C106 +EX900C106 -B1
95 +EX900C106 -JB1 =900C10… ZR-RVVP 3*0.5 20.00 m +EX900C106 -JB1 -X1 =1CD02 +1CD02 -X3
96 +EX900C106 =900C106 -M… ZR-VV-1KV 3*2.5+1*1.5 20.00 m =900C106 +EX900C106 -M1 +1CP01 -X3
97 +EX900C106 =900C106 -M… ZR-RVV-500V 2*0.75 20.00 m =900C106 +EX900C106 -M1 +1CP01 -X3
98 +EX900C107 -B1-W1 Sensor cable GSEE 2.00 m +EX900C107 -JB1 -X1 +EX900C107 -B1
D 99 +EX900C107 -JB1 -W1 ZR-RVVP 4*0.5 15.00 m +EX900C107 -JB1 -X1 =1CD02 +1CD02 -X3 D
100 +EX900C107 =900C107 -M… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =900C107 +EX900C107 -M1 +1CP01 -X3
101 +EX900C108 =900C108 -B… Sensor cable GSEE 2.00 m +EX900C108 -JB1 -X1 =900C108 +EX900C108 -B1
102 +EX900C108 =900C108 -B… Sensor cable GSEE 2.00 m =900C108 +EX900C108 -B2 +EX900C107 -JB1 -X1
103 +EX900C108 =900C108 -B… Sensor cable 2.00 m +EX900C108 -JB1 -X1 =900C108 +EX900C108 -B3
104 +EX900C108 =900C108 -B… Sensor cable 2.00 m +EX900C108 -JB1 -X1 =900C108 +EX900C108 -B4
105 +EX900C108 -JB1 =900C10… ZR-RVVP 7*0.5 10.00 m +EX900C108 -JB1 -X1 =1CD02 +1CD02 -X3
106 +EX900C108 =900C108 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C108 +EX900C108 -M1 +1CP01 -X3
E 107 +EX900C108 =900C108 -M… ZR-RVV-500V 2*0.75 30.00 m =900C108 +EX900C108 -M1 +1CP01 -X3 E

108 +EX900C109 -B1-W1 Sensor cable GSEE 2.00 m +EX900C109 -JB1 -X1 +EX900C109 -B1
109 +EX900C109 -B2-W1 Sensor cable GSEE 2.00 m +EX900C109 -JB2 -X1 +EX900C109 -B2
110 +EX900C109 -JB1 -W1 ZR-RVVP 3*0.5 20.00 m +EX900C109 -JB1 -X1 =1CD02 +1CD02 -X3
111 +EX900C109 -JB2 -W1 ZR-RVVP 3*0.5 15.00 m +EX900C109 -JB2 -X1 =1CD02 +1CD02 -X3
3 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
112 +EX900C109 =900C109 -M… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =900C109 +EX900C109 -M1 +1CP01 -X3
A A
113 +EX900C110 -B1-W1 Sensor cable GSEE 2.00 m +EX900C110 -JB1 -X1 +EX900C110 -B1
114 +EX900C110 -B2-W1 Sensor cable GSEE 2.00 m +EX900C110 -JB2 -X1 +EX900C110 -B2
115 +EX900C110 -JB1 -W1 ZR-RVVP 4*0.5 30.00 m +EX900C110 -JB1 -X1 =1CP20 +1CP20 -X3
116 +EX900C110 -JB2 -W1 ZR-RVVP 4*0.5 35.00 m +EX900C110 -JB2 -X1 =1CP20 +1CP20 -X3
117 +EX900C110 =900C110 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C110 +EX900C110 -M1 +1CP02 -1X3
118 +EX900C111 -B1-W1 Sensor cable GSEE 2.00 m +EX900C111 -JB1 -X1 +EX900C111 -B1
119 +EX900C111 -B2-W1 Sensor cable GSEE 2.00 m +EX900C111 -JB2 -X1 +EX900C111 -B2
120 +EX900C111 -JB1 -W1 ZR-RVVP 3*0.5 40.00 m +EX900C111 -JB1 -X1 =1CD02 +1CD02 -X3
B B
121 +EX900C111 -JB2 -W1 ZR-RVVP 3*0.5 45.00 m +EX900C111 -JB2 -X1 =1CD02 +1CD02 -X3
122 +EX900C111 =900C111 -M1… ZR-VV-1KV 3*2.5+1*1.5 40.00 m =900C111 +EX900C111 -M1 +1CP01 -X3
123 +EX900C112 =900C112 -B1… Sensor cable GSEE 2.00 m +EX900C112 -JB1 -X1 =900C112 +EX900C112 -B1
124 +EX900C112 =900C112 -B2… Sensor cable GSEE 2.00 m +EX900C112 -JB2 -X1 =900C112 +EX900C112 -B2
125 +EX900C112 -JB1 =900C11… ZR-RVVP 4*0.5 25.00 m +EX900C112 -JB1 -X1 =1CP20 +1CP20 -X3
126 +EX900C112 -JB2 =900C11… ZR-RVVP 4*0.5 25.00 m +EX900C112 -JB2 -X1 =1CP20 +1CP20 -X3
127 +EX900C112 =900C112 -M… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =900C112 +EX900C112 -M1 +1CP02 -1X3
C 128 +EX900C113 =900C113 -B1… Sensor cable GSEE 2.00 m =900C113 +EX900C113 -B1 +EX900C112 -JB2 -X1 C
129 +EX900C113 =900C113 -B2… Sensor cable GSEE 2.00 m +EX900C113 -JB2 -X1 =900C113 +EX900C113 -B2
130 +EX900C113 -JB2 =900C11… ZR-RVVP 4*0.5 30.00 m +EX900C113 -JB2 -X1 =1CP20 +1CP20 -X3
131 +EX900C113 =900C113 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C113 +EX900C113 -M1 +1CP02 -1X3
132 +EX900C113 =900C113 -M… ZR-RVV-500V 2*0.75 30.00 m =900C113 +EX900C113 -M1 +1CP02 -1X3
133 +EX900C114 =900C114 -B1… Sensor cable GSEE 2.00 m =900C114 +EX900C114 -B1 +EX900C113 -JB2 -X1
134 +EX900C114 =900C114 -B2… Sensor cable GSEE 2.00 m +EX900C114 -JB2 -X1 =900C114 +EX900C114 -B2
135 +EX900C114 -JB2 =900C11… ZR-RVVP 4*0.5 35.00 m +EX900C114 -JB2 -X1 =1CP20 +1CP20 -X3
D 136 +EX900C114 =900C114 -M… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =900C114 +EX900C114 -M1 +1CP02 -1X3 D
137 +EX900C114 =900C114 -M… ZR-RVV-500V 2*0.75 35.00 m =900C114 +EX900C114 -M1 +1CP02 -1X3
138 +EX900C115 =900C115 -B1… Sensor cable GSEE 2.00 m =900C115 +EX900C115 -B1 +EX900C114 -JB2 -X1
139 +EX900C115 =900C115 -B2… Sensor cable GSEE 2.00 m +EX900C115 -JB2 -X1 =900C115 +EX900C115 -B2
140 +EX900C115 -JB2 =900C11… ZR-RVVP 4*0.5 40.00 m +EX900C115 -JB2 -X1 =1CP20 +1CP20 -X3
141 +EX900C115 =900C115 -M… ZR-VV-1KV 3*2.5+1*1.5 40.00 m =900C115 +EX900C115 -M1 +1CP02 -1X3
142 +EX900C115 =900C115 -M… ZR-RVV-500V 2*0.75 40.00 m =900C115 +EX900C115 -M1 +1CP02 -1X3
143 +EX900C116 =900C116 -B1… Sensor cable GSEE 2.00 m +EX900C116 -JB2 -X1 =900C116 +EX900C116 -B1
E 144 +EX900C116 =900C116 -B2… Sensor cable GSEE 2.00 m =900C116 +EX900C116 -B2 +EX900C115 -JB2 -X1 E

145 +EX900C116 -JB2 =900C11… ZR-RVVP 4*0.5 45.00 m +EX900C116 -JB2 -X1 =1CP20 +1CP20 -X3
146 +EX900C116 =900C116 -M… ZR-VV-1KV 3*2.5+1*1.5 45.00 m =900C116 +EX900C116 -M1 +1CP02 -1X3
147 +EX900C116 =900C116 -M… ZR-RVV-500V 2*0.75 45.00 m =900C116 +EX900C116 -M1 +1CP02 -1X3
148 +EX900C117 =900C117 -B1… Sensor cable GSEE 2.00 m =900C117 +EX900C117 -B1 +EX900C116 -JB2 -X1
4 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
149 +EX900C117 =900C117 -B2… Sensor cable GSEE 2.00 m +EX900C117 -JB2 -X1 =900C117 +EX900C117 -B2
A A
150 +EX900C117 -JB2 =900C11… ZR-RVVP 4*0.5 50.00 m +EX900C117 -JB2 -X1 =1CP20 +1CP20 -X3
151 +EX900C117 =900C117 -M… ZR-VV-1KV 3*2.5+1*1.5 50.00 m =900C117 +EX900C117 -M1 +1CP02 -1X3
152 +EX900C118 =900C118 -B1… Sensor cable GSEE 2.00 m =900C118 +EX900C118 -B1 +EX900C117 -JB2 -X1
153 +EX900C118 =900C118 -B2… Sensor cable GSEE 2.00 m +EX900C118 -JB2 -X1 =900C118 +EX900C118 -B2
154 +EX900C118 =900C118 -B3… Sensor cable 1.00 m +EX900C118 -JB3 -X1 =900C118 +EX900C118 -B3
155 +EX900C118 -JB2 =900C11… ZR-RVVP 4*0.5 55.00 m +EX900C118 -JB2 -X1 =1CP20 +1CP20 -X3
156 +EX900C118 -JB3 =900C11… ZR-RVVP 4*0.5 30.00 m +EX900C118 -JB3 -X1
157 +EX900C118 =900C118 -M… ZR-VV-1KV 3*2.5+1*1.5 55.00 m =900C118 +EX900C118 -M1 +1CP02 -1X3
B B
158 +EX900C118 =900C118 -M… ZR-RVV-500V 2*0.75 55.00 m =900C118 +EX900C118 -M1 +1CP02 -1X3
159 +EX900C119 =900C119 -B1… Sensor cable GSEE 2.00 m =900C119 +EX900C119 -B1 +EX900C118 -JB2 -X1
160 +EX900C119 =900C119 -B2… Sensor cable GSEE 2.00 m +EX900C119 -JB2 -X1 =900C119 +EX900C119 -B2
161 +EX900C119 -JB2 =900C11… ZR-RVVP 4*0.5 60.00 m +EX900C119 -JB2 -X1 =1CP20 +1CP20 -X3
162 +EX900C119 =900C119 -M… ZR-VV-1KV 3*2.5+1*1.5 60.00 m =900C119 +EX900C119 -M1 +1CP02 -1X3
163 +EX900C120 =900C120 -B… Sensor cable GSEE 2.00 m +EX900C120 -JB1 -X1 =900C120 +EX900C120 -B1
164 +EX900C120 =900C120 -B… Sensor cable GSEE 2.00 m +EX900C120 -JB2 -X1 =900C120 +EX900C120 -B2
C 165 +EX900C120 -JB1 =900C12… ZR-RVVP 4*0.5 15.00 m +EX900C120 -JB1 -X1 =1CD03 +1CD03 -X3 C
166 +EX900C120 -JB2 =900C12… ZR-RVVP 4*0.5 20.00 m +EX900C120 -JB2 -X1 =1CD03 +1CD03 -X3
167 +EX900C120 =900C120 -M… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =900C120 +EX900C120 -M1 +1CP03 -1X3
168 +EX900C120 =900C120 -M… ZR-RVV-500V 2*0.75 35.00 m =900C120 +EX900C120 -M1 +1CP03 -1X3
169 +EX900C301 -B1-W1 Sensor cable 5.00 m +EX900C301 -JB1 -X1 +EX900C301 -B1
170 +EX900C301 -B2-W1 Sensor cable 5.00 m +EX900C301 -JB2 -X1 +EX900C301 -B2
171 +EX900C301 -B3-W1 Sensor cable 5.00 m +EX900C301 -JB1 -X1 +EX900C301 -B3
172 +EX900C301 -JB1 -W1 ZR-RVVP 4*0.5 20.00 m +EX900C301 -JB1 -X1 =1CP20 +1CP20 -X4
D 173 +EX900C301 -JB2 -W1 ZR-RVVP 4*0.5 20.00 m +EX900C301 =1CP20 +1CP20 -X4 D
174 +EX900C301 =900C301 -M… ZR-VV-1KV 3*2.5+1*1.5 20.00 m =900C301 +EX900C301 -M1 +1CP02 -1X3
175 +EX900C301 =900C301 -M… ZR-RVV-500V 2*0.75 20.00 m
176 +EX900C302 =900E303 -B1… Sensor cable 5.00 m +EX900C302 -JB1 -X1 =900E303 +EX900C302 -B1
177 +EX900C302 =900E303 -B2… Sensor cable 5.00 m +EX900C302 -JB2 -X1 =900E303 +EX900C302 -B2
178 +EX900C302 =900E303 -B3… Sensor cable 5.00 m +EX900C302 -JB2 -X1 =900E303 +EX900C302 -B3
179 +EX900C302 -JB1 =900E30… ZR-RVVP 4*0.5 15.00 m +EX900C302 -JB1 -X1 =1CP20 +1CP20 -X4
180 +EX900C302 -JB2 =900E30… ZR-RVVP 4*0.5 15.00 m +EX900C302 -JB2 -X1 =1CP20 +1CP20 -X4
E 181 +EX900C302 =900C302 -M… ZR-VV-1KV 3*2.5+1*1.5 15.00 m =900C302 +EX900C302 -M1 +1CP02 -1X3 E

182 +EX900C302 =900C302 -M… ZR-RVV-500V 2*0.75 15.00 m


183 +EX900C303 =900C303 -B… Sensor cable GSEE 2.00 m +EX900C303 -JB1 -X1 =900C303 +EX900C303 -B1
184 +EX900C303 =900C303 -B… Sensor cable GSEE 2.00 m +EX900C303 -JB2 -X1 =900C303 +EX900C303 -B2
185 +EX900C303 -JB1 =900C30… ZR-RVVP 4*0.5 15.00 m +EX900C303 -JB1 -X1 =1CP20 +1CP20 -X4
5 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
186 +EX900C303 -JB2 =900C30… ZR-RVVP 4*0.5 15.00 m +EX900C303 -JB2 -X1 =1CP20 +1CP20 -X4
A A
187 +EX900C303 =900C303 -M… ZR-VV-1KV 3*2.5+1*1.5 15.00 m =900C303 +EX900C303 -M1 +1CP02 -1X3
188 +EX900C304 -B1-W1 Sensor cable GSEE 2.00 m +EX900C304 -JB1 -X1 +EX900C304 -B1
189 +EX900C304 -B2-W1 Sensor cable GSEE 2.00 m +EX900C304 -JB2 -X1 +EX900C304 -B2
190 +EX900C304 -JB1 -W1 ZR-RVVP 4*0.5 50.00 m +EX900C304 -JB1 -X1 =1CP03.2 +1CP03 -2X3
191 +EX900C304 -JB2 -W1 ZR-RVVP 4*0.5 50.00 m +EX900C304 -JB2 -X1 =1CP03.2 +1CP03 -2X3
192 +EX900C304 =900C304 -M… ZR-VV-1KV 3*2.5+1*1.5 50.00 m =900C304 +EX900C304 -M1 +1CP03 -1X3
193 +EX900C305 =900C305 -B… Sensor cable GSEE 2.00 m =900C305 +EX900C305 -B1 +EX900C304 -JB2 -X1
194 +EX900C305 =900C305 -B… Sensor cable GSEE 2.00 m +EX900C305 -JB2 -X1 =900C305 +EX900C305 -B2
B B
195 +EX900C305 -JB2 =900C30… ZR-RVVP 4*0.5 40.00 m +EX900C305 -JB2 -X1 =1CP03.2 +1CP03 -2X3
196 +EX900C305 =900C305 -M… ZR-VV-1KV 3*2.5+1*1.5 40.00 m =900C305 +EX900C305 -M1 +1CP03 -1X3
197 +EX900C305 =900C305 -M… ZR-RVV-500V 2*0.75 40.00 m =900C305 +EX900C305 -M1 +1CP03 -1X3
198 +EX900C306 =900C306 -B… Sensor cable GSEE 2.00 m =900C306 +EX900C306 -B1 +EX900C305 -JB2 -X1
199 +EX900C306 =900C306 -B… Sensor cable GSEE 2.00 m +EX900C306 -JB2 -X1 =900C306 +EX900C306 -B2
200 +EX900C306 -JB2 =900C30… ZR-RVVP 4*0.5 30.00 m +EX900C306 -JB2 -X1 =1CP03.2 +1CP03 -2X3
201 +EX900C306 =900C306 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C306 +EX900C306 -M1 +1CP03 -1X3
C 202 +EX900C306 =900C306 -M… ZR-RVV-500V 2*0.75 30.00 m =900C306 +EX900C306 -M1 +1CP03 -1X3 C
203 +EX900C307 =900C307 -B… Sensor cable GSEE 2.00 m =900C307 +EX900C307 -B1 +EX900C306 -JB2 -X1
204 +EX900C307 =900C307 -B… Sensor cable GSEE 2.00 m +EX900C307 -JB2 -X1 =900C307 +EX900C307 -B2
205 +EX900C307 -JB2 =900C30… ZR-RVVP 4*0.5 25.00 m +EX900C307 -JB2 -X1 =1CP03.2 +1CP03 -2X3
206 +EX900C307 =900C307 -M… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =900C307 +EX900C307 -M1 +1CP03 -1X3
207 +EX900C307 =900C307 -M… ZR-RVV-500V 2*0.75 25.00 m =900C307 +EX900C307 -M1 +1CP03 -1X3
208 +EX900C345 =900C345 -B… Sensor cable GSEE 2.00 m +EX900C345 -JB1 -X1 =900C345 +EX900C345 -B1
209 +EX900C345 =900C345 -B… Sensor cable GSEE 2.00 m +EX900C345 -JB2 -X1 =900C345 +EX900C345 -B2
D 210 +EX900C345 -JB1 =900C34… ZR-RVVP 4*0.5 30.00 m +EX900C345 -JB1 -X1 =1CD03 +1CD03 -X3 D
211 +EX900C345 -JB2 =900C34… ZR-RVVP 4*0.5 30.00 m +EX900C345 -JB2 -X1 =1CD03 +1CD03 -X3
212 +EX900C345 =900C345 -M… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =900C345 +EX900C345 -M1 +1CP03 -1X3
213 +EX900C425 =900C425 -B… Sensor cable GSEE 2.00 m +EX900C425 -JB1 -X1 =900C425 +EX900C425 -B1
214 +EX900C425 =900C425 -B… Sensor cable GSEE 2.00 m +EX900C425 -JB2 -X1 =900C425 +EX900C425 -B2
215 +EX900C425 -JB1 =900C42… ZR-RVVP 4*0.5 30.00 m +EX900C425 -JB1 -X1 =1CD03 +1CD03 -X3
216 +EX900C425 -JB2 =900C42… ZR-RVVP 4*0.5 35.00 m +EX900C425 -JB2 -X1 =1CD03 +1CD03 -X3
217 +EX900C425 =900C425 -M… ZR-VV-1KV 3*2.5+1*1.5 50.00 m =900C425 +EX900C425 -M1 +1CP03 -1X3
E 218 +EX900C426 =900C426 -B… Sensor cable GSEE 2.00 m =900C426 +EX900C426 -B1 +EX900C425 -JB2 -X1 E

219 +EX900C426 =900C426 -B… Sensor cable GSEE 2.00 m +EX900C426 -JB2 -X1 =900C426 +EX900C426 -B2
220 +EX900C426 -JB2 =900C42… ZR-RVVP 4*0.5 20.00 m +EX900C426 -JB2 -X1 =1CD03 +1CD03 -X3
221 +EX900C426 =900C426 -M… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =900C426 +EX900C426 -M1 +1CP03 -1X3
222 +EX900C426 =900C426 -M… ZR-RVV-500V 2*0.75 35.00 m =900C426 +EX900C426 -M1 +1CP03 -1X3
6 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
223 +EX900C427 =900C427 -B… Sensor cable GSEE 2.00 m =900C427 +EX900C427 -B1 +EX900C426 -JB2 -X1
A A
224 +EX900C427 =900C427 -B… Sensor cable GSEE 2.00 m +EX900C427 -JB2 -X1 =900C427 +EX900C427 -B2
225 +EX900C427 -JB2 =900C42… ZR-RVVP 4*0.5 15.00 m +EX900C427 -JB2 -X1 =1CD03 +1CD03 -X3
226 +EX900C427 =900C427 -M… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900C427 +EX900C427 -M1 +1CP03 -1X3
227 +EX900C428 =900C428 -B… Sensor cable GSEE 2.00 m +EX900C428 -JB2 -X1 =900C428 +EX900C428 -B1
228 +EX900C428 =900C428 -B… Sensor cable GSEE 2.00 m +EX900C428 -JB1 -X1 +EX900C428 -B2
229 +EX900C428 -JB1 -W1 ZR-RVVP 4*0.5 10.00 m +EX900C428 -JB1 -X1 =1CD03 +1CD03 -X3
230 +EX900C428 -JB2 =900C42… ZR-RVVP 4*0.5 10.00 m +EX900C428 -JB2 -X1 =1CD03 +1CD03 -X3
231 +EX900C428 =900C428 -M… ZR-VV-1KV 3*2.5+1*1.5 20.00 m =900C428 +EX900C428 -M1 +1CP03 -1X3
B B
232 +EX900C429 =900C429 -B… Sensor cable GSEE 2.00 m =900C429 +EX900C429 -B2 +EX900C428 -JB2 -X1
233 +EX900C429 =900C429 -B… Sensor cable GSEE 2.00 m +EX900C429 -JB2 -X1 =900C429 +EX900C429 -B1
234 +EX900C429 -JB2 =900C42… ZR-RVVP 4*0.5 15.00 m +EX900C429 -JB2 -X1 =1CD03 +1CD03 -X3
235 +EX900C429 =900C429 -M… ZR-VV-1KV 3*2.5+1*1.5 15.00 m =900C429 +EX900C429 -M1 +1CP03 -1X3
236 +EX900E104 =900E104 -B1… Sensor cable 1.00 m +EX900E104 -JB1 -X1 =900E104 +EX900E104 -B1
237 +EX900E104 =900E104 -B2… Sensor cable 2.00 m +EX900E104 -JB2 -X2 =900E104 +EX900E104 -B2
238 +EX900E104 -JB1 =900E10… ZR-RVVP 4*0.5 60.00 m +EX900E104 -JB1 -X1 =1CD02 +1CD02 -X4
C 239 +EX900E104 -JB2 =900E10… ZR-RVVP 4*0.5 60.00 m +EX900E104 -JB2 -X2 =1CD02 +1CD02 -X4 C
240 +EX900E105 =900E105 -B1… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B1
241 +EX900E105 =900E105 -B2… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B2
242 +EX900E105 =900E105 -B3… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B3
243 +EX900E105 =900E105 -B4… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B4
244 +EX900E105 =900E105 -B5… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B5
245 +EX900E105 =900E105 -B6… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B6
246 +EX900E105 =900E105 -B7… Sensor cable 2.00 m +EX900E105 -JB1 -X1 =900E105 +EX900E105 -B7
D 247 +EX900E105 =900E105 -B8… Sensor cable 1.00 m D
248 +EX900E105 -JB1 =900E10… ZR-RVVP 10*0.5 15.00 m +EX900E105 -JB1 -X1 =1CD01 +1CD01 -X3
249 +EX900E105 -JB1 =900E10… ZR-RVV-500V 4*0.75 15.00 m +EX900E105 -JB2 -X1 =1CD01 +1CD01
250 +EX900E105 -JB2 =900E10… ZR-RVVP 10*0.5 15.00 m +EX900E105 -JB2 -X1 =1CD01 +1CD01 -X3
251 +EX900E105 -JB3 =900E10… ZR-RVVP 4*0.5 60.00 m
252 +EX900E105 -M1-W1 ZR-VV-1KV 3*1.5+1*1.0 35.00 m =900E105 +EX900E105 -M1 +1CP01 -X3
253 +EX900E105 -M1-W2 ZR-RVV-500V 4*0.75 35.00 m =900E105 +EX900E105 -M1 +1CP01 -X3
254 +EX900E105 =900E105 -P1… ZR-RVVP 4*0.5 5.00 m +EX900E105 -JB2 -X1
E 255 +EX900E105 =900E105 -TB… TRVVP-JQ-10*0.5 15.00 m =900E105 +EX900E105 -TBJ +EX900E105 -JB2 -X1 E

256 +EX900E106 =900E106 -B1… Sensor cable 5.00 m +EX900E106 -X =900E106 +EX900E106 -B1
257 +EX900E106 =900E106 -B2… Sensor cable 5.00 m +EX900E106 -X =900E106 +EX900E106 -B2
258 +EX900E106 =900E106 -B3… Sensor cable 5.00 m +EX900E106 -X =900E106 +EX900E106 -B3
259 +EX900E106 =900E106 -B4… Sensor cable 5.00 m +EX900E106 -X =900E106 +EX900E106 -B4
7 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
260 +EX900E106 =900E106 -B5… Sensor cable 5.00 m +EX900E106 -JB2 -X2 =900E106 +EX900E106 -B5
A A
261 +EX900E106 =900E106 -B6… Sensor cable 5.00 m +EX900E106 -JB2 -X2 =900E106 +EX900E106 -B6
262 +EX900E106 =900E106 -JB… ZR-VV-1KV 3*1.5+1*1.0 30.00 m +EX900E106 -JB1 -X1 +1CP01 -X3
263 +EX900E106 -JB2 =900E10… ZR-RVVP 10*0.5 15.00 m +EX900E106 -JB2 -X2 =1CD01 +1CD01 -X3
264 +EX900E106 -JB2 =900E10… 5.00 m +EX900E106 -X +EX900E106 -JB2 -X2
265 +EX900E106 =900E106 -M… ZR-VV-1KV 3*1.5+1*1.0 5.00 m =900E106 +EX900E106 -Q1 =900E106 +EX900E106 -M1
266 +EX900E106 =900E106 -M… ZR-RVV-500V 2*0.75 30.00 m =900E106 +EX900E106 -M1 +1CP01 -X3
267 +EX900E106 =900E106 -M… =900E106 +EX900E106 -M2 +EX900E106 -JB1 -X1
268 +EX900E106 =900E106 -Q… ZR-VV-1KV 3*1.5+1*1.0 30.00 m +EX900E106 +1CP01 -X3
B B
269 +EX900E108 =900E108 -A1… Scanner cable 5.00 m =900E108 +EX900E108 -JB1 -F1
270 +EX900E108 =900E108 -B1… Sensor cable 5.00 m =900E108 +EX900E108 -JB1 -X2
271 +EX900E108 -JB1 =900E10… ZR-RVVP 4*0.5 15.00 m =900E108 +EX900E108 -JB1 -X2 =1CD02 +1CD02 -X4
272 +EX900E108 =900E108 -P1… ZR-RVVP 3*0.5 5.00 m =900E108 +EX900E108 -P1 +EX900E108 -JB1
273 +EX900E109 =900E109 -B1… Sensor cable 1.00 m +EX900E109 -JB1 -X1 =900E109 +EX900E109 -B1
274 +EX900E109 =900E109 -B2… Sensor cable 2.00 m +EX900E109 -JB2 -X2 =900E109 +EX900E109 -B2
275 +EX900E109 -JB1 =900E10… ZR-RVVP 4*0.5 15.00 m +EX900E109 -JB1 -X1 =1CD02 +1CD02 -X4
C 276 +EX900E109 -JB2 =900E10… ZR-RVVP 4*0.5 15.00 m +EX900E109 -JB2 -X2 =1CD02 +1CD02 -X4 C
277 +EX900E110 =900E110 -B1… Sensor cable 5.00 m =900E110 +EX900E110 -JB1 -X1 =900E110 +EX900E110 -JB1 -X1
278 +EX900E110 =900E110 -B2… Sensor cable 5.00 m =900E110 +EX900E110 -JB1 -X1 =900E110 +EX900E110 -B2
279 +EX900E110 =900E110 -B5… Sensor cable 5.00 m =900E110 +EX900E110 -JB1 -X1 =900E110 +EX900E110 -B5
280 +EX900E110 =900E110 -B6… Sensor cable 5.00 m =900E110 +EX900E110 -JB1 -X1 =900E110 +EX900E110 -B6
281 +EX900E110 -CC1 =900E11… ZR-RVVP 3*0.5 15.00 m =900E110 +EX900E110 -CC1 -X1 =1CD02 +1CD02 -X4
282 +EX900E110 -JB1 =900E11… ZR-RVVP 7*0.5 15.00 m =900E110 +EX900E110 -JB1 -X1 =1CD02 +1CD02 -X4
283 +EX900E110 =900C108 -M… ZR-VV-1KV 3*1.5+1*1.0 30.00 m =900C108 +EX900E110 -M2 +1CP01 -X3
D 284 +EX900E110 =900C108 -M… ZR-RVV-500V 4*0.75 30.00 m =900C108 +EX900E110 -M2 +1CP01 -X3 D
285 +EX900E110 =900E110 -P… TRVVP-JQ-4*1 15.00 m =900E110 +EX900E110 -PMJ1 =1CD02 +1CD02 -X1
286 +EX900E110 =900E110 -P… TRVVP-JQ-4*1 15.00 m =900E110 +EX900E110 -PMJ1 =900E110 +EX900E110 -CC1 -X1
287 +EX900E111 =900E111 -B1-…Sensor cable 5.00 m +EX900E111 -X =900E111 +EX900E111 -B1
288 +EX900E111 =900E111 -B2-…Sensor cable 5.00 m +EX900E111 -X =900E111 +EX900E111 -B2
289 +EX900E111 =900E111 -B3-…Sensor cable 5.00 m +EX900E111 -X =900E111 +EX900E111 -B3
290 +EX900E111 =900E111 -B4-…Sensor cable 5.00 m +EX900E111 -X =900E111 +EX900E111 -B4
291 +EX900E111 =900E111 -B5-…Sensor cable 5.00 m +EX900E111 -JB2 -X2 =900E111 +EX900E111 -B5
E 292 +EX900E111 =900E111 -B6-…Sensor cable 5.00 m +EX900E111 -JB2 -X2 =900E111 +EX900E111 -B6 E

293 +EX900E111 =900E111 -B7-…Sensor cable 5.00 m =900E111 +EX900E111 -B7


294 +EX900E111 =900E111 -JB… ZR-VV-1KV 3*2.5+1*1.5 45.00 m +EX900E111 -JB1 -X1 +1CP01 -X3
295 +EX900E111 -JB2 =900E11… ZR-RVVP 10*0.5 25.00 m +EX900E111 -JB2 -X2 =1CD02 +1CD02 -X3
296 +EX900E111 -JB2 =900E11… 5.00 m +EX900E111 -X +EX900E111 -JB2 -X2
8 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
297 +EX900E111 =900E111 -M1… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E111 +EX900E111 -M1 =900E111 +1CP01 -Q3
A A
298 +EX900E111 =900E111 -M1… ZR-RVV-500V 2*0.75 45.00 m =900E111 +EX900E111 -M1 +1CP01 -X3
299 +EX900E111 =900E111 -M2… =900E111 +EX900E111 -M2 +EX900E111 -JB1 -X1
300 +EX900E111 =900E111 -Q3… ZR-VV-1KV 3*2.5+1*1.5 45.00 m +1CP01 -X3 =900E111 +1CP01 -Q3, =900E111 +EX900E111 …
301 +EX900E301 =900E301 -B1… Sensor cable 5.00 m +EX900E301 -X =900E301 +EX900E301 -B1
302 +EX900E301 =900E301 -B2… Sensor cable 5.00 m +EX900E301 -X =900E301 +EX900E301 -B2
303 +EX900E301 =900E301 -B3… Sensor cable 5.00 m +EX900E301 -X =900E301 +EX900E301 -B3
304 +EX900E301 =900E301 -B4… Sensor cable 5.00 m +EX900E301 -X =900E301 +EX900E301 -B4
305 +EX900E301 =900E301 -B5… Sensor cable 5.00 m +EX900E301 -JB2 -X2 =900E301 +EX900E301 -B5
B B
306 +EX900E301 =900E301 -B6… Sensor cable 5.00 m +EX900E301 -JB2 -X2 =900E301 +EX900E301 -B6
307 +EX900E301 =900E301 -JB… ZR-VV-1KV 3*2.5+1*1.5 25.00 m +EX900E301 -JB1 -X1 +1CP02 -2X3
308 +EX900E301 -JB2 =900E30… ZR-RVVP 10*0.5 25.00 m +EX900E301 -JB2 -X2 =1CP20 +1CP20 -X5
309 +EX900E301 -JB2 =900E30… 5.00 m +EX900E301 -X +EX900E301 -JB2 -X2
310 +EX900E301 =900E301 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E301 +EX900E301 -Q1 =900E301 +EX900E301 -M1
311 +EX900E301 =900E301 -M… ZR-RVV-500V 2*0.75 25.00 m =900E301 +EX900E301 -M1 +1CP02 -2X3
312 +EX900E301 =900E301 -M… =900E301 +EX900E301 -M2 +EX900E301 -JB1 -X1
C 313 +EX900E301 =900E301 -Q… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =900E301 +EX900E301 -Q1 +1CP02 -2X3 C
314 +EX900E302 =900E302 -B1… Sensor cable 5.00 m =900E302 +EX900E302 -JB1 -X1 =900E302 +EX900E302 -B1
315 +EX900E302 =900E302 -B2… Sensor cable 5.00 m =900E302 +EX900E302 -JB1 -X1 =900E302 +EX900E302 -B2
316 +EX900E302 =900E302 -B3… Sensor cable 5.00 m =900E302 +EX900E302 -JB1 -X1 =900E302 +EX900E302 -B3
317 +EX900E302 =900E302 -B4… Sensor cable 5.00 m =900E302 +EX900E302 -JB1 -X1 =900E302 +EX900E302 -B4
318 +EX900E302 =900E302 -B5… Sensor cable 2.00 m =900E302 +EX900E302 -JB1 -X1 =900E302 +EX900E302 -B5
319 +EX900E302 -JB1 =900E30… ZR-RVVP 10*0.5 25.00 m =900E302 +EX900E302 -JB1 -X1 =1CP20 +1CP20 -X4
320 +EX900E302 =900C301 -M… ZR-VV-1KV 3*1.5+1*1.0 25.00 m =900C301 +EX900E302 -M2 +1CP02 -1X3
D 321 +EX900E302 =900C301 -M… ZR-RVV-500V 4*0.75 25.00 m =900C301 +EX900E302 -M2 +1CP02 -1X3 D
322 +EX900E303 =900E303 -B1… Sensor cable 5.00 m =900E303 +EX900E303 -JB1 -X1 =900E303 +EX900E303 -B1
323 +EX900E303 =900E303 -B2… Sensor cable 5.00 m =900E303 +EX900E303 -JB1 -X1 =900E303 +EX900E303 -B2
324 +EX900E303 =900E303 -B3… Sensor cable 5.00 m =900E303 +EX900E303 -JB1 -X1 =900E303 +EX900E303 -B3
325 +EX900E303 =900E303 -B4… Sensor cable 5.00 m =900E303 +EX900E303 -JB1 -X1 =900E303 +EX900E303 -B4
326 +EX900E303 =900E303 -B5… Sensor cable 2.00 m =900E303 +EX900E303 -JB1 -X1 =900E303 +EX900E303 -B5
327 +EX900E303 -JB1 =900E30… ZR-RVVP 10*0.5 20.00 m =900E303 +EX900E303 -JB1 -X1 =1CP20 +1CP20 -X4
328 +EX900E303 =900C302 -M… ZR-VV-1KV 3*1.5+1*1.0 20.00 m =900C302 +EX900E303 -M2 +1CP02 -1X3
E 329 +EX900E303 =900C302 -M… ZR-RVV-500V 4*0.75 20.00 m =900C302 +EX900E303 -M2 +1CP02 -1X3 E

330 +EX900E304 =900E304 -B1… Sensor cable 5.00 m +EX900E304 -X =900E304 +EX900E304 -B1
331 +EX900E304 =900E304 -B2… Sensor cable 5.00 m +EX900E304 -X =900E304 +EX900E304 -B2
332 +EX900E304 =900E304 -B3… Sensor cable 5.00 m +EX900E304 -X =900E304 +EX900E304 -B3
333 +EX900E304 =900E304 -B4… Sensor cable 5.00 m +EX900E304 -X =900E304 +EX900E304 -B4
9 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
334 +EX900E304 =900E304 -B5… Sensor cable 5.00 m +EX900E304 -JB2 -X2 =900E304 +EX900E304 -B5
A A
335 +EX900E304 =900E304 -B6… Sensor cable 5.00 m +EX900E304 -JB2 -X2 =900E304 +EX900E304 -B6
336 +EX900E304 =900E304 -JB… ZR-VV-1KV 3*2.5+1*1.5 15.00 m +EX900E304 -JB1 -X1 +1CP02 -2X3
337 +EX900E304 -JB2 =900E30… ZR-RVVP 10*0.5 15.00 m +EX900E304 -JB2 -X2 =1CP20 +1CP20 -X5
338 +EX900E304 -JB2 =900E30… 5.00 m +EX900E304 -X +EX900E304 -JB2 -X2
339 +EX900E304 =900E304 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E304 +EX900E304 -Q1 =900E304 +EX900E304 -M1
340 +EX900E304 =900E304 -M… ZR-RVV-500V 2*0.75 15.00 m =900E304 +EX900E304 -M1 +1CP02 -2X3
341 +EX900E304 =900E304 -M… =900E304 +EX900E304 -M2 +EX900E304 -JB1 -X1
342 +EX900E304 =900E304 -Q… ZR-VV-1KV 3*2.5+1*1.5 15.00 m =900E304 +EX900E304 -Q1 +1CP02 -2X3
B B
343 +EX900E305 =900E305 -B1… Sensor cable 5.00 m +EX900E305 -X =900E305 +EX900E305 -B1
344 +EX900E305 =900E305 -B2… Sensor cable 5.00 m +EX900E305 -X =900E305 +EX900E305 -B2
345 +EX900E305 =900E305 -B3… Sensor cable 5.00 m +EX900E305 -X =900E305 +EX900E305 -B3
346 +EX900E305 =900E305 -B4… Sensor cable 5.00 m +EX900E305 -X =900E305 +EX900E305 -B4
347 +EX900E305 =900E305 -B5… Sensor cable 5.00 m +EX900E305 -JB2 -X2 =900E305 +EX900E305 -B5
348 +EX900E305 =900E305 -B6… Sensor cable 5.00 m +EX900E305 -JB2 -X2 =900E305 +EX900E305 -B6
349 +EX900E305 =900E305 -JB… ZR-VV-1KV 3*2.5+1*1.5 20.00 m +EX900E305 -JB1 -X1 +1CP02 -2X3
C 350 +EX900E305 =900E305 -JB… ZR-RVV-500V 2*0.75 20.00 m C
351 +EX900E305 =900E305 -JB… ZR-RVV-500V 4*0.75 20.00 m
352 +EX900E305 -JB2 =900E30… ZR-RVVP 10*0.5 20.00 m +EX900E305 -JB2 -X2 =1CP20 +1CP20 -X5
353 +EX900E305 -JB2 =900E30… 5.00 m +EX900E305 -X +EX900E305 -JB2 -X2
354 +EX900E305 =900E305 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E305 +EX900E305 -Q1 =900E305 +EX900E305 -M1
355 +EX900E305 =900E305 -M… ZR-RVV-500V 2*0.75 20.00 m =900E305 +EX900E305 -M1 +1CP02 -2X3
356 +EX900E305 =900E305 -M… =900E305 +EX900E305 -M2 +EX900E305 -JB1 -X1
357 +EX900E305 =900E305 -M…
D 358 +EX900E305 =900E305 -Q… ZR-VV-1KV 3*2.5+1*1.5 20.00 m =900E305 +EX900E305 -Q1 +1CP02 -2X3 D
359 +EX900E306 =900E306 -B1… Sensor cable 5.00 m +EX900E306 -X =900E306 +EX900E306 -B1
360 +EX900E306 =900E306 -B2… Sensor cable 5.00 m +EX900E306 -X =900E306 +EX900E306 -B2
361 +EX900E306 =900E306 -B3… Sensor cable 5.00 m +EX900E306 -X =900E306 +EX900E306 -B3
362 +EX900E306 =900E306 -B4… Sensor cable 5.00 m +EX900E306 -X =900E306 +EX900E306 -B4
363 +EX900E306 =900E306 -B5… Sensor cable 5.00 m +EX900E306 -JB2 -X2 =900E306 +EX900E306 -B5
364 +EX900E306 =900E306 -B6… Sensor cable 5.00 m +EX900E306 -JB2 -X2 =900E306 +EX900E306 -B6
365 +EX900E306 =900E306 -JB… ZR-VV-1KV 3*2.5+1*1.5 30.00 m +EX900E306 -JB1 -X1 +1CP02 -2X3
E 366 +EX900E306 =900E306 -JB… ZR-RVV-500V 2*0.75 20.00 m E

367 +EX900E306 =900E306 -JB… ZR-RVV-500V 4*0.75 20.00 m


368 +EX900E306 -JB2 =900E30… ZR-RVVP 10*0.5 30.00 m +EX900E306 -JB2 -X2 =1CP20 +1CP20 -X5
369 +EX900E306 -JB2 =900E30… 5.00 m +EX900E306 -X +EX900E306 -JB2 -X2
370 +EX900E306 =900E306 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E306 +EX900E306 -Q1 =900E306 +EX900E306 -M1
10 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
371 +EX900E306 =900E306 -M… ZR-RVV-500V 2*0.75 30.00 m =900E306 +EX900E306 -M1 +1CP02 -2X3
A A
372 +EX900E306 =900E306 -M… =900E306 +EX900E306 -M2 +EX900E306 -JB1 -X1
373 +EX900E306 =900E306 -M…
374 +EX900E306 =900E306 -Q… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =900E306 +EX900E306 -Q1 +1CP02 -2X3
375 +EX900E307.1 =900E307.1… Sensor cable 5.00 m +EX900E307.1 -JB1 -X1 =900E307.1 +EX900E307.1 -B1
376 +EX900E307.1 =900E307.1… Sensor cable 5.00 m +EX900E307.1 -JB1 -X1 =900E307.1 +EX900E307.1 -B2
377 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB4 -X4 =900E307.1 +EX900E307.1 -B3
378 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB4 -X4 =900E307.1 +EX900E307.1 -B4
379 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB5 -X5 =900E307.1 +EX900E307.1 -B5
B B
380 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB5 -X5 =900E307.1 +EX900E307.1 -B6
381 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB6 -X6 =900E307.1 +EX900E307.1 -B7
382 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -JB6 -X6 =900E307.1 +EX900E307.1 -B8
383 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -CC1 -X1 =900E307.1 +EX900E307.1 -B9
384 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -CC1 -X1 =900E307.1 +EX900E307.1 -B10
385 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -CC2 -X1 =900E307.1 +EX900E307.1 -B11
386 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -CC2 -X1 =900E307.1 +EX900E307.1 -B12
C 387 +EX900E307.1 =900E307.1… Sensor cable 1.00 m +EX900E307.1 -JB7 -X7 =900E307.1 +EX900E307.1 C
388 +EX900E307.1 =900E307.1… Sensor cable 5.00 m +EX900E307.1 -CC1-1 -X1 =900E307.1 +EX900E307.1 -B14
389 +EX900E307.1 =900E307.1… Sensor cable 5.00 m +EX900E307.1 -CC1-1 -X1 =900E307.1 +EX900E307.1 -B15
390 +EX900E307.1 -CC1 =900E… ZR-RVVP 7*0.5 20.00 m =900E307.1 +1CP03 -2X6 =900E307.1 +EX900E307.1 -CC1 -X1
391 +EX900E307.1 -CC1-1 =90… ZR-RVVP 7*0.5 20.00 m +EX900E307.1 -CC1-1 -X1 =900E307.1 +1CP03 -2X6
392 +EX900E307.1 -CC2 =900E… ZR-RVVP 7*0.5 30.00 m =900E307.1 +1CP03 -2X6 =900E307.1 +EX900E307.1 -CC2 -X1
393 +EX900E307.1 -JB1 =900E… ZR-RVVP 10*0.5 20.00 m +EX900E307.1 -JB1 -X1 =900E307.1 +1CP03 -2X6
394 +EX900E307.1 -JB2 =900E… ZR-VV-1KV 3*2.5+1*1.5 25.00 m +1CP04 -1X3 =900E307.1 +EX900E307.1 -JB2 -X2
D 395 +EX900E307.1 -JB2 =900E… ZR-RVV-500V 2*0.75 25.00 m +1CP04 -1X3 =900E307.1 +EX900E307.1 -JB2 -X2 D
396 +EX900E307.1 -JB3 =900E… TRVVP-JQ-7*0.5 20.00 m =900E307.2 +EX900E307.1 -JB3 -X3 +EX900E307.1 -JB1 -X1
397 +EX900E307.1 -JB4 =900E… ZR-RVVP 4*0.5 20.00 m =900E307.1 +1CP03 -2X6 =900E307.1 +EX900E307.1 -JB4 -X4
398 +EX900E307.1 -JB5 =900E… ZR-RVVP 4*0.5 30.00 m =900E307.1 +1CP03 -2X6 =900E307.1 +EX900E307.1 -JB5 -X5
399 +EX900E307.1 -JB6 =900E… ZR-RVVP 4*0.5 30.00 m =900E307.1 +1CP03 -2X6 =900E307.1 +EX900E307.1 -JB6 -X6
400 +EX900E307.1 -JB7 =900E… ZR-RVVP 4*0.5 20.00 m =900E307.1 +EX900E307.1 =900E307.1 +1CP03 -2X6
401 +EX900E307.1 -JB8 =900E… ZR-RVVP 7*0.5 20.00 m +EX900E307.1 -JB8 -X1
402 +EX900E307.1 =900E307.1… ZR-RVVP 4*0.5 5.00 m =900E307.1 +EX900E307.1 -K1 +EX900E307.1 -JB8 -X1
E 403 +EX900E307.1 =900E307.1… Sensor cable 5.00 m =900E307.1 +EX900E307.1 -K3 +EX900E307.1 -JB8 -X1 E

404 +EX900E307.1 =900E307.1… ZR-VV-1KV 3*25+1*16 30.00 m =900E307.1 +EX900E307.1 -M1 +1CP04 -T1
405 +EX900E307.1 =900E307.1… ZR-RVV-500V 4*0.75 30.00 m +1CP04 -1X3 =900E307.1 +EX900E307.1 -M1
406 +EX900E307.1 =900E307.1… ZR-VV-1KV 3*1.5+1*1.0 20.00 m =900E307.1 +EX900E307.1 -M2
407 +EX900E307.1 =900E307.1… ZR-RVVP 4*0.5 20.00 m =900E307.1 +1OP1 -X1 =900E307.1 +EX900E307.1 -S2
11 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
408 +EX900E307.1 =900E307.1… ZR-RVVP 3*0.5 20.00 m =900E307.1 +1OP1 -X1 =900E307.1 +EX900E307.1 -S3
A A
409 +EX900E307.2 =900E307.2… Sensor cable 5.00 m =900E307.2 +EX900E307.1 -JB3 -X3 =900E307.2 +EX900E307.2 -B1
410 +EX900E307.2 =900E307.2… Sensor cable 5.00 m =900E307.2 +EX900E307.1 -JB3 -X3 =900E307.2 +EX900E307.2 -B2
411 +EX900E307.2 =900E307.2… Sensor cable 5.00 m =900E307.2 +EX900E307.1 -JB3 -X3 =900E307.2 +EX900E307.2 -B3
412 +EX900E307.2 =900E307.2… TRVV-JQ-4*2.0+2*1.0 20.00 m =900E307.2 +EX900E307.2 -M2 =900E307.1 +EX900E307.1 -JB2 -X2
413 +EX900E410 =900E410 -B1… Sensor cable 5.00 m +EX900E410 -X =900E410 +EX900E410 -B1
414 +EX900E410 =900E410 -B2… Sensor cable 5.00 m +EX900E410 -X =900E410 +EX900E410 -B2
415 +EX900E410 =900E410 -B3… Sensor cable 5.00 m +EX900E410 -X =900E410 +EX900E410 -B3
416 +EX900E410 =900E410 -B4… Sensor cable 5.00 m +EX900E410 -X =900E410 +EX900E410 -B4
B B
417 +EX900E410 =900E410 -B5… Sensor cable 5.00 m +EX900E410 -JB2 -X2 =900E410 +EX900E410 -B5
418 +EX900E410 =900E410 -B6… Sensor cable 5.00 m +EX900E410 -JB2 -X2 =900E410 +EX900E410 -B6
419 +EX900E410 =900E410 -JB… ZR-VV-1KV 3*2.5+1*1.5 30.00 m +EX900E410 -JB1 -X1 +1CP03 -1X3
420 +EX900E410 -JB2 =900E41… ZR-RVVP 10*0.5 15.00 m +EX900E410 -JB2 -X2 =1CD03 +1CD03 -X3
421 +EX900E410 -JB2 =900E41… 5.00 m +EX900E410 -X +EX900E410 -JB2 -X2
422 +EX900E410 =900E410 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E410 +EX900E410 -Q1 =900E410 +EX900E410 -M1
423 +EX900E410 =900E410 -M… ZR-RVV-500V 2*0.75 30.00 m =900E410 +EX900E410 -M1 +1CP03 -1X3
C 424 +EX900E410 =900E410 -M… =900E410 +EX900E410 -M2 +EX900E410 -JB1 -X1 C
425 +EX900E410 =900E410 -Q… ZR-VV-1KV 3*2.5+1*1.5 30.00 m +EX900E410 +1CP03 -1X3
426 +EX900E411 =900E411 -B1… Sensor cable 5.00 m +EX900E411 -X =900E411 +EX900E411 -B1
427 +EX900E411 =900E411 -B2… Sensor cable 5.00 m +EX900E411 -X =900E411 +EX900E411 -B2
428 +EX900E411 =900E411 -B3… Sensor cable 5.00 m +EX900E411 -X =900E411 +EX900E411 -B3
429 +EX900E411 =900E411 -B4… Sensor cable 5.00 m +EX900E411 -X =900E411 +EX900E411 -B4
430 +EX900E411 =900E411 -B5… Sensor cable 5.00 m +EX900E411 -JB2 -X2 =900E411 +EX900E411 -B5
431 +EX900E411 =900E411 -B6… Sensor cable 5.00 m +EX900E411 -JB2 -X2 =900E411 +EX900E411 -B6
D 432 +EX900E411 =900E411 -JB… ZR-VV-1KV 3*2.5+1*1.5 15.00 m +EX900E411 -JB1 -X1 +1CP03 -1X3 D
433 +EX900E411 -JB2 =900E41… ZR-RVVP 10*0.5 15.00 m +EX900E411 -JB2 -X2 =1CD03 +1CD03 -X3
434 +EX900E411 -JB2 =900E41… 5.00 m +EX900E411 -X +EX900E411 -JB2 -X2
435 +EX900E411 =900E411 -M1… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =900E411 +EX900E411 -Q1 =900E411 +EX900E411 -M1
436 +EX900E411 =900E411 -M1… ZR-RVV-500V 2*0.75 15.00 m =900E411 +EX900E411 -M1 +1CP03 -1X3
437 +EX900E411 =900E411 -M2… =900E411 +EX900E411 -M2 +EX900E411 -JB1 -X1
438 +EX900E411 =900E411 -Q1… ZR-VV-1KV 3*2.5+1*1.5 15.00 m +EX900E411 +1CP03 -1X3
439 +EX900E413 =900E413 -B1… Sensor cable 1.00 m +EX900E413 -JB1 -X1 =900E413 +EX900E413 -B1
E 440 +EX900E413 =900E413 -B2… Sensor cable 2.00 m +EX900E413 -JB2 -X2 =900E413 +EX900E413 -B2 E

441 +EX900E413 -JB1 =900E41… ZR-RVVP 4*0.5 10.00 m +EX900E413 -JB1 -X1 =1CP03.2 +1CP03 -2X4
442 +EX900E413 -JB2 =900E41… ZR-RVVP 4*0.5 10.00 m +EX900E413 -JB2 -X2 =1CP03.2 +1CP03 -2X4
443 +EX900E414 =900E414 -A1… Scanner cable 5.00 m =900E414 +EX900E414 -JB1 -F1
444 +EX900E414 =900E414 -B1… Sensor cable 5.00 m =900E414 +EX900E414 -JB1 -X2 =900E414 +EX900E414 -B1
12 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
445 +EX900E414 -JB1 =900E41… ZR-RVVP 4*0.5 10.00 m =900E414 +EX900E414 -JB1 -X2 =1CP03.2 +1CP03 -2X4, =1CD03 +1CD03 -X3
A A
446 +EX900E414 =900E414 -P1… ZR-RVVP 3*0.5 5.00 m =900E414 +EX900E414 -JB1 -X2
447 +EX902C001 =902C001 -B… Sensor cable GSEE 2.00 m +EX902C001 -JB1 -X1 =902C001 +EX902C001 -B1
448 +EX902C001 =902C001 -B… Sensor cable GSEE 2.00 m +EX902C001 -JB2 -X1 =902C001 +EX902C001 -B2
449 +EX902C001 -JB1 =902C00… ZR-RVVP 4*0.5 25.00 m +EX902C001 -JB1 -X1 =1CP20 +1CP20 -X4
450 +EX902C001 -JB2 =902C00… ZR-RVVP 4*0.5 20.00 m +EX902C001 -JB2 -X1 =1CP20 +1CP20 -X4
451 +EX902C001 =902C001 -M… ZR-VV-1KV 3*2.5+1*1.5 25.00 m =902C001 +EX902C001 -M1 +1CP02 -1X3
452 +EX902C002 =902C002 -M… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =902C002 +EX902C002 -M1 +1CP02 -1X3
453 +EX902CC02 =902C002 -B… Sensor cable GSEE 2.00 m +EX902CC02 -JB1 -X1 =902C002 +EX902CC02 -B1
B B
454 +EX902CC02 =902C002 -B… Sensor cable GSEE 2.00 m +EX902CC02 -JB2 -X1 =902C002 +EX902CC02 -B2
455 +EX902CC02 -JB1 =902C0… ZR-RVVP 4*0.5 35.00 m +EX902CC02 -JB1 -X1 =1CP20 +1CP20 -X4
456 +EX902CC02 -JB2 =902C0… ZR-RVVP 4*0.5 40.00 m +EX902CC02 -JB2 -X1 =1CP20 +1CP20 -X4
457 +EX902E001 =902E001 -B1… Sensor cable 5.00 m +EX902E001 -X =902E001 +EX902E001 -B1
458 +EX902E001 =902E001 -B2… Sensor cable 5.00 m +EX902E001 -X =902E001 +EX902E001 -B2
459 +EX902E001 =902E001 -B3… Sensor cable 5.00 m +EX902E001 -X =902E001 +EX902E001 -B3
460 +EX902E001 =902E001 -B4… Sensor cable 5.00 m +EX902E001 -X =902E001 +EX902E001 -B4
C 461 +EX902E001 =902E001 -B5… Sensor cable 5.00 m +EX902E001 -JB2 -X2 =902E001 +EX902E001 -B5 C
462 +EX902E001 =902E001 -B6… Sensor cable 5.00 m +EX902E001 -JB2 -X2 =902E001 +EX902E001 -B6
463 +EX902E001 =902E001 -JB… ZR-VV-1KV 3*2.5+1*1.5 30.00 m +EX902E001 -JB1 -X1 +1CP02 -2X3
464 +EX902E001 =902E001 -JB… ZR-RVV-500V 2*0.75 20.00 m
465 +EX902E001 =902E001 -JB… ZR-RVV-500V 4*0.75 20.00 m
466 +EX902E001 -JB2 =902E00… ZR-RVVP 10*0.5 30.00 m +EX902E001 -JB2 -X2 =1CP20 +1CP20 -X5
467 +EX902E001 -JB2 =902E00… 5.00 m +EX902E001 -X +EX902E001 -JB2 -X2
468 +EX902E001 =902E001 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =902E001 +EX902E001 -Q1 =902E001 +EX902E001 -M1
D 469 +EX902E001 =902E001 -M… ZR-RVV-500V 2*0.75 30.00 m =902E001 +EX902E001 -M1 +1CP02 -2X3 D
470 +EX902E001 =902E001 -M… =902E001 +EX902E001 -M2 +EX902E001 -JB1 -X1
471 +EX902E001 =902E001 -M…
472 +EX902E001 =902E001 -Q… ZR-VV-1KV 3*2.5+1*1.5 30.00 m =902E001 +EX902E001 -Q1 +1CP02 -2X3
473 +EX902E003 =902E003 -B1… Sensor cable 5.00 m +EX902E003 -X =902E003 +EX902E003 -B1
474 +EX902E003 =902E003 -B2… Sensor cable 5.00 m +EX902E003 -X =902E003 +EX902E003 -B2
475 +EX902E003 =902E003 -B3… Sensor cable 5.00 m +EX902E003 -X =902E003 +EX902E003 -B3
476 +EX902E003 =902E003 -B4… Sensor cable 5.00 m +EX902E003 -X =902E003 +EX902E003 -B4
E 477 +EX902E003 =902E003 -B5… Sensor cable 5.00 m +EX902E003 -JB2 -X2 =902E003 +EX902E003 -B5 E

478 +EX902E003 =902E003 -B6… Sensor cable 5.00 m +EX902E003 -JB2 -X2 =902E003 +EX902E003 -B6
479 +EX902E003 =902E003 -JB… ZR-VV-1KV 3*2.5+1*1.5 35.00 m +EX902E003 -JB1 -X1 +1CP02 -2X3
480 +EX902E003 =902E003 -JB… ZR-RVV-500V 2*0.75 20.00 m
481 +EX902E003 =902E003 -JB… ZR-RVV-500V 4*0.75 20.00 m
13 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
482 +EX902E003 -JB2 =902E00… ZR-RVVP 10*0.5 35.00 m +EX902E003 -JB2 -X2 =1CP20 +1CP20 -X5
A A
483 +EX902E003 -JB2 =902E00… 5.00 m +EX902E003 -X +EX902E003 -JB2 -X2
484 +EX902E003 =902E003 -M… ZR-VV-1KV 3*2.5+1*1.5 5.00 m =902E003 +EX902E003 -Q1 =902E003 +EX902E003 -M1
485 +EX902E003 =902E003 -M… ZR-RVV-500V 2*0.75 35.00 m =902E003 +EX902E003 -M1 +1CP02 -2X3
486 +EX902E003 =902E003 -M… =902E003 +EX902E003 -M2 +EX902E003 -JB1 -X1
487 +EX902E003 =902E003 -M…
488 +EX902E003 =902E003 -Q… ZR-VV-1KV 3*2.5+1*1.5 35.00 m =902E003 +EX902E003 -Q1 +1CP02 -2X3
489 +EX.DO16 =DO16 -B6-W1 Sensor cable 5.00 m +EX.DO16 -JB1 -X1 =DO16 +EX.DO16 -B6
490 +EX.DO16 -CB1 =DO16 -C… ZR-RVVP 7*0.5 35.00 m +EX.DO16 -CB1 =1CP20 +1CP20 -X6
B B
491 +EX.DO16 -JB1 =DO16 -W1 ZR-RVVP 3*0.5 35.00 m +EX.DO16 -JB1 -X1 =1CP20 +1CP20 -X6
492 +EX.DO17 =DO17 -B6-W1 Sensor cable 5.00 m +EX.DO17 -JB1 -X1 =DO17 +EX.DO17 -B6
493 +EX.DO17 -CB1 =DO17 -C… ZR-RVVP 7*0.5 25.00 m +EX.DO17 -CB1 =1CP20 +1CP20 -X6
494 +EX.DO17 -JB1 =DO17 -W1 ZR-RVVP 3*0.5 25.00 m +EX.DO17 -JB1 -X1 =1CP20 +1CP20 -X6
495 +EX.DO18 =DO18 -B6-W1 Sensor cable 5.00 m +EX.DO18 -JB1 -X1 =DO18 +EX.DO18 -B6
496 +EX.DO18 -CB1 =DO18 -C… ZR-RVVP 7*0.5 45.00 m +EX.DO18 -CB1 =1CP20 +1CP20 -X6
497 +EX.DO18 -JB1 =DO18 -W1 ZR-RVVP 3*0.5 45.00 m +EX.DO18 -JB1 -X1 =1CP20 +1CP20 -X6
C 498 +EX.DO19 =DO19 -B6-W1 Sensor cable 5.00 m +EX.DO19 -JB1 -X1 =DO19 +EX.DO19 -B6 C
499 +EX.DO19 -CB1 =DO19 -C… ZR-RVVP 7*0.5 65.00 m +EX.DO19 -CB1 =1CP20 +1CP20 -X6
500 +EX.DO19 -JB1 =DO19 -W1 ZR-RVVP 3*0.5 65.00 m +EX.DO19 -JB1 -X1 =1CP20 +1CP20 -X6
501 +EX.DO22 =DO22 -B6-W1 Sensor cable 5.00 m +EX.DO22 -JB1 -X1 =DO22 +EX.DO22 -B6
502 +EX.DO22 -CB1 =DO22 -C… ZR-RVVP 7*0.5 25.00 m +EX.DO22 -CB1 =1CP03.2 +1CP03 -2X5
503 +EX.DO22 -JB1 =DO22 -W1 ZR-RVVP 3*0.5 25.00 m +EX.DO22 -JB1 -X1 =1CP03.2 +1CP03 -2X5
504 +EXFJJ =WIND1 -VMT-W1 ZR-RVVP 10*1 100.00 m =WIND1 +1CD01 -X5
505 +EXFJJ =WIND1 -VMT-W2 ZR-RVVP 10*1 100.00 m =WIND1 +1CD01 -X5
D 506 -ETHERNET-W1 AMP_ Type 5 Shielded network cables 75.00 m D
507 -ETHERNET-W2 AMP_ Type 5 Shielded network cables 5.00 m
508 -ETHERNET-W3 AMP_ Type 5 Shielded network cables 35.00 m
509 -ETHERNET-W4 AMP_ Type 5 Shielded network cables 5.00 m
510 -ETHERNET-W5 AMP_ Type 5 Shielded network cables 60.00 m
511 -ETHERNET-W6 AMP_ Type 5 Shielded network cables 25.00 m
512 -ETHERNET-W7 AMP_ Type 5 Shielded network cables 20.00 m
513 -ETHERNET-W8 AMP_ Type 5 Shielded network cables 80.00 m
E 514 -ETHERNET-W9 AMP_ Type 5 Shielded network cables 5.00 m E

515 -ETHERNET-W10 AMP_ Type 5 Shielded network cables 35.00 m


516 -ETHERNET-W11 AMP_ Type 5 Shielded network cables 5.00 m
517 -ETHERNET-W12 AMP_ Type 5 Shielded network cables 60.00 m
518 -ETHERNET-W13 AMP_ Type 5 Shielded network cables 25.00 m
14 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Material Manufacturer Length Cable Origin Cable Destination
519 -ETHERNET-W14 AMP_ Type 5 Shielded network cables 45.00 m
A A

B B

C C

D D

E E

15 / 15
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 01
APPROVED DWG. NO: PAGE : REV.
Cable list 001-M4-01 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1 -ETHERNET-W1 ( AMP_ Type 5 Shielded network cables 75.00 …WH/OG WH/OG 0.51mm
A A
2 OG OG 0.51mm
3 WH/GN WH/GN 0.51mm
4 GN GN 0.51mm
5 WH/BU WH/BU 0.51mm
6 BU BU 0.51mm
7 WU/BN WU/BN 0.51mm
8 BN BN 0.51mm
9 -ETHERNET-W2 ( AMP_ Type 5 Shielded network cables 5.00 m ) WH/OG WH/OG 0.51mm
B B
10 OG OG 0.51mm
11 WH/GN WH/GN 0.51mm
12 GN GN 0.51mm
13 WH/BU WH/BU 0.51mm
14 BU BU 0.51mm
15 WU/BN WU/BN 0.51mm
16 BN BN 0.51mm
C 17 -ETHERNET-W3 ( AMP_ Type 5 Shielded network cables 35.00 …WH/OG WH/OG 0.51mm C
18 OG OG 0.51mm
19 WH/GN WH/GN 0.51mm
20 GN GN 0.51mm
21 WH/BU WH/BU 0.51mm
22 BU BU 0.51mm
23 WU/BN WU/BN 0.51mm
24 BN BN 0.51mm
D 25 -ETHERNET-W4 ( AMP_ Type 5 Shielded network cables 5.00 m ) WH/OG WH/OG 0.51mm D
26 OG OG 0.51mm
27 WH/GN WH/GN 0.51mm
28 GN GN 0.51mm
29 WH/BU WH/BU 0.51mm
30 BU BU 0.51mm
31 WU/BN WU/BN 0.51mm
32 BN BN 0.51mm
E 33 -ETHERNET-W5 ( AMP_ Type 5 Shielded network cables 60.00 …WH/OG WH/OG 0.51mm E

34 OG OG 0.51mm
35 WH/GN WH/GN 0.51mm
36 GN GN 0.51mm
37 WH/BU WH/BU 0.51mm
1 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
38 BU BU 0.51mm
A A
39 WU/BN WU/BN 0.51mm
40 BN BN 0.51mm
41 -ETHERNET-W6 ( AMP_ Type 5 Shielded network cables 25.00 …WH/OG WH/OG 0.51mm
42 OG OG 0.51mm
43 WH/GN WH/GN 0.51mm
44 GN GN 0.51mm
45 WH/BU WH/BU 0.51mm
46 BU BU 0.51mm
B B
47 WU/BN WU/BN 0.51mm
48 BN BN 0.51mm
49 -ETHERNET-W7 ( AMP_ Type 5 Shielded network cables 20.00 …WH/OG WH/OG 0.51mm
50 OG OG 0.51mm
51 WH/GN WH/GN 0.51mm
52 GN GN 0.51mm
53 WH/BU WH/BU 0.51mm
C 54 BU BU 0.51mm C
55 WU/BN WU/BN 0.51mm
56 BN BN 0.51mm
57 -ETHERNET-W8 ( AMP_ Type 5 Shielded network cables 80.00 …WH/OG WH/OG 0.51mm
58 OG OG 0.51mm
59 WH/GN WH/GN 0.51mm
60 GN GN 0.51mm
61 WH/BU WH/BU 0.51mm
D 62 BU BU 0.51mm D
63 WU/BN WU/BN 0.51mm
64 BN BN 0.51mm
65 -ETHERNET-W9 ( AMP_ Type 5 Shielded network cables 5.00 m ) WH/OG WH/OG 0.51mm
66 OG OG 0.51mm
67 WH/GN WH/GN 0.51mm
68 GN GN 0.51mm
69 WH/BU WH/BU 0.51mm
E 70 BU BU 0.51mm E

71 WU/BN WU/BN 0.51mm


72 BN BN 0.51mm
73 -ETHERNET-W10 ( AMP_ Type 5 Shielded network cables 35.0… WH/OG WH/OG 0.51mm
74 OG OG 0.51mm
2 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
75 WH/GN WH/GN 0.51mm
A A
76 GN GN 0.51mm
77 WH/BU WH/BU 0.51mm
78 BU BU 0.51mm
79 WU/BN WU/BN 0.51mm
80 BN BN 0.51mm
81 -ETHERNET-W11 ( AMP_ Type 5 Shielded network cables 5.00 …WH/OG WH/OG 0.51mm
82 OG OG 0.51mm
83 WH/GN WH/GN 0.51mm
B B
84 GN GN 0.51mm
85 WH/BU WH/BU 0.51mm
86 BU BU 0.51mm
87 WU/BN WU/BN 0.51mm
88 BN BN 0.51mm
89 -ETHERNET-W12 ( AMP_ Type 5 Shielded network cables 60.0… WH/OG WH/OG 0.51mm
90 OG OG 0.51mm
C 91 WH/GN WH/GN 0.51mm C
92 GN GN 0.51mm
93 WH/BU WH/BU 0.51mm
94 BU BU 0.51mm
95 WU/BN WU/BN 0.51mm
96 BN BN 0.51mm
97 -ETHERNET-W13 ( AMP_ Type 5 Shielded network cables 25.0… WH/OG WH/OG 0.51mm
98 OG OG 0.51mm
D 99 WH/GN WH/GN 0.51mm D
100 GN GN 0.51mm
101 WH/BU WH/BU 0.51mm
102 BU BU 0.51mm
103 WU/BN WU/BN 0.51mm
104 BN BN 0.51mm
105 -ETHERNET-W14 ( AMP_ Type 5 Shielded network cables 45.0… WH/OG WH/OG 0.51mm
106 OG OG 0.51mm
E 107 WH/GN WH/GN 0.51mm E

108 GN GN 0.51mm
109 WH/BU WH/BU 0.51mm
110 BU BU 0.51mm
111 WU/BN WU/BN 0.51mm
3 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
112 BN BN 0.51mm
A A
113 +1CB01 =1CD01 -W1 ( ZR-RVVP 16*0.5 20.00 m ) 1 BK 0.5 09/4.B8 =1CD01 +1CD01 -X2 :10 =1CB01 +1CB01 -P01 :1
114 2 BK 0.5 09/4.B8 =1CD01 +1CD01 -X2 :20 =1CB01 +1CB01 -P01 :2
115 3 BK 0.5 09/18.B3 =1CD01 +1CD01 -S1 :14 =1CB01 +1CB01 -S6 :14
116 4 BK 0.5 09/18.B4 =1CD01 +1CD01 -S2 :14 =1CB01 +1CB01 -S7 :14
117 5 BK 0.5 09/18.D3 =1CD01 +1CD01 -S1 :1 =1CB01 +1CB01 -S6 :1
118 6 BK 0.5 09/18.D4 =1CD01 +1CD01 -S2 :1 =1CB01 +1CB01 -S7 :1
119 7 BK 0.5 09/18.B4 =900C101 +1CD01 -S3 :14 =900C101 +1CB01 -S1 :14
120 8 BK 0.5 09/18.B5 =1CD01 +1CD01 -S3 :24 =1CB01 +1CB01 -S1 :24
B B
121 9 BK 0.5 09/18.B5 =900C101 +1CD01 -S4 :22 =900C101 +1CB01 -S2 :22
122 10 BK 0.5 09/18.B6 =900C102 +1CD01 -S5 :14 =900C102 +1CB01 -S1 :14
123 11 BK 0.5 09/18.B6 =1CD01 +1CD01 -S5 :24 =1CB01 +1CB01 -S1 :24
124 12 BK 0.5 09/18.B7 =900C102 +1CD01 -S6 :22 =900C102 +1CB01 -S2 :22
125 13 BK 0.5 09/18.B7 =1CD01 +1CD01 -X4 :6 =1CB01 +1CB01 -SE1 :22
126 14 BK 0.5
127 15 BK 0.5
C 128 16 BK 0.5 C
129 屏蔽/shield
130 +1CD01 =1CD01 -P1-W1 ( ZR-RVV-500V 3*0.5 5.00 m ) 1 BK 0.5 09/5.D7 =1CD01 +1CD01 -P02 :2绿/GN =1CD01 +1CD01 -X4 :3
131 2 BK 0.5 09/5.D8 =1CD01 +1CD01 -P02 :1红/RD =1CD01 +1CD01 -X4 :4
132 3 BK 0.5 09/5.D8 =1CD01 +1CD01 -P02 :黑/BK =1CD01 +1CD01 -X4 :5
133 +1CD01 =1CD01 -W1 ( ZR-VV-1KV 3*1.5+1*1.0 50.00 m ) 1 YE 1.5 09/4.B2 +1CP01 -F5 :2 =1CD01 +1CD01 -F1 :1
134 2 GN 1.5 09/4.B2 =1CD01 +1CD01 -X1 :5 +1CP01 -X1 :9
135 3 RD 1.5
D 136 PE GN/YE 1.0 09/4.B1 +1CP01 PE : =900E101 +1CD01 PE : D
137 +1CD01 =1CD01 -W2 ( ZR-VV-1KV 3*1.5+1*1.0 5.00 m ) 1 YE 1.5 09/4.E6 =1CD01 -1WS01 :L =1CD01 +1CD01 -F6 :2
138 2 GN 1.5 09/4.E6 =1CD01 -1WS01 :N =1CD01 +1CD01 -X1 :8
139 3 RD 1.5
140 PE GN/YE 1.0 09/4.E6 =900E101 +1CD01 PE : =1CD01 -1WS01 :PE
141 +1CD02 =1CD02 -P1-W1 ( ZR-RVV-500V 3*0.5 5.00 m ) 1 BK 0.5 09/23.D6 =1CD02 +1CD02 -P02 :2绿/GN =1CD02 +1CD02 -X0 :3
142 2 BK 0.5 09/23.D7 =1CD02 +1CD02 -P02 :1红/RD =1CD02 +1CD02 -X0 :4
143 3 BK 0.5 09/23.D7 =1CD02 +1CD02 -P02 :黑/BK =1CD02 +1CD02 -X0 :5
E 144 +1CD02 =1CD02 -W1 ( ZR-VV-1KV 3*1.5+1*1.0 30.00 m ) 1 YE 1.5 09/22.B2 +1CP01 -F6 :2 =1CD02 +1CD02 -F1 :1 E

145 2 GN 1.5 09/22.B2 +1CP01 -X1 :10 =1CD02 +1CD02 -X1 :5


146 3 RD 1.5
147 PE GN/YE 1.0 09/22.B1 +1CP01 PE : =1CD02 +1CD02 PE :
148 +1CD02 =1CD02 -W3 ( ZR-VV-1KV 3*1.5+1*1.0 5.00 m ) 1 YE 1.5 09/22.D6 =1CD02 -1WS03 :L =1CD02 +1CD02 -F6 :2
4 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
149 2 GN 1.5 09/22.D7 =1CD02 -1WS03 :N =1CD02 +1CD02 -X1 :8
A A
150 3 RD 1.5
151 PE GN/YE 1.0 09/22.D6 =1CD02 -1WS03 :PE =1CD02 +1CD02 PE :
152 +1CD02 =900C108 -W2 ( ZR-RVVP 16*0.5 30.00 m ) 1 BK 0.5 02/22.B2 +1CP01 -X4 :1 =1CD02 +1CD02 -X5 :1
153 2 BK 0.5 02/22.B3 +1CP01 -X4 :2 =1CD02 +1CD02 -X5 :2
154 3 BK 0.5 02/22.B4 +1CP01 -X4 :3 =1CD02 +1CD02 -X5 :3
155 4 BK 0.5 02/22.B5 +1CP01 -X4 :4 =1CD02 +1CD02 -X5 :4
156 5 BK 0.5 02/22.E2 +1CP01 -X4 :5 =1CD02 +1CD02 -X5 :5
157 6 BK 0.5 02/22.E3 +1CP01 -X4 :6 =1CD02 +1CD02 -X5 :6
B B
158 7 BK 0.5 02/22.E4 +1CP01 -X4 :7 =1CD02 +1CD02 -X5 :7
159 8 BK 0.5 02/11.C6 +1CP01 -X4 :8 =1CD02 +1CD02 -X5 :8
160 9 BK 0.5
161 10 BK 0.5 02/31.B3 +1CP01 -X4 :10 =1CD02 +1CD02 -X5 :10
162 11 BK 0.5 02/31.B4 +1CP01 -X4 :11 =1CD02 +1CD02 -X5 :11
163 12 BK 0.5 02/31.D2 +1CP01 -X4 :12 =1CD02 +1CD02 -X5 :12
164 13 BK 0.5 02/31.D3 +1CP01 -X4 :13 =1CD02 +1CD02 -X5 :13
C 165 14 BK 0.5 02/31.D4 +1CP01 -X4 :14 =1CD02 +1CD02 -X5 :14 C
166 15 BK 0.5 02/6.C5 +1CP01 -X4 :15 =1CD02 +1CD02 -X5 :15
167 16 BK 0.5
168 shield
169 +1CD03 =1CD03 -P1-W1 ( ZR-RVV-500V 3*0.5 5.00 m ) 1 BK 0.5 09/33.D6 =1CD03 +1CD03 -P02 :2绿/GN =1CD03 +1CD03 -X0 :3
170 2 BK 0.5 09/33.D7 =1CD03 +1CD03 -P02 :1红/RD =1CD03 +1CD03 -X0 :4
171 3 BK 0.5 09/33.D7 =1CD03 +1CD03 -P02 :黑/BK =1CD03 +1CD03 -X0 :5
172 +1CD03 =1CD03 -W1 ( ZR-VV-1KV 3*2.5+1*1.5 40.00 m ) 1 YE 2.5 09/32.B2 =1CP03.2 +1CP03 -2X1 :4 =1CD03 +1CD03 -F1 :1
D 173 2 GN 2.5 09/32.B2 =1CP03.2 +1CP03 -2X1 :10 =1CD03 +1CD03 -X1 :5 D
174 3 RD 2.5
175 PE GN/YE 1.5 09/32.B1 =1CD03 +1CD03 PE :
176 +1CD03 WS_1 -W1 ( ZR-RVVP 10*0.5 50.00 m ) 1 BK 0.5 02/123.D1 =1CD03 +1CD03 -X4 :1
177 2 BK 0.5 02/123.D2 =1CD03 +1CD03 -X4 :2
178 3 BK 0.5 02/123.D3 =1CD03 +1CD03 -X4 :3
179 4 BK 0.5 02/123.D4 =1CD03 +1CD03 -X4 :4
180 5 BK 0.5 02/123.D4 =1CD03 +1CD03 -X4 :5
E 181 6 BK 0.5 02/123.B6 =1CD03 +1CD03 -X4 :6 E

182 7 BK 0.5 02/123.B6 =1CD03 +1CD03 -X4 :7


183 8 BK 0.5 02/123.B6 =1CD03 +1CD03 -X4 :8
184 9 BK 0.5 02/123.B7 =1CD03 +1CD03 -X4 :9
185 10 BK 0.5 02/123.B7 =1CD03 +1CD03 -X4 :10
5 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
186 shield
A A
187 +1CD03 WS_1 -W2 ( ZR-RVVP 10*0.5 50.00 m ) 1 BK 0.5 02/124.D1 =1CD03 +1CD03 -X4 :11
188 2 BK 0.5 02/124.D2 =1CD03 +1CD03 -X4 :12
189 3 BK 0.5 02/124.D3 =1CD03 +1CD03 -X4 :13
190 4 BK 0.5 02/124.D4 =1CD03 +1CD03 -X4 :14
191 5 BK 0.5 02/124.D4 =1CD03 +1CD03 -X4 :15
192 6 BK 0.5 02/124.B6 =1CD03 +1CD03 -X4 :16
193 7 BK 0.5 02/124.B6 =1CD03 +1CD03 -X4 :17
194 8 BK 0.5 02/124.B6 =1CD03 +1CD03 -X4 :18
B B
195 9 BK 0.5 02/124.B7 =1CD03 +1CD03 -X4 :19
196 10 BK 0.5 02/124.B7 =1CD03 +1CD03 -X4 :20
197 shield
198 +1CP01 -W1 ( ZR-RVV-500V 3*1 45.00 m ) 1 BK 1 02/5.A4 =1CD01 +1CD01 -X4 :1 +1CP01 -X0 :2
199 2 BK 1 02/5.A4 =1CD01 +1CD01 -X4 :2 +1CP01 -X0 :3
200 3 BK 1
201 +1CP01 -W2 ( ZR-RVV-500V 3*1 30.00 m ) 1 BK 1 02/5.A5 +1CP01 -X0 :4 =1CD02 +1CD02 -X0 :1
C 202 2 BK 1 02/5.A5 +1CP01 -X0 :5 =1CD02 +1CD02 -X0 :2 C
203 3 BK 1
204 +1CP01 =1CB01 -W3 ( ZR-RVV-500V 3*1 60.00 m ) 1 BK 1 02/5.A6,… +1CP01 -X0 :6 =1CB01 +1CB01 -SE1 :11
205 2 BK 1 02/5.A6,… +1CP01 -X0 :7 =1CB01 +1CB01 -SE1 :12
206 3 BK 1
207 +1CP02 -1W3 ( ZR-VV-1KV 3*2.5+1*1.5 15.00 m ) 1 YE 2.5 02/39.A7 +1CP02 -1Q1 :A1 =1CP20 +1CP20 -1X1 :9
208 2 GN 2.5
209 3 RD 2.5
D 210 PE GN/YE 1.5 D
211 +1CP02 -2W3 ( ZR-VV-1KV 3*2.5+1*1.5 15.00 m ) 1 YE 2.5 02/66.A6 +1CP02 -2Q1 :A1
212 2 GN 2.5
213 3 RD 2.5
214 PE GN/YE 1.5
215 +1CP03 -W3 ( ZR-VV-1KV 3*2.5+1*1.5 80.00 m ) 1 YE 2.5 02/97.A6 =1CP20 +1CP20 -1X1 :11 +1CP03 -1Q1 :A1
216 2 GN 2.5
217 3 RD 2.5
E 218 PE GN/YE 1.5 E

219 +1CP04 =900E307.1 -1W1 ( ZR-VV-1KV 3*2.5+1*1.5 80.00 m ) 1 YE 2.5 02/137.A5 =1CP20 +1CP20 -1X1 :11 =900E307.1 +1CP04 -K1 :5
220 2 GN 2.5
221 3 RD 2.5
222 PE GN/YE 1.5
6 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
223 +1CP20 =1CP20 -W1 ( ZR-RVV-500V 3*1 35.00 m ) 1 BK 1 03/5.A4 =1CP20 +1CP20 -1X2 :2 -901E003 X2 :25
A A
224 2 BK 1 03/5.A4 =1CP20 +1CP20 -1X2 :3 -901E003 X2 :26
225 3 BK 1
226 +1CP20 =1CP20 -W2 ( ZR-RVV-500V 3*1 50.00 m ) 1 BK 1 03/5.A5 =1CP20 +1CP20 -1X2 :4 -901E004 X2 :25
227 2 BK 1 03/5.A5 =1CP20 +1CP20 -1X2 :5 -901E004 X2 :26
228 3 BK 1
229 +1CP20 =1CP20 -W3 ( ZR-RVV-500V 3*1 85.00 m ) 1 BK 1 03/5.A6 =1CP20 +1CP20 -1X2 :6 =1CD03 +1CD03 -X0 :1
230 2 BK 1 03/5.A6 =1CP20 +1CP20 -1X2 :7 =1CD03 +1CD03 -X0 :2
231 3 BK 1
B B
232 +1CP20 =1CP20 -W4 ( ZR-RVV-500V 3*1 115.00 m ) 1 BK 1 03/5.A7 =1CP20 +1CP20 -1X2 :8 =1OP4 +1OP4 -X0 :1
233 2 BK 1 03/5.A7 =1CP20 +1CP20 -1X2 :9 =1OP4 +1OP4 -X0 :2
234 3 BK 1
235 +1CP20 =1CP20 -W5 ( ZR-RVV-500V 3*1 45.00 m ) 1 BK 1 03/5.C4 =1CP20 +1CP20 -1X2 :10 +EX900E112/113/114 -X5 :29
236 2 BK 1 03/5.C4 =1CP20 +1CP20 -1X2 :11 +EX900E112/113/114 -X5 :30
237 3 BK 1
238 +1OP1 -W4 ( ZR-RVVP 7*0.5 25.00 m ) 1 BK 0.5 02/139.A3 +1CP04 -1X4 :1 =900E307.1 +1OP1 -X1 :29
C 239 2 BK 0.5 02/139.C7 +1CP04 -1X4 :2 =900E307.1 +1OP1 -X1 :30 C
240 3 BK 0.5 02/139.C8 +1CP04 -1X4 :3 =900E307.1 +1OP1 -X1 :31
241 4 BK 0.5 02/141.B2 +1CP04 -1X4 :4 =900E307.1 +1OP1 -X1 :32
242 5 BK 0.5 02/141.C2 +1CP04 -1X4 :5 =900E307.1 +1OP1 -X1 :33
243 6 BK 0.5
244 7 BK 0.5
245 Shield
246 +1OP1 =900E307.1 -P4-W1 ( ZR-RVVP 3*0.5 5.00 m ) 1 BK 0.5 02/141.D7 =900E307.1 +1OP1 -X1 :51 =900E307.1 +1OP1 -P4 :1红/RD
D 247 2 BK 0.5 02/141.D7 =900E307.1 +1OP1 -X1 :51 =900E307.1 +1OP1 -P4 :灰/GY D
248 3 BK 0.5 02/141.D8 =900E307.1 +1OP1 -X1 :5 =900E307.1 +1OP1 -P4 :黑/BK
249 Shield
250 +1OP1 =900E307.1 -W1 ( ZR-RVVP 7*0.5 25.00 m ) 1 BK 0.5 02/135.C5 +1CP04 -1X2 :8 =900E307.1 +1OP1 -X1 :1
251 2 BK 0.5 02/135.C6 +1CP04 -1X2 :18 =900E307.1 +1OP1 -X1 :4
252 3 BK 0.5 02/140.D5 =900E307.1 +1CP03 -2X7 :10 =900E307.1 +1OP1 -X1 :15
253 4 BK 0.5 02/140.D6 =900E307.1 +1CP03 -2X7 :11 =900E307.1 +1OP1 -X1 :16
254 5 BK 0.5 02/140.D7 =900E307.1 +1CP03 -2X7 :12 =900E307.1 +1OP1 -X1 :17
E 255 6 BK 0.5 E

256 7 BK 0.5
257 Shield
258 +1OP1 =900E307.1 -W2 ( ZR-RVVP 10*0.5 25.00 m ) 1 BK 0.5 02/139.D2 =900E307.1 +1CP03 -2X7 :1 =900E307.1 +1OP1 -X1 :6
259 2 BK 0.5 02/139.D3 =900E307.1 +1CP03 -2X7 :2 =900E307.1 +1OP1 -X1 :7
7 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
260 3 BK 0.5
A A
261 4 BK 0.5 02/140.D1 =900E307.1 +1CP03 -2X7 :4 =900E307.1 +1OP1 -X1 :9
262 5 BK 0.5 02/140.D2 =900E307.1 +1CP03 -2X7 :5 =900E307.1 +1OP1 -X1 :10
263 6 BK 0.5 02/140.D3 =900E307.1 +1CP03 -2X7 :6 =900E307.1 +1OP1 -X1 :11
264 7 BK 0.5 02/140.D3 =900E307.1 +1CP03 -2X7 :7 =900E307.1 +1OP1 -X1 :12
265 8 BK 0.5 02/140.D4 =900E307.1 +1CP03 -2X7 :8 =900E307.1 +1OP1 -X1 :13
266 9 BK 0.5 02/140.D5 =900E307.1 +1CP03 -2X7 :9 =900E307.1 +1OP1 -X1 :14
267 10 BK 0.5
268 Shield
B B
269 +1OP1 =900E307.1 -W3 ( ZR-RVVP 10*0.5 25.00 m ) 1 BK 0.5 02/140.D7 =900E307.1 +1CP03 -2X7 :14 =900E307.1 +1OP1 -X1 :19
270 2 BK 0.5 02/140.D8 =900E307.1 +1CP03 -2X7 :15 =900E307.1 +1OP1 -X1 :20
271 3 BK 0.5 02/141.B3 =900E307.1 +1CP03 -2X7 :16 =900E307.1 +1OP1 -X1 :21
272 4 BK 0.5 02/141.B4 =900E307.1 +1CP03 -2X7 :17 =900E307.1 +1OP1 -X1 :22
273 5 BK 0.5 02/141.B5 =900E307.1 +1CP03 -2X7 :18 =900E307.1 +1OP1 -X1 :23
274 6 BK 0.5 02/148.D1 =900E307.1 +1CP03 -2X7 :19 =900E307.1 +1OP1 -X1 :24
275 7 BK 0.5 02/148.D2 =900E307.1 +1CP03 -2X7 :20 =900E307.1 +1OP1 -X1 :25
C 276 8 BK 0.5 02/148.D2 =900E307.1 +1CP03 -2X7 :21 =900E307.1 +1OP1 -X1 :26 C
277 9 BK 0.5 02/148.D3 =900E307.1 +1CP03 -2X7 :22 =900E307.1 +1OP1 -X1 :27
278 10 BK 0.5
279 Shield
280 +1OP2 -W2 ( ZR-RVVP 10*0.5 30.00 m ) 1 BK 0.5 02/142.D3 =900E307.1 +1CP03 -2X7 :24 =900E307.1 +1OP2 -X1 :6
281 2 BK 0.5 02/142.D4 =900E307.1 +1CP03 -2X7 :25 =900E307.1 +1OP2 -X1 :7
282 3 BK 0.5 02/142.D5 =900E307.1 +1CP03 -2X7 :26 =900E307.1 +1OP2 -X1 :8
283 4 BK 0.5 02/142.D5 =900E307.1 +1CP03 -2X7 :27 =900E307.1 +1OP2 -X1 :9
D 284 5 BK 0.5 02/142.D6 =900E307.1 +1CP03 -2X7 :28 =900E307.1 +1OP2 -X1 :10 D
285 6 BK 0.5 02/148.D5 =900E307.1 +1CP03 -2X7 :29 =900E307.1 +1OP2 -X1 :11
286 7 BK 0.5 02/148.D5 =900E307.1 +1CP03 -2X7 :30 =900E307.1 +1OP2 -X1 :12
287 8 BK 0.5 02/143.C2 =900E307.1 +1CP03 -2X7 :31 =900E307.1 +1OP2 -X1 :13
288 9 BK 0.5 02/143.C2 =900E307.1 +1CP03 -2X7 :32 =900E307.1 +1OP2 -X1 :14
289 10 BK 0.5 02/143.C3 =900E307.1 +1CP03 -2X7 :33 =900E307.1 +1OP2 -X1 :15
290 Shield
291 +1OP2 -W3 ( ZR-RVVP 10*0.5 20.00 m ) 1 BK 0.5 02/142.C1 =900E307.1 +1OP1 -X1 :35 =900E307.1 +1OP2 -X1 :19
E 292 2 BK 0.5 02/142.C2 =900E307.1 +1OP1 -X1 :36 =900E307.1 +1OP2 -X1 :20 E

293 3 BK 0.5 02/142.C3 =900E307.1 +1OP1 -X1 :37 =900E307.1 +1OP2 -X1 :21
294 4 BK 0.5 02/143.C1 =900E307.1 +1OP1 -X1 :38 =900E307.1 +1OP2 -X1 :22
295 5 BK 0.5 02/148.C4 =900E307.1 +1OP1 -X1 :39 =900E307.1 +1OP2 -X1 :23
296 6 BK 0.5 02/148.C4 =900E307.1 +1OP1 -X1 :40 =900E307.1 +1OP2 -X1 :24
8 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
297 7 BK 0.5 02/141.C3 =900E307.1 +1OP1 -X1 :41 =900E307.1 +1OP2 -X1 :25
A A
298 8 BK 0.5
299 9 BK 0.5
300 10 BK 0.5
301 Shield
302 +1OP2 -W4 ( ZR-RVVP 3*0.5 20.00 m ) 1 BK 0.5 02/139.B5 =900E307.1 +1OP1 -X1 :48 =900E307.1 +1OP2 -X1 :17
303 2 BK 0.5 02/139.B5 =900E307.1 +1OP1 -X1 :49 =900E307.1 +1OP2 -X1 :18
304 3 BK 0.5
305 Shield
B B
306 +1OP2 =900E307.1 -P6-W1 ( ZR-RVVP 3*0.5 5.00 m ) 1 BK 0.5 02/143.D5 =900E307.1 +1OP2 -X1 :28 =900E307.1 +1OP2 -P6 :1红/RD
307 2 BK 0.5 02/143.D5 =900E307.1 +1OP2 -X1 :28 =900E307.1 +1OP2 -P6 :灰/GY
308 3 BK 0.5 02/143.D5 =900E307.1 +1OP2 -X1 :5 =900E307.1 +1OP2 -P6 :黑/BK
309 Shield
310 +1OP2 =900E307.1 -W1 ( ZR-RVVP 3*0.5 30.00 m ) 1 BK 0.5 02/135.C7 +1CP04 -1X2 :10 =900E307.1 +1OP2 -X1 :1
311 2 BK 0.5 02/135.C8 +1CP04 -1X2 :20 =900E307.1 +1OP2 -X1 :4
312 3 BK 0.5
C 313 Shield C
314 +1OP4 =1OP4 -P1-W1 ( ZR-RVV-500V 3*1 5.00 m ) 1 BK 1 09/42.D6 =1OP4 +1OP4 -P02 :2绿/GN =1OP4 +1OP4 -X0 :7
315 2 BK 1 09/42.D7 =1OP4 +1OP4 -P02 :1红/RD =1OP4 +1OP4 -X0 :8
316 3 BK 1 09/42.D7 =1OP4 +1OP4 -P02 :黑/BK =1OP4 +1OP4 -X0 :9
317 +1OP4 =1OP4 -W1 ( ZR-VV-1KV 3*2.5+1*1.5 45.00 m ) 1 YE 2.5 09/41.B2 =1CD03 +1CD03 -X1 :4 =1OP4 +1OP4 -F1 :1
318 2 GN 2.5 09/41.B2 =1CD03 +1CD03 -X1 :8 =1OP4 +1OP4 -X1 :3
319 3 RD 2.5
320 PE GN/YE 1.5 09/41.B1 =1OP4 +1OP4 PE : =1OP4 +1OP4 PE :
D 321 +1OP4 =1OP4 -W2 ( ZR-RVV-500V 3*1 45.00 m ) 1 BK 1 09/41.B5 =1CD03 +1CD03 -X2 :5 =1OP4 +1OP4 -F3 :1 D
322 2 BK 1 09/41.B6 =1CD03 +1CD03 -X2 :15 =1OP4 +1OP4 -X2 :5
323 3 BK 1
324 +1OP4 =1OP4 -W3 ( ZR-RVVP 4*0.5 45.00 m ) 1 BK 0.5 09/42.D2 =1OP4 +1OP4 -X0 :3 =1CD03 +1CD03 -X0 :6
325 2 BK 0.5 09/42.D3 =1CD03 +1CD03 -X0 :7 =1OP4 +1OP4 -X0 :4
326 3 BK 0.5 09/42.C4 =1CD03 +1CD03 -X0 :8 =1OP4 +1OP4 -X0 :5
327 4 BK 0.5 09/42.C5 =1CD03 +1CD03 -X0 :9 =1OP4 +1OP4 -X0 :6
328 shield
E 329 +CP10 =CP10 -W1 ( ZR-YJV-1KV 4*25 90.00 m ) 1 YE 25 01/7.D1 =CP10 +CP10 -1F1 :2 E

330 2 GN 25 01/7.D2 =CP10 +CP10 -1F1 :4


331 3 RD 25 01/7.D2 =CP10 +CP10 -1F1 :6
332 PE GN/YE 25 01/7.D2 =CP10 +CP10 N :
333 +CP10 =CP10 -W2 ( BVR 16 (YE/GN) 90.00 m ) PE GN/YE 16 01/7.D2 =CP10 +CP10 PE :
9 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
334 +CP10 =CP10 -W3 ( ZR-YJV-1KV 4*25 15.00 m ) 1 YE 25 01/7.D3 =CP10 +CP10 -1F2 :2
A A
335 2 GN 25 01/7.D3 =CP10 +CP10 -1F2 :4
336 3 RD 25 01/7.D3 =CP10 +CP10 -1F2 :6
337 PE GN/YE 25 01/7.D3 =CP10 +CP10 N :
338 +CP10 =CP10 -W4 ( BVR 16 (YE/GN) 15.00 m ) PE GN/YE 16 01/7.D3 =CP10 +CP10 PE :
339 +CP10 =CP10 -W5 ( ZR-YJV-1KV 4*25 15.00 m ) 1 YE 25 01/7.D4 =CP10 +CP10 -1F3 :2
340 2 GN 25 01/7.D4 =CP10 +CP10 -1F3 :4
341 3 RD 25 01/7.D4 =CP10 +CP10 -1F3 :6
342 PE GN/YE 25 01/7.D5 =CP10 +CP10 N :
B B
343 +CP10 =CP10 -W6 ( BVR 16 (YE/GN) 15.00 m ) PE GN/YE 16 01/7.D5 =CP10 +CP10 PE :
344 +CP10 =CP10 -W7 ( ZR-YJV-1KV 4*35 80.00 m ) 1 YE 35 01/7.D6 =CP10 +CP10 -1F4 :2
345 2 GN 35 01/7.D6 =CP10 +CP10 -1F4 :4
346 3 RD 35 01/7.D6 =CP10 +CP10 -1F4 :6
347 PE GN/YE 35 01/7.D6 =CP10 +CP10 N :
348 +CP10 =CP10 -W8 ( BVR 16 (YE/GN) 80.00 m ) PE GN/YE 16 01/7.D6 =CP10 +CP10 PE :
349 +CP10 =CP10 -W9 ( ZR-YJV-1KV 4*25 95.00 m ) 1 YE 25 01/7.D7 =CP10 +CP10 -1F5 :2
C 350 2 GN 25 01/7.D7 =CP10 +CP10 -1F5 :4 C
351 3 RD 25 01/7.D7 =CP10 +CP10 -1F5 :6
352 PE GN/YE 25 01/7.D8 =CP10 +CP10 N :
353 +CP10 =CP10 -W10 ( BVR 16 (YE/GN) 95.00 m ) PE GN/YE 16 01/7.D8 =CP10 +CP10 PE :
354 +CP10 =CP10 -W11 ( ZR-YJV-1KV 4*35 110.00 m ) 1 YE 35 01/8.D1 =CP10 +CP10 -1F6 :2
355 2 GN 35 01/8.D1 =CP10 +CP10 -1F6 :4
356 3 RD 35 01/8.D2 =CP10 +CP10 -1F6 :6
357 PE GN/YE 35 01/8.D2 =CP10 +CP10 N :
D 358 +CP10 =CP10 -W12 ( BVR 16 (YE/GN) 110.00 m ) PE GN/YE 16 01/8.D2 =CP10 +CP10 PE : D
359 +CP10 =CP10 -W13 ( ZR-YJV-1KV 4*25 110.00 m ) 1 YE 25 01/8.D3 =CP10 +CP10 -1F7 :2
360 2 GN 25 01/8.D3 =CP10 +CP10 -1F7 :4
361 3 RD 25 01/8.D3 =CP10 +CP10 -1F7 :6
362 PE GN/YE 25 01/8.D3 =CP10 +CP10 N :
363 +CP10 =CP10 -W14 ( BVR 16 (YE/GN) 110.00 m ) PE GN/YE 16 01/8.D3 =CP10 +CP10 PE :
364 +CP10 =CP10 -W15 ( ZR-YJV-1KV 4*70 160.00 m ) 1 YE 25 01/8.D4
365 2 GN 25 01/8.D4
E 366 3 RD 25 01/8.D4 E

367 PE GN/YE 25 01/8.D5 =CP10 +CP10 N :


368 +CP10 =CP10 -W16 ( BVR 16 (YE/GN) 160.00 m ) PE GN/YE 16 01/8.D5 =CP10 +CP10 PE :
369 +CP10 =CP10 -W17 ( ZR-YJV-1KV 4*50 155.00 m ) 1 YE 50 01/8.D6
370 2 GN 50 01/8.D6
10 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
371 3 RD 50 01/8.D6
A A
372 PE GN/YE 50 01/8.D6 =CP10 +CP10 N :
373 +CP10 =CP10 -W18 ( BVR 16 (YE/GN) 155.00 m ) PE GN/YE 16 01/8.D6 =CP10 +CP10 PE :
374 +CP10 =CP10 -W19 ( ZR-YJV-1KV 4*50 150.00 m ) 1 YE 50 01/8.D7
375 2 GN 50 01/8.D7
376 3 RD 50 01/8.D8
377 PE GN/YE 50 01/8.D8 =CP10 +CP10 N :
378 +CP10 =CP10 -W20 ( BVR 16 (YE/GN) 150.00 m ) PE GN/YE 16 01/8.D8 =CP10 +CP10 PE :
379 +CP10 =CP10 -W21 ( ZR-VV-1KV 3*2.5+1*1.5 30.00 m ) 1 YE 50 01/9.D1 =CP10 +CP10 -1F11 :2
B B
380 2 GN 50 01/9.D2 =CP10 +CP10 -1F11 :4
381 3 RD 50 01/9.D2 =CP10 +CP10 -1F11 :6
382 PE GN/YE 50 01/9.D2 =CP10 +CP10 N :
383 +CP10 =CP10 -W22 ( BVR 6 (YE/GN) 30.00 m ) PE GN/YE 16 01/9.D2 =CP10 +CP10 PE :
384 +CP10 =CP10 -W23 ( ZR-YJV-1KV 4*16 35.00 m ) 1 YE 50 01/9.D3 =CP10 +CP10 -1F12 :2
385 2 GN 50 01/9.D3 =CP10 +CP10 -1F12 :4
386 3 RD 50 01/9.D3 =CP10 +CP10 -1F12 :6
C 387 PE GN/YE 50 01/9.D3 =CP10 +CP10 N : C
388 +CP10 =CP10 -W24 ( BVR 6 (YE/GN) 35.00 m ) PE GN/YE 16 01/9.D4 =CP10 +CP10 PE :
389 +CP10 =CP10 -W25 ( ZR-YJV-1KV 4*16 50.00 m ) 1 YE 50 01/9.D4 =CP10 +CP10 -1F13 :2
390 2 GN 50 01/9.D5 =CP10 +CP10 -1F13 :4
391 3 RD 50 01/9.D5 =CP10 +CP10 -1F13 :6
392 PE GN/YE 50 01/9.D5 =CP10 +CP10 N :
393 +CP10 =CP10 -W26 ( BVR 6 (YE/GN) 50.00 m ) PE GN/YE 16 01/9.D5 =CP10 +CP10 PE :
394 +CP10 =CP10 -W27 ( ZR-YJV-1KV 4*16 45.00 m ) 1 YE 50 01/9.D6 =CP10 +CP10 -1F14 :2
D 395 2 GN 50 01/9.D6 =CP10 +CP10 -1F14 :4 D
396 3 RD 50 01/9.D6 =CP10 +CP10 -1F14 :6
397 PE GN/YE 50 01/9.D6 =CP10 +CP10 N :
398 +CP10 =CP10 -W28 ( BVR 6 (YE/GN) 45.00 m ) PE GN/YE 6 01/9.D7 =CP10 +CP10 PE :
399 +CP10 =CP10 -W29 ( ZR-YJV-1KV 4*16 95.00 m ) 1 YE 50 01/9.D7
400 2 GN 50 01/9.D7
401 3 RD 50 01/9.D8
402 PE GN/YE 50 01/9.D8 =CP10 +CP10 N :
E 403 +CP10 =CP10 -W30 ( BVR 6 (YE/GN) 95.00 m ) PE GN/YE 6 01/9.D8 =CP10 +CP10 PE : E

404 +CP10 =CP10 -W31 ( ZR-YJV-1KV 4*10 185.00 m ) 1 YE 50 01/10.D1 =CP10 +CP10 -1F16 :2
405 2 GN 50 01/10.D2 =CP10 +CP10 -1F16 :4
406 3 RD 50 01/10.D2 =CP10 +CP10 -1F16 :6
407 PE GN/YE 50 01/10.D2 =CP10 +CP10 N :
11 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
408 +CP10 =CP10 -W32 ( BVR 6 (YE/GN) 185.00 m ) PE GN/YE 6 01/10.D2 =CP10 +CP10 PE :
A A
409 +EX900C101 -M1-W2 ( ZR-RVV-500V 2*0.75 65.00 m ) 1 BK 0.75
410 2 BK 0.75
411 +EX900C101 -JB1 =1CD01 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/7.A6 +EX900C101 -JB1 -X1 :1 =1CD01 +1CD01 -X3 :1
412 2 BK 0.5 02/7.A6 +EX900C101 -JB1 -X1 :3 =1CD01 +1CD01 -X3 :2
413 3 BK 0.5 02/7.D6 =1CD01 +1CD01 -X3 :3 +EX900C101 -JB1 -X1 :5
414 4 BK 0.5
415 Shield
416 +EX900C101 -JB2 =1CD01 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/7.A7 =1CD01 +1CD01 -X3 :4 +EX900C101 -JB2 -X1 :1
B B
417 2 BK 0.5 02/7.A7 =1CD01 +1CD01 -X3 :5 +EX900C101 -JB2 -X1 :3
418 3 BK 0.5 02/7.D7 =1CD01 +1CD01 -X3 :6 +EX900C101 -JB2 -X1 :5
419 4 BK 0.5 02/8.D6 =1CD01 +1CD01 -X3 :7 +EX900C101 -JB2 -X1 :6
420 Shield
421 +EX900C101 =1CD01 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/7.B6 +EX900C101 -JB1 -X1 :1 +EX900C101 -B1 :1/BN
422 3/BU BU 0.34 02/7.B6 +EX900C101 -JB1 -X1 :3 +EX900C101 -B1 :3/BU
423 4/BK BK 0.34 02/7.D6 +EX900C101 -JB1 -X1 :5 +EX900C101 -B1 :4/BK
C 424 +EX900C101 =1CD01 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/7.B7 +EX900C101 -JB2 -X1 :1 +EX900C101 -B2 :1/BN C
425 3/BU BU 0.34 02/7.B7 +EX900C101 -JB2 -X1 :3 +EX900C101 -B2 :3/BU
426 4/BK BK 0.34 02/7.D7 +EX900C101 -JB2 -X1 :5 +EX900C101 -B2 :4/BK
427 +EX900C101 =900C101 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 65.0… 1 YE 2.5 02/7.E2 +1CP01 -X3 :1 =900C101 +EX900C101 -M1 :U
428 2 GN 2.5 02/7.E2 +1CP01 -X3 :2 =900C101 +EX900C101 -M1 :V
429 3 RD 2.5 02/7.E2 +1CP01 -X3 :3 =900C101 +EX900C101 -M1 :W
430 PE GN/YE 1.5 02/7.E2 +1CP01 -X3 :4 =900C101 +EX900C101 -M1 :PE
431 +EX900C102 -JB1 =1CD01 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/8.A7 =1CD01 +1CD01 -X3 :8 +EX900C102 -JB1 -X1 :1
D 432 2 BK 0.5 02/8.A7 =1CD01 +1CD01 -X3 :9 +EX900C102 -JB1 -X1 :3 D
433 3 BK 0.5 02/8.D7 =1CD01 +1CD01 -X3 :10 +EX900C102 -JB1 -X1 :5
434 4 BK 0.5 02/9.D6 =1CD01 +1CD01 -X3 :11 +EX900C102 -JB1 -X1 :6
435 Shield
436 +EX900C102 =1CD01 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/8.B6 +EX900C101 -JB2 -X1 :2 =1CD01 +EX900C102 -B1 :1/BN
437 3/BU BU 0.34 02/8.B6 +EX900C101 -JB2 -X1 :4 =1CD01 +EX900C102 -B1 :3/BU
438 4/BK BK 0.34 02/8.D6 +EX900C101 -JB2 -X1 :6 =1CD01 +EX900C102 -B1 :4/BK
439 +EX900C102 =1CD01 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/8.B7 +EX900C102 -JB1 -X1 :1 =1CD01 +EX900C102 -B2 :1/BN
E 440 3/BU BU 0.34 02/8.B7 +EX900C102 -JB1 -X1 :3 =1CD01 +EX900C102 -B2 :3/BU E

441 4/BK BK 0.34 02/8.D7 +EX900C102 -JB1 -X1 :5 =1CD01 +EX900C102 -B2 :4/BK
442 +EX900C102 =900C102 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 55.0… 1 YE 2.5 02/8.E1 +1CP01 -X3 :7 =900C102 +EX900C102 -M1 :U
443 2 GN 2.5 02/8.E1 +1CP01 -X3 :8 =900C102 +EX900C102 -M1 :V
444 3 RD 2.5 02/8.E2 +1CP01 -X3 :9 =900C102 +EX900C102 -M1 :W
12 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
445 PE GN/YE 1.5 02/8.E2 +1CP01 -X3 :10 =900C102 +EX900C102 -M1 :PE
A A
446 +EX900C102 =900C102 -M1-W2 ( ZR-RVV-500V 2*0.75 55.00 m ) 1 BK 0.75 02/7.E4,… +1CP01 -X3 :11 =900C102 +EX900C102 -M1 :AC1
447 2 BK 0.75 02/7.E5,… +1CP01 -X3 :12 =900C102 +EX900C102 -M1 :AC2
448 +EX900C103 -JB2 =1CD01 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/9.A7 =1CD01 +1CD01 -X3 :12 +EX900C103 -JB2 -X1 :1
449 2 BK 0.5 02/9.A7 =1CD01 +1CD01 -X3 :13 +EX900C103 -JB2 -X1 :3
450 3 BK 0.5 02/9.D7 =1CD01 +1CD01 -X3 :14 +EX900C103 -JB2 -X1 :5
451 4 BK 0.5
452 Shield
453 +EX900C103 =1CD01 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/9.B7 +EX900C103 -JB2 -X1 :1 =1CD01 +EX900C103 -B2 :1/BN
B B
454 3/BU BU 0.34 02/9.B7 +EX900C103 -JB2 -X1 :3 =1CD01 +EX900C103 -B2 :3/BU
455 4/BK BK 0.34 02/9.D7 +EX900C103 -JB2 -X1 :5 =1CD01 +EX900C103 -B2 :4/BK
456 +EX900C103 =900C103 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/9.B6 +EX900C102 -JB1 -X1 :2 =900C103 +EX900C103 -B1 :1/BN
457 3/BU BU 0.34 02/9.B6 +EX900C102 -JB1 -X1 :4 =900C103 +EX900C103 -B1 :3/BU
458 4/BK BK 0.34 02/9.D6 +EX900C102 -JB1 -X1 :6 =900C103 +EX900C103 -B1 :4/BK
459 +EX900C103 =900C103 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 45.0… 1 YE 2.5 02/9.E1 +1CP01 -X3 :13 =900C103 +EX900C103 -M1 :U
460 2 GN 2.5 02/9.E1 +1CP01 -X3 :14 =900C103 +EX900C103 -M1 :V
C 461 3 RD 2.5 02/9.E2 +1CP01 -X3 :15 =900C103 +EX900C103 -M1 :W C
462 PE GN/YE 1.5 02/9.E2 +1CP01 -X3 :16 =900C103 +EX900C103 -M1 :PE
463 +EX900C103 =900C103 -M1-W2 ( ZR-RVV-500V 2*0.75 45.00 m ) 1 BK 0.75 02/9.E4 +1CP01 -X3 :17 =900C103 +EX900C103 -M1 :AC1
464 2 BK 0.75 02/9.E4 +1CP01 -X3 :18 =900C103 +EX900C103 -M1 :AC2
465 +EX900C104 -JB1 -W1 ( ZR-RVVP 3*0.5 55.00 m ) 1 BK 0.5 02/16.A6 =1CD02 +1CD02 -X3 :1 +EX900C104 -JB1 -X1 :1
466 2 BK 0.5 02/16.A6 =1CD02 +1CD02 -X3 :2 +EX900C104 -JB1 -X1 :3
467 3 BK 0.5 02/16.D6 =1CD02 +1CD02 -X3 :3 +EX900C104 -JB1 -X1 :5
468 Shield
D 469 +EX900C104 =900C104 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/16.B6 +EX900C104 -JB1 -X1 :1 =900E104 +EX900C104 -B1 :1/BN D
470 3/BU BU 0.34 02/16.B6 +EX900C104 -JB1 -X1 :3 =900E104 +EX900C104 -B1 :3/BU
471 4/BK BK 0.34 02/16.D6 +EX900C104 -JB1 -X1 :5 =900E104 +EX900C104 -B1 :4/BK
472 +EX900C104 =900C104 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/16.E2 +1CP01 -X3 :19 =900C104 +EX900C104 -M1 :U
473 2 GN 2.5 02/16.E2 +1CP01 -X3 :20 =900C104 +EX900C104 -M1 :V
474 3 RD 2.5 02/16.E2 +1CP01 -X3 :21 =900C104 +EX900C104 -M1 :W
475 PE GN/YE 1.5 02/16.E2 +1CP01 -X3 :22 =900C104 +EX900C104 -M1 :PE
476 +EX900C105 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/17.B6 +EX900C105 -JB1 -X1 :1 +EX900C105 -B1 :1/BN
E 477 3/BU BU 0.34 02/17.B6 +EX900C105 -JB1 -X1 :3 +EX900C105 -B1 :3/BU E

478 4/BK BK 0.34 02/17.D6 +EX900C105 -JB1 -X1 :5 +EX900C105 -B1 :4/BK
479 +EX900C105 -JB1 -W1 ( ZR-RVVP 3*0.5 40.00 m ) 1 BK 0.5 02/17.B6 =1CD02 +1CD02 -X3 :4 +EX900C105 -JB1 -X1 :1
480 2 BK 0.5 02/17.B6 =1CD02 +1CD02 -X3 :5 +EX900C105 -JB1 -X1 :3
481 3 BK 0.5 02/17.E6 =1CD02 +1CD02 -X3 :6 +EX900C105 -JB1 -X1 :5
13 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
482 Shield
A A
483 +EX900C105 =900C105 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 2.5 02/17.E1 +1CP01 -X3 :23 =900C105 +EX900C105 -M1 :U
484 2 GN 2.5 02/17.E2 +1CP01 -X3 :24 =900C105 +EX900C105 -M1 :V
485 3 RD 2.5 02/17.E2 +1CP01 -X3 :25 =900C105 +EX900C105 -M1 :W
486 PE GN/YE 1.5 02/17.E2 +1CP01 -X3 :26 =900C105 +EX900C105 -M1 :PE
487 +EX900C105 =900C105 -M1-W2 ( ZR-RVV-500V 2*0.75 15.00 m ) 1 BK 0.75 02/17.E4 +1CP01 -X3 :27 =900C105 +EX900C105 -M1 :AC1
488 2 BK 0.75 02/17.E4 +1CP01 -X3 :28 =900C105 +EX900C105 -M1 :AC2
489 +EX900C106 -JB1 =900C106 -W1 ( ZR-RVVP 3*0.5 20.00 m ) 1 BK 0.5 02/18.A7 =1CD02 +1CD02 -X3 :7 +EX900C106 -JB1 -X1 :1
490 2 BK 0.5 02/18.A7 =1CD02 +1CD02 -X3 :8 +EX900C106 -JB1 -X1 :3
B B
491 3 BK 0.5 02/18.D7 =1CD02 +1CD02 -X3 :9 +EX900C106 -JB1 -X1 :5
492 Shield
493 +EX900C106 =900C106 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/18.B7 +EX900C106 -JB1 -X1 :1 =900C106 +EX900C106 -B1 :1/BN
494 3/BU BU 0.34 02/18.B7 +EX900C106 -JB1 -X1 :3 =900C106 +EX900C106 -B1 :3/BU
495 4/BK BK 0.34 02/18.D7 +EX900C106 -JB1 -X1 :5 =900C106 +EX900C106 -B1 :4/BK
496 +EX900C106 =900C106 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 20.0… 1 YE 2.5 02/18.E2 +1CP01 -X3 :41 =900C106 +EX900C106 -M1 :U
497 2 GN 2.5 02/18.E2 +1CP01 -X3 :42 =900C106 +EX900C106 -M1 :V
C 498 3 RD 2.5 02/18.E2 +1CP01 -X3 :43 =900C106 +EX900C106 -M1 :W C
499 PE GN/YE 1.5 02/18.E2 +1CP01 -X3 :44 =900C106 +EX900C106 -M1 :PE
500 +EX900C106 =900C106 -M1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/18.E4 +1CP01 -X3 :45 =900C106 +EX900C106 -M1 :AC1
501 2 BK 0.75 02/18.E4 +1CP01 -X3 :46 =900C106 +EX900C106 -M1 :AC2
502 +EX900C107 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/19.B6 +EX900C107 -JB1 -X1 :1 +EX900C107 -B1 :1/BN
503 3/BU BU 0.34 02/19.B6 +EX900C107 -JB1 -X1 :3 +EX900C107 -B1 :3/BU
504 4/BK BK 0.34 02/19.D6 +EX900C107 -JB1 -X1 :5 +EX900C107 -B1 :4/BK
505 +EX900C107 -JB1 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/19.B6 =1CD02 +1CD02 -X3 :10 +EX900C107 -JB1 -X1 :1
D 506 2 BK 0.5 02/19.B6 =1CD02 +1CD02 -X3 :11 +EX900C107 -JB1 -X1 :3 D
507 3 BK 0.5 02/19.E6 =1CD02 +1CD02 -X3 :12 +EX900C107 -JB1 -X1 :5
508 4 BK 0.5 02/23.D3 =1CD02 +1CD02 -X3 :20 +EX900C107 -JB1 -X1 :6
509 Shield
510 +EX900C107 =900C107 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.0… 1 YE 2.5 02/19.E2 +1CP01 -X3 :29 =900C107 +EX900C107 -M1 :U
511 2 GN 2.5 02/19.E2 +1CP01 -X3 :30 =900C107 +EX900C107 -M1 :V
512 3 RD 2.5 02/19.E2 +1CP01 -X3 :31 =900C107 +EX900C107 -M1 :W
513 PE GN/YE 1.5 02/19.E2 +1CP01 -X3 :32 =900C107 +EX900C107 -M1 :PE
E 514 +EX900C108 -JB1 =900C108 -W1 ( ZR-RVVP 7*0.5 10.00 m ) 1 BK 0.5 02/23.A4 =1CD02 +1CD02 -X3 :13 +EX900C108 -JB1 -X1 :1 E

515 2 BK 0.5 02/23.A4 =1CD02 +1CD02 -X3 :14 +EX900C108 -JB1 -X1 :3
516 3 BK 0.5 02/23.D4 =1CD02 +1CD02 -X3 :15 +EX900C108 -JB1 -X1 :5
517 4 BK 0.5 02/23.D5 =1CD02 +1CD02 -X3 :16 +EX900C108 -JB1 -X1 :6
518 5 BK 0.5 02/23.D6 =1CD02 +1CD02 -X3 :17 +EX900C108 -JB1 -X1 :7
14 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
519 6 BK 0.5
A A
520 7 BK 0.5
521 Shield
522 +EX900C108 =900C108 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/23.B4 +EX900C108 -JB1 -X1 :1 =900C108 +EX900C108 -B1 :1/BN
523 3/BU BU 0.34 02/23.B4 +EX900C108 -JB1 -X1 :3 =900C108 +EX900C108 -B1 :3/BU
524 4/BK BK 0.34 02/23.D4 +EX900C108 -JB1 -X1 :5 =900C108 +EX900C108 -B1 :4/BK
525 +EX900C108 =900C108 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/23.B3 +EX900C107 -JB1 -X1 :2 =900C108 +EX900C108 -B2 :1/BN
526 3/BU BU 0.34 02/23.B3 +EX900C107 -JB1 -X1 :4 =900C108 +EX900C108 -B2 :3/BU
527 4/BK BK 0.34 02/23.D3 +EX900C107 -JB1 -X1 :6 =900C108 +EX900C108 -B2 :4/BK
B B
528 +EX900C108 =900C108 -B3-W1 ( Sensor cable 2.00 m ) BN BN 02/23.B5 +EX900C108 -JB1 -X1 :2 =900C108 +EX900C108 -B3 :1/BN
529 BU BU 02/23.B5 +EX900C108 -JB1 -X1 :4 =900C108 +EX900C108 -B3 :3/BU
530 BK BK 02/23.D5 +EX900C108 -JB1 -X1 :6 =900C108 +EX900C108 -B3 :4/BK
531 +EX900C108 =900C108 -B4-W1 ( Sensor cable 2.00 m ) BN BN 02/23.B6 +EX900C108 -JB1 -X1 :2 =900C108 +EX900C108 -B4 :1/BN
532 BU BU 02/23.B7 +EX900C108 -JB1 -X1 :4 =900C108 +EX900C108 -B4 :3/BU
533 BK BK 02/23.D6 +EX900C108 -JB1 -X1 :7 =900C108 +EX900C108 -B4 :4/BK
534 +EX900C108 =900C108 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/21.D2 +1CP01 -X3 :57 =900C108 +EX900C108 -M1 :U
C 535 2 GN 2.5 02/21.D2 +1CP01 -X3 :58 =900C108 +EX900C108 -M1 :V C
536 3 RD 2.5 02/21.D2 +1CP01 -X3 :59 =900C108 +EX900C108 -M1 :W
537 PE GN/YE 1.5 02/21.D3 +1CP01 -X3 :60 =900C108 +EX900C108 -M1 :PE
538 +EX900C108 =900C108 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/21.D4 +1CP01 -X3 :61 =900C108 +EX900C108 -M1 :AC1
539 2 BK 0.75 02/21.D4 +1CP01 -X3 :62 =900C108 +EX900C108 -M1 :AC2
540 +EX900C109 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/27.B6 +EX900C109 -JB1 -X1 :1 +EX900C109 -B1 :1/BN
541 3/BU BU 0.34 02/27.B6 +EX900C109 -JB1 -X1 :3 +EX900C109 -B1 :3/BU
542 4/BK BK 0.34 02/27.D6 +EX900C109 -JB1 -X1 :5 +EX900C109 -B1 :4/BK
D 543 +EX900C109 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/27.B7 +EX900C109 -JB2 -X1 :1 +EX900C109 -B2 :1/BN D
544 3/BU BU 0.34 02/27.B7 +EX900C109 -JB2 -X1 :3 +EX900C109 -B2 :3/BU
545 4/BK BK 0.34 02/27.D7 +EX900C109 -JB2 -X1 :5 +EX900C109 -B2 :4/BK
546 +EX900C109 -JB1 -W1 ( ZR-RVVP 3*0.5 20.00 m ) 1 BK 0.5 02/27.A6 =1CD02 +1CD02 -X3 :21 +EX900C109 -JB1 -X1 :1
547 2 BK 0.5 02/27.A6 =1CD02 +1CD02 -X3 :22 +EX900C109 -JB1 -X1 :3
548 3 BK 0.5 02/27.D6 =1CD02 +1CD02 -X3 :23 +EX900C109 -JB1 -X1 :5
549 Shield
550 +EX900C109 -JB2 -W1 ( ZR-RVVP 3*0.5 15.00 m ) 1 BK 0.5 02/27.A7 =1CD02 +1CD02 -X3 :24 +EX900C109 -JB2 -X1 :1
E 551 2 BK 0.5 02/27.A7 =1CD02 +1CD02 -X3 :25 +EX900C109 -JB2 -X1 :3 E

552 3 BK 0.5 02/27.D7 =1CD02 +1CD02 -X3 :26 +EX900C109 -JB2 -X1 :5
553 Shield
554 +EX900C109 =900C109 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.0… 1 YE 2.5 02/27.E2 +1CP01 -X3 :33 =900C109 +EX900C109 -M1 :U
555 2 GN 2.5 02/27.E2 +1CP01 -X3 :34 =900C109 +EX900C109 -M1 :V
15 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
556 3 RD 2.5 02/27.E2 +1CP01 -X3 :35 =900C109 +EX900C109 -M1 :W
A A
557 PE GN/YE 1.5 02/27.E2 +1CP01 -X3 :36 =900C109 +EX900C109 -M1 :PE
558 +EX900C110 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/41.B6 +EX900C110 -JB1 -X1 :1 +EX900C110 -B1 :1/BN
559 3/BU BU 0.34 02/41.B6 +EX900C110 -JB1 -X1 :3 +EX900C110 -B1 :3/BU
560 4/BK BK 0.34 02/41.D6 +EX900C110 -JB1 -X1 :5 +EX900C110 -B1 :4/BK
561 +EX900C110 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/41.B7 +EX900C110 -JB2 -X1 :1 +EX900C110 -B2 :1/BN
562 3/BU BU 0.34 02/41.B7 +EX900C110 -JB2 -X1 :3 +EX900C110 -B2 :3/BU
563 4/BK BK 0.34 02/41.D7 +EX900C110 -JB2 -X1 :5 +EX900C110 -B2 :4/BK
564 +EX900C110 -JB1 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/41.A6 =1CP20 +1CP20 -X3 :1 +EX900C110 -JB1 -X1 :1
B B
565 2 BK 0.5 02/41.A6 =1CP20 +1CP20 -X3 :2 +EX900C110 -JB1 -X1 :3
566 3 BK 0.5 02/41.D6 =1CP20 +1CP20 -X3 :3 +EX900C110 -JB1 -X1 :5
567 4 BK 0.5
568 Shield
569 +EX900C110 -JB2 -W1 ( ZR-RVVP 4*0.5 35.00 m ) 1 BK 0.5 02/41.A7 =1CP20 +1CP20 -X3 :4 +EX900C110 -JB2 -X1 :1
570 2 BK 0.5 02/41.A7 =1CP20 +1CP20 -X3 :5 +EX900C110 -JB2 -X1 :3
571 3 BK 0.5 02/41.D7 =1CP20 +1CP20 -X3 :6 +EX900C110 -JB2 -X1 :5
C 572 4 BK 0.5 C
573 Shield
574 +EX900C110 =900C110 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.00…1 YE 2.5 02/41.E2 +1CP02 -1X3 :1 =900C110 +EX900C110 -M1 :U
575 2 GN 2.5 02/41.E2 +1CP02 -1X3 :2 =900C110 +EX900C110 -M1 :V
576 3 RD 2.5 02/41.E2 +1CP02 -1X3 :3 =900C110 +EX900C110 -M1 :W
577 PE GN/YE 1.5 02/41.E2 +1CP02 -1X3 :4 =900C110 +EX900C110 -M1 :PE
578 +EX900C111 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/28.B6 +EX900C111 -JB1 -X1 :1 +EX900C111 -B1 :1/BN
579 3/BU BU 0.34 02/28.B6 +EX900C111 -JB1 -X1 :3 +EX900C111 -B1 :3/BU
D 580 4/BK BK 0.34 02/28.D6 +EX900C111 -JB1 -X1 :5 +EX900C111 -B1 :4/BK D
581 +EX900C111 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/28.B7 +EX900C111 -JB2 -X1 :1 +EX900C111 -B2 :1/BN
582 3/BU BU 0.34 02/28.B7 +EX900C111 -JB2 -X1 :3 +EX900C111 -B2 :3/BU
583 4/BK BK 0.34 02/28.D7 +EX900C111 -JB2 -X1 :5 +EX900C111 -B2 :4/BK
584 +EX900C111 -JB1 -W1 ( ZR-RVVP 3*0.5 40.00 m ) 1 BK 0.5 02/28.A6 =1CD02 +1CD02 -X3 :27 +EX900C111 -JB1 -X1 :1
585 2 BK 0.5 02/28.A6 =1CD02 +1CD02 -X3 :28 +EX900C111 -JB1 -X1 :3
586 3 BK 0.5 02/28.D6 =1CD02 +1CD02 -X3 :29 +EX900C111 -JB1 -X1 :5
587 Shield
E 588 +EX900C111 -JB2 -W1 ( ZR-RVVP 3*0.5 45.00 m ) 1 BK 0.5 02/28.A7 =1CD02 +1CD02 -X3 :30 +EX900C111 -JB2 -X1 :1 E

589 2 BK 0.5 02/28.A7 =1CD02 +1CD02 -X3 :31 +EX900C111 -JB2 -X1 :3
590 3 BK 0.5 02/28.D7 =1CD02 +1CD02 -X3 :32 +EX900C111 -JB2 -X1 :5
591 Shield
592 +EX900C111 =900C111 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 40.00…1 YE 2.5 02/28.E2 +1CP01 -X3 :37 =900C111 +EX900C111 -M1 :U
16 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
593 2 GN 2.5 02/28.E2 +1CP01 -X3 :38 =900C111 +EX900C111 -M1 :V
A A
594 3 RD 2.5 02/28.E2 +1CP01 -X3 :39 =900C111 +EX900C111 -M1 :W
595 PE GN/YE 1.5 02/28.E2 +1CP01 -X3 :40 =900C111 +EX900C111 -M1 :PE
596 +EX900C112 -JB1 =900C112 -W1 ( ZR-RVVP 4*0.5 25.00 m ) 1 BK 0.5 02/42.A6 =1CP20 +1CP20 -X3 :7 +EX900C112 -JB1 -X1 :1
597 2 BK 0.5 02/42.A6 =1CP20 +1CP20 -X3 :8 +EX900C112 -JB1 -X1 :3
598 3 BK 0.5 02/42.D6 =1CP20 +1CP20 -X3 :9 +EX900C112 -JB1 -X1 :5
599 4 BK 0.5 +EX900C112 -JB1 -X1 :6
600 Shield
601 +EX900C112 -JB2 =900C112 -W1 ( ZR-RVVP 4*0.5 25.00 m ) 1 BK 0.5 02/42.A7 =1CP20 +1CP20 -X3 :10 +EX900C112 -JB2 -X1 :1
B B
602 2 BK 0.5 02/42.A7 =1CP20 +1CP20 -X3 :11 +EX900C112 -JB2 -X1 :3
603 3 BK 0.5 02/42.D7 =1CP20 +1CP20 -X3 :12 +EX900C112 -JB2 -X1 :5
604 4 BK 0.5 02/43.D6 =1CP20 +1CP20 -X3 :13 +EX900C112 -JB2 -X1 :6
605 Shield
606 +EX900C112 =900C112 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/42.B6 +EX900C112 -JB1 -X1 :1 =900C112 +EX900C112 -B1 :1/BN
607 3/BU BU 0.34 02/42.B6 +EX900C112 -JB1 -X1 :3 =900C112 +EX900C112 -B1 :3/BU
608 4/BK BK 0.34 02/42.D6 +EX900C112 -JB1 -X1 :5 =900C112 +EX900C112 -B1 :4/BK
C 609 +EX900C112 =900C112 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/42.B7 +EX900C112 -JB2 -X1 :1 =900C112 +EX900C112 -B2 :1/BN C
610 3/BU BU 0.34 02/42.B7 +EX900C112 -JB2 -X1 :3 =900C112 +EX900C112 -B2 :3/BU
611 4/BK BK 0.34 02/42.D7 +EX900C112 -JB2 -X1 :5 =900C112 +EX900C112 -B2 :4/BK
612 +EX900C112 =900C112 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.00…1 YE 2.5 02/42.E2 +1CP02 -1X3 :9 =900C112 +EX900C112 -M1 :U
613 2 GN 2.5 02/42.E2 +1CP02 -1X3 :10 =900C112 +EX900C112 -M1 :V
614 3 RD 2.5 02/42.E2 +1CP02 -1X3 :11 =900C112 +EX900C112 -M1 :W
615 PE GN/YE 1.5 02/42.E2 +1CP02 -1X3 :12 =900C112 +EX900C112 -M1 :PE
616 +EX900C113 -JB2 =900C113 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/43.A7 =1CP20 +1CP20 -X3 :14 +EX900C113 -JB2 -X1 :1
D 617 2 BK 0.5 02/43.A7 =1CP20 +1CP20 -X3 :15 +EX900C113 -JB2 -X1 :3 D
618 3 BK 0.5 02/43.D7 =1CP20 +1CP20 -X3 :16 +EX900C113 -JB2 -X1 :5
619 4 BK 0.5 02/44.D6 =1CP20 +1CP20 -X3 :17 +EX900C113 -JB2 -X1 :6
620 Shield
621 +EX900C113 =900C113 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/43.B6 +EX900C112 -JB2 -X1 :2 =900C113 +EX900C113 -B1 :1/BN
622 3/BU BU 0.34 02/43.B6 +EX900C112 -JB2 -X1 :4 =900C113 +EX900C113 -B1 :3/BU
623 4/BK BK 0.34 02/43.D6 +EX900C112 -JB2 -X1 :6 =900C113 +EX900C113 -B1 :4/BK
624 +EX900C113 =900C113 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/43.B7 +EX900C113 -JB2 -X1 :1 =900C113 +EX900C113 -B2 :1/BN
E 625 3/BU BU 0.34 02/43.B7 +EX900C113 -JB2 -X1 :3 =900C113 +EX900C113 -B2 :3/BU E

626 4/BK BK 0.34 02/43.D7 +EX900C113 -JB2 -X1 :5 =900C113 +EX900C113 -B2 :4/BK
627 +EX900C113 =900C113 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.00…1 YE 2.5 02/43.E2 +1CP02 -1X3 :14 =900C113 +EX900C113 -M1 :U
628 2 GN 2.5 02/43.E2 +1CP02 -1X3 :15 =900C113 +EX900C113 -M1 :V
629 3 RD 2.5 02/43.E2 +1CP02 -1X3 :16 =900C113 +EX900C113 -M1 :W
17 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
630 PE GN/YE 1.5 02/43.E2 +1CP02 -1X3 :17 =900C113 +EX900C113 -M1 :PE
A A
631 +EX900C113 =900C113 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/43.E4 +1CP02 -1X3 :18 =900C113 +EX900C113 -M1 :AC1
632 2 BK 0.75 02/43.E4 +1CP02 -1X3 :19 =900C113 +EX900C113 -M1 :AC2
633 +EX900C114 -JB2 =900C114 -W1 ( ZR-RVVP 4*0.5 35.00 m ) 1 BK 0.5 02/44.A7 =1CP20 +1CP20 -X3 :18 +EX900C114 -JB2 -X1 :1
634 2 BK 0.5 02/44.A7 =1CP20 +1CP20 -X3 :19 +EX900C114 -JB2 -X1 :3
635 3 BK 0.5 02/44.D7 =1CP20 +1CP20 -X3 :20 +EX900C114 -JB2 -X1 :5
636 4 BK 0.5 02/45.D6 =1CP20 +1CP20 -X3 :21 +EX900C114 -JB2 -X1 :6
637 Shield
638 +EX900C114 =900C114 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/44.B6 +EX900C113 -JB2 -X1 :2 =900C114 +EX900C114 -B1 :1/BN
B B
639 3/BU BU 0.34 02/44.B6 +EX900C113 -JB2 -X1 :4 =900C114 +EX900C114 -B1 :3/BU
640 4/BK BK 0.34 02/44.D6 +EX900C113 -JB2 -X1 :6 =900C114 +EX900C114 -B1 :4/BK
641 +EX900C114 =900C114 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/44.B7 +EX900C114 -JB2 -X1 :1 =900C114 +EX900C114 -B2 :1/BN
642 3/BU BU 0.34 02/44.B7 +EX900C114 -JB2 -X1 :3 =900C114 +EX900C114 -B2 :3/BU
643 4/BK BK 0.34 02/44.D7 +EX900C114 -JB2 -X1 :5 =900C114 +EX900C114 -B2 :4/BK
644 +EX900C114 =900C114 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.00…1 YE 2.5 02/44.E2 +1CP02 -1X3 :21 =900C114 +EX900C114 -M1 :U
645 2 GN 2.5 02/44.E2 +1CP02 -1X3 :22 =900C114 +EX900C114 -M1 :V
C 646 3 RD 2.5 02/44.E2 +1CP02 -1X3 :23 =900C114 +EX900C114 -M1 :W C
647 PE GN/YE 1.5 02/44.E2 +1CP02 -1X3 :24 =900C114 +EX900C114 -M1 :PE
648 +EX900C114 =900C114 -M1-W2 ( ZR-RVV-500V 2*0.75 35.00 m ) 1 BK 0.75 02/44.E5 +1CP02 -1X3 :25 =900C114 +EX900C114 -M1 :AC1
649 2 BK 0.75 02/44.E5 +1CP02 -1X3 :26 =900C114 +EX900C114 -M1 :AC2
650 +EX900C115 -JB2 =900C115 -W1 ( ZR-RVVP 4*0.5 40.00 m ) 1 BK 0.5 02/45.A7 =1CP20 +1CP20 -X3 :22 +EX900C115 -JB2 -X1 :1
651 2 BK 0.5 02/45.A7 =1CP20 +1CP20 -X3 :23 +EX900C115 -JB2 -X1 :3
652 3 BK 0.5 02/45.D7 =1CP20 +1CP20 -X3 :24 +EX900C115 -JB2 -X1 :5
653 4 BK 0.5 02/46.D6 =1CP20 +1CP20 -X3 :29 +EX900C115 -JB2 -X1 :6
D 654 Shield D
655 +EX900C115 =900C115 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/45.B6 +EX900C114 -JB2 -X1 :2 =900C115 +EX900C115 -B1 :1/BN
656 3/BU BU 0.34 02/45.B6 +EX900C114 -JB2 -X1 :4 =900C115 +EX900C115 -B1 :3/BU
657 4/BK BK 0.34 02/45.D6 +EX900C114 -JB2 -X1 :6 =900C115 +EX900C115 -B1 :4/BK
658 +EX900C115 =900C115 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/45.B7 +EX900C115 -JB2 -X1 :1 =900C115 +EX900C115 -B2 :1/BN
659 3/BU BU 0.34 02/45.B7 +EX900C115 -JB2 -X1 :3 =900C115 +EX900C115 -B2 :3/BU
660 4/BK BK 0.34 02/45.D7 +EX900C115 -JB2 -X1 :5 =900C115 +EX900C115 -B2 :4/BK
661 +EX900C115 =900C115 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 40.00…1 YE 2.5 02/45.E2 +1CP02 -1X3 :28 =900C115 +EX900C115 -M1 :U
E 662 2 GN 2.5 02/45.E2 +1CP02 -1X3 :29 =900C115 +EX900C115 -M1 :V E

663 3 RD 2.5 02/45.E2 +1CP02 -1X3 :30 =900C115 +EX900C115 -M1 :W


664 PE GN/YE 1.5 02/45.E2 +1CP02 -1X3 :31 =900C115 +EX900C115 -M1 :PE
665 +EX900C115 =900C115 -M1-W2 ( ZR-RVV-500V 2*0.75 40.00 m ) 1 BK 0.75 02/45.E4 +1CP02 -1X3 :32 =900C115 +EX900C115 -M1 :AC1
666 2 BK 0.75 02/45.E5 +1CP02 -1X3 :33 =900C115 +EX900C115 -M1 :AC2
18 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
667 +EX900C116 -JB2 =900C116 -W1 ( ZR-RVVP 4*0.5 45.00 m ) 1 BK 0.5 02/46.A7 =1CP20 +1CP20 -X3 :25 +EX900C116 -JB2 -X1 :1
A A
668 2 BK 0.5 02/46.A7 =1CP20 +1CP20 -X3 :26 +EX900C116 -JB2 -X1 :3
669 3 BK 0.5 02/46.D7 =1CP20 +1CP20 -X3 :27 +EX900C116 -JB2 -X1 :5
670 4 BK 0.5 02/47.D6 =1CP20 +1CP20 -X3 :28 +EX900C116 -JB2 -X1 :6
671 Shield
672 +EX900C116 =900C116 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/46.B7 +EX900C116 -JB2 -X1 :1 =900C116 +EX900C116 -B1 :1/BN
673 3/BU BU 0.34 02/46.B7 +EX900C116 -JB2 -X1 :3 =900C116 +EX900C116 -B1 :3/BU
674 4/BK BK 0.34 02/46.D7 +EX900C116 -JB2 -X1 :5 =900C116 +EX900C116 -B1 :4/BK
675 +EX900C116 =900C116 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/46.B6 +EX900C115 -JB2 -X1 :2 =900C116 +EX900C116 -B2 :1/BN
B B
676 3/BU BU 0.34 02/46.B6 +EX900C115 -JB2 -X1 :4 =900C116 +EX900C116 -B2 :3/BU
677 4/BK BK 0.34 02/46.D6 +EX900C115 -JB2 -X1 :6 =900C116 +EX900C116 -B2 :4/BK
678 +EX900C116 =900C116 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 45.00…1 YE 2.5 02/46.E2 +1CP02 -1X3 :35 =900C116 +EX900C116 -M1 :U
679 2 GN 2.5 02/46.E2 +1CP02 -1X3 :36 =900C116 +EX900C116 -M1 :V
680 3 RD 2.5 02/46.E2 +1CP02 -1X3 :37 =900C116 +EX900C116 -M1 :W
681 PE GN/YE 1.5 02/46.E2 +1CP02 -1X3 :38 =900C116 +EX900C116 -M1 :PE
682 +EX900C116 =900C116 -M1-W2 ( ZR-RVV-500V 2*0.75 45.00 m ) 1 BK 0.75 02/46.E4 +1CP02 -1X3 :39 =900C116 +EX900C116 -M1 :AC1
C 683 2 BK 0.75 02/46.E4 +1CP02 -1X3 :40 =900C116 +EX900C116 -M1 :AC2 C
684 +EX900C117 -JB2 =900C117 -W1 ( ZR-RVVP 4*0.5 50.00 m ) 1 BK 0.5 02/47.A7 =1CP20 +1CP20 -X3 :30 +EX900C117 -JB2 -X1 :1
685 2 BK 0.5 02/47.A7 =1CP20 +1CP20 -X3 :31 +EX900C117 -JB2 -X1 :3
686 3 BK 0.5 02/47.D7 =1CP20 +1CP20 -X3 :32 +EX900C117 -JB2 -X1 :5
687 4 BK 0.5 02/48.D6 =1CP20 +1CP20 -X3 :33 +EX900C117 -JB2 -X1 :6
688 Shield
689 +EX900C117 =900C117 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/47.B6 +EX900C116 -JB2 -X1 :2 =900C117 +EX900C117 -B1 :1/BN
690 3/BU BU 0.34 02/47.B6 +EX900C116 -JB2 -X1 :4 =900C117 +EX900C117 -B1 :3/BU
D 691 4/BK BK 0.34 02/47.D6 +EX900C116 -JB2 -X1 :6 =900C117 +EX900C117 -B1 :4/BK D
692 +EX900C117 =900C117 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/47.B7 +EX900C117 -JB2 -X1 :1 =900C117 +EX900C117 -B2 :1/BN
693 3/BU BU 0.34 02/47.B7 +EX900C117 -JB2 -X1 :3 =900C117 +EX900C117 -B2 :3/BU
694 4/BK BK 0.34 02/47.D7 +EX900C117 -JB2 -X1 :5 =900C117 +EX900C117 -B2 :4/BK
695 +EX900C117 =900C117 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 50.00…1 YE 2.5 02/47.E1 +1CP02 -1X3 :42 =900C117 +EX900C117 -M1 :U
696 2 GN 2.5 02/47.E2 +1CP02 -1X3 :43 =900C117 +EX900C117 -M1 :V
697 3 RD 2.5 02/47.E2 +1CP02 -1X3 :44 =900C117 +EX900C117 -M1 :W
698 PE GN/YE 1.5 02/47.E2 +1CP02 -1X3 :45 =900C117 +EX900C117 -M1 :PE
E 699 +EX900C118 -JB2 =900C118 -W1 ( ZR-RVVP 4*0.5 55.00 m ) 1 BK 0.5 02/48.A7 =1CP20 +1CP20 -X3 :34 +EX900C118 -JB2 -X1 :1 E

700 2 BK 0.5 02/48.A8 =1CP20 +1CP20 -X3 :35 +EX900C118 -JB2 -X1 :3
701 3 BK 0.5 02/48.D7 =1CP20 +1CP20 -X3 :36 +EX900C118 -JB2 -X1 :5
702 4 BK 0.5 02/50.D5 =1CP20 +1CP20 -X3 :37 +EX900C118 -JB2 -X1 :6
703 Shield
19 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
704 +EX900C118 -JB3 =900C118 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/49.A3 +EX900C118 -JB3 -X1 :1 +EX900E112/113/114 -X2 :5
A A
705 2 BK 0.5 02/49.A3 +EX900C118 -JB3 -X1 :3 +EX900E112/113/114 -X2 :12
706 3 BK 0.5 02/49.D3 +EX900C118 -JB3 -X1 :5 +EX900E112/113/114 -X5 :27
707 4 BK 0.5 02/49.D3 +EX900E112/113/114 -X5 :28 +EX900C118 -JB3 -X1 :6
708 Shield 02/49.D3
709 +EX900C118 =900C118 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/48.B6 +EX900C117 -JB2 -X1 :2 =900C118 +EX900C118 -B1 :1/BN
710 3/BU BU 0.34 02/48.B7 +EX900C117 -JB2 -X1 :4 =900C118 +EX900C118 -B1 :3/BU
711 4/BK BK 0.34 02/48.D6 +EX900C117 -JB2 -X1 :6 =900C118 +EX900C118 -B1 :4/BK
712 +EX900C118 =900C118 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/48.B7 +EX900C118 -JB2 -X1 :1 =900C118 +EX900C118 -B2 :1/BN
B B
713 3/BU BU 0.34 02/48.B8 +EX900C118 -JB2 -X1 :3 =900C118 +EX900C118 -B2 :3/BU
714 4/BK BK 0.34 02/48.D7 +EX900C118 -JB2 -X1 :5 =900C118 +EX900C118 -B2 :4/BK
715 +EX900C118 =900C118 -B3-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/49.B3 +EX900C118 -JB3 -X1 :1 =900C118 +EX900C118 -B3 :UB/Red
716 BK/黑 BK 02/49.B3 +EX900C118 -JB3 -X1 :3 =900C118 +EX900C118 -B3 :GND/Black
717 GN/绿 GN 02/49.C3 +EX900C118 -JB3 -X1 :5 =900C118 +EX900C118 -B3 :A/Green
718 WH/白 WH 02/49.C3 +EX900C118 -JB3 -X1 :6 =900C118 +EX900C118 -B3 :B/White
719 YE/黄 YE
C 720 屏蔽/Shield C
721 +EX900C118 =900C118 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 55.00…1 YE 2.5 02/48.E1 +1CP02 -1X3 :47 =900C118 +EX900C118 -M1 :U
722 2 GN 2.5 02/48.E2 +1CP02 -1X3 :48 =900C118 +EX900C118 -M1 :V
723 3 RD 2.5 02/48.E2 +1CP02 -1X3 :49 =900C118 +EX900C118 -M1 :W
724 PE GN/YE 1.5 02/48.E2 +1CP02 -1X3 :50 =900C118 +EX900C118 -M1 :PE
725 +EX900C118 =900C118 -M1-W2 ( ZR-RVV-500V 2*0.75 55.00 m ) 1 BK 0.75 02/48.E4 +1CP02 -1X3 :51 =900C118 +EX900C118 -M1 :AC1
726 2 BK 0.75 02/48.E4 +1CP02 -1X3 :52 =900C118 +EX900C118 -M1 :AC2
727 +EX900C119 -JB2 =900C119 -W1 ( ZR-RVVP 4*0.5 60.00 m ) 1 BK 0.5 02/50.A6 =1CP20 +1CP20 -X3 :38 +EX900C119 -JB2 -X1 :1
D 728 2 BK 0.5 02/50.A6 =1CP20 +1CP20 -X3 :39 +EX900C119 -JB2 -X1 :3 D
729 3 BK 0.5 02/50.D6 =1CP20 +1CP20 -X3 :40 +EX900C119 -JB2 -X1 :5
730 4 BK 0.5
731 Shield
732 +EX900C119 =900C119 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/50.B5 +EX900C118 -JB2 -X1 :2 =900C119 +EX900C119 -B1 :1/BN
733 BK/黑 BK
734 3/BU BU 0.34 02/50.B5 +EX900C118 -JB2 -X1 :4 =900C119 +EX900C119 -B1 :3/BU
735 4/BK BK 0.34 02/50.D5 +EX900C118 -JB2 -X1 :6 =900C119 +EX900C119 -B1 :4/BK
E 736 YE/黄 YE E

737 屏蔽/Shield
738 +EX900C119 =900C119 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/50.B6 +EX900C119 -JB2 -X1 :1 =900C119 +EX900C119 -B2 :1/BN
739 BK/黑 BK
740 3/BU BU 0.34 02/50.B6 +EX900C119 -JB2 -X1 :3 =900C119 +EX900C119 -B2 :3/BU
20 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
741 4/BK BK 0.34 02/50.D6 +EX900C119 -JB2 -X1 :5 =900C119 +EX900C119 -B2 :4/BK
A A
742 YE/黄 YE
743 屏蔽/Shield
744 +EX900C119 =900C119 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 60.00…1 YE 2.5 02/50.E1 +1CP02 -1X3 :54 =900C119 +EX900C119 -M1 :U
745 2 GN 2.5 02/50.E2 +1CP02 -1X3 :55 =900C119 +EX900C119 -M1 :V
746 3 RD 2.5 02/50.E2 +1CP02 -1X3 :56 =900C119 +EX900C119 -M1 :W
747 PE GN/YE 1.5 02/50.E2 +1CP02 -1X3 :57 =900C119 +EX900C119 -M1 :PE
748 +EX900C120 -JB1 =900C120 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/104.A6 =1CD03 +1CD03 -X3 :7 +EX900C120 -JB1 -X1 :1
749 2 BK 0.5 02/104.A6 =1CD03 +1CD03 -X3 :8 +EX900C120 -JB1 -X1 :3
B B
750 3 BK 0.5 02/104.D6 =1CD03 +1CD03 -X3 :9 +EX900C120 -JB1 -X1 :5
751 4 BK 0.5
752 Shield
753 +EX900C120 -JB2 =900C120 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/104.A7 =1CD03 +1CD03 -X3 :10 +EX900C120 -JB2 -X1 :1
754 2 BK 0.5 02/104.A7 =1CD03 +1CD03 -X3 :11 +EX900C120 -JB2 -X1 :3
755 3 BK 0.5 02/104.D7 =1CD03 +1CD03 -X3 :12 +EX900C120 -JB2 -X1 :5
756 4 BK 0.5 +EX900C120 -JB2 -X1 :6
C 757 Shield C
758 +EX900C120 =900C120 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/104.B6 +EX900C120 -JB1 -X1 :1 =900C120 +EX900C120 -B1 :1/BN
759 BK/黑 BK
760 3/BU BU 0.34 02/104.B6 +EX900C120 -JB1 -X1 :3 =900C120 +EX900C120 -B1 :3/BU
761 4/BK BK 0.34 02/104.D6 +EX900C120 -JB1 -X1 :5 =900C120 +EX900C120 -B1 :4/BK
762 YE/黄 YE
763 屏蔽/Shield
764 +EX900C120 =900C120 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/104.B7 +EX900C120 -JB2 -X1 :1 =900C120 +EX900C120 -B2 :1/BN
D 765 BK/黑 BK D
766 3/BU BU 0.34 02/104.B7 +EX900C120 -JB2 -X1 :3 =900C120 +EX900C120 -B2 :3/BU
767 4/BK BK 0.34 02/104.D7 +EX900C120 -JB2 -X1 :5 =900C120 +EX900C120 -B2 :4/BK
768 YE/黄 YE
769 屏蔽/Shield
770 +EX900C120 =900C120 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.0… 1 YE 2.5 02/104.E2 +1CP03 -1X3 :64 =900C120 +EX900C120 -M1 :U
771 2 GN 2.5 02/104.E2 +1CP03 -1X3 :65 =900C120 +EX900C120 -M1 :V
772 3 RD 2.5 02/104.E2 +1CP03 -1X3 :66 =900C120 +EX900C120 -M1 :W
E 773 PE GN/YE 1.5 02/104.E2 +1CP03 -1X3 :67 =900C120 +EX900C120 -M1 :PE E

774 +EX900C120 =900C120 -M1-W2 ( ZR-RVV-500V 2*0.75 35.00 m ) 1 BK 0.75 02/104.E4 +1CP03 -1X3 :68 =900C120 +EX900C120 -M1 :AC1
775 2 BK 0.75 02/104.E4 +1CP03 -1X3 :69 =900C120 +EX900C120 -M1 :AC2
776 +EX900C301 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/54.B1 +EX900C301 -JB1 -X1 :1 +EX900C301 -B1 :1/BN
777 BU BU 02/54.B2 +EX900C301 -JB1 -X1 :3 +EX900C301 -B1 :3/BU
21 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
778 BK BK 02/54.C1 +EX900C301 -JB1 -X1 :5 +EX900C301 -B1 :4/BK
A A
779 +EX900C301 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/54.B3 +EX900C301 -JB2 -X1 :1 +EX900C301 -B2 :1/BN
780 BU BU 02/54.B3 +EX900C301 -JB2 -X1 :3 +EX900C301 -B2 :3/BU
781 BK BK 02/54.C3 +EX900C301 -JB2 -X1 :5 +EX900C301 -B2 :4/BK
782 +EX900C301 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/54.B2 +EX900C301 -JB1 -X1 :2 +EX900C301 -B3 :1/BN
783 BU BU 02/54.B3 +EX900C301 -JB1 -X1 :4 +EX900C301 -B3 :3/BU
784 BK BK 02/54.C2 +EX900C301 -JB1 -X1 :6 +EX900C301 -B3 :4/BK
785 +EX900C301 -JB1 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/54.A1 =1CP20 +1CP20 -X4 :1 +EX900C301 -JB1 -X1 :1
786 2 BK 0.5 02/54.A2 =1CP20 +1CP20 -X4 :2 +EX900C301 -JB1 -X1 :3
B B
787 3 BK 0.5 02/54.D1 =1CP20 +1CP20 -X4 :3 +EX900C301 -JB1 -X1 :5
788 4 BK 0.5
789 Shield
790 +EX900C301 -JB2 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/54.A3 =1CP20 +1CP20 -X4 :5 +EX900C301 -JB2 -X1 :1
791 2 BK 0.5 02/54.A3 =1CP20 +1CP20 -X4 :6 +EX900C301 -JB2 -X1 :3
792 3 BK 0.5 02/54.D3 =1CP20 +1CP20 -X4 :7 +EX900C301 -JB2 -X1 :5
793 4 BK 0.5 02/54.D2 =1CP20 +1CP20 -X4 :4 +EX900C301 -JB1 -X1 :6
C 794 Shield C
795 +EX900C301 =900C301 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 20.0… 1 YE 1.5 02/52.C2 +1CP02 -1X3 :59 =900C301 +EX900C301 -M1 :U
796 2 GN 1.5 02/52.C2 +1CP02 -1X3 :60 =900C301 +EX900C301 -M1 :V
797 3 RD 1.5 02/52.C2 +1CP02 -1X3 :61 =900C301 +EX900C301 -M1 :W
798 PE GN/YE 1.0 02/52.C3 +1CP02 -1X3 :62 =900C301 +EX900C301 -M1 :PE
799 +EX900C301 =900C301 -M1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/52.C4 =900C301 +EX900C301 -M1 :AC1 +1CP02 -1X3 :63
800 2 BK 0.75 02/52.C4 +1CP02 -1X3 :64 =900C301 +EX900C301 -M1 :AC2
801 +EX900C302 -JB1 =900E303 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/58.A1 =1CP20 +1CP20 -X4 :16 +EX900C302 -JB1 -X1 :1
D 802 2 BK 0.5 02/58.A2 =1CP20 +1CP20 -X4 :17 +EX900C302 -JB1 -X1 :3 D
803 3 BK 0.5 02/58.D1 =1CP20 +1CP20 -X4 :18 +EX900C302 -JB1 -X1 :5
804 4 BK 0.5
805 Shield
806 +EX900C302 -JB2 =900E303 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/58.A2 =1CP20 +1CP20 -X4 :19 +EX900C302 -JB2 -X1 :1
807 2 BK 0.5 02/58.A3 =1CP20 +1CP20 -X4 :20 +EX900C302 -JB2 -X1 :3
808 3 BK 0.5 02/58.D2 =1CP20 +1CP20 -X4 :21 +EX900C302 -JB2 -X1 :5
809 4 BK 0.5 02/58.D3 =1CP20 +1CP20 -X4 :22 +EX900C302 -JB2 -X1 :6
E 810 Shield E

811 +EX900C302 =900C302 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 1.5 02/56.C2 +1CP02 -1X3 :73 =900C302 +EX900C302 -M1 :U
812 2 GN 1.5 02/56.C2 +1CP02 -1X3 :74 =900C302 +EX900C302 -M1 :V
813 3 RD 1.5 02/56.C2 +1CP02 -1X3 :75 =900C302 +EX900C302 -M1 :W
814 PE GN/YE 1.0 02/56.C3 +1CP02 -1X3 :76 =900C302 +EX900C302 -M1 :PE
22 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
815 +EX900C302 =900C302 -M1-W2 ( ZR-RVV-500V 2*0.75 15.00 m ) 1 BK 0.75 02/56.C4 +1CP02 -1X3 :77 =900C302 +EX900C302 -M1 :AC1
A A
816 2 BK 0.75 02/56.C4 +1CP02 -1X3 :78 =900C302 +EX900C302 -M1 :AC2
817 +EX900C302 =900E303 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/58.B1 +EX900C302 -JB1 -X1 :1 =900E303 +EX900C302 -B1 :1/BN
818 BU BU 02/58.B2 +EX900C302 -JB1 -X1 :3 =900E303 +EX900C302 -B1 :3/BU
819 BK BK 02/58.C1 +EX900C302 -JB1 -X1 :5 =900E303 +EX900C302 -B1 :4/BK
820 +EX900C302 =900E303 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/58.B2 +EX900C302 -JB2 -X1 :1 =900E303 +EX900C302 -B2 :1/BN
821 BU BU 02/58.B3 +EX900C302 -JB2 -X1 :3 =900E303 +EX900C302 -B2 :3/BU
822 BK BK 02/58.C2 +EX900C302 -JB2 -X1 :5 =900E303 +EX900C302 -B2 :4/BK
823 +EX900C302 =900E303 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/58.B3 +EX900C302 -JB2 -X1 :2 =900E303 +EX900C302 -B3 :1/BN
B B
824 BU BU 02/58.B4 +EX900C302 -JB2 -X1 :4 =900E303 +EX900C302 -B3 :3/BU
825 BK BK 02/58.C3 +EX900C302 -JB2 -X1 :6 =900E303 +EX900C302 -B3 :4/BK
826 +EX900C303 -JB1 =900C303 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/59.A6 =1CP20 +1CP20 -X4 :31 +EX900C303 -JB1 -X1 :1
827 2 BK 0.5 02/59.A6 =1CP20 +1CP20 -X4 :32 +EX900C303 -JB1 -X1 :3
828 3 BK 0.5 02/59.D6 =1CP20 +1CP20 -X4 :33 +EX900C303 -JB1 -X1 :5
829 4 BK 0.5
830 Shield
C 831 +EX900C303 -JB2 =900C303 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/59.A7 =1CP20 +1CP20 -X4 :34 +EX900C303 -JB2 -X1 :1 C
832 2 BK 0.5 02/59.A7 =1CP20 +1CP20 -X4 :35 +EX900C303 -JB2 -X1 :3
833 3 BK 0.5 02/59.D7 =1CP20 +1CP20 -X4 :36 +EX900C303 -JB2 -X1 :5
834 4 BK 0.5
835 Shield
836 +EX900C303 =900C303 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/59.B6 +EX900C303 -JB1 -X1 :1 =900C303 +EX900C303 -B1 :1/BN
837 3/BU BU 0.34 02/59.B6 +EX900C303 -JB1 -X1 :3 =900C303 +EX900C303 -B1 :3/BU
838 4/BK BK 0.34 02/59.D6 +EX900C303 -JB1 -X1 :5 =900C303 +EX900C303 -B1 :4/BK
D 839 +EX900C303 =900C303 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/59.B7 +EX900C303 -JB2 -X1 :1 =900C303 +EX900C303 -B2 :1/BN D
840 3/BU BU 0.34 02/59.B7 +EX900C303 -JB2 -X1 :3 =900C303 +EX900C303 -B2 :3/BU
841 4/BK BK 0.34 02/59.D7 +EX900C303 -JB2 -X1 :5 =900C303 +EX900C303 -B2 :4/BK
842 +EX900C303 =900C303 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 2.5 02/59.E2 +1CP02 -1X3 :87 =900C303 +EX900C303 -M1 :U
843 2 GN 2.5 02/59.E2 +1CP02 -1X3 :88 =900C303 +EX900C303 -M1 :V
844 3 RD 2.5 02/59.E2 +1CP02 -1X3 :89 =900C303 +EX900C303 -M1 :W
845 PE GN/YE 1.5 02/59.E2 +1CP02 -1X3 :90 =900C303 +EX900C303 -M1 :PE
846 +EX900C304 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/99.B6 +EX900C304 -JB1 -X1 :1 +EX900C304 -B1 :1/BN
E 847 3/BU BU 0.34 02/99.B6 +EX900C304 -JB1 -X1 :3 +EX900C304 -B1 :3/BU E

848 4/BK BK 0.34 02/99.D6 +EX900C304 -JB1 -X1 :5 +EX900C304 -B1 :4/BK
849 +EX900C304 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/99.B7 +EX900C304 -JB2 -X1 :1 +EX900C304 -B2 :1/BN
850 3/BU BU 0.34 02/99.B7 +EX900C304 -JB2 -X1 :3 +EX900C304 -B2 :3/BU
851 4/BK BK 0.34 02/99.D7 +EX900C304 -JB2 -X1 :5 +EX900C304 -B2 :4/BK
23 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
852 +EX900C304 -JB1 -W1 ( ZR-RVVP 4*0.5 50.00 m ) 1 BK 0.5 02/99.A6 =1CP03.2 +1CP03 -2X3 :1 +EX900C304 -JB1 -X1 :1
A A
853 2 BK 0.5 02/99.A6 =1CP03.2 +1CP03 -2X3 :2 +EX900C304 -JB1 -X1 :3
854 3 BK 0.5 02/99.D6 =1CP03.2 +1CP03 -2X3 :3 +EX900C304 -JB1 -X1 :5
855 4 BK 0.5
856 Shield
857 +EX900C304 -JB2 -W1 ( ZR-RVVP 4*0.5 50.00 m ) 1 BK 0.5 02/99.A7 =1CP03.2 +1CP03 -2X3 :4 +EX900C304 -JB2 -X1 :1
858 2 BK 0.5 02/99.A7 =1CP03.2 +1CP03 -2X3 :5 +EX900C304 -JB2 -X1 :3
859 3 BK 0.5 02/99.D7 =1CP03.2 +1CP03 -2X3 :6 +EX900C304 -JB2 -X1 :5
860 4 BK 0.5 02/100.D6 =1CP03.2 +1CP03 -2X3 :7 +EX900C304 -JB2 -X1 :6
B B
861 Shield
862 +EX900C304 =900C304 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 50.0… 1 YE 2.5 02/99.E2 +1CP03 -1X3 :1 =900C304 +EX900C304 -M1 :U
863 2 GN 2.5 02/99.E2 +1CP03 -1X3 :2 =900C304 +EX900C304 -M1 :V
864 3 RD 2.5 02/99.E2 +1CP03 -1X3 :3 =900C304 +EX900C304 -M1 :W
865 PE GN/YE 1.5 02/99.E2 +1CP03 -1X3 :4 =900C304 +EX900C304 -M1 :PE
866 +EX900C305 -JB2 =900C305 -W1 ( ZR-RVVP 4*0.5 40.00 m ) 1 BK 0.5 02/100.A7 =1CP03.2 +1CP03 -2X3 :8 +EX900C305 -JB2 -X1 :1
867 2 BK 0.5 02/100.A7 =1CP03.2 +1CP03 -2X3 :9 +EX900C305 -JB2 -X1 :3
C 868 3 BK 0.5 02/100.D7 =1CP03.2 +1CP03 -2X3 :10 +EX900C305 -JB2 -X1 :5 C
869 4 BK 0.5 02/101.D6 =1CP03.2 +1CP03 -2X3 :11 +EX900C305 -JB2 -X1 :6
870 Shield
871 +EX900C305 =900C305 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/100.B6 +EX900C304 -JB2 -X1 :2 =900C305 +EX900C305 -B1 :1/BN
872 3/BU BU 0.34 02/100.B6 +EX900C304 -JB2 -X1 :4 =900C305 +EX900C305 -B1 :3/BU
873 4/BK BK 0.34 02/100.D6 +EX900C304 -JB2 -X1 :6 =900C305 +EX900C305 -B1 :4/BK
874 +EX900C305 =900C305 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/100.B7 +EX900C305 -JB2 -X1 :1 =900C305 +EX900C305 -B2 :1/BN
875 3/BU BU 0.34 02/100.B7 +EX900C305 -JB2 -X1 :3 =900C305 +EX900C305 -B2 :3/BU
D 876 4/BK BK 0.34 02/100.D7 +EX900C305 -JB2 -X1 :5 =900C305 +EX900C305 -B2 :4/BK D
877 +EX900C305 =900C305 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 40.0… 1 YE 2.5 02/100.E2 +1CP03 -1X3 :5 =900C305 +EX900C305 -M1 :U
878 2 GN 2.5 02/100.E2 +1CP03 -1X3 :6 =900C305 +EX900C305 -M1 :V
879 3 RD 2.5 02/100.E2 +1CP03 -1X3 :7 =900C305 +EX900C305 -M1 :W
880 PE GN/YE 1.5 02/100.E2 +1CP03 -1X3 :8 =900C305 +EX900C305 -M1 :PE
881 +EX900C305 =900C305 -M1-W2 ( ZR-RVV-500V 2*0.75 40.00 m ) 1 BK 0.75 02/100.E4 +1CP03 -1X3 :9 =900C305 +EX900C305 -M1 :AC1
882 2 BK 0.75 02/100.E5 +1CP03 -1X3 :10 =900C305 +EX900C305 -M1 :AC2
883 +EX900C306 -JB2 =900C306 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/101.A7 =1CP03.2 +1CP03 -2X3 :12 +EX900C306 -JB2 -X1 :1
E 884 2 BK 0.5 02/101.A7 =1CP03.2 +1CP03 -2X3 :13 +EX900C306 -JB2 -X1 :3 E

885 3 BK 0.5 02/101.D7 =1CP03.2 +1CP03 -2X3 :14 +EX900C306 -JB2 -X1 :5
886 4 BK 0.5 02/102.E6 =1CP03.2 +1CP03 -2X3 :15 +EX900C306 -JB2 -X1 :6
887 Shield
888 +EX900C306 =900C306 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/101.B6 +EX900C305 -JB2 -X1 :2 =900C306 +EX900C306 -B1 :1/BN
24 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
889 3/BU BU 0.34 02/101.B6 +EX900C305 -JB2 -X1 :4 =900C306 +EX900C306 -B1 :3/BU
A A
890 4/BK BK 0.34 02/101.D6 +EX900C305 -JB2 -X1 :6 =900C306 +EX900C306 -B1 :4/BK
891 +EX900C306 =900C306 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/101.B7 +EX900C306 -JB2 -X1 :1 =900C306 +EX900C306 -B2 :1/BN
892 3/BU BU 0.34 02/101.B7 +EX900C306 -JB2 -X1 :3 =900C306 +EX900C306 -B2 :3/BU
893 4/BK BK 0.34 02/101.D7 +EX900C306 -JB2 -X1 :5 =900C306 +EX900C306 -B2 :4/BK
894 +EX900C306 =900C306 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/101.E2 +1CP03 -1X3 :11 =900C306 +EX900C306 -M1 :U
895 2 GN 2.5 02/101.E2 +1CP03 -1X3 :12 =900C306 +EX900C306 -M1 :V
896 3 RD 2.5 02/101.E2 +1CP03 -1X3 :13 =900C306 +EX900C306 -M1 :W
897 PE GN/YE 1.5 02/101.E2 +1CP03 -1X3 :14 =900C306 +EX900C306 -M1 :PE
B B
898 +EX900C306 =900C306 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/101.E4 +1CP03 -1X3 :15 =900C306 +EX900C306 -M1 :AC1
899 2 BK 0.75 02/101.E5 +1CP03 -1X3 :16 =900C306 +EX900C306 -M1 :AC2
900 +EX900C307 -JB2 =900C307 -W1 ( ZR-RVVP 4*0.5 25.00 m ) 1 BK 0.5 02/102.B7 =1CP03.2 +1CP03 -2X3 :16 +EX900C307 -JB2 -X1 :1
901 2 BK 0.5 02/102.B7 =1CP03.2 +1CP03 -2X3 :17 +EX900C307 -JB2 -X1 :3
902 3 BK 0.5 02/102.E7 =1CP03.2 +1CP03 -2X3 :18 +EX900C307 -JB2 -X1 :5
903 4 BK 0.5
904 Shield
C 905 +EX900C307 =900C307 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/102.B6 +EX900C306 -JB2 -X1 :2 =900C307 +EX900C307 -B1 :1/BN C
906 3/BU BU 0.34 02/102.B6 +EX900C306 -JB2 -X1 :4 =900C307 +EX900C307 -B1 :3/BU
907 4/BK BK 0.34 02/102.D6 +EX900C306 -JB2 -X1 :6 =900C307 +EX900C307 -B1 :4/BK
908 +EX900C307 =900C307 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/102.B7 +EX900C307 -JB2 -X1 :1 =900C307 +EX900C307 -B2 :1/BN
909 3/BU BU 0.34 02/102.B7 +EX900C307 -JB2 -X1 :3 =900C307 +EX900C307 -B2 :3/BU
910 4/BK BK 0.34 02/102.D7 +EX900C307 -JB2 -X1 :5 =900C307 +EX900C307 -B2 :4/BK
911 +EX900C307 =900C307 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.0… 1 YE 2.5 02/102.E2 +1CP03 -1X3 :17 =900C307 +EX900C307 -M1 :U
912 2 GN 2.5 02/102.E2 +1CP03 -1X3 :18 =900C307 +EX900C307 -M1 :V
D 913 3 RD 2.5 02/102.E2 +1CP03 -1X3 :19 =900C307 +EX900C307 -M1 :W D
914 PE GN/YE 1.5 02/102.E2 +1CP03 -1X3 :20 =900C307 +EX900C307 -M1 :PE
915 +EX900C307 =900C307 -M1-W2 ( ZR-RVV-500V 2*0.75 25.00 m ) 1 BK 0.75 02/102.E4 +1CP03 -1X3 :21 =900C307 +EX900C307 -M1 :AC1
916 2 BK 0.75 02/102.E4 +1CP03 -1X3 :22 =900C307 +EX900C307 -M1 :AC2
917 +EX900C345 -JB1 =900C345 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/103.A6 =1CD03 +1CD03 -X3 :1 +EX900C345 -JB1 -X1 :1
918 2 BK 0.5 02/103.A6 =1CD03 +1CD03 -X3 :2 +EX900C345 -JB1 -X1 :3
919 3 BK 0.5 02/103.D6 =1CD03 +1CD03 -X3 :3 +EX900C345 -JB1 -X1 :5
920 4 BK 0.5 +EX900C345 -JB1 -X1 :6
E 921 Shield E

922 +EX900C345 -JB2 =900C345 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/103.A7 =1CD03 +1CD03 -X3 :4 +EX900C345 -JB2 -X1 :1
923 2 BK 0.5 02/103.A7 =1CD03 +1CD03 -X3 :5 +EX900C345 -JB2 -X1 :3
924 3 BK 0.5 02/103.D7 =1CD03 +1CD03 -X3 :6 +EX900C345 -JB2 -X1 :5
925 4 BK 0.5 +EX900C345 -JB2 -X1 :6
25 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
926 Shield
A A
927 +EX900C345 =900C345 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/103.B6 +EX900C345 -JB1 -X1 :1 =900C345 +EX900C345 -B1 :1/BN
928 3/BU BU 0.34 02/103.B6 +EX900C345 -JB1 -X1 :3 =900C345 +EX900C345 -B1 :3/BU
929 4/BK BK 0.34 02/103.D6 +EX900C345 -JB1 -X1 :5 =900C345 +EX900C345 -B1 :4/BK
930 +EX900C345 =900C345 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/103.B7 +EX900C345 -JB2 -X1 :1 =900C345 +EX900C345 -B2 :1/BN
931 3/BU BU 0.34 02/103.B7 +EX900C345 -JB2 -X1 :3 =900C345 +EX900C345 -B2 :3/BU
932 4/BK BK 0.34 02/103.D7 +EX900C345 -JB2 -X1 :5 =900C345 +EX900C345 -B2 :4/BK
933 +EX900C345 =900C345 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.0… 1 YE 2.5 02/103.E2 +1CP03 -1X3 :23 =900C345 +EX900C345 -M1 :U
934 2 GN 2.5 02/103.E2 +1CP03 -1X3 :24 =900C345 +EX900C345 -M1 :V
B B
935 3 RD 2.5 02/103.E2 +1CP03 -1X3 :25 =900C345 +EX900C345 -M1 :W
936 PE GN/YE 1.5 02/103.E2 +1CP03 -1X3 :26 =900C345 +EX900C345 -M1 :PE
937 +EX900C425 -JB1 =900C425 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/105.A6 =1CD03 +1CD03 -X3 :13 +EX900C425 -JB1 -X1 :1
938 2 BK 0.5 02/105.A6 =1CD03 +1CD03 -X3 :14 +EX900C425 -JB1 -X1 :3
939 3 BK 0.5 02/105.D6 =1CD03 +1CD03 -X3 :15 +EX900C425 -JB1 -X1 :5
940 4 BK 0.5 +EX900C425 -JB1 -X1 :6
941 Shield
C 942 +EX900C425 -JB2 =900C425 -W1 ( ZR-RVVP 4*0.5 35.00 m ) 1 BK 0.5 02/105.A7 =1CD03 +1CD03 -X3 :16 +EX900C425 -JB2 -X1 :1 C
943 2 BK 0.5 02/105.A7 =1CD03 +1CD03 -X3 :17 +EX900C425 -JB2 -X1 :3
944 3 BK 0.5 02/105.D7 =1CD03 +1CD03 -X3 :18 +EX900C425 -JB2 -X1 :5
945 4 BK 0.5 02/106.E6 =1CD03 +1CD03 -X3 :19 +EX900C425 -JB2 -X1 :6
946 Shield
947 +EX900C425 =900C425 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/105.B6 +EX900C425 -JB1 -X1 :1 =900C425 +EX900C425 -B1 :1/BN
948 3/BU BU 0.34 02/105.B6 +EX900C425 -JB1 -X1 :3 =900C425 +EX900C425 -B1 :3/BU
949 4/BK BK 0.34 02/105.D6 +EX900C425 -JB1 -X1 :5 =900C425 +EX900C425 -B1 :4/BK
D 950 +EX900C425 =900C425 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/105.B7 +EX900C425 -JB2 -X1 :1 =900C425 +EX900C425 -B2 :1/BN D
951 3/BU BU 0.34 02/105.B7 +EX900C425 -JB2 -X1 :3 =900C425 +EX900C425 -B2 :3/BU
952 4/BK BK 0.34 02/105.D7 +EX900C425 -JB2 -X1 :5 =900C425 +EX900C425 -B2 :4/BK
953 +EX900C425 =900C425 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 50.0… 1 YE 2.5 02/105.E2 +1CP03 -1X3 :60 =900C425 +EX900C425 -M1 :U
954 2 GN 2.5 02/105.E2 +1CP03 -1X3 :61 =900C425 +EX900C425 -M1 :V
955 3 RD 2.5 02/105.E2 +1CP03 -1X3 :62 =900C425 +EX900C425 -M1 :W
956 PE GN/YE 1.5 02/105.E2 +1CP03 -1X3 :63 =900C425 +EX900C425 -M1 :PE
957 +EX900C426 -JB2 =900C426 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/106.B7 =1CD03 +1CD03 -X3 :20 +EX900C426 -JB2 -X1 :1
E 958 2 BK 0.5 02/106.B7 =1CD03 +1CD03 -X3 :21 +EX900C426 -JB2 -X1 :3 E

959 3 BK 0.5 02/106.E7 =1CD03 +1CD03 -X3 :22 +EX900C426 -JB2 -X1 :5
960 4 BK 0.5 02/107.D6 =1CD03 +1CD03 -X3 :23 +EX900C426 -JB2 -X1 :6
961 Shield
962 +EX900C426 =900C426 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/106.B6 +EX900C425 -JB2 -X1 :2 =900C426 +EX900C426 -B1 :1/BN
26 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
963 3/BU BU 0.34 02/106.B6 +EX900C425 -JB2 -X1 :4 =900C426 +EX900C426 -B1 :3/BU
A A
964 4/BK BK 0.34 02/106.D6 +EX900C425 -JB2 -X1 :6 =900C426 +EX900C426 -B1 :4/BK
965 +EX900C426 =900C426 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/106.B7 +EX900C426 -JB2 -X1 :1 =900C426 +EX900C426 -B2 :1/BN
966 3/BU BU 0.34 02/106.B7 +EX900C426 -JB2 -X1 :3 =900C426 +EX900C426 -B2 :3/BU
967 4/BK BK 0.34 02/106.D7 +EX900C426 -JB2 -X1 :5 =900C426 +EX900C426 -B2 :4/BK
968 +EX900C426 =900C426 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.0… 1 YE 2.5 02/106.E2 +1CP03 -1X3 :43 =900C426 +EX900C426 -M1 :U
969 2 GN 2.5 02/106.E2 +1CP03 -1X3 :44 =900C426 +EX900C426 -M1 :V
970 3 RD 2.5 02/106.E2 +1CP03 -1X3 :45 =900C426 +EX900C426 -M1 :W
971 PE GN/YE 1.5 02/106.E2 +1CP03 -1X3 :46 =900C426 +EX900C426 -M1 :PE
B B
972 +EX900C426 =900C426 -M1-W2 ( ZR-RVV-500V 2*0.75 35.00 m ) 1 BK 0.75 02/106.E4 +1CP03 -1X3 :47 =900C426 +EX900C426 -M1 :AC1
973 2 BK 0.75 02/106.E4 +1CP03 -1X3 :48 =900C426 +EX900C426 -M1 :AC2
974 +EX900C427 -JB2 =900C427 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/107.A7 =1CD03 +1CD03 -X3 :24 +EX900C427 -JB2 -X1 :1
975 2 BK 0.5 02/107.A8 =1CD03 +1CD03 -X3 :25 +EX900C427 -JB2 -X1 :3
976 3 BK 0.5 02/107.D7 =1CD03 +1CD03 -X3 :26 +EX900C427 -JB2 -X1 :5
977 4 BK 0.5 +EX900C427 -JB2 -X1 :6
978 Shield
C 979 +EX900C427 =900C427 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/107.B6 +EX900C426 -JB2 -X1 :2 =900C427 +EX900C427 -B1 :1/BN C
980 3/BU BU 0.34 02/107.B7 +EX900C426 -JB2 -X1 :4 =900C427 +EX900C427 -B1 :3/BU
981 4/BK BK 0.34 02/107.D6 +EX900C426 -JB2 -X1 :6 =900C427 +EX900C427 -B1 :4/BK
982 +EX900C427 =900C427 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/107.B7 +EX900C427 -JB2 -X1 :1 =900C427 +EX900C427 -B2 :1/BN
983 3/BU BU 0.34 02/107.B8 +EX900C427 -JB2 -X1 :3 =900C427 +EX900C427 -B2 :3/BU
984 4/BK BK 0.34 02/107.D7 +EX900C427 -JB2 -X1 :5 =900C427 +EX900C427 -B2 :4/BK
985 +EX900C427 =900C427 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/107.E2 +1CP03 -1X3 :39 =900C427 +EX900C427 -M1 :U
986 2 GN 2.5 02/107.E2 +1CP03 -1X3 :40 =900C427 +EX900C427 -M1 :V
D 987 3 RD 2.5 02/107.E2 +1CP03 -1X3 :41 =900C427 +EX900C427 -M1 :W D
988 PE GN/YE 1.5 02/107.E2 +1CP03 -1X3 :42 =900C427 +EX900C427 -M1 :PE
989 +EX900C428 -JB1 -W1 ( ZR-RVVP 4*0.5 10.00 m ) 1 BK 0.5 02/108.A5 =1CD03 +1CD03 -X3 :27 +EX900C428 -JB1 -X1 :1
990 2 BK 0.5 02/108.A6 =1CD03 +1CD03 -X3 :28 +EX900C428 -JB1 -X1 :3
991 3 BK 0.5 02/108.D5 =1CD03 +1CD03 -X3 :29 +EX900C428 -JB1 -X1 :5
992 4 BK 0.5 +EX900C428 -JB1 -X1 :6
993 Shield
994 +EX900C428 -JB2 =900C428 -W1 ( ZR-RVVP 4*0.5 10.00 m ) 1 BK 0.5 02/108.A6 =1CD03 +1CD03 -X3 :30 +EX900C428 -JB2 -X1 :1
E 995 2 BK 0.5 02/108.A7 =1CD03 +1CD03 -X3 :31 +EX900C428 -JB2 -X1 :3 E

996 3 BK 0.5 02/108.D6 =1CD03 +1CD03 -X3 :32 +EX900C428 -JB2 -X1 :5
997 4 BK 0.5 02/109.D6 =1CD03 +1CD03 -X3 :33 +EX900C428 -JB2 -X1 :6
998 Shield
999 +EX900C428 =900C428 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/108.B6 +EX900C428 -JB2 -X1 :1 =900C428 +EX900C428 -B1 :1/BN
27 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1000 3/BU BU 0.34 02/108.B7 +EX900C428 -JB2 -X1 :3 =900C428 +EX900C428 -B1 :3/BU
A A
1001 4/BK BK 0.34 02/108.D6 +EX900C428 -JB2 -X1 :5 =900C428 +EX900C428 -B1 :4/BK
1002 +EX900C428 =900C428 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/108.B5 +EX900C428 -JB1 -X1 :1 +EX900C428 -B2 :1/BN
1003 3/BU BU 0.34 02/108.B6 +EX900C428 -JB1 -X1 :3 +EX900C428 -B2 :3/BU
1004 4/BK BK 0.34 02/108.D5 +EX900C428 -JB1 -X1 :5 +EX900C428 -B2 :4/BK
1005 +EX900C428 =900C428 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 20.0… 1 YE 2.5 02/108.E2 +1CP03 -1X3 :35 =900C428 +EX900C428 -M1 :U
1006 2 GN 2.5 02/108.E2 +1CP03 -1X3 :36 =900C428 +EX900C428 -M1 :V
1007 3 RD 2.5 02/108.E2 +1CP03 -1X3 :37 =900C428 +EX900C428 -M1 :W
1008 PE GN/YE 1.5 02/108.E2 +1CP03 -1X3 :38 =900C428 +EX900C428 -M1 :PE
B B
1009 +EX900C429 -JB2 =900C429 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/109.A7 =1CD03 +1CD03 -X3 :34 +EX900C429 -JB2 -X1 :1
1010 2 BK 0.5 02/109.A7 =1CD03 +1CD03 -X3 :35 +EX900C429 -JB2 -X1 :3
1011 3 BK 0.5 02/109.D7 =1CD03 +1CD03 -X3 :36 +EX900C429 -JB2 -X1 :5
1012 4 BK 0.5 +EX900C429 -JB2 -X1 :6
1013 Shield
1014 +EX900C429 =900C429 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/109.B6 +EX900C428 -JB2 -X1 :2 =900C429 +EX900C429 -B2 :1/BN
1015 3/BU BU 0.34 02/109.B6 +EX900C428 -JB2 -X1 :4 =900C429 +EX900C429 -B2 :3/BU
C 1016 4/BK BK 0.34 02/109.D6 +EX900C428 -JB2 -X1 :6 =900C429 +EX900C429 -B2 :4/BK C
1017 +EX900C429 =900C429 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/109.B7 +EX900C429 -JB2 -X1 :1 =900C429 +EX900C429 -B1 :1/BN
1018 3/BU BU 0.34 02/109.B7 +EX900C429 -JB2 -X1 :3 =900C429 +EX900C429 -B1 :3/BU
1019 4/BK BK 0.34 02/109.D7 +EX900C429 -JB2 -X1 :5 =900C429 +EX900C429 -B1 :4/BK
1020 +EX900C429 =900C429 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 2.5 02/109.E1 +1CP03 -1X3 :30 =900C429 +EX900C429 -M1 :U
1021 2 GN 2.5 02/109.E2 +1CP03 -1X3 :31 =900C429 +EX900C429 -M1 :V
1022 3 RD 2.5 02/109.E2 +1CP03 -1X3 :32 =900C429 +EX900C429 -M1 :W
1023 PE GN/YE 1.5 02/109.E2 +1CP03 -1X3 :33 =900C429 +EX900C429 -M1 :PE
D 1024 +EX900E104 -JB1 =900E104 -W1 ( ZR-RVVP 4*0.5 60.00 m ) 1 BK 0.5 02/10.A3 =1CD02 +1CD02 -X4 :1 +EX900E104 -JB1 -X1 :1 D
1025 2 BK 0.5 02/10.A3 =1CD02 +1CD02 -X4 :2 +EX900E104 -JB1 -X1 :3
1026 3 BK 0.5 02/10.D3 =1CD02 +1CD02 -X4 :3 +EX900E104 -JB1 -X1 :5
1027 4 BK 0.5 02/10.D3 =1CD02 +1CD02 -X4 :4 +EX900E104 -JB1 -X1 :6
1028 Shield 02/10.D3
1029 +EX900E104 -JB2 =900E104 -W1 ( ZR-RVVP 4*0.5 60.00 m ) 1 BK 0.5 02/10.A5 =1CD02 +1CD02 -X4 :5 +EX900E104 -JB2 -X2 :1
1030 2 BK 0.5 02/10.A5 =1CD02 +1CD02 -X4 :6 +EX900E104 -JB2 -X2 :3
1031 3 BK 0.5 02/10.D5 =1CD02 +1CD02 -X4 :8 +EX900E104 -JB2 -X2 :5
E 1032 4 BK 0.5 E

1033 Shield 02/10.D6


1034 +EX900E104 =900E104 -B1-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/10.B3 +EX900E104 -JB1 -X1 :1 =900E104 +EX900E104 -B1 :UB/Red
1035 BK/黑 BK 02/10.B3 +EX900E104 -JB1 -X1 :3 =900E104 +EX900E104 -B1 :GND/Black
1036 GN/绿 GN 02/10.C3 +EX900E104 -JB1 -X1 :5 =900E104 +EX900E104 -B1 :A/Green
28 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1037 WH/白 WH 02/10.C3 +EX900E104 -JB1 -X1 :6 =900E104 +EX900E104 -B1 :B/White
A A
1038 YE/黄 YE
1039 屏蔽/Shield
1040 +EX900E104 =900E104 -B2-W1 ( Sensor cable 2.00 m ) 棕/BN BN 02/10.B5 +EX900E104 -JB2 -X2 :1 =900E104 +EX900E104 -B2 :1/BN
1041 蓝/BU BU 02/10.B5 +EX900E104 -JB2 -X2 :3 =900E104 +EX900E104 -B2 :3/BU
1042 黑/BK BK
1043 白/WH WH 02/10.C5 +EX900E104 -JB2 -X2 :5 =900E104 +EX900E104 -B2 :2/WH
1044 +EX900E105 -M1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 35.00 m ) 1 YE 1.5 02/11.E1 +1CP01 -X3 :71 =900E105 +EX900E105 -M1 :U
1045 2 GN 1.5 02/11.E2 +1CP01 -X3 :72 =900E105 +EX900E105 -M1 :V
B B
1046 3 RD 1.5 02/11.E2 +1CP01 -X3 :73 =900E105 +EX900E105 -M1 :W
1047 PE GN/YE 1.0 02/11.E2 +1CP01 -X3 :74 =900E105 +EX900E105 -M1 :PE
1048 +EX900E105 -M1-W2 ( ZR-RVV-500V 4*0.75 35.00 m ) 1 BK 0.75 02/11.E4 +1CP01 -X3 :75 =900E105 +EX900E105 -M1 :AC1
1049 2 BK 0.75 02/11.E4 +1CP01 -X3 :76 =900E105 +EX900E105 -M1 :AC2
1050 3 BK 0.75 02/11.E4 +1CP01 -X3 :77 =900E105 +EX900E105 -M1 :NO1
1051 4 BK 0.75 02/11.E4 +1CP01 -X3 :78 =900E105 +EX900E105 -M1 :NO2
1052 +EX900E105 -JB1 =900E105 -W1 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/13.A2 =1CD01 +1CD01 -X3 :26 +EX900E105 -JB1 -X1 :1
C 1053 2 BK 0.5 02/13.A2 =1CD01 +1CD01 -X3 :27 +EX900E105 -JB1 -X1 :5 C
1054 3 BK 0.5 02/13.D2 =1CD01 +1CD01 -X3 :28 +EX900E105 -JB1 -X1 :9
1055 4 BK 0.5 02/13.D2 =1CD01 +1CD01 -X3 :29 +EX900E105 -JB1 -X1 :10
1056 5 BK 0.5 02/13.D3 =1CD01 +1CD01 -X3 :30 +EX900E105 -JB1 -X1 :11
1057 6 BK 0.5 02/13.D4 =1CD01 +1CD01 -X3 :31 +EX900E105 -JB1 -X1 :12
1058 7 BK 0.5 02/13.D4 =1CD01 +1CD01 -X3 :32 +EX900E105 -JB1 -X1 :13
1059 8 BK 0.5 02/13.D5 =1CD01 +1CD01 -X3 :33 +EX900E105 -JB1 -X1 :16
1060 9 BK 0.5 02/13.D6 =1CD01 +1CD01 -X3 :34 +EX900E105 -JB1 -X1 :17
D 1061 10 BK 0.5 D
1062 Shield
1063 +EX900E105 -JB1 =900E105 -W2 ( ZR-RVV-500V 4*0.75 15.00 … 1 BK 0.75 02/12.D1 +EX900E105 -JB2 -X1 :11 =1CD01 +1CD01 -F5 :2
1064 2 BK 0.75 02/12.D2 +EX900E105 -JB2 -X1 :12 =900E101 +1CD01 PE :
1065 3 BK 0.75 02/12.D2 =1CD01 +1CD01 -X1 :8 +EX900E105 -JB2 -X1 :13
1066 4 BK 0.75
1067 +EX900E105 -JB2 =900E105 -W1 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/12.A2 =1CD01 +1CD01 -X3 :16 +EX900E105 -JB2 -X1 :1
1068 2 BK 0.5 02/12.A3 =1CD01 +1CD01 -X3 :18 +EX900E105 -JB2 -X1 :2
E 1069 3 BK 0.5 02/12.D3 =1CD01 +1CD01 -X3 :19 +EX900E105 -JB2 -X1 :4 E

1070 4 BK 0.5 02/12.E7 =1CD01 +1CD01 -X3 :20 +EX900E105 -JB2 -X1 :5
1071 5 BK 0.5 02/12.E7 =1CD01 +1CD01 -X3 :21 +EX900E105 -JB2 -X1 :6
1072 6 BK 0.5 02/12.B6 =1CD01 +1CD01 -X3 :23 +EX900E105 -JB2 -X1 :7
1073 7 BK 0.5 02/12.B7 =1CD01 +1CD01 -X3 :24 +EX900E105 -JB2 -X1 :8
29 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1074 8 BK 0.5 02/12.B7 =1CD01 +1CD01 -X3 :25 +EX900E105 -JB2 -X1 :9
A A
1075 9 BK 0.5 02/12.E8 =1CD01 +1CD01 -X3 :22 +EX900E105 -JB2 -X1 :10
1076 10 BK 0.5
1077 Shield
1078 +EX900E105 -JB3 =900E105 -W1 ( ZR-RVVP 4*0.5 60.00 m ) 1 BK 0.5 02/13.A7 +EX900E105 -JB3 -X1 :1 =1CD02 +1CD02 -X4 :9
1079 2 BK 0.5 02/13.A7 +EX900E105 -JB3 -X1 :3 =1CD02 +1CD02 -X4 :10
1080 3 BK 0.5 02/13.D7 +EX900E105 -JB3 -X1 :5 =1CD02 +1CD02 -X4 :11
1081 4 BK 0.5 02/13.D7 =1CD02 +1CD02 -X4 :12 +EX900E105 -JB3 -X1 :6
1082 Shield 02/13.D8
B B
1083 +EX900E105 =900E105 -B1-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B2 +EX900E105 -JB1 -X1 :1 =900E105 +EX900E105 -B1 :1/棕
1084 BU BU 02/13.B2 +EX900E105 -JB1 -X1 :5 =900E105 +EX900E105 -B1 :3/蓝
1085 BK BK 02/13.C2 +EX900E105 -JB1 -X1 :9 =900E105 +EX900E105 -B1 :4/黑
1086 +EX900E105 =900E105 -B2-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B2 +EX900E105 -JB1 -X1 :2 =900E105 +EX900E105 -B2 :1/棕
1087 BU BU 02/13.B2 +EX900E105 -JB1 -X1 :6 =900E105 +EX900E105 -B2 :3/蓝
1088 BK BK 02/13.C2 +EX900E105 -JB1 -X1 :10 =900E105 +EX900E105 -B2 :4/黑
1089 +EX900E105 =900E105 -B3-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B3 +EX900E105 -JB1 -X1 :2 =900E105 +EX900E105 -B3 :BN/棕
C 1090 BU BU 02/13.B3 +EX900E105 -JB1 -X1 :6 =900E105 +EX900E105 -B3 :BU/蓝 C
1091 BK BK 02/13.C3 +EX900E105 -JB1 -X1 :11 =900E105 +EX900E105 -B3 :BK/黑
1092 +EX900E105 =900E105 -B4-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B4 +EX900E105 -JB1 -X1 :3 =900E105 +EX900E105 -B4 :BN/棕
1093 BU BU 02/13.B4 +EX900E105 -JB1 -X1 :7 =900E105 +EX900E105 -B4 :BU/蓝
1094 BK BK 02/13.C4 +EX900E105 -JB1 -X1 :12 =900E105 +EX900E105 -B4 :BK/黑
1095 +EX900E105 =900E105 -B5-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B4 +EX900E105 -JB1 -X1 :3 =900E105 +EX900E105 -B5 :BN/棕
1096 BU BU 02/13.B4 +EX900E105 -JB1 -X1 :7 =900E105 +EX900E105 -B5 :BU/蓝
1097 BK BK 02/13.C4 +EX900E105 -JB1 -X1 :13 =900E105 +EX900E105 -B5 :BK/黑
D 1098 +EX900E105 =900E105 -B6-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B5 +EX900E105 -JB1 -X1 :4 =900E105 +EX900E105 -B6 :1/BN D
1099 BU BU 02/13.B5 +EX900E105 -JB1 -X1 :8 =900E105 +EX900E105 -B6 :3/BU
1100 BK BK 02/13.C5 +EX900E105 -JB1 -X1 :16 =900E105 +EX900E105 -B6 :4/BK
1101 +EX900E105 =900E105 -B7-W1 ( Sensor cable 2.00 m ) BN BN 02/13.B6 +EX900E105 -JB1 -X1 :4 =900E105 +EX900E105 -B7 :1/BN
1102 BU BU 02/13.B6 +EX900E105 -JB1 -X1 :8 =900E105 +EX900E105 -B7 :3/BU
1103 BK BK 02/13.C6 +EX900E105 -JB1 -X1 :17 =900E105 +EX900E105 -B7 :4/BK
1104 +EX900E105 =900E105 -B8-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/13.B7 +EX900E105 -JB3 -X1 :1 =900E105 +EX900E105 -B8 :UB/Red
1105 BK/黑 BK 02/13.B7 +EX900E105 -JB3 -X1 :3 =900E105 +EX900E105 -B8 :GND/Black
E 1106 GN/绿 GN 02/13.C7 =900E105 +EX900E105 -B8 :A/Green +EX900E105 -JB3 -X1 :5 E

1107 WH/白 WH 02/13.C7 =900E105 +EX900E105 -B8 :B/White +EX900E105 -JB3 -X1 :6
1108 YE/黄 YE
1109 屏蔽/Shield
1110 +EX900E105 =900E105 -P1-W1 ( ZR-RVVP 4*0.5 5.00 m ) 1 BK 0.5 02/12.D3 =900E105 +EX900E105 -P1 :1红/RD +EX900E105 -JB2 -X1 :4
30 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1111 2 BK 0.5
A A
1112 3 BK 0.5 02/12.D4 +EX900E105 -JB2 -X1 :3 =900E105 +EX900E105 -P1 :黑/BK
1113 4 BK 0.5
1114 Shield
1115 +EX900E105 =900E105 -TBJ-W1 ( TRVVP-JQ-10*0.5 15.00 m ) 1 BK 0.5 02/12.D6 +EX900E105 -JB2 -X1 :1 =900E105 +EX900E105 -TBJ :29
1116 2 BK 0.5 02/12.D7 +EX900E105 -JB2 -X1 :5 =900E105 +EX900E105 -TBJ :31
1117 3 BK 0.5 02/12.D7 +EX900E105 -JB2 -X1 :6 =900E105 +EX900E105 -TBJ :33
1118 4 BK 0.5 02/12.C6 +EX900E105 -JB2 -X1 :7 =900E105 +EX900E105 -TBJ :+24V ACC+
1119 5 BK 0.5 02/12.C7 +EX900E105 -JB2 -X1 :8 =900E105 +EX900E105 -TBJ :1X3 21
B B
1120 6 BK 0.5 02/12.C7 +EX900E105 -JB2 -X1 :9 =900E105 +EX900E105 -TBJ :DI:预留
1121 7 BK 0.5 02/12.D8 +EX900E105 -JB2 -X1 :10 =900E105 +EX900E105 -TBJ :34
1122 8 BK 0.5 02/12.E1 +EX900E105 -JB2 -X1 :11 =900E105 +EX900E105 -TBJ :L
1123 9 BK 0.5 02/12.E2 +EX900E105 -JB2 -X1 :12 =900E105 +EX900E105 -TBJ :PE
1124 10 BK 0.5 02/12.E2 +EX900E105 -JB2 -X1 :13 =900E105 +EX900E105 -TBJ :N
1125 Shield
1126 +EX900E106 -JB2 =900E106 -W3 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/15.A1 =1CD01 +1CD01 -X3 :35 +EX900E106 -JB2 -X2 :1
C 1127 2 BK 0.5 02/15.A2 =1CD01 +1CD01 -X3 :36 +EX900E106 -JB2 -X2 :2 C
1128 3 BK 0.5 02/15.E1 =1CD01 +1CD01 -X3 :37 +EX900E106 -JB2 -X2 :3
1129 4 BK 0.5 02/15.E2 =1CD01 +1CD01 -X3 :38 +EX900E106 -JB2 -X2 :4
1130 5 BK 0.5 02/15.E3 =1CD01 +1CD01 -X3 :39 +EX900E106 -JB2 -X2 :5
1131 6 BK 0.5 02/15.E4 =1CD01 +1CD01 -X3 :40 +EX900E106 -JB2 -X2 :6
1132 7 BK 0.5 02/15.E5 =1CD01 +1CD01 -X3 :41 +EX900E106 -JB2 -X2 :7
1133 8 BK 0.5 02/15.E5 =1CD01 +1CD01 -X3 :42 +EX900E106 -JB2 -X2 :8
1134 9 BK 0.5
D 1135 10 BK 0.5 D
1136 Shield
1137 +EX900E106 -JB2 =900E106 -W4 ( 5.00 m ) 1 BK 0.5 02/15.B1 +EX900E106 -X :1 +EX900E106 -JB2 -X2 :1
1138 2 BK 0.5 02/15.B2 +EX900E106 -X :2 +EX900E106 -JB2 -X2 :2
1139 3 BK 0.5 02/15.D1 +EX900E106 -X :3 +EX900E106 -JB2 -X2 :3
1140 4 BK 0.5 02/15.D2 +EX900E106 -X :4 +EX900E106 -JB2 -X2 :4
1141 5 BK 0.5 02/15.D3 +EX900E106 -X :5 +EX900E106 -JB2 -X2 :5
1142 6 BK 0.5 02/15.D4 +EX900E106 -X :6 +EX900E106 -JB2 -X2 :6
E 1143 7 BK 0.5 E

1144 +EX900E106 =900E106 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C1 +EX900E106 -X :1 =900E106 +EX900E106 -B1 :1/BN
1145 BU BU 02/15.C2 +EX900E106 -X :2 =900E106 +EX900E106 -B1 :3/BU
1146 BK BK 02/15.D1 +EX900E106 -X :3 =900E106 +EX900E106 -B1 :4/BK
1147 +EX900E106 =900E106 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C2 +EX900E106 -X :1 =900E106 +EX900E106 -B2 :1/BN
31 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1148 BU BU 02/15.C2 +EX900E106 -X :2 =900E106 +EX900E106 -B2 :3/BU
A A
1149 BK BK 02/15.D2 +EX900E106 -X :4 =900E106 +EX900E106 -B2 :4/BK
1150 +EX900E106 =900E106 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C3 +EX900E106 -X :1 =900E106 +EX900E106 -B3 :1/BN
1151 BU BU 02/15.C3 +EX900E106 -X :2 =900E106 +EX900E106 -B3 :3/BU
1152 BK BK 02/15.D3 +EX900E106 -X :5 =900E106 +EX900E106 -B3 :4/BK
1153 +EX900E106 =900E106 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C4 +EX900E106 -X :1 =900E106 +EX900E106 -B4 :1/BN
1154 BU BU 02/15.C4 +EX900E106 -X :2 =900E106 +EX900E106 -B4 :3/BU
1155 BK BK 02/15.D4 +EX900E106 -X :6 =900E106 +EX900E106 -B4 :4/BK
1156 +EX900E106 =900E106 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C5 +EX900E106 -JB2 -X2 :1 =900E106 +EX900E106 -B5 :1/棕
B B
1157 BU BU 02/15.C5 +EX900E106 -JB2 -X2 :2 =900E106 +EX900E106 -B5 :3/蓝
1158 BK BK 02/15.D5 +EX900E106 -JB2 -X2 :7 =900E106 +EX900E106 -B5 :4/黑
1159 +EX900E106 =900E106 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/15.C5 +EX900E106 -JB2 -X2 :1 =900E106 +EX900E106 -B6 :1/棕
1160 BU BU 02/15.C5 +EX900E106 -JB2 -X2 :2 =900E106 +EX900E106 -B6 :3/蓝
1161 BK BK 02/15.D5 +EX900E106 -JB2 -X2 :8 =900E106 +EX900E106 -B6 :4/黑
1162 +EX900E106 =900E106 -JB1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 30.0… 1 YE 1.5 02/14.D6 +1CP01 -X3 :53 +EX900E106 -JB1 -X1 :1
1163 2 GN 1.5 02/14.D6 +1CP01 -X3 :54 +EX900E106 -JB1 -X1 :2
C 1164 3 RD 1.5 02/14.D6 +1CP01 -X3 :55 +EX900E106 -JB1 -X1 :3 C
1165 PE GN/YE 1.0 02/14.D6 +1CP01 -X3 :56 +EX900E106 -JB1 -X1 :4
1166 +EX900E106 =900E106 -M1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 5.00 … 1 YE 1.5 02/14.E1 =900E106 +EX900E106 -Q1 :2 =900E106 +EX900E106 -M1 :U
1167 2 GN 1.5 02/14.E2 =900E106 +EX900E106 -Q1 :4 =900E106 +EX900E106 -M1 :V
1168 3 RD 1.5 02/14.E2 =900E106 +EX900E106 -Q1 :6 =900E106 +EX900E106 -M1 :W
1169 PE GN/YE 1.0 02/14.E2
1170 +EX900E106 =900E106 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/14.E4 +1CP01 -X3 :51 =900E106 +EX900E106 -M1 :AC1
1171 2 BK 0.75 02/14.E4 +1CP01 -X3 :52 =900E106 +EX900E106 -M1 :AC2
D 1172 +EX900E106 =900E106 -M2-W1 ( ) 1 YE 1.5 02/14.E6 +EX900E106 -JB1 -X1 :1 =900E106 +EX900E106 -M2 :U D
1173 2 GN 1.5 02/14.E6 +EX900E106 -JB1 -X1 :2 =900E106 +EX900E106 -M2 :V
1174 3 RD 1.5 02/14.E6 +EX900E106 -JB1 -X1 :3 =900E106 +EX900E106 -M2 :W
1175 4 BK 1 02/14.E6 +EX900E106 -JB1 -X1 :4 =900E106 +EX900E106 -M2 :PE
1176 5 BK 1
1177 6 BK 1
1178 7 BK 1
1179 +EX900E106 =900E106 -Q1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 30.00… 1 YE 1.5 02/14.D1 +1CP01 -X3 :47 =900E106 +EX900E106 -Q1 :1
E 1180 2 GN 1.5 02/14.D2 +1CP01 -X3 :48 =900E106 +EX900E106 -Q1 :3 E

1181 3 RD 1.5 02/14.D2 +1CP01 -X3 :49 =900E106 +EX900E106 -Q1 :5


1182 PE GN/YE 1.0 02/14.D2 +1CP01 -X3 :50 =900E106 +EX900E106 -M1 :PE
1183 +EX900E108 -JB1 =900E108 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/25.A2 =1CD02 +1CD02 -X4 :21 =900E108 +EX900E108 -JB1 -X2 :1
1184 2 BK 0.5 02/25.A2 =1CD02 +1CD02 -X4 :22 =900E108 +EX900E108 -JB1 -X2 :4
32 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1185 3 BK 0.5 02/25.D2 =1CD02 +1CD02 -X4 :23 =900E108 +EX900E108 -JB1 -X2 :9
A A
1186 4 BK 0.5 02/25.B5 =1CD02 +1CD02 -X4 :24 =900E108 +EX900E108 -JB1 -X2 :10
1187 Shield
1188 +EX900E108 =900E108 -A1-W1 ( Scanner cable 5.00 m ) 1/白 WH
1189 2/GN GN
1190 3/PK BN
1191 4/YE
1192 5/灰
1193 6/BK BK
B B
1194 7/BN BN 02/25.C3 =900E108 +EX900E108 -A1 :+24 VDC =900E108 +EX900E108 -JB1 -F1 :2
1195 8/BU 02/25.C3 =900E108 +EX900E108 -JB1 -X2 :5 =900E108 +EX900E108 -A1 :GND
1196 9/VT
1197 10/RD BK
1198 11/GY/PK WH
1199 12/RD/蓝 WH
1200 +EX900E108 =900E108 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/25.B2 =900E108 +EX900E108 -JB1 -X2 :1
C 1201 BU BU 02/25.B2 =900E108 +EX900E108 -JB1 -X2 :4 C
1202 BK BK 02/25.C2 =900E108 +EX900E108 -JB1 -X2 :9
1203 +EX900E108 =900E108 -P1-W1 ( ZR-RVVP 3*0.5 5.00 m ) 1 BK 0.5 02/25.D4 =900E108 +EX900E108 -JB1 -K2 :12 =900E108 +EX900E108 -P1 :1红/RD
1204 2 BK 0.5 02/25.D5 =900E108 +EX900E108 -JB1 -X2 :6 =900E108 +EX900E108 -P1 :黑/BK
1205 3 BK 0.5
1206 Shield
1207 +EX900E109 -JB1 =900E109 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/26.A3 =1CD02 +1CD02 -X4 :25 +EX900E109 -JB1 -X1 :1
1208 2 BK 0.5 02/26.A3 =1CD02 +1CD02 -X4 :26 +EX900E109 -JB1 -X1 :3
D 1209 3 BK 0.5 02/26.D3 =1CD02 +1CD02 -X4 :27 +EX900E109 -JB1 -X1 :5 D
1210 4 BK 0.5 02/26.D3 =1CD02 +1CD02 -X4 :28 +EX900E109 -JB1 -X1 :6
1211 Shield 02/26.D3
1212 +EX900E109 -JB2 =900E109 -W1 ( ZR-RVVP 4*0.5 15.00 m ) 1 BK 0.5 02/26.A5 =1CD02 +1CD02 -X4 :29 +EX900E109 -JB2 -X2 :1
1213 2 BK 0.5 02/26.A5 =1CD02 +1CD02 -X4 :30 +EX900E109 -JB2 -X2 :3
1214 3 BK 0.5 02/26.D5 =1CD02 +1CD02 -X4 :32 +EX900E109 -JB2 -X2 :5
1215 4 BK 0.5
1216 Shield 02/26.D6
E 1217 +EX900E109 =900E109 -B1-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/26.B3 +EX900E109 -JB1 -X1 :1 =900E109 +EX900E109 -B1 :UB/Red E

1218 BK/黑 BK 02/26.B3 +EX900E109 -JB1 -X1 :3 =900E109 +EX900E109 -B1 :GND/Black
1219 GN/绿 GN 02/26.C3 +EX900E109 -JB1 -X1 :5 =900E109 +EX900E109 -B1 :A/Green
1220 WH/白 WH 02/26.C3 +EX900E109 -JB1 -X1 :6 =900E109 +EX900E109 -B1 :B/White
1221 YE/黄 YE
33 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1222 屏蔽/Shield
A A
1223 +EX900E109 =900E109 -B2-W1 ( Sensor cable 2.00 m ) 棕/BN BN 02/26.B5 +EX900E109 -JB2 -X2 :1 =900E109 +EX900E109 -B2 :1/BN
1224 蓝/BU BU 02/26.B5 +EX900E109 -JB2 -X2 :3 =900E109 +EX900E109 -B2 :3/BU
1225 黑/BK BK
1226 白/WH WH 02/26.C5 +EX900E109 -JB2 -X2 :5 =900E109 +EX900E109 -B2 :2/WH
1227 +EX900E110 -CC1 =900E110 -W1 ( ZR-RVVP 3*0.5 15.00 m ) 1 BK 0.5 02/24.D6 =1CD02 +1CD02 -X4 :19 =900E110 +EX900E110 -CC1 -X1 :4
1228 2 BK 0.5 02/24.D7 =1CD02 +1CD02 -X4 :20 =900E110 +EX900E110 -CC1 -X1 :5
1229 3 BK 0.5
1230 Shield
B B
1231 +EX900E110 -JB1 =900E110 -W1 ( ZR-RVVP 7*0.5 15.00 m ) 1 BK 0.5 02/24.A2 =1CD02 +1CD02 -X4 :13 =900E110 +EX900E110 -JB1 -X1 :1
1232 2 BK 0.5 02/24.A2 =1CD02 +1CD02 -X4 :14 =900E110 +EX900E110 -JB1 -X1 :5
1233 3 BK 0.5 02/24.D2 =1CD02 +1CD02 -X4 :15 =900E110 +EX900E110 -JB1 -X1 :9
1234 4 BK 0.5 02/24.D3 =1CD02 +1CD02 -X4 :16 =900E110 +EX900E110 -JB1 -X1 :10
1235 5 BK 0.5 02/24.D4 =1CD02 +1CD02 -X4 :17 =900E110 +EX900E110 -JB1 -X1 :11
1236 6 BK 0.5 02/24.D5 =1CD02 +1CD02 -X4 :18 =900E110 +EX900E110 -JB1 -X1 :12
1237 7 BK 0.5
C 1238 Shield C
1239 +EX900E110 =900C108 -M1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 30.00… 1 YE 1.5 02/21.D6 +1CP01 -X3 :63 =900C108 +EX900E110 -M2 :U
1240 2 GN 1.5 02/21.D6 +1CP01 -X3 :64 =900C108 +EX900E110 -M2 :V
1241 3 RD 1.5 02/21.D6 +1CP01 -X3 :65 =900C108 +EX900E110 -M2 :W
1242 PE GN/YE 1.0 02/21.D6 +1CP01 -X3 :66 =900C108 +EX900E110 -M2 :PE
1243 +EX900E110 =900C108 -M2-W2 ( ZR-RVV-500V 4*0.75 30.00 m ) 1 BK 0.75 02/21.D7 +1CP01 -X3 :67 =900C108 +EX900E110 -M2 :AC1
1244 2 BK 0.75 02/21.D7 +1CP01 -X3 :68 =900C108 +EX900E110 -M2 :AC2
1245 3 BK 0.75 02/21.D7 +1CP01 -X3 :69 =900C108 +EX900E110 -M2 :NO1
D 1246 4 BK 0.75 02/21.D8 +1CP01 -X3 :70 =900C108 +EX900E110 -M2 :NO2 D
1247 +EX900E110 =900E110 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/24.B2 =900E110 +EX900E110 -JB1 -X1 :9 =900E110 +EX900E110 -JB1 -X1 :1
1248 BU BU 02/24.B2 =900E110 +EX900E110 -JB1 -X1 :5
1249 BK BK 02/24.C2
1250 +EX900E110 =900E110 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/24.B3 =900E110 +EX900E110 -JB1 -X1 :2 =900E110 +EX900E110 -B2 :1/BN
1251 BU BU 02/24.B3 =900E110 +EX900E110 -JB1 -X1 :6 =900E110 +EX900E110 -B2 :3/BU
1252 BK BK 02/24.C3 =900E110 +EX900E110 -JB1 -X1 :10 =900E110 +EX900E110 -B2 :4/BK
1253 +EX900E110 =900E110 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/24.B4 =900E110 +EX900E110 -JB1 -X1 :3 =900E110 +EX900E110 -B5 :1/棕
E 1254 BU BU 02/24.B4 =900E110 +EX900E110 -JB1 -X1 :7 =900E110 +EX900E110 -B5 :3/蓝 E

1255 BK BK 02/24.C4 =900E110 +EX900E110 -JB1 -X1 :11 =900E110 +EX900E110 -B5 :4/黑
1256 +EX900E110 =900E110 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/24.B5 =900E110 +EX900E110 -JB1 -X1 :4 =900E110 +EX900E110 -B6 :1/棕
1257 BU BU 02/24.B5 =900E110 +EX900E110 -JB1 -X1 :8 =900E110 +EX900E110 -B6 :3/蓝
1258 BK BK 02/24.C5 =900E110 +EX900E110 -JB1 -X1 :12 =900E110 +EX900E110 -B6 :4/黑
34 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1259 +EX900E110 =900E110 -PMJ-W1 ( TRVVP-JQ-4*1 15.00 m ) 1 YE 2.5 02/24.B6 =1CD02 +1CD02 -X1 :9 =900E110 +EX900E110 -PMJ1 :L
A A
1260 2 GN 2.5 02/24.B6 =1CD02 +1CD02 -X1 :10 =900E110 +EX900E110 -PMJ1 :N
1261 3 RD 2.5
1262 PE GN/YE 2.5 02/24.B7 =1CD02 +1CD02 -X1 :11 =900E110 +EX900E110 -PMJ1 PE :PE
1263 +EX900E110 =900E110 -PMJ-W2 ( TRVVP-JQ-4*1 15.00 m ) 1 BK 1 02/24.B7 =900E110 +EX900E110 -CC1 -X1 :1 =900E110 +EX900E110 -PMJ1 :Plus+
1264 2 BK 1 02/24.B7 =900E110 +EX900E110 -CC1 -X1 :2 =900E110 +EX900E110 -PMJ1 :Plus-
1265 3 BK 1
1266 4 BK 1
1267 Shield
B B
1268 +EX900E111 -JB2 =900E111 -W3 ( ZR-RVVP 10*0.5 25.00 m ) 1 BK 0.5 02/32.A1 =1CD02 +1CD02 -X3 :33 +EX900E111 -JB2 -X2 :1
1269 2 BK 0.5 02/32.A2 =1CD02 +1CD02 -X3 :34 +EX900E111 -JB2 -X2 :2
1270 3 BK 0.5 02/32.E1 =1CD02 +1CD02 -X3 :35 +EX900E111 -JB2 -X2 :3
1271 4 BK 0.5 02/32.E2 =1CD02 +1CD02 -X3 :36 +EX900E111 -JB2 -X2 :4
1272 5 BK 0.5 02/32.E3 =1CD02 +1CD02 -X3 :37 +EX900E111 -JB2 -X2 :5
1273 6 BK 0.5 02/32.E4 =1CD02 +1CD02 -X3 :38 +EX900E111 -JB2 -X2 :6
1274 7 BK 0.5 02/32.E5 =1CD02 +1CD02 -X3 :39 +EX900E111 -JB2 -X2 :7
C 1275 8 BK 0.5 02/32.E5 =1CD02 +1CD02 -X3 :40 +EX900E111 -JB2 -X2 :8 C
1276 9 BK 0.5 02/32.E6 =1CD02 +1CD02 -X3 :41 +EX900E111 -JB2 -X2 :9
1277 10 BK 0.5
1278 Shield
1279 +EX900E111 -JB2 =900E111 -W4 ( 5.00 m ) 1 BK 0.5 02/32.B1 +EX900E111 -X :1 +EX900E111 -JB2 -X2 :1
1280 2 BK 0.5 02/32.B2 +EX900E111 -X :2 +EX900E111 -JB2 -X2 :2
1281 3 BK 0.5 02/32.D1 +EX900E111 -X :3 +EX900E111 -JB2 -X2 :3
1282 4 BK 0.5 02/32.D2 +EX900E111 -X :4 +EX900E111 -JB2 -X2 :4
D 1283 5 BK 0.5 02/32.D3 +EX900E111 -X :5 +EX900E111 -JB2 -X2 :5 D
1284 6 BK 0.5 02/32.D4 +EX900E111 -X :6 +EX900E111 -JB2 -X2 :6
1285 7 BK 0.5
1286 +EX900E111 =900E111 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C1 +EX900E111 -X :1 =900E111 +EX900E111 -B1 :1/BN
1287 BU BU 02/32.C2 +EX900E111 -X :2 =900E111 +EX900E111 -B1 :3/BU
1288 BK BK 02/32.D1 +EX900E111 -X :3 =900E111 +EX900E111 -B1 :4/BK
1289 +EX900E111 =900E111 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C2 +EX900E111 -X :1 =900E111 +EX900E111 -B2 :1/BN
1290 BU BU 02/32.C2 +EX900E111 -X :2 =900E111 +EX900E111 -B2 :3/BU
E 1291 BK BK 02/32.D2 +EX900E111 -X :4 =900E111 +EX900E111 -B2 :4/BK E

1292 +EX900E111 =900E111 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C3 +EX900E111 -X :1 =900E111 +EX900E111 -B3 :1/BN
1293 BU BU 02/32.C3 +EX900E111 -X :2 =900E111 +EX900E111 -B3 :3/BU
1294 BK BK 02/32.D3 +EX900E111 -X :5 =900E111 +EX900E111 -B3 :4/BK
1295 +EX900E111 =900E111 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C4 +EX900E111 -X :1 =900E111 +EX900E111 -B4 :1/BN
35 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1296 BU BU 02/32.C4 +EX900E111 -X :2 =900E111 +EX900E111 -B4 :3/BU
A A
1297 BK BK 02/32.D4 +EX900E111 -X :6 =900E111 +EX900E111 -B4 :4/BK
1298 +EX900E111 =900E111 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C5 +EX900E111 -JB2 -X2 :1 =900E111 +EX900E111 -B5 :1/棕
1299 BU BU 02/32.C5 +EX900E111 -JB2 -X2 :2 =900E111 +EX900E111 -B5 :3/蓝
1300 BK BK 02/32.D5 +EX900E111 -JB2 -X2 :7 =900E111 +EX900E111 -B5 :4/黑
1301 +EX900E111 =900E111 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C5 +EX900E111 -JB2 -X2 :1 =900E111 +EX900E111 -B6 :1/棕
1302 BU BU 02/32.C5 +EX900E111 -JB2 -X2 :2 =900E111 +EX900E111 -B6 :3/蓝
1303 BK BK 02/32.D5 +EX900E111 -JB2 -X2 :8 =900E111 +EX900E111 -B6 :4/黑
1304 +EX900E111 =900E111 -B7-W1 ( Sensor cable 5.00 m ) BN BN 02/32.C6 +EX900E111 -JB2 -X2 :1 =900E111 +EX900E111 -B7 :1/棕
B B
1305 BU BU 02/32.C6 +EX900E111 -JB2 -X2 :2 =900E111 +EX900E111 -B7 :3/蓝
1306 BK BK 02/32.D6 +EX900E111 -JB2 -X2 :9 =900E111 +EX900E111 -B7 :4/黑
1307 +EX900E111 =900E111 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 45.0… 1 YE 2.5 02/30.C6 +EX900E111 -JB1 -X1 :1 +1CP01 -X3 :85
1308 2 GN 2.5 02/30.C6 +EX900E111 -JB1 -X1 :2 +1CP01 -X3 :86
1309 3 RD 2.5 02/30.C6 +EX900E111 -JB1 -X1 :3 +1CP01 -X3 :87
1310 PE GN/YE 1.5 02/30.C6 +EX900E111 -JB1 -X1 :4 +1CP01 -X3 :88
1311 +EX900E111 =900E111 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 m )1 YE 2.5 02/30.D2 =900E111 +1CP01 -Q3 :2 =900E111 +EX900E111 -M1 :U
C 1312 2 GN 2.5 02/30.D2 =900E111 +1CP01 -Q3 :4 =900E111 +EX900E111 -M1 :V C
1313 3 RD 2.5 02/30.D2 =900E111 +1CP01 -Q3 :6 =900E111 +EX900E111 -M1 :W
1314 PE GN/YE 1.5 02/30.D3
1315 +EX900E111 =900E111 -M1-W2 ( ZR-RVV-500V 2*0.75 45.00 m ) 1 BK 0.75 02/30.C3 +1CP01 -X3 :83 =900E111 +EX900E111 -M1 :AC1
1316 2 BK 0.75 02/30.C3 +1CP01 -X3 :84 =900E111 +EX900E111 -M1 :AC2
1317 +EX900E111 =900E111 -M2-W1 ( ) 1 YE 1.5 02/30.E6 +EX900E111 -JB1 -X1 :1 =900E111 +EX900E111 -M2 :U
1318 2 GN 1.5 02/30.E6 +EX900E111 -JB1 -X1 :2 =900E111 +EX900E111 -M2 :V
1319 3 RD 1.5 02/30.E6 +EX900E111 -JB1 -X1 :3 =900E111 +EX900E111 -M2 :W
D 1320 4 BK 1 02/30.E6 +EX900E111 -JB1 -X1 :4 =900E111 +EX900E111 -M2 :PE D
1321 5 BK 1
1322 6 BK 1
1323 7 BK 1
1324 +EX900E111 =900E111 -Q3-W1 ( ZR-VV-1KV 3*2.5+1*1.5 45.00 …1 YE 2.5 02/30.C2 +1CP01 -X3 :79 =900E111 +1CP01 -Q3 :1
1325 2 GN 2.5 02/30.C2 +1CP01 -X3 :80 =900E111 +1CP01 -Q3 :3
1326 3 RD 2.5 02/30.C2 +1CP01 -X3 :81 =900E111 +1CP01 -Q3 :5
1327 PE GN/YE 1.5 02/30.C3 +1CP01 -X3 :82 =900E111 +EX900E111 -M1 :PE
E 1328 +EX900E301 -JB2 =900E301 -W3 ( ZR-RVVP 10*0.5 25.00 m ) 1 BK 0.5 02/71.A2 =1CP20 +1CP20 -X5 :1 +EX900E301 -JB2 -X2 :1 E

1329 2 BK 0.5 02/71.A2 =1CP20 +1CP20 -X5 :2 +EX900E301 -JB2 -X2 :2


1330 3 BK 0.5 02/71.E2 =1CP20 +1CP20 -X5 :3 +EX900E301 -JB2 -X2 :3
1331 4 BK 0.5 02/71.E2 =1CP20 +1CP20 -X5 :4 +EX900E301 -JB2 -X2 :4
1332 5 BK 0.5 02/71.E3 =1CP20 +1CP20 -X5 :5 +EX900E301 -JB2 -X2 :5
36 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1333 6 BK 0.5 02/71.E4 =1CP20 +1CP20 -X5 :6 +EX900E301 -JB2 -X2 :6
A A
1334 7 BK 0.5 02/71.E5 =1CP20 +1CP20 -X5 :7 +EX900E301 -JB2 -X2 :7
1335 8 BK 0.5 02/71.E5 =1CP20 +1CP20 -X5 :8 +EX900E301 -JB2 -X2 :8
1336 9 BK 0.5
1337 10 BK 0.5
1338 Shield
1339 +EX900E301 -JB2 =900E301 -W4 ( 5.00 m ) 1 BK 0.5 02/71.B2 +EX900E301 -X :1 +EX900E301 -JB2 -X2 :1
1340 2 BK 0.5 02/71.B2 +EX900E301 -X :2 +EX900E301 -JB2 -X2 :2
1341 3 BK 0.5 02/71.D2 +EX900E301 -X :3 +EX900E301 -JB2 -X2 :3
B B
1342 4 BK 0.5 02/71.D2 +EX900E301 -X :4 +EX900E301 -JB2 -X2 :4
1343 5 BK 0.5 02/71.D3 +EX900E301 -X :5 +EX900E301 -JB2 -X2 :5
1344 6 BK 0.5 02/71.D4 +EX900E301 -X :6 +EX900E301 -JB2 -X2 :6
1345 7 BK 0.5
1346 +EX900E301 =900E301 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C2 +EX900E301 -X :1 =900E301 +EX900E301 -B1 :1/BN
1347 BU BU 02/71.C2 +EX900E301 -X :2 =900E301 +EX900E301 -B1 :3/BU
1348 BK BK 02/71.D2 +EX900E301 -X :3 =900E301 +EX900E301 -B1 :4/BK
C 1349 +EX900E301 =900E301 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C2 +EX900E301 -X :1 =900E301 +EX900E301 -B2 :1/BN C
1350 BU BU 02/71.C2 +EX900E301 -X :2 =900E301 +EX900E301 -B2 :3/BU
1351 BK BK 02/71.D2 +EX900E301 -X :4 =900E301 +EX900E301 -B2 :4/BK
1352 +EX900E301 =900E301 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C3 +EX900E301 -X :1 =900E301 +EX900E301 -B3 :1/BN
1353 BU BU 02/71.C3 +EX900E301 -X :2 =900E301 +EX900E301 -B3 :3/BU
1354 BK BK 02/71.D3 +EX900E301 -X :5 =900E301 +EX900E301 -B3 :4/BK
1355 +EX900E301 =900E301 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C4 +EX900E301 -X :1 =900E301 +EX900E301 -B4 :1/BN
1356 BU BU 02/71.C4 +EX900E301 -X :2 =900E301 +EX900E301 -B4 :3/BU
D 1357 BK BK 02/71.D4 +EX900E301 -X :6 =900E301 +EX900E301 -B4 :4/BK D
1358 +EX900E301 =900E301 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C5 +EX900E301 -JB2 -X2 :1 =900E301 +EX900E301 -B5 :1/棕
1359 BU BU 02/71.C5 +EX900E301 -JB2 -X2 :2 =900E301 +EX900E301 -B5 :3/蓝
1360 BK BK 02/71.D5 +EX900E301 -JB2 -X2 :7 =900E301 +EX900E301 -B5 :4/黑
1361 +EX900E301 =900E301 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/71.C5 +EX900E301 -JB2 -X2 :1 =900E301 +EX900E301 -B6 :1/棕
1362 BU BU 02/71.C6 +EX900E301 -JB2 -X2 :2 =900E301 +EX900E301 -B6 :3/蓝
1363 BK BK 02/71.D5 +EX900E301 -JB2 -X2 :8 =900E301 +EX900E301 -B6 :4/黑
1364 +EX900E301 =900E301 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.0… 1 YE 2.5 02/69.C6 +EX900E301 -JB1 -X1 :1 +1CP02 -2X3 :7
E 1365 2 GN 2.5 02/69.C6 +EX900E301 -JB1 -X1 :2 +1CP02 -2X3 :8 E

1366 3 RD 2.5 02/69.C6 +EX900E301 -JB1 -X1 :3 +1CP02 -2X3 :9


1367 PE GN/YE 1.5 02/69.C6 +EX900E301 -JB1 -X1 :4 +1CP02 -2X3 :10
1368 +EX900E301 =900E301 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/69.E2 =900E301 +EX900E301 -Q1 :2 =900E301 +EX900E301 -M1 :U
1369 2 GN 2.5 02/69.E2 =900E301 +EX900E301 -Q1 :4 =900E301 +EX900E301 -M1 :V
37 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1370 3 RD 2.5 02/69.E2 =900E301 +EX900E301 -Q1 :6 =900E301 +EX900E301 -M1 :W
A A
1371 PE GN/YE 1.5 02/69.E3 =900E301 +EX900E301 -Q1 :PE =900E301 +EX900E301 -M1 :PE
1372 +EX900E301 =900E301 -M1-W2 ( ZR-RVV-500V 2*0.75 25.00 m ) 1 BK 0.75 02/69.C3 +1CP02 -2X3 :5 =900E301 +EX900E301 -M1 :AC1
1373 2 BK 0.75 02/69.C3 +1CP02 -2X3 :6 =900E301 +EX900E301 -M1 :AC2
1374 +EX900E301 =900E301 -M2-W1 ( ) 1 YE 1.5 02/69.E6 +EX900E301 -JB1 -X1 :1 =900E301 +EX900E301 -M2 :U
1375 2 GN 1.5 02/69.E6 +EX900E301 -JB1 -X1 :2 =900E301 +EX900E301 -M2 :V
1376 3 RD 1.5 02/69.E6 +EX900E301 -JB1 -X1 :3 =900E301 +EX900E301 -M2 :W
1377 4 BK 1 02/69.E6 +EX900E301 -JB1 -X1 :4 =900E301 +EX900E301 -M2 :PE
1378 5 BK 1
B B
1379 6 BK 1
1380 7 BK 1
1381 +EX900E301 =900E301 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.00… 1 YE 2.5 02/69.C2 +1CP02 -2X3 :1 =900E301 +EX900E301 -Q1 :1
1382 2 GN 2.5 02/69.C2 +1CP02 -2X3 :2 =900E301 +EX900E301 -Q1 :3
1383 3 RD 2.5 02/69.C2 +1CP02 -2X3 :3 =900E301 +EX900E301 -Q1 :5
1384 PE GN/YE 1.5 02/69.C3 +1CP02 -2X3 :4 =900E301 +EX900E301 -Q1 :PE
1385 +EX900E302 -JB1 =900E302 -W1 ( ZR-RVVP 10*0.5 25.00 m ) 1 BK 0.5 02/54.B4 =1CP20 +1CP20 -X4 :8 =900E302 +EX900E302 -JB1 -X1 :1
C 1386 2 BK 0.5 02/54.B4 =1CP20 +1CP20 -X4 :9 =900E302 +EX900E302 -JB1 -X1 :4 C
1387 3 BK 0.5 02/54.D4 =1CP20 +1CP20 -X4 :10 =900E302 +EX900E302 -JB1 -X1 :7
1388 4 BK 0.5 02/54.D5 =1CP20 +1CP20 -X4 :11 =900E302 +EX900E302 -JB1 -X1 :8
1389 5 BK 0.5 02/54.D6 =1CP20 +1CP20 -X4 :12 =900E302 +EX900E302 -JB1 -X1 :9
1390 6 BK 0.5 02/54.D6 =1CP20 +1CP20 -X4 :13 =900E302 +EX900E302 -JB1 -X1 :10
1391 7 BK 0.5 02/54.D7 =1CP20 +1CP20 -X4 :14 =900E302 +EX900E302 -JB1 -X1 :11
1392 8 BK 0.5
1393 9 BK 0.5
D 1394 10 BK 0.5 D
1395 Shield
1396 +EX900E302 =900C301 -M1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 25.0… 1 YE 1.5 02/52.C6 +1CP02 -1X3 :65 =900C301 +EX900E302 -M2 :U
1397 2 GN 1.5 02/52.C6 +1CP02 -1X3 :66 =900C301 +EX900E302 -M2 :V
1398 3 RD 1.5 02/52.C6 +1CP02 -1X3 :67 =900C301 +EX900E302 -M2 :W
1399 PE GN/YE 1.0 02/52.C6 +1CP02 -1X3 :68 =900C301 +EX900E302 -M2 :PE
1400 +EX900E302 =900C301 -M2-W2 ( ZR-RVV-500V 4*0.75 25.00 m ) 1 BK 0.75 02/52.C7 +1CP02 -1X3 :69 =900C301 +EX900E302 -M2 :AC1
1401 2 BK 0.75 02/52.C7 +1CP02 -1X3 :70 =900C301 +EX900E302 -M2 :AC2
E 1402 3 BK 0.75 02/52.C7 +1CP02 -1X3 :71 =900C301 +EX900E302 -M2 :NO1 E

1403 4 BK 0.75 02/52.C8 +1CP02 -1X3 :72 =900C301 +EX900E302 -M2 :NO2
1404 +EX900E302 =900E302 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/54.C4 =900E302 +EX900E302 -JB1 -X1 :1 =900E302 +EX900E302 -B1 :1/BN
1405 BU BU 02/54.C4 =900E302 +EX900E302 -JB1 -X1 :4 =900E302 +EX900E302 -B1 :3/BU
1406 BK BK 02/54.D4 =900E302 +EX900E302 -JB1 -X1 :7 =900E302 +EX900E302 -B1 :4/BK
38 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1407 +EX900E302 =900E302 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/54.C5 =900E302 +EX900E302 -JB1 -X1 :2 =900E302 +EX900E302 -B2 :1/BN
A A
1408 BU BU 02/54.C5 =900E302 +EX900E302 -JB1 -X1 :5 =900E302 +EX900E302 -B2 :3/BU
1409 BK BK 02/54.D5 =900E302 +EX900E302 -JB1 -X1 :8 =900E302 +EX900E302 -B2 :4/BK
1410 +EX900E302 =900E302 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/54.C6 =900E302 +EX900E302 -JB1 -X1 :2 =900E302 +EX900E302 -B3 :BN
1411 BU BU 02/54.C6 =900E302 +EX900E302 -JB1 -X1 :5 =900E302 +EX900E302 -B3 :3/蓝
1412 BK BK 02/54.D6 =900E302 +EX900E302 -JB1 -X1 :9 =900E302 +EX900E302 -B3 :BK
1413 +EX900E302 =900E302 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/54.C6 =900E302 +EX900E302 -JB1 -X1 :3 =900E302 +EX900E302 -B4 :BN
1414 BU BU 02/54.C6 =900E302 +EX900E302 -JB1 -X1 :6 =900E302 +EX900E302 -B4 :3/蓝
1415 BK BK 02/54.D6 =900E302 +EX900E302 -JB1 -X1 :10 =900E302 +EX900E302 -B4 :BK
B B
1416 +EX900E302 =900E302 -B5-W1 ( Sensor cable 2.00 m ) BN BN 02/54.B7 =900E302 +EX900E302 -JB1 -X1 :3 =900E302 +EX900E302 -B5 :L+
1417 WH WH 02/54.B7 =900E302 +EX900E302 -JB1 -X1 :11 =900E302 +EX900E302 -B5 :Qa
1418 BU BU 02/54.B7 =900E302 +EX900E302 -JB1 -X1 :6 =900E302 +EX900E302 -B5 :M
1419 BK BK
1420 GY GY
1421 PK PK
1422 VI VI
C 1423 OG OG C
1424 +EX900E303 -JB1 =900E303 -W1 ( ZR-RVVP 10*0.5 20.00 m ) 1 BK 0.5 02/58.B4 =1CP20 +1CP20 -X4 :23 =900E303 +EX900E303 -JB1 -X1 :1
1425 2 BK 0.5 02/58.B4 =1CP20 +1CP20 -X4 :24 =900E303 +EX900E303 -JB1 -X1 :4
1426 3 BK 0.5 02/58.D4 =1CP20 +1CP20 -X4 :25 =900E303 +EX900E303 -JB1 -X1 :7
1427 4 BK 0.5 02/58.D5 =1CP20 +1CP20 -X4 :26 =900E303 +EX900E303 -JB1 -X1 :8
1428 5 BK 0.5 02/58.D6 =1CP20 +1CP20 -X4 :27 =900E303 +EX900E303 -JB1 -X1 :9
1429 6 BK 0.5 02/58.D6 =1CP20 +1CP20 -X4 :28 =900E303 +EX900E303 -JB1 -X1 :10
1430 7 BK 0.5 02/58.D7 =1CP20 +1CP20 -X4 :29 =900E303 +EX900E303 -JB1 -X1 :11
D 1431 8 BK 0.5 D
1432 9 BK 0.5
1433 10 BK 0.5
1434 Shield
1435 +EX900E303 =900C302 -M1-W1 ( ZR-VV-1KV 3*1.5+1*1.0 20.0… 1 YE 1.5 02/56.C6 +1CP02 -1X3 :79 =900C302 +EX900E303 -M2 :U
1436 2 GN 1.5 02/56.C6 +1CP02 -1X3 :80 =900C302 +EX900E303 -M2 :V
1437 3 RD 1.5 02/56.C6 +1CP02 -1X3 :81 =900C302 +EX900E303 -M2 :W
1438 PE GN/YE 1.0 02/56.C6 +1CP02 -1X3 :82 =900C302 +EX900E303 -M2 :PE
E 1439 +EX900E303 =900C302 -M2-W2 ( ZR-RVV-500V 4*0.75 20.00 m ) 1 BK 0.75 02/56.C7 +1CP02 -1X3 :83 =900C302 +EX900E303 -M2 :AC1 E

1440 2 BK 0.75 02/56.C7 +1CP02 -1X3 :84 =900C302 +EX900E303 -M2 :AC2
1441 3 BK 0.75 02/56.C7 +1CP02 -1X3 :85 =900C302 +EX900E303 -M2 :NO1
1442 4 BK 0.75 02/56.C8 +1CP02 -1X3 :86 =900C302 +EX900E303 -M2 :NO2
1443 +EX900E303 =900E303 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/58.C4 =900E303 +EX900E303 -JB1 -X1 :1 =900E303 +EX900E303 -B1 :1/BN
39 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1444 BU BU 02/58.C4 =900E303 +EX900E303 -JB1 -X1 :4 =900E303 +EX900E303 -B1 :3/BU
A A
1445 BK BK 02/58.D4 =900E303 +EX900E303 -JB1 -X1 :7 =900E303 +EX900E303 -B1 :4/BK
1446 +EX900E303 =900E303 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/58.C5 =900E303 +EX900E303 -JB1 -X1 :2 =900E303 +EX900E303 -B2 :1/BN
1447 BU BU 02/58.C5 =900E303 +EX900E303 -JB1 -X1 :5 =900E303 +EX900E303 -B2 :3/BU
1448 BK BK 02/58.D5 =900E303 +EX900E303 -JB1 -X1 :8 =900E303 +EX900E303 -B2 :4/BK
1449 +EX900E303 =900E303 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/58.C6 =900E303 +EX900E303 -JB1 -X1 :2 =900E303 +EX900E303 -B3 :BN
1450 BU BU 02/58.C6 =900E303 +EX900E303 -JB1 -X1 :5 =900E303 +EX900E303 -B3 :3/蓝
1451 BK BK 02/58.D6 =900E303 +EX900E303 -JB1 -X1 :9 =900E303 +EX900E303 -B3 :BK
1452 +EX900E303 =900E303 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/58.C6 =900E303 +EX900E303 -JB1 -X1 :3 =900E303 +EX900E303 -B4 :BN
B B
1453 BU BU 02/58.C6 =900E303 +EX900E303 -JB1 -X1 :6 =900E303 +EX900E303 -B4 :3/蓝
1454 BK BK 02/58.D6 =900E303 +EX900E303 -JB1 -X1 :10 =900E303 +EX900E303 -B4 :BK
1455 +EX900E303 =900E303 -B5-W1 ( Sensor cable 2.00 m ) BN BN 02/58.B7 =900E303 +EX900E303 -JB1 -X1 :3 =900E303 +EX900E303 -B5 :L+
1456 WH WH 02/58.B7 =900E303 +EX900E303 -JB1 -X1 :11 =900E303 +EX900E303 -B5 :Qa
1457 BU BU 02/58.B7 =900E303 +EX900E303 -JB1 -X1 :6 =900E303 +EX900E303 -B5 :M
1458 BK BK
1459 GY GY
C 1460 PK PK C
1461 VI VI
1462 OG OG
1463 +EX900E304 -JB2 =900E304 -W3 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/75.A1 =1CP20 +1CP20 -X5 :9 +EX900E304 -JB2 -X2 :1
1464 2 BK 0.5 02/75.A2 =1CP20 +1CP20 -X5 :10 +EX900E304 -JB2 -X2 :2
1465 3 BK 0.5 02/75.E1 =1CP20 +1CP20 -X5 :11 +EX900E304 -JB2 -X2 :3
1466 4 BK 0.5 02/75.E2 =1CP20 +1CP20 -X5 :12 +EX900E304 -JB2 -X2 :4
1467 5 BK 0.5 02/75.E3 =1CP20 +1CP20 -X5 :13 +EX900E304 -JB2 -X2 :5
D 1468 6 BK 0.5 02/75.E4 =1CP20 +1CP20 -X5 :14 +EX900E304 -JB2 -X2 :6 D
1469 7 BK 0.5 02/75.E5 =1CP20 +1CP20 -X5 :15 +EX900E304 -JB2 -X2 :7
1470 8 BK 0.5 02/75.E5 =1CP20 +1CP20 -X5 :16 +EX900E304 -JB2 -X2 :8
1471 9 BK 0.5
1472 10 BK 0.5
1473 Shield
1474 +EX900E304 -JB2 =900E304 -W4 ( 5.00 m ) 1 BK 0.5 02/75.B1 +EX900E304 -X :1 +EX900E304 -JB2 -X2 :1
1475 2 BK 0.5 02/75.B2 +EX900E304 -X :2 +EX900E304 -JB2 -X2 :2
E 1476 3 BK 0.5 02/75.D1 +EX900E304 -X :3 +EX900E304 -JB2 -X2 :3 E

1477 4 BK 0.5 02/75.D2 +EX900E304 -X :4 +EX900E304 -JB2 -X2 :4


1478 5 BK 0.5 02/75.D3 +EX900E304 -X :5 +EX900E304 -JB2 -X2 :5
1479 6 BK 0.5 02/75.D4 +EX900E304 -X :6 +EX900E304 -JB2 -X2 :6
1480 7 BK 0.5
40 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1481 +EX900E304 =900E304 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C1 +EX900E304 -X :1 =900E304 +EX900E304 -B1 :1/BN
A A
1482 BU BU 02/75.C2 +EX900E304 -X :2 =900E304 +EX900E304 -B1 :3/BU
1483 BK BK 02/75.D1 +EX900E304 -X :3 =900E304 +EX900E304 -B1 :4/BK
1484 BK BK
1485 GY GY
1486 PK PK
1487 VI VI
1488 OG OG
1489 +EX900E304 =900E304 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C2 +EX900E304 -X :1 =900E304 +EX900E304 -B2 :1/BN
B B
1490 BU BU 02/75.C2 +EX900E304 -X :2 =900E304 +EX900E304 -B2 :3/BU
1491 BK BK 02/75.D2 +EX900E304 -X :4 =900E304 +EX900E304 -B2 :4/BK
1492 BK BK
1493 GY GY
1494 PK PK
1495 VI VI
1496 OG OG
C 1497 +EX900E304 =900E304 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C3 +EX900E304 -X :1 =900E304 +EX900E304 -B3 :1/BN C
1498 BU BU 02/75.C3 +EX900E304 -X :2 =900E304 +EX900E304 -B3 :3/BU
1499 BK BK 02/75.D3 +EX900E304 -X :5 =900E304 +EX900E304 -B3 :4/BK
1500 BK BK
1501 GY GY
1502 PK PK
1503 VI VI
1504 OG OG
D 1505 +EX900E304 =900E304 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C4 +EX900E304 -X :1 =900E304 +EX900E304 -B4 :1/BN D
1506 BU BU 02/75.C4 +EX900E304 -X :2 =900E304 +EX900E304 -B4 :3/BU
1507 BK BK 02/75.D4 +EX900E304 -X :6 =900E304 +EX900E304 -B4 :4/BK
1508 BK BK
1509 GY GY
1510 PK PK
1511 VI VI
1512 OG OG
E 1513 +EX900E304 =900E304 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C5 +EX900E304 -JB2 -X2 :1 =900E304 +EX900E304 -B5 :1/棕 E

1514 BU BU 02/75.C5 +EX900E304 -JB2 -X2 :2 =900E304 +EX900E304 -B5 :3/蓝


1515 BK BK 02/75.D5 +EX900E304 -JB2 -X2 :7 =900E304 +EX900E304 -B5 :4/黑
1516 BK BK
1517 GY GY
41 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1518 PK PK
A A
1519 VI VI
1520 OG OG
1521 +EX900E304 =900E304 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/75.C5 +EX900E304 -JB2 -X2 :1 =900E304 +EX900E304 -B6 :1/棕
1522 BU BU 02/75.C5 +EX900E304 -JB2 -X2 :2 =900E304 +EX900E304 -B6 :3/蓝
1523 BK BK 02/75.D5 +EX900E304 -JB2 -X2 :8 =900E304 +EX900E304 -B6 :4/黑
1524 BK BK
1525 GY GY
1526 PK PK
B B
1527 VI VI
1528 OG OG
1529 +EX900E304 =900E304 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 2.5 02/73.C6 +EX900E304 -JB1 -X1 :1 +1CP02 -2X3 :17
1530 2 GN 2.5 02/73.C6 +EX900E304 -JB1 -X1 :2 +1CP02 -2X3 :18
1531 3 RD 2.5 02/73.C6 +EX900E304 -JB1 -X1 :3 +1CP02 -2X3 :19
1532 PE GN/YE 1.5 02/73.C6 +EX900E304 -JB1 -X1 :4 +1CP02 -2X3 :20
1533 +EX900E304 =900E304 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/73.E2 =900E304 +EX900E304 -Q1 :2 =900E304 +EX900E304 -M1 :U
C 1534 2 GN 2.5 02/73.E2 =900E304 +EX900E304 -Q1 :4 =900E304 +EX900E304 -M1 :V C
1535 3 RD 2.5 02/73.E2 =900E304 +EX900E304 -Q1 :6 =900E304 +EX900E304 -M1 :W
1536 PE GN/YE 1.5 02/73.E3 =900E304 +EX900E304 -Q1 :PE =900E304 +EX900E304 -M1 :PE
1537 +EX900E304 =900E304 -M1-W2 ( ZR-RVV-500V 2*0.75 15.00 m ) 1 BK 0.75 02/73.C3 +1CP02 -2X3 :15 =900E304 +EX900E304 -M1 :AC1
1538 2 BK 0.75 02/73.C3 +1CP02 -2X3 :16 =900E304 +EX900E304 -M1 :AC2
1539 +EX900E304 =900E304 -M2-W1 ( ) 1 YE 1.5 02/73.E6 +EX900E304 -JB1 -X1 :1 =900E304 +EX900E304 -M2 :U
1540 2 GN 1.5 02/73.E6 +EX900E304 -JB1 -X1 :2 =900E304 +EX900E304 -M2 :V
1541 3 RD 1.5 02/73.E6 +EX900E304 -JB1 -X1 :3 =900E304 +EX900E304 -M2 :W
D 1542 4 BK 1 02/73.E6 +EX900E304 -JB1 -X1 :4 =900E304 +EX900E304 -M2 :PE D
1543 5 BK 1
1544 6 BK 1
1545 7 BK 1
1546 +EX900E304 =900E304 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.00… 1 YE 2.5 02/73.C2 +1CP02 -2X3 :11 =900E304 +EX900E304 -Q1 :1
1547 2 GN 2.5 02/73.C2 +1CP02 -2X3 :12 =900E304 +EX900E304 -Q1 :3
1548 3 RD 2.5 02/73.C2 +1CP02 -2X3 :13 =900E304 +EX900E304 -Q1 :5
1549 PE GN/YE 1.5 02/73.C3 +1CP02 -2X3 :14 =900E304 +EX900E304 -Q1 :PE
E 1550 +EX900E305 -JB2 =900E305 -W3 ( ZR-RVVP 10*0.5 20.00 m ) 1 BK 0.5 02/79.A1 =1CP20 +1CP20 -X5 :17 +EX900E305 -JB2 -X2 :1 E

1551 2 BK 0.5 02/79.A2 =1CP20 +1CP20 -X5 :18 +EX900E305 -JB2 -X2 :2
1552 3 BK 0.5 02/79.E1 =1CP20 +1CP20 -X5 :19 +EX900E305 -JB2 -X2 :3
1553 4 BK 0.5 02/79.E2 =1CP20 +1CP20 -X5 :20 +EX900E305 -JB2 -X2 :4
1554 5 BK 0.5 02/79.E3 =1CP20 +1CP20 -X5 :21 +EX900E305 -JB2 -X2 :5
42 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1555 6 BK 0.5 02/79.E4 =1CP20 +1CP20 -X5 :22 +EX900E305 -JB2 -X2 :6
A A
1556 7 BK 0.5 02/79.E5 =1CP20 +1CP20 -X5 :23 +EX900E305 -JB2 -X2 :7
1557 8 BK 0.5 02/79.E5 =1CP20 +1CP20 -X5 :24 +EX900E305 -JB2 -X2 :8
1558 9 BK 0.5
1559 10 BK 0.5
1560 Shield
1561 +EX900E305 -JB2 =900E305 -W4 ( 5.00 m ) 1 BK 0.5 02/79.B1 +EX900E305 -X :1 +EX900E305 -JB2 -X2 :1
1562 2 BK 0.5 02/79.B2 +EX900E305 -X :2 +EX900E305 -JB2 -X2 :2
1563 3 BK 0.5 02/79.D1 +EX900E305 -X :3 +EX900E305 -JB2 -X2 :3
B B
1564 4 BK 0.5 02/79.D2 +EX900E305 -X :4 +EX900E305 -JB2 -X2 :4
1565 5 BK 0.5 02/79.D3 +EX900E305 -X :5 +EX900E305 -JB2 -X2 :5
1566 6 BK 0.5 02/79.D4 +EX900E305 -X :6 +EX900E305 -JB2 -X2 :6
1567 7 BK 0.5
1568 +EX900E305 =900E305 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C1 +EX900E305 -X :1 =900E305 +EX900E305 -B1 :1/BN
1569 BU BU 02/79.C2 +EX900E305 -X :2 =900E305 +EX900E305 -B1 :3/BU
1570 BK BK 02/79.D1 +EX900E305 -X :3 =900E305 +EX900E305 -B1 :4/BK
C 1571 BK BK C
1572 GY GY
1573 PK PK
1574 VI VI
1575 OG OG
1576 +EX900E305 =900E305 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C2 +EX900E305 -X :1 =900E305 +EX900E305 -B2 :1/BN
1577 BU BU 02/79.C2 +EX900E305 -X :2 =900E305 +EX900E305 -B2 :3/BU
1578 BK BK 02/79.D2 +EX900E305 -X :4 =900E305 +EX900E305 -B2 :4/BK
D 1579 BK BK D
1580 GY GY
1581 PK PK
1582 VI VI
1583 OG OG
1584 +EX900E305 =900E305 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C3 +EX900E305 -X :1 =900E305 +EX900E305 -B3 :1/BN
1585 BU BU 02/79.C3 +EX900E305 -X :2 =900E305 +EX900E305 -B3 :3/BU
1586 BK BK 02/79.D3 +EX900E305 -X :5 =900E305 +EX900E305 -B3 :4/BK
E 1587 BK BK E

1588 GY GY
1589 PK PK
1590 VI VI
1591 OG OG
43 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1592 +EX900E305 =900E305 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C4 +EX900E305 -X :1 =900E305 +EX900E305 -B4 :1/BN
A A
1593 BU BU 02/79.C4 +EX900E305 -X :2 =900E305 +EX900E305 -B4 :3/BU
1594 BK BK 02/79.D4 +EX900E305 -X :6 =900E305 +EX900E305 -B4 :4/BK
1595 BK BK
1596 GY GY
1597 PK PK
1598 VI VI
1599 OG OG
1600 +EX900E305 =900E305 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C5 +EX900E305 -JB2 -X2 :1 =900E305 +EX900E305 -B5 :1/棕
B B
1601 BU BU 02/79.C5 +EX900E305 -JB2 -X2 :2 =900E305 +EX900E305 -B5 :3/蓝
1602 BK BK 02/79.D5 +EX900E305 -JB2 -X2 :7 =900E305 +EX900E305 -B5 :4/黑
1603 BK BK
1604 GY GY
1605 PK PK
1606 VI VI
1607 OG OG
C 1608 +EX900E305 =900E305 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/79.C5 +EX900E305 -JB2 -X2 :1 =900E305 +EX900E305 -B6 :1/棕 C
1609 BU BU 02/79.C5 +EX900E305 -JB2 -X2 :2 =900E305 +EX900E305 -B6 :3/蓝
1610 BK BK 02/79.D5 +EX900E305 -JB2 -X2 :8 =900E305 +EX900E305 -B6 :4/黑
1611 BK BK
1612 GY GY
1613 PK PK
1614 VI VI
1615 OG OG
D 1616 +EX900E305 =900E305 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 20.0… 1 YE 2.5 02/77.C5 +EX900E305 -JB1 -X1 :1 +1CP02 -2X3 :27 D
1617 2 GN 2.5 02/77.C5 +EX900E305 -JB1 -X1 :2 +1CP02 -2X3 :28
1618 3 RD 2.5 02/77.C5 +EX900E305 -JB1 -X1 :3 +1CP02 -2X3 :29
1619 PE GN/YE 1.5 02/77.C5 +EX900E305 -JB1 -X1 :4 +1CP02 -2X3 :30
1620 +EX900E305 =900E305 -JB1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/77.C6 +1CP02 -2X3 :31 +EX900E305 -JB1 -X1 :5
1621 2 BK 0.75 02/77.C6 +1CP02 -2X3 :32 +EX900E305 -JB1 -X1 :6
1622 +EX900E305 =900E305 -JB1-W3 ( ZR-RVV-500V 4*0.75 20.00 m ) 1 BK 0.75 02/77.C7 +1CP02 -2X3 :69 +EX900E305 -JB1 -X1 :7
1623 2 BK 0.75 02/77.C7 +1CP02 -2X3 :70 +EX900E305 -JB1 -X1 :8
E 1624 3 BK 0.75 02/77.C8 +1CP02 -2X3 :71 +EX900E305 -JB1 -X1 :9 E

1625 4 BK 0.75 02/77.C8 +EX900E305 -JB1 -X1 :10 +1CP02 -2X3 :72
1626 +EX900E305 =900E305 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/77.E2 =900E305 +EX900E305 -Q1 :2 =900E305 +EX900E305 -M1 :U
1627 2 GN 2.5 02/77.E2 =900E305 +EX900E305 -Q1 :4 =900E305 +EX900E305 -M1 :V
1628 3 RD 2.5 02/77.E2 =900E305 +EX900E305 -Q1 :6 =900E305 +EX900E305 -M1 :W
44 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1629 PE GN/YE 1.5 02/77.E2 =900E305 +EX900E305 -Q1 :PE =900E305 +EX900E305 -M1 :PE
A A
1630 +EX900E305 =900E305 -M1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/77.C3 +1CP02 -2X3 :25 =900E305 +EX900E305 -M1 :AC1
1631 2 BK 0.75 02/77.C3 +1CP02 -2X3 :26 =900E305 +EX900E305 -M1 :AC2
1632 +EX900E305 =900E305 -M2-W1 ( ) 1 YE 1.5 02/77.E5 +EX900E305 -JB1 -X1 :1 =900E305 +EX900E305 -M2 :U
1633 2 GN 1.5 02/77.E5 +EX900E305 -JB1 -X1 :2 =900E305 +EX900E305 -M2 :V
1634 3 RD 1.5 02/77.E5 +EX900E305 -JB1 -X1 :3 =900E305 +EX900E305 -M2 :W
1635 4 BK 1 02/77.E5 +EX900E305 -JB1 -X1 :4 =900E305 +EX900E305 -M2 :PE
1636 5 BK 1 02/77.E6 =900E305 +EX900E305 -M2 :AC1 +EX900E305 -JB1 -X1 :5
1637 6 BK 1 02/77.E6 =900E305 +EX900E305 -M2 :AC2 +EX900E305 -JB1 -X1 :6
B B
1638 7 BK 1
1639 +EX900E305 =900E305 -M2-W2 ( ) 1 YE 1.5 02/77.E7 +EX900E305 -JB1 -X1 :7 =900E305 +EX900E305 -M2 Fan :U
1640 2 GN 1.5 02/77.E7 +EX900E305 -JB1 -X1 :8 =900E305 +EX900E305 -M2 Fan :V
1641 3 RD 1.5 02/77.E8 +EX900E305 -JB1 -X1 :9 =900E305 +EX900E305 -M2 Fan :W
1642 4 BK 1 02/77.E8 +EX900E305 -JB1 -X1 :10 =900E305 +EX900E305 -M2 Fan :PE
1643 +EX900E305 =900E305 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 20.00… 1 YE 2.5 02/77.C2 +1CP02 -2X3 :21 =900E305 +EX900E305 -Q1 :1
1644 2 GN 2.5 02/77.C2 +1CP02 -2X3 :22 =900E305 +EX900E305 -Q1 :3
C 1645 3 RD 2.5 02/77.C2 +1CP02 -2X3 :23 =900E305 +EX900E305 -Q1 :5 C
1646 PE GN/YE 1.5 02/77.C2 +1CP02 -2X3 :24 =900E305 +EX900E305 -Q1 :PE
1647 +EX900E306 -JB2 =900E306 -W3 ( ZR-RVVP 10*0.5 30.00 m ) 1 BK 0.5 02/83.A1 =1CP20 +1CP20 -X5 :25 +EX900E306 -JB2 -X2 :1
1648 2 BK 0.5 02/83.A2 =1CP20 +1CP20 -X5 :26 +EX900E306 -JB2 -X2 :2
1649 3 BK 0.5 02/83.E1 =1CP20 +1CP20 -X5 :27 +EX900E306 -JB2 -X2 :3
1650 4 BK 0.5 02/83.E2 =1CP20 +1CP20 -X5 :28 +EX900E306 -JB2 -X2 :4
1651 5 BK 0.5 02/83.E3 =1CP20 +1CP20 -X5 :29 +EX900E306 -JB2 -X2 :5
1652 6 BK 0.5 02/83.E4 =1CP20 +1CP20 -X5 :30 +EX900E306 -JB2 -X2 :6
D 1653 7 BK 0.5 02/83.E5 =1CP20 +1CP20 -X5 :31 +EX900E306 -JB2 -X2 :7 D
1654 8 BK 0.5 02/83.E5 =1CP20 +1CP20 -X5 :32 +EX900E306 -JB2 -X2 :8
1655 9 BK 0.5
1656 10 BK 0.5
1657 Shield
1658 +EX900E306 -JB2 =900E306 -W4 ( 5.00 m ) 1 BK 0.5 02/83.B1 +EX900E306 -X :1 +EX900E306 -JB2 -X2 :1
1659 2 BK 0.5 02/83.B2 +EX900E306 -X :2 +EX900E306 -JB2 -X2 :2
1660 3 BK 0.5 02/83.D1 +EX900E306 -X :3 +EX900E306 -JB2 -X2 :3
E 1661 4 BK 0.5 02/83.D2 +EX900E306 -X :4 +EX900E306 -JB2 -X2 :4 E

1662 5 BK 0.5 02/83.D3 +EX900E306 -X :5 +EX900E306 -JB2 -X2 :5


1663 6 BK 0.5 02/83.D4 +EX900E306 -X :6 +EX900E306 -JB2 -X2 :6
1664 7 BK 0.5
1665 +EX900E306 =900E306 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C1 +EX900E306 -X :1 =900E306 +EX900E306 -B1 :1/BN
45 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1666 BU BU 02/83.C2 +EX900E306 -X :2 =900E306 +EX900E306 -B1 :3/BU
A A
1667 BK BK 02/83.D1 +EX900E306 -X :3 =900E306 +EX900E306 -B1 :4/BK
1668 BK BK
1669 GY GY
1670 PK PK
1671 VI VI
1672 OG OG
1673 +EX900E306 =900E306 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C2 +EX900E306 -X :1 =900E306 +EX900E306 -B2 :1/BN
1674 BU BU 02/83.C2 +EX900E306 -X :2 =900E306 +EX900E306 -B2 :3/BU
B B
1675 BK BK 02/83.D2 +EX900E306 -X :4 =900E306 +EX900E306 -B2 :4/BK
1676 BK BK
1677 GY GY
1678 PK PK
1679 VI VI
1680 OG OG
1681 +EX900E306 =900E306 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C3 +EX900E306 -X :1 =900E306 +EX900E306 -B3 :1/BN
C 1682 BU BU 02/83.C3 +EX900E306 -X :2 =900E306 +EX900E306 -B3 :3/BU C
1683 BK BK 02/83.D3 +EX900E306 -X :5 =900E306 +EX900E306 -B3 :4/BK
1684 BK BK
1685 GY GY
1686 PK PK
1687 VI VI
1688 OG OG
1689 +EX900E306 =900E306 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C4 +EX900E306 -X :1 =900E306 +EX900E306 -B4 :1/BN
D 1690 BU BU 02/83.C4 +EX900E306 -X :2 =900E306 +EX900E306 -B4 :3/BU D
1691 BK BK 02/83.D4 +EX900E306 -X :6 =900E306 +EX900E306 -B4 :4/BK
1692 BK BK
1693 GY GY
1694 PK PK
1695 VI VI
1696 OG OG
1697 +EX900E306 =900E306 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C5 +EX900E306 -JB2 -X2 :1 =900E306 +EX900E306 -B5 :1/棕
E 1698 BU BU 02/83.C5 +EX900E306 -JB2 -X2 :2 =900E306 +EX900E306 -B5 :3/蓝 E

1699 BK BK 02/83.D5 +EX900E306 -JB2 -X2 :7 =900E306 +EX900E306 -B5 :4/黑


1700 BK BK
1701 GY GY
1702 PK PK
46 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1703 VI VI
A A
1704 OG OG
1705 +EX900E306 =900E306 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/83.C5 +EX900E306 -JB2 -X2 :1 =900E306 +EX900E306 -B6 :1/棕
1706 BU BU 02/83.C5 +EX900E306 -JB2 -X2 :2 =900E306 +EX900E306 -B6 :3/蓝
1707 BK BK 02/83.D5 +EX900E306 -JB2 -X2 :8 =900E306 +EX900E306 -B6 :4/黑
1708 BK BK
1709 GY GY
1710 PK PK
1711 VI VI
B B
1712 OG OG
1713 +EX900E306 =900E306 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/81.C5 +EX900E306 -JB1 -X1 :1 +1CP02 -2X3 :39
1714 2 GN 2.5 02/81.C5 +EX900E306 -JB1 -X1 :2 +1CP02 -2X3 :40
1715 3 RD 2.5 02/81.C5 +EX900E306 -JB1 -X1 :3 +1CP02 -2X3 :41
1716 PE GN/YE 1.5 02/81.C5 +EX900E306 -JB1 -X1 :4 +1CP02 -2X3 :42
1717 +EX900E306 =900E306 -JB1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/81.C6 +1CP02 -2X3 :43 +EX900E306 -JB1 -X1 :5
1718 2 BK 0.75 02/81.C6 +1CP02 -2X3 :44 +EX900E306 -JB1 -X1 :6
C 1719 +EX900E306 =900E306 -JB1-W3 ( ZR-RVV-500V 4*0.75 20.00 m ) 1 BK 0.75 02/81.C7 +1CP02 -2X3 :73 +EX900E306 -JB1 -X1 :7 C
1720 2 BK 0.75 02/81.C7 +1CP02 -2X3 :74 +EX900E306 -JB1 -X1 :8
1721 3 BK 0.75 02/81.C8 +1CP02 -2X3 :75 +EX900E306 -JB1 -X1 :9
1722 4 BK 0.75 02/81.C8 +EX900E306 -JB1 -X1 :10 +1CP02 -2X3 :76
1723 +EX900E306 =900E306 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/81.E2 =900E306 +EX900E306 -Q1 :2 =900E306 +EX900E306 -M1 :U
1724 2 GN 2.5 02/81.E2 =900E306 +EX900E306 -Q1 :4 =900E306 +EX900E306 -M1 :V
1725 3 RD 2.5 02/81.E2 =900E306 +EX900E306 -Q1 :6 =900E306 +EX900E306 -M1 :W
1726 PE GN/YE 1.5 02/81.E3 =900E306 +EX900E306 -Q1 :PE =900E306 +EX900E306 -M1 :PE
D 1727 +EX900E306 =900E306 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/81.C3 +1CP02 -2X3 :37 =900E306 +EX900E306 -M1 :AC1 D
1728 2 BK 0.75 02/81.C3 +1CP02 -2X3 :38 =900E306 +EX900E306 -M1 :AC2
1729 +EX900E306 =900E306 -M2-W1 ( ) 1 YE 1.5 02/81.E5 +EX900E306 -JB1 -X1 :1 =900E306 +EX900E306 -M2 :U
1730 2 GN 1.5 02/81.E5 +EX900E306 -JB1 -X1 :2 =900E306 +EX900E306 -M2 :V
1731 3 RD 1.5 02/81.E5 +EX900E306 -JB1 -X1 :3 =900E306 +EX900E306 -M2 :W
1732 4 BK 1 02/81.E5 +EX900E306 -JB1 -X1 :4 =900E306 +EX900E306 -M2 :PE
1733 5 BK 1 02/81.E6 =900E306 +EX900E306 -M2 :AC1 +EX900E306 -JB1 -X1 :5
1734 6 BK 1 02/81.E6 =900E306 +EX900E306 -M2 :AC2 +EX900E306 -JB1 -X1 :6
E 1735 7 BK 1 E

1736 +EX900E306 =900E306 -M2-W2 ( ) 1 YE 1.5 02/81.E7 +EX900E306 -JB1 -X1 :7 =900E306 +EX900E306 -M2 Fan :U
1737 2 GN 1.5 02/81.E7 +EX900E306 -JB1 -X1 :8 =900E306 +EX900E306 -M2 Fan :V
1738 3 RD 1.5 02/81.E8 +EX900E306 -JB1 -X1 :9 =900E306 +EX900E306 -M2 Fan :W
1739 4 BK 1 02/81.E8 =900E306 +EX900E306 -M2 Fan :PE +EX900E306 -JB1 -X1 :10
47 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1740 +EX900E306 =900E306 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.00… 1 YE 2.5 02/81.C2 +1CP02 -2X3 :33 =900E306 +EX900E306 -Q1 :1
A A
1741 2 GN 2.5 02/81.C2 +1CP02 -2X3 :34 =900E306 +EX900E306 -Q1 :3
1742 3 RD 2.5 02/81.C2 +1CP02 -2X3 :35 =900E306 +EX900E306 -Q1 :5
1743 PE GN/YE 1.5 02/81.C3 +1CP02 -2X3 :36 =900E306 +EX900E306 -Q1 :PE
1744 +EX900E307.1 -CC1 =900E307.1 -W1 ( ZR-RVVP 7*0.5 20.00 m ) 1 BK 0.5 02/145.A1 =900E307.1 +1CP03 -2X6 :24 =900E307.1 +EX900E307.1 -CC1 -X1 :1
1745 2 BK 0.5 02/145.A2 =900E307.1 +1CP03 -2X6 :25 =900E307.1 +EX900E307.1 -CC1 -X1 :3
1746 3 BK 0.5 02/145.D1 =900E307.1 +1CP03 -2X6 :26 =900E307.1 +EX900E307.1 -CC1 -X1 :6
1747 4 BK 0.5 02/145.D2 =900E307.1 +1CP03 -2X6 :27 =900E307.1 +EX900E307.1 -CC1 -X1 :7
1748 5 BK 0.5 02/146.C2 =900E307.1 +1CP03 -2X6 :28 =900E307.1 +EX900E307.1 -CC1 -X1 :8
B B
1749 6 BK 0.5 02/146.C3 =900E307.1 +1CP03 -2X6 :29 =900E307.1 +EX900E307.1 -CC1 -X1 :9
1750 7 BK 0.5
1751 Shield
1752 +EX900E307.1 -CC1-1 =900E307.1 -W1 ( ZR-RVVP 7*0.5 20.00 … 1 BK 0.5 02/145.A4 =900E307.1 +1CP03 -2X6 :31 +EX900E307.1 -CC1-1 -X1 :1
1753 2 BK 0.5 02/145.A4 =900E307.1 +1CP03 -2X6 :32 +EX900E307.1 -CC1-1 -X1 :3
1754 3 BK 0.5 02/145.D4 =900E307.1 +1CP03 -2X6 :33 +EX900E307.1 -CC1-1 -X1 :6
1755 4 BK 0.5 02/145.D4 =900E307.1 +1CP03 -2X6 :34 +EX900E307.1 -CC1-1 -X1 :7
C 1756 5 BK 0.5 02/146.C4 =900E307.1 +1CP03 -2X6 :35 +EX900E307.1 -CC1-1 -X1 :8 C
1757 6 BK 0.5 02/146.C5 =900E307.1 +1CP03 -2X6 :36 +EX900E307.1 -CC1-1 -X1 :9
1758 7 BK 0.5
1759 Shield
1760 +EX900E307.1 -CC2 =900E307.1 -W1 ( ZR-RVVP 7*0.5 30.00 m ) 1 BK 0.5 02/145.A6 =900E307.1 +1CP03 -2X6 :38 =900E307.1 +EX900E307.1 -CC2 -X1 :1
1761 2 BK 0.5 02/145.A6 =900E307.1 +1CP03 -2X6 :39 =900E307.1 +EX900E307.1 -CC2 -X1 :3
1762 3 BK 0.5 02/145.D6 =900E307.1 +1CP03 -2X6 :40 =900E307.1 +EX900E307.1 -CC2 -X1 :6
1763 4 BK 0.5 02/145.D6 =900E307.1 +1CP03 -2X6 :41 =900E307.1 +EX900E307.1 -CC2 -X1 :7
D 1764 5 BK 0.5 02/146.C7 =900E307.1 +1CP03 -2X6 :42 =900E307.1 +EX900E307.1 -CC2 -X1 :8 D
1765 6 BK 0.5 02/146.C8 =900E307.1 +1CP03 -2X6 :43 =900E307.1 +EX900E307.1 -CC2 -X1 :9
1766 7 BK 0.5
1767 Shield
1768 +EX900E307.1 -JB1 =900E307.1 -W1 ( ZR-RVVP 10*0.5 20.00 m ) 1 BK 0.5 02/144.A1 =900E307.1 +1CP03 -2X6 :1 +EX900E307.1 -JB1 -X1 :1
1769 2 BK 0.5 02/144.A2 =900E307.1 +1CP03 -2X6 :2 +EX900E307.1 -JB1 -X1 :4
1770 3 BK 0.5 02/144.D1 =900E307.1 +1CP03 -2X6 :3 +EX900E307.1 -JB1 -X1 :7
1771 4 BK 0.5 02/144.D2 =900E307.1 +1CP03 -2X6 :4 +EX900E307.1 -JB1 -X1 :8
E 1772 5 BK 0.5 02/148.E7 =900E307.1 +1CP03 -2X6 :5 +EX900E307.1 -JB1 -X1 :9 E

1773 6 BK 0.5 02/148.E7 =900E307.1 +1CP03 -2X6 :6 +EX900E307.1 -JB1 -X1 :10
1774 7 BK 0.5 02/148.E8 =900E307.1 +1CP03 -2X6 :7 +EX900E307.1 -JB1 -X1 :11
1775 8 BK 0.5 +EX900E307.1 -JB1 -X1 :12
1776 9 BK 0.5
48 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1777 10 BK 0.5
A A
1778 Shield
1779 +EX900E307.1 -JB2 =900E307.2 -W1 ( ZR-VV-1KV 3*2.5+1*1.5 … 1 YE 2.5 02/147.D2 +1CP04 -1X3 :6 =900E307.1 +EX900E307.1 -JB2 -X2 :1
1780 2 GN 2.5 02/147.D2 +1CP04 -1X3 :7 =900E307.1 +EX900E307.1 -JB2 -X2 :2
1781 3 RD 2.5 02/147.D2 +1CP04 -1X3 :8 =900E307.1 +EX900E307.1 -JB2 -X2 :3
1782 PE 2.5 02/147.D2 +1CP04 -1X3 :9 =900E307.1 +EX900E307.1 -JB2 -X2 :4
1783 +EX900E307.1 -JB2 =900E307.2 -W2 ( ZR-RVV-500V 2*0.75 25.… 1 BK 0.75 02/147.D4 +1CP04 -1X3 :10 =900E307.1 +EX900E307.1 -JB2 -X2 :5
1784 2 BK 0.75 02/147.D4 +1CP04 -1X3 :11 =900E307.1 +EX900E307.1 -JB2 -X2 :6
1785 +EX900E307.1 -JB3 =900E307.2 -W1 ( TRVVP-JQ-7*0.5 20.00 m ) 1 BK 0.5 02/148.A7 +EX900E307.1 -JB1 -X1 :4 =900E307.2 +EX900E307.1 -JB3 -X3 :1
B B
1786 2 BK 0.5 02/148.A7 +EX900E307.1 -JB1 -X1 :6 =900E307.2 +EX900E307.1 -JB3 -X3 :4
1787 3 BK 0.5 02/148.D7 +EX900E307.1 -JB1 -X1 :9 =900E307.2 +EX900E307.1 -JB3 -X3 :7
1788 4 BK 0.5 02/148.D7 +EX900E307.1 -JB1 -X1 :10 =900E307.2 +EX900E307.1 -JB3 -X3 :8
1789 5 BK 0.5 02/148.D8 +EX900E307.1 -JB1 -X1 :11 =900E307.2 +EX900E307.1 -JB3 -X3 :9
1790 6 BK 0.5
1791 7 BK 0.5
1792 Shield
C 1793 +EX900E307.1 -JB4 =900E307.1 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/144.A3 =900E307.1 +1CP03 -2X6 :9 =900E307.1 +EX900E307.1 -JB4 -X4 :1 C
1794 2 BK 0.5 02/144.A4 =900E307.1 +1CP03 -2X6 :10 =900E307.1 +EX900E307.1 -JB4 -X4 :4
1795 3 BK 0.5 02/144.D3 =900E307.1 +1CP03 -2X6 :11 =900E307.1 +EX900E307.1 -JB4 -X4 :7
1796 4 BK 0.5 02/144.D4 =900E307.1 +1CP03 -2X6 :12 =900E307.1 +EX900E307.1 -JB4 -X4 :8
1797 Shield
1798 +EX900E307.1 -JB5 =900E307.1 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/144.A5 =900E307.1 +1CP03 -2X6 :14 =900E307.1 +EX900E307.1 -JB5 -X5 :1
1799 2 BK 0.5 02/144.A5 =900E307.1 +1CP03 -2X6 :15 =900E307.1 +EX900E307.1 -JB5 -X5 :3
1800 3 BK 0.5 02/144.D5 =900E307.1 +1CP03 -2X6 :16 =900E307.1 +EX900E307.1 -JB5 -X5 :5
D 1801 4 BK 0.5 02/144.D6 =900E307.1 +1CP03 -2X6 :17 =900E307.1 +EX900E307.1 -JB5 -X5 :6 D
1802 Shield
1803 +EX900E307.1 -JB6 =900E307.1 -W1 ( ZR-RVVP 4*0.5 30.00 m ) 1 BK 0.5 02/144.A7 =900E307.1 +1CP03 -2X6 :19 =900E307.1 +EX900E307.1 -JB6 -X6 :1
1804 2 BK 0.5 02/144.A7 =900E307.1 +1CP03 -2X6 :20 =900E307.1 +EX900E307.1 -JB6 -X6 :3
1805 3 BK 0.5 02/144.D7 =900E307.1 +1CP03 -2X6 :21 =900E307.1 +EX900E307.1 -JB6 -X6 :5
1806 4 BK 0.5 02/144.D8 =900E307.1 +1CP03 -2X6 :22 =900E307.1 +EX900E307.1 -JB6 -X6 :6
1807 Shield
1808 +EX900E307.1 -JB7 =900E307.1 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/143.C6 =900E307.1 +1CP03 -2X6 :45 +EX900E307.1 -JB7 -X7 :1
E 1809 2 BK 0.5 02/143.C6 =900E307.1 +1CP03 -2X6 :46 +EX900E307.1 -JB7 -X7 :3 E

1810 3 BK 0.5 02/143.C6 =900E307.1 +1CP03 -2X6 :47 +EX900E307.1 -JB7 -X7 :5
1811 4 BK 0.5 02/143.C7 =900E307.1 +1CP03 -2X6 :48 +EX900E307.1 -JB7 -X7 :6
1812 Shield 02/143.C7 =900E307.1 +EX900E307.1 :PE
1813 +EX900E307.1 -JB8 =900E307.1 -W1 ( ZR-RVVP 7*0.5 20.00 m ) 1 BK 0.5 02/136.A6 +1CP04 -1X4 :6 +EX900E307.1 -JB8 -X1 :1
49 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1814 2 BK 0.5 02/136.A6 +1CP04 -1X4 :7 +EX900E307.1 -JB8 -X1 :3
A A
1815 3 BK 0.5 02/136.D6 +1CP04 -1X4 :8 +EX900E307.1 -JB8 -X1 :5
1816 4 BK 0.5 02/136.D7 +1CP04 -1X4 :9 +EX900E307.1 -JB8 -X1 :6
1817 5 BK 0.5
1818 6 BK 0.5
1819 7 BK 0.5
1820 Shield
1821 +EX900E307.1 =900E307.1 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B1 +EX900E307.1 -JB1 -X1 :1 =900E307.1 +EX900E307.1 -B1 :1/BN
1822 BU BU 02/144.B2 +EX900E307.1 -JB1 -X1 :4 =900E307.1 +EX900E307.1 -B1 :3/BU
B B
1823 BK BK 02/144.C1 +EX900E307.1 -JB1 -X1 :7 =900E307.1 +EX900E307.1 -B1 :4/BK
1824 BK BK
1825 GY GY
1826 PK PK
1827 VI VI
1828 OG OG
1829 +EX900E307.1 =900E307.1 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B2 +EX900E307.1 -JB1 -X1 :2 =900E307.1 +EX900E307.1 -B2 :1/BN
C 1830 BU BU 02/144.B2 +EX900E307.1 -JB1 -X1 :5 =900E307.1 +EX900E307.1 -B2 :3/BU C
1831 BK BK 02/144.C2 +EX900E307.1 -JB1 -X1 :8 =900E307.1 +EX900E307.1 -B2 :4/BK
1832 BK BK
1833 GY GY
1834 PK PK
1835 VI VI
1836 OG OG
1837 +EX900E307.1 =900E307.1 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B3 =900E307.1 +EX900E307.1 -JB4 -X4 :1 =900E307.1 +EX900E307.1 -B3 :1/BN
D 1838 BU BU 02/144.B4 =900E307.1 +EX900E307.1 -JB4 -X4 :4 =900E307.1 +EX900E307.1 -B3 :3/BU D
1839 BK BK 02/144.C3 =900E307.1 +EX900E307.1 -JB4 -X4 :7 =900E307.1 +EX900E307.1 -B3 :4/BK
1840 BK BK
1841 GY GY
1842 PK PK
1843 VI VI
1844 OG OG
1845 +EX900E307.1 =900E307.1 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B4 =900E307.1 +EX900E307.1 -JB4 -X4 :2 =900E307.1 +EX900E307.1 -B4 :1/棕
E 1846 BU BU 02/144.B4 =900E307.1 +EX900E307.1 -JB4 -X4 :5 =900E307.1 +EX900E307.1 -B4 :3/蓝 E

1847 BK BK 02/144.C4 =900E307.1 +EX900E307.1 -JB4 -X4 :8 =900E307.1 +EX900E307.1 -B4 :4/黑
1848 BK BK
1849 GY GY
1850 PK PK
50 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1851 VI VI
A A
1852 OG OG
1853 +EX900E307.1 =900E307.1 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B5 =900E307.1 +EX900E307.1 -JB5 -X5 :1 =900E307.1 +EX900E307.1 -B5 :1/BN
1854 BU BU 02/144.B5 =900E307.1 +EX900E307.1 -JB5 -X5 :3 =900E307.1 +EX900E307.1 -B5 :3/BU
1855 BK BK 02/144.C5 =900E307.1 +EX900E307.1 -JB5 -X5 :5 =900E307.1 +EX900E307.1 -B5 :4/BK
1856 BK BK
1857 GY GY
1858 PK PK
1859 VI VI
B B
1860 OG OG
1861 +EX900E307.1 =900E307.1 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B6 =900E307.1 +EX900E307.1 -JB5 -X5 :2 =900E307.1 +EX900E307.1 -B6 :1/棕
1862 BU BU 02/144.B6 =900E307.1 +EX900E307.1 -JB5 -X5 :4 =900E307.1 +EX900E307.1 -B6 :3/蓝
1863 BK BK 02/144.C6 =900E307.1 +EX900E307.1 -JB5 -X5 :6 =900E307.1 +EX900E307.1 -B6 :4/黑
1864 BK BK
1865 GY GY
1866 PK PK
C 1867 VI VI C
1868 OG OG
1869 +EX900E307.1 =900E307.1 -B7-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B7 =900E307.1 +EX900E307.1 -JB6 -X6 :1 =900E307.1 +EX900E307.1 -B7 :1/BN
1870 BU BU 02/144.B7 =900E307.1 +EX900E307.1 -JB6 -X6 :3 =900E307.1 +EX900E307.1 -B7 :3/BU
1871 BK BK 02/144.C7 =900E307.1 +EX900E307.1 -JB6 -X6 :5 =900E307.1 +EX900E307.1 -B7 :4/BK
1872 BK BK
1873 GY GY
1874 PK PK
D 1875 VI VI D
1876 OG OG
1877 +EX900E307.1 =900E307.1 -B8-W1 ( Sensor cable 5.00 m ) BN BN 02/144.B8 =900E307.1 +EX900E307.1 -JB6 -X6 :2 =900E307.1 +EX900E307.1 -B8 :1/BN
1878 BU BU 02/144.B8 =900E307.1 +EX900E307.1 -JB6 -X6 :4 =900E307.1 +EX900E307.1 -B8 :3/BU
1879 BK BK 02/144.C8 =900E307.1 +EX900E307.1 -JB6 -X6 :6 =900E307.1 +EX900E307.1 -B8 :4/BK
1880 BK BK
1881 GY GY
1882 PK PK
E 1883 VI VI E

1884 OG OG
1885 +EX900E307.1 =900E307.1 -B9-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B1 =900E307.1 +EX900E307.1 -CC1 -X1 :1 =900E307.1 +EX900E307.1 -B9 :1/棕
1886 BU BU 02/145.B2 =900E307.1 +EX900E307.1 -CC1 -X1 :3 =900E307.1 +EX900E307.1 -B9 :3/蓝
1887 BK BK 02/145.D1 =900E307.1 +EX900E307.1 -CC1 -X1 :6 =900E307.1 +EX900E307.1 -B9 :4/黑
51 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1888 BK BK
A A
1889 GY GY
1890 PK PK
1891 VI VI
1892 OG OG
1893 +EX900E307.1 =900E307.1 -B10-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B2 =900E307.1 +EX900E307.1 -CC1 -X1 :2 =900E307.1 +EX900E307.1 -B10 :1/棕
1894 BU BU 02/145.B2 =900E307.1 +EX900E307.1 -CC1 -X1 :4 =900E307.1 +EX900E307.1 -B10 :3/蓝
1895 BK BK 02/145.D2 =900E307.1 +EX900E307.1 -CC1 -X1 :7 =900E307.1 +EX900E307.1 -B10 :4/黑
1896 BK BK
B B
1897 GY GY
1898 PK PK
1899 VI VI
1900 OG OG
1901 +EX900E307.1 =900E307.1 -B11-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B6 =900E307.1 +EX900E307.1 -CC2 -X1 :1 =900E307.1 +EX900E307.1 -B11 :1/棕
1902 BU BU 02/145.B6 =900E307.1 +EX900E307.1 -CC2 -X1 :3 =900E307.1 +EX900E307.1 -B11 :3/蓝
1903 BK BK 02/145.D6 =900E307.1 +EX900E307.1 -CC2 -X1 :6 =900E307.1 +EX900E307.1 -B11 :4/黑
C 1904 BK BK C
1905 GY GY
1906 PK PK
1907 VI VI
1908 OG OG
1909 +EX900E307.1 =900E307.1 -B12-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B6 =900E307.1 +EX900E307.1 -CC2 -X1 :2 =900E307.1 +EX900E307.1 -B12 :1/棕
1910 BU BU 02/145.B7 =900E307.1 +EX900E307.1 -CC2 -X1 :4 =900E307.1 +EX900E307.1 -B12 :3/蓝
1911 BK BK 02/145.D6 =900E307.1 +EX900E307.1 -CC2 -X1 :7 =900E307.1 +EX900E307.1 -B12 :4/黑
D 1912 BK BK D
1913 GY GY
1914 PK PK
1915 VI VI
1916 OG OG
1917 +EX900E307.1 =900E307.1 -B13-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/143.B6 +EX900E307.1 -JB7 -X7 :1 =900E307.1 +EX900E307.1 -B13 :UB/Red
1918 BK/黑 BK 02/143.B6 +EX900E307.1 -JB7 -X7 :3 =900E307.1 +EX900E307.1 -B13 :GND/Bl…
1919 GN/绿 GN 02/143.B6 +EX900E307.1 -JB7 -X7 :5 =900E307.1 +EX900E307.1 -B13 :A/Green
E 1920 WH/白 WH 02/143.B7 +EX900E307.1 -JB7 -X7 :6 =900E307.1 +EX900E307.1 -B13 :B/White E

1921 YE/黄 YE
1922 屏蔽/Shield 02/143.B7 =900E307.1 +EX900E307.1 :PE
1923 +EX900E307.1 =900E307.1 -B14-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B4 +EX900E307.1 -CC1-1 -X1 :1 =900E307.1 +EX900E307.1 -B14 :1/棕
1924 BU BU 02/145.B4 +EX900E307.1 -CC1-1 -X1 :3 =900E307.1 +EX900E307.1 -B14 :3/蓝
52 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1925 BK BK 02/145.D4 +EX900E307.1 -CC1-1 -X1 :6 =900E307.1 +EX900E307.1 -B14 :4/黑
A A
1926 BK BK
1927 GY GY
1928 PK PK
1929 VI VI
1930 OG OG
1931 +EX900E307.1 =900E307.1 -B15-W1 ( Sensor cable 5.00 m ) BN BN 02/145.B4 +EX900E307.1 -CC1-1 -X1 :2 =900E307.1 +EX900E307.1 -B15 :1/棕
1932 BU BU 02/145.B5 +EX900E307.1 -CC1-1 -X1 :4 =900E307.1 +EX900E307.1 -B15 :3/蓝
1933 BK BK 02/145.D4 +EX900E307.1 -CC1-1 -X1 :7 =900E307.1 +EX900E307.1 -B15 :4/黑
B B
1934 BK BK
1935 GY GY
1936 PK PK
1937 VI VI
1938 OG OG
1939 +EX900E307.1 =900E307.1 -K1-W1 ( ZR-RVVP 4*0.5 5.00 m ) 1 BK 0.5 02/136.B7 +EX900E307.1 -JB8 -X1 :2 =900E307.1 +EX900E307.1 -K1 :1
1940 2 BK 0.5 02/136.C7 +EX900E307.1 -JB8 -X1 :6 =900E307.1 +EX900E307.1 -K1 :2
C 1941 3 BK 0.5 C
1942 4 BK 0.5
1943 Shield
1944 +EX900E307.1 =900E307.1 -K3-W1 ( Sensor cable 5.00 m ) BN BN 02/136.B6 +EX900E307.1 -JB8 -X1 :1 =900E307.1 +EX900E307.1 -K3 :1/BN
1945 BU BU 02/136.B6 +EX900E307.1 -JB8 -X1 :3 =900E307.1 +EX900E307.1 -K3 :3/BU
1946 BK BK 02/136.C6 +EX900E307.1 -JB8 -X1 :5 =900E307.1 +EX900E307.1 -K3 :4/BK
1947 BK BK
1948 GY GY
D 1949 PK PK D
1950 VI VI
1951 OG OG
1952 +EX900E307.1 =900E307.1 -M1-W1 ( ZR-VV-1KV 3*25+1*16 30.… 1 YE 10 02/137.E2 +1CP04 -T1 :U2 =900E307.1 +EX900E307.1 -M1 :U
1953 2 GN 10 02/137.E2 +1CP04 -T1 :V2 =900E307.1 +EX900E307.1 -M1 :V
1954 3 RD 10 02/137.E2 +1CP04 -T1 :W2 =900E307.1 +EX900E307.1 -M1 :W
1955 PE GN/YE 10 02/137.E2 +1CP04 -T1 :PE =900E307.1 +EX900E307.1 -M1 :PE
1956 +EX900E307.1 =900E307.1 -M1-W2 ( ZR-RVV-500V 4*0.75 30.0… 1 BK 0.75 02/137.E4 +1CP04 -1X3 :1 =900E307.1 +EX900E307.1 -M1 :AC1
E 1957 2 BK 0.75 02/137.E4 +1CP04 -1X3 :2 =900E307.1 +EX900E307.1 -M1 :AC2 E

1958 3 BK 0.75 02/137.E4 +1CP04 -1X3 :3 =900E307.1 +EX900E307.1 -M1 :NO1


1959 4 BK 0.75 02/137.E4 +1CP04 -1X3 :4 =900E307.1 +EX900E307.1 -M1 :NO2
1960 +EX900E307.1 =900E307.1 -M2-W1 ( ZR-VV-1KV 3*1.5+1*1.0 2… 1 YE 1.5 02/136.E2 +1CP04 -1X3 :12 =900E307.1 +EX900E307.1 -M2 :U
1961 2 GN 1.5 02/136.E2 +1CP04 -1X3 :13 =900E307.1 +EX900E307.1 -M2 :V
53 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1962 3 RD 1.5 02/136.E2 +1CP04 -1X3 :14 =900E307.1 +EX900E307.1 -M2 :W
A A
1963 PE GN/YE 1.0 02/136.E2 +1CP04 -1X3 :15 =900E307.1 +EX900E307.1 -M2 :PE
1964 +EX900E307.1 =900E307.1 -S2-W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/139.C3 =900E307.1 +1OP1 -X1 :44 =900E307.1 +EX900E307.1 -S2 :1
1965 2 BK 0.5 02/139.C3 =900E307.1 +1OP1 -X1 :45 =900E307.1 +EX900E307.1 -S2 :2
1966 3 BK 0.5
1967 4 BK 0.5
1968 Shield
1969 +EX900E307.1 =900E307.1 -S3-W1 ( ZR-RVVP 3*0.5 20.00 m ) 1 BK 0.5 02/139.C4 =900E307.1 +1OP1 -X1 :46 =900E307.1 +EX900E307.1 -S3 :1
1970 2 BK 0.5 02/139.C4 =900E307.1 +1OP1 -X1 :47 =900E307.1 +EX900E307.1 -S3 :2
B B
1971 3 BK 0.5
1972 Shield
1973 +EX900E307.2 =900E307.2 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/148.B7 =900E307.2 +EX900E307.1 -JB3 -X3 :1 =900E307.2 +EX900E307.2 -B1 :1/BN
1974 BU BU 02/148.B7 =900E307.2 +EX900E307.1 -JB3 -X3 :4 =900E307.2 +EX900E307.2 -B1 :3/BU
1975 BK BK 02/148.C7 =900E307.2 +EX900E307.1 -JB3 -X3 :7 =900E307.2 +EX900E307.2 -B1 :4/BK
1976 BK BK
1977 GY GY
C 1978 PK PK C
1979 VI VI
1980 OG OG
1981 +EX900E307.2 =900E307.2 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/148.B7 =900E307.2 +EX900E307.1 -JB3 -X3 :2 =900E307.2 +EX900E307.2 -B2 :1/BN
1982 BU BU 02/148.B7 =900E307.2 +EX900E307.1 -JB3 -X3 :5 =900E307.2 +EX900E307.2 -B2 :3/BU
1983 BK BK 02/148.C7 =900E307.2 +EX900E307.1 -JB3 -X3 :8 =900E307.2 +EX900E307.2 -B2 :4/BK
1984 BK BK
1985 GY GY
D 1986 PK PK D
1987 VI VI
1988 OG OG
1989 +EX900E307.2 =900E307.2 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/148.B8 =900E307.2 +EX900E307.1 -JB3 -X3 :3 =900E307.2 +EX900E307.2 -B3 :1/BN
1990 BU BU 02/148.B8 =900E307.2 +EX900E307.1 -JB3 -X3 :6 =900E307.2 +EX900E307.2 -B3 :3/BU
1991 BK BK 02/148.C8 =900E307.2 +EX900E307.1 -JB3 -X3 :9 =900E307.2 +EX900E307.2 -B3 :4/BK
1992 BK BK
1993 GY GY
E 1994 PK PK E

1995 VI VI
1996 OG OG
1997 +EX900E307.2 =900E307.2 -M2-W1 ( TRVV-JQ-4*2.0+2*1.0 20.… 1 YE 2.0 02/147.E2 =900E307.1 +EX900E307.1 -JB2 -X2 :1 =900E307.2 +EX900E307.2 -M2 :U
1998 2 GN 2.0 02/147.E2 =900E307.1 +EX900E307.1 -JB2 -X2 :2 =900E307.2 +EX900E307.2 -M2 :V
54 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
1999 3 RD 2.0 02/147.E2 =900E307.1 +EX900E307.1 -JB2 -X2 :3 =900E307.2 +EX900E307.2 -M2 :W
A A
2000 PE GN/YE 2.0 02/147.E2 =900E307.1 +EX900E307.1 -JB2 -X2 :4 =900E307.2 +EX900E307.2 -M2 :PE
2001 5 BK 1.0 02/147.E4 =900E307.1 +EX900E307.1 -JB2 -X2 :5 =900E307.2 +EX900E307.2 -M2 :AC1
2002 6 BK 1.0 02/147.E4 =900E307.1 +EX900E307.1 -JB2 -X2 :6 =900E307.2 +EX900E307.2 -M2 :AC2
2003 +EX900E410 -JB2 =900E410 -W3 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/111.A2 =1CD03 +1CD03 -X3 :37 +EX900E410 -JB2 -X2 :1
2004 2 BK 0.5 02/111.A2 =1CD03 +1CD03 -X3 :38 +EX900E410 -JB2 -X2 :2
2005 3 BK 0.5 02/111.E2 =1CD03 +1CD03 -X3 :39 +EX900E410 -JB2 -X2 :3
2006 4 BK 0.5 02/111.E2 =1CD03 +1CD03 -X3 :40 +EX900E410 -JB2 -X2 :4
2007 5 BK 0.5 02/111.E3 =1CD03 +1CD03 -X3 :41 +EX900E410 -JB2 -X2 :5
B B
2008 6 BK 0.5 02/111.E4 =1CD03 +1CD03 -X3 :42 +EX900E410 -JB2 -X2 :6
2009 7 BK 0.5 02/111.E5 =1CD03 +1CD03 -X3 :43 +EX900E410 -JB2 -X2 :7
2010 8 BK 0.5 02/111.E6 =1CD03 +1CD03 -X3 :44 +EX900E410 -JB2 -X2 :8
2011 9 BK 0.5
2012 10 BK 0.5
2013 Shield
2014 +EX900E410 -JB2 =900E410 -W4 ( 5.00 m ) 1 BK 0.5 02/111.B2 +EX900E410 -X :1 +EX900E410 -JB2 -X2 :1
C 2015 2 BK 0.5 02/111.B2 +EX900E410 -X :2 +EX900E410 -JB2 -X2 :2 C
2016 3 BK 0.5 02/111.D2 +EX900E410 -X :3 +EX900E410 -JB2 -X2 :3
2017 4 BK 0.5 02/111.D2 +EX900E410 -X :4 +EX900E410 -JB2 -X2 :4
2018 5 BK 0.5 02/111.D3 +EX900E410 -X :5 +EX900E410 -JB2 -X2 :5
2019 6 BK 0.5 02/111.D4 +EX900E410 -X :6 +EX900E410 -JB2 -X2 :6
2020 7 BK 0.5
2021 +EX900E410 =900E410 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C2 +EX900E410 -X :1 =900E410 +EX900E410 -B1 :1/BN
2022 BU BU 02/111.C2 +EX900E410 -X :2 =900E410 +EX900E410 -B1 :3/BU
D 2023 BK BK 02/111.D2 +EX900E410 -X :3 =900E410 +EX900E410 -B1 :4/BK D
2024 BK BK
2025 GY GY
2026 PK PK
2027 VI VI
2028 OG OG
2029 +EX900E410 =900E410 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C2
2030 BU BU 02/111.C2
E 2031 BK BK 02/111.D2 +EX900E410 -X :4 =900E410 +EX900E410 -B2 :4/BK E

2032 BK BK
2033 GY GY
2034 PK PK
2035 VI VI
55 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2036 OG OG
A A
2037 +EX900E410 =900E410 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C3
2038 BU BU 02/111.C3
2039 BK BK 02/111.D3 +EX900E410 -X :5 =900E410 +EX900E410 -B3 :4/BK
2040 BK BK
2041 GY GY
2042 PK PK
2043 VI VI
2044 OG OG
B B
2045 +EX900E410 =900E410 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C4
2046 BU BU 02/111.C4
2047 BK BK 02/111.D4 +EX900E410 -X :6 =900E410 +EX900E410 -B4 :4/BK
2048 BK BK
2049 GY GY
2050 PK PK
2051 VI VI
C 2052 OG OG C
2053 +EX900E410 =900E410 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C5 +EX900E410 -JB2 -X2 :1 =900E410 +EX900E410 -B5 :1/棕
2054 BU BU 02/111.C5 +EX900E410 -JB2 -X2 :2 =900E410 +EX900E410 -B5 :3/蓝
2055 BK BK 02/111.D5 +EX900E410 -JB2 -X2 :7 =900E410 +EX900E410 -B5 :4/黑
2056 BK BK
2057 GY GY
2058 PK PK
2059 VI VI
D 2060 OG OG D
2061 +EX900E410 =900E410 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/111.C6 +EX900E410 -JB2 -X2 :1 =900E410 +EX900E410 -B6 :1/棕
2062 BU BU 02/111.C6 +EX900E410 -JB2 -X2 :2 =900E410 +EX900E410 -B6 :3/蓝
2063 BK BK 02/111.D6 +EX900E410 -JB2 -X2 :8 =900E410 +EX900E410 -B6 :4/黑
2064 BK BK
2065 GY GY
2066 PK PK
2067 VI VI
E 2068 OG OG E

2069 +EX900E410 =900E410 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/110.D6 +1CP03 -1X3 :76 +EX900E410 -JB1 -X1 :1
2070 2 GN 2.5 02/110.D6 +1CP03 -1X3 :77 +EX900E410 -JB1 -X1 :2
2071 3 RD 2.5 02/110.D6 +1CP03 -1X3 :78 +EX900E410 -JB1 -X1 :3
2072 PE GN/YE 1.5 02/110.D6 +1CP03 -1X3 :79 +EX900E410 -JB1 -X1 :4
56 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2073 +EX900E410 =900E410 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/110.E2 =900E410 +EX900E410 -Q1 :2 =900E410 +EX900E410 -M1 :U
A A
2074 2 GN 2.5 02/110.E2 =900E410 +EX900E410 -Q1 :4 =900E410 +EX900E410 -M1 :V
2075 3 RD 2.5 02/110.E2 =900E410 +EX900E410 -Q1 :6 =900E410 +EX900E410 -M1 :W
2076 PE GN/YE 1.5 02/110.E2
2077 +EX900E410 =900E410 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/110.E4 +1CP03 -1X3 :74 =900E410 +EX900E410 -M1 :AC1
2078 2 BK 0.75 02/110.E4 +1CP03 -1X3 :75 =900E410 +EX900E410 -M1 :AC2
2079 +EX900E410 =900E410 -M2-W1 ( ) 1 YE 1.5 02/110.E6 +EX900E410 -JB1 -X1 :1 =900E410 +EX900E410 -M2 :U
2080 2 GN 1.5 02/110.E6 +EX900E410 -JB1 -X1 :2 =900E410 +EX900E410 -M2 :V
2081 3 RD 1.5 02/110.E6 +EX900E410 -JB1 -X1 :3 =900E410 +EX900E410 -M2 :W
B B
2082 4 BK 1 02/110.E6 +EX900E410 -JB1 -X1 :4 =900E410 +EX900E410 -M2 :PE
2083 5 BK 1
2084 6 BK 1
2085 7 BK 1
2086 +EX900E410 =900E410 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.00… 1 YE 2.5 02/110.D2 +1CP03 -1X3 :70 =900E410 +EX900E410 -Q1 :1
2087 2 GN 2.5 02/110.D2 +1CP03 -1X3 :71 =900E410 +EX900E410 -Q1 :3
2088 3 RD 2.5 02/110.D2 +1CP03 -1X3 :72 =900E410 +EX900E410 -Q1 :5
C 2089 PE GN/YE 1.5 02/110.D2 +1CP03 -1X3 :73 =900E410 +EX900E410 -M1 :PE C
2090 +EX900E411 -JB2 =900E411 -W3 ( ZR-RVVP 10*0.5 15.00 m ) 1 BK 0.5 02/113.A2 =1CD03 +1CD03 -X3 :48 +EX900E411 -JB2 -X2 :1
2091 2 BK 0.5 02/113.A2 =1CD03 +1CD03 -X3 :49 +EX900E411 -JB2 -X2 :2
2092 3 BK 0.5 02/113.E2 =1CD03 +1CD03 -X3 :50 +EX900E411 -JB2 -X2 :3
2093 4 BK 0.5 02/113.E2 =1CD03 +1CD03 -X3 :51 +EX900E411 -JB2 -X2 :4
2094 5 BK 0.5 02/113.E3 =1CD03 +1CD03 -X3 :52 +EX900E411 -JB2 -X2 :5
2095 6 BK 0.5 02/113.E4 =1CD03 +1CD03 -X3 :53 +EX900E411 -JB2 -X2 :6
2096 7 BK 0.5 02/113.E5 =1CD03 +1CD03 -X3 :54 +EX900E411 -JB2 -X2 :7
D 2097 8 BK 0.5 02/113.E6 =1CD03 +1CD03 -X3 :55 +EX900E411 -JB2 -X2 :8 D
2098 9 BK 0.5
2099 10 BK 0.5
2100 Shield
2101 +EX900E411 -JB2 =900E411 -W4 ( 5.00 m ) 1 BK 0.5 02/113.B2 +EX900E411 -X :1 +EX900E411 -JB2 -X2 :1
2102 2 BK 0.5 02/113.B2 +EX900E411 -X :2 +EX900E411 -JB2 -X2 :2
2103 3 BK 0.5 02/113.D2 +EX900E411 -X :3 +EX900E411 -JB2 -X2 :3
2104 4 BK 0.5 02/113.D2 +EX900E411 -X :4 +EX900E411 -JB2 -X2 :4
E 2105 5 BK 0.5 02/113.D3 +EX900E411 -X :5 +EX900E411 -JB2 -X2 :5 E

2106 6 BK 0.5 02/113.D4 +EX900E411 -X :6 +EX900E411 -JB2 -X2 :6


2107 7 BK 0.5
2108 +EX900E411 =900E411 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C2 +EX900E411 -X :1 =900E411 +EX900E411 -B1 :1/BN
2109 BU BU 02/113.C2 +EX900E411 -X :2 =900E411 +EX900E411 -B1 :3/BU
57 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2110 BK BK 02/113.D2 +EX900E411 -X :3 =900E411 +EX900E411 -B1 :4/BK
A A
2111 BK BK
2112 GY GY
2113 PK PK
2114 VI VI
2115 OG OG
2116 +EX900E411 =900E411 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C2 +EX900E411 -X :1 =900E411 +EX900E411 -B2 :1/BN
2117 BU BU 02/113.C3 +EX900E411 -X :2 =900E411 +EX900E411 -B2 :3/BU
2118 BK BK 02/113.D2 +EX900E411 -X :4 =900E411 +EX900E411 -B2 :4/BK
B B
2119 BK BK
2120 GY GY
2121 PK PK
2122 VI VI
2123 OG OG
2124 +EX900E411 =900E411 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C3 +EX900E411 -X :1 =900E411 +EX900E411 -B3 :1/BN
2125 BU BU 02/113.C3 +EX900E411 -X :2 =900E411 +EX900E411 -B3 :3/BU
C 2126 BK BK 02/113.D3 +EX900E411 -X :5 =900E411 +EX900E411 -B3 :4/BK C
2127 BK BK
2128 GY GY
2129 PK PK
2130 VI VI
2131 OG OG
2132 +EX900E411 =900E411 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C4 +EX900E411 -X :1 =900E411 +EX900E411 -B4 :1/BN
2133 BU BU 02/113.C4 +EX900E411 -X :2 =900E411 +EX900E411 -B4 :3/BU
D 2134 BK BK 02/113.D4 +EX900E411 -X :6 =900E411 +EX900E411 -B4 :4/BK D
2135 BK BK
2136 GY GY
2137 PK PK
2138 VI VI
2139 OG OG
2140 +EX900E411 =900E411 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C5 +EX900E411 -JB2 -X2 :1 =900E411 +EX900E411 -B5 :1/棕
2141 BU BU 02/113.C5 +EX900E411 -JB2 -X2 :2 =900E411 +EX900E411 -B5 :3/蓝
E 2142 BK BK 02/113.D5 +EX900E411 -JB2 -X2 :7 =900E411 +EX900E411 -B5 :4/黑 E

2143 BK BK
2144 GY GY
2145 PK PK
2146 VI VI
58 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2147 OG OG
A A
2148 +EX900E411 =900E411 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/113.C6 +EX900E411 -JB2 -X2 :1 =900E411 +EX900E411 -B6 :1/棕
2149 BU BU 02/113.C6 +EX900E411 -JB2 -X2 :2 =900E411 +EX900E411 -B6 :3/蓝
2150 BK BK 02/113.D6 +EX900E411 -JB2 -X2 :8 =900E411 +EX900E411 -B6 :4/黑
2151 BK BK
2152 GY GY
2153 PK PK
2154 VI VI
2155 OG OG
B B
2156 +EX900E411 =900E411 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.0… 1 YE 2.5 02/112.D6 +1CP03 -1X3 :56 +EX900E411 -JB1 -X1 :1
2157 2 GN 2.5 02/112.D6 +1CP03 -1X3 :57 +EX900E411 -JB1 -X1 :2
2158 3 RD 2.5 02/112.D6 +1CP03 -1X3 :58 +EX900E411 -JB1 -X1 :3
2159 PE GN/YE 1.5 02/112.D6 +1CP03 -1X3 :59 +EX900E411 -JB1 -X1 :4
2160 +EX900E411 =900E411 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 m )1 YE 2.5 02/112.E1 =900E411 +EX900E411 -Q1 :2 =900E411 +EX900E411 -M1 :U
2161 2 GN 2.5 02/112.E2 =900E411 +EX900E411 -Q1 :4 =900E411 +EX900E411 -M1 :V
2162 3 RD 2.5 02/112.E2 =900E411 +EX900E411 -Q1 :6 =900E411 +EX900E411 -M1 :W
C 2163 PE GN/YE 1.5 02/112.E2 C
2164 +EX900E411 =900E411 -M1-W2 ( ZR-RVV-500V 2*0.75 15.00 m ) 1 BK 0.75 02/112.E4 +1CP03 -1X3 :53 =900E411 +EX900E411 -M1 :AC1
2165 2 BK 0.75 02/112.E4 +1CP03 -1X3 :54 =900E411 +EX900E411 -M1 :AC2
2166 +EX900E411 =900E411 -M2-W1 ( ) 1 YE 1.5 02/112.E6 +EX900E411 -JB1 -X1 :1 =900E411 +EX900E411 -M2 :U
2167 2 GN 1.5 02/112.E6 +EX900E411 -JB1 -X1 :2 =900E411 +EX900E411 -M2 :V
2168 3 RD 1.5 02/112.E6 +EX900E411 -JB1 -X1 :3 =900E411 +EX900E411 -M2 :W
2169 4 BK 1 02/112.E6 +EX900E411 -JB1 -X1 :4 =900E411 +EX900E411 -M2 :PE
2170 5 BK 1
D 2171 6 BK 1 D
2172 7 BK 1
2173 +EX900E411 =900E411 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 15.00… 1 YE 2.5 02/112.D1 +1CP03 -1X3 :49 =900E411 +EX900E411 -Q1 :1
2174 2 GN 2.5 02/112.D2 +1CP03 -1X3 :50 =900E411 +EX900E411 -Q1 :3
2175 3 RD 2.5 02/112.D2 +1CP03 -1X3 :51 =900E411 +EX900E411 -Q1 :5
2176 PE GN/YE 1.5 02/112.D2 +1CP03 -1X3 :52 =900E411 +EX900E411 -M1 :PE
2177 +EX900E413 -JB1 =900E413 -W1 ( ZR-RVVP 4*0.5 10.00 m ) 1 BK 0.5 02/114.A3 =1CP03.2 +1CP03 -2X4 :1 +EX900E413 -JB1 -X1 :1
2178 2 BK 0.5 02/114.A3 =1CP03.2 +1CP03 -2X4 :2 +EX900E413 -JB1 -X1 :3
E 2179 3 BK 0.5 02/114.D3 =1CP03.2 +1CP03 -2X4 :3 +EX900E413 -JB1 -X1 :5 E

2180 4 BK 0.5 02/114.D3 =1CP03.2 +1CP03 -2X4 :4 +EX900E413 -JB1 -X1 :6


2181 Shield 02/114.D3
2182 +EX900E413 -JB2 =900E413 -W1 ( ZR-RVVP 4*0.5 10.00 m ) 1 BK 0.5 02/114.A5 =1CP03.2 +1CP03 -2X4 :5 +EX900E413 -JB2 -X2 :1
2183 2 BK 0.5 02/114.A5 =1CP03.2 +1CP03 -2X4 :6 +EX900E413 -JB2 -X2 :3
59 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2184 3 BK 0.5 02/114.D5 =1CP03.2 +1CP03 -2X4 :8 +EX900E413 -JB2 -X2 :5
A A
2185 4 BK 0.5
2186 Shield 02/114.D6
2187 +EX900E413 =900E413 -B1-W1 ( Sensor cable 1.00 m ) RD/红 RD 02/114.B3 +EX900E413 -JB1 -X1 :1 =900E413 +EX900E413 -B1 :UB/Red
2188 BK/黑 BK 02/114.B3 +EX900E413 -JB1 -X1 :3 =900E413 +EX900E413 -B1 :GND/Black
2189 GN/绿 GN 02/114.C3 +EX900E413 -JB1 -X1 :5 =900E413 +EX900E413 -B1 :A/Green
2190 WH/白 WH 02/114.C3 +EX900E413 -JB1 -X1 :6 =900E413 +EX900E413 -B1 :B/White
2191 YE/黄 YE
2192 屏蔽/Shield
B B
2193 +EX900E413 =900E413 -B2-W1 ( Sensor cable 2.00 m ) 棕/BN BN 02/114.B5 +EX900E413 -JB2 -X2 :1 =900E413 +EX900E413 -B2 :1/BN
2194 蓝/BU BU 02/114.B5 +EX900E413 -JB2 -X2 :3 =900E413 +EX900E413 -B2 :3/BU
2195 黑/BK BK
2196 白/WH WH 02/114.C5 +EX900E413 -JB2 -X2 :5 =900E413 +EX900E413 -B2 :2/WH
2197 GY GY
2198 PK PK
2199 VI VI
C 2200 OG OG C
2201 +EX900E414 -JB1 =900E414 -W1 ( ZR-RVVP 4*0.5 10.00 m ) 1 BK 0.5 02/115.A2 =1CD03 +1CD03 -X3 :59 =900E414 +EX900E414 -JB1 -X2 :1
2202 2 BK 0.5 02/115.A2 =1CD03 +1CD03 -X3 :60 =900E414 +EX900E414 -JB1 -X2 :4
2203 3 BK 0.5 02/115.D2 =1CD03 +1CD03 -X3 :61 =900E414 +EX900E414 -JB1 -X2 :9
2204 4 BK 0.5 02/115.B5 =1CD03 +1CD03 -X3 :37 =900E414 +EX900E414 -JB1 -X2 :10
2205 Shield
2206 +EX900E414 =900E414 -A1-W1 ( Scanner cable 5.00 m ) 1/白 WH
2207 2/GN GN
D 2208 3/PK BN D
2209 4/YE
2210 5/GY
2211 6/BK BK
2212 7BN BN 02/115.C3 =900E414 +EX900E414 -A1 :+24 VDC =900E414 +EX900E414 -JB1 -F1 :2
2213 8/BU 02/115.C3 =900E414 +EX900E414 -JB1 -X2 :5 =900E414 +EX900E414 -A1 :GND
2214 9/VT
2215 10/RD BK
E 2216 11/GY/PK WH E

2217 12/RD/BU WH
2218 +EX900E414 =900E414 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/115.B2 =900E414 +EX900E414 -JB1 -X2 :1 =900E414 +EX900E414 -B1 :1/BN
2219 BU BU 02/115.B2 =900E414 +EX900E414 -JB1 -X2 :4 =900E414 +EX900E414 -B1 :3/BU
2220 BK BK 02/115.C2 =900E414 +EX900E414 -JB1 -X2 :9 =900E414 +EX900E414 -B1 :4/BK
60 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2221 BK BK
A A
2222 GY GY
2223 PK PK
2224 VI VI
2225 OG OG
2226 +EX900E414 =900E414 -P1-W1 ( ZR-RVVP 3*0.5 5.00 m ) 1 BK 0.5 02/115.D4 =900E414 +EX900E414 -P1 :1红/RD =900E414 +EX900E414 -JB1 -K2 :12
2227 2 BK 0.5 02/115.D5 =900E414 +EX900E414 -JB1 -X2 :6 =900E414 +EX900E414 -P1 :黑/BK
2228 3 BK 0.5
2229 Shield
B B
2230 +EX902C001 -JB1 =902C001 -W1 ( ZR-RVVP 4*0.5 25.00 m ) 1 BK 0.5 02/60.A5 =1CP20 +1CP20 -X4 :37 +EX902C001 -JB1 -X1 :1
2231 2 BK 0.5 02/60.A5 =1CP20 +1CP20 -X4 :38 +EX902C001 -JB1 -X1 :3
2232 3 BK 0.5 02/60.D5 =1CP20 +1CP20 -X4 :39 +EX902C001 -JB1 -X1 :5
2233 4 BK 0.5
2234 Shield
2235 +EX902C001 -JB2 =902C001 -W1 ( ZR-RVVP 4*0.5 20.00 m ) 1 BK 0.5 02/60.A6 =1CP20 +1CP20 -X4 :40 +EX902C001 -JB2 -X1 :1
2236 2 BK 0.5 02/60.A6 =1CP20 +1CP20 -X4 :41 +EX902C001 -JB2 -X1 :3
C 2237 3 BK 0.5 02/60.D6 =1CP20 +1CP20 -X4 :42 +EX902C001 -JB2 -X1 :5 C
2238 4 BK 0.5 +EX902C001 -JB2 -X1 :6
2239 Shield
2240 +EX902C001 =902C001 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/60.B5 +EX902C001 -JB1 -X1 :1 =902C001 +EX902C001 -B1 :1/BN
2241 BU BU
2242 3/BU BU 0.34 02/60.B5 +EX902C001 -JB1 -X1 :3 =902C001 +EX902C001 -B1 :3/BU
2243 4/BK BK 0.34 02/60.D5 +EX902C001 -JB1 -X1 :5 =902C001 +EX902C001 -B1 :4/BK
2244 GY GY
D 2245 PK PK D
2246 VI VI
2247 OG OG
2248 +EX902C001 =902C001 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/60.B6 +EX902C001 -JB2 -X1 :1 =902C001 +EX902C001 -B2 :1/BN
2249 BU BU
2250 3/BU BU 0.34 02/60.B6 +EX902C001 -JB2 -X1 :3 =902C001 +EX902C001 -B2 :3/BU
2251 4/BK BK 0.34 02/60.D6 +EX902C001 -JB2 -X1 :5 =902C001 +EX902C001 -B2 :4/BK
2252 GY GY
E 2253 PK PK E

2254 VI VI
2255 OG OG
2256 +EX902C001 =902C001 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 25.0… 1 YE 2.5 02/60.E1 +1CP02 -1X3 :93 =902C001 +EX902C001 -M1 :U
2257 2 GN 2.5 02/60.E2 +1CP02 -1X3 :94 =902C001 +EX902C001 -M1 :V
61 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2258 3 RD 2.5 02/60.E2 +1CP02 -1X3 :95 =902C001 +EX902C001 -M1 :W
A A
2259 PE GN/YE 1.5 02/60.E2 +1CP02 -1X3 :96 =902C001 +EX902C001 -M1 :PE
2260 +EX902C002 =902C002 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.0… 1 YE 2.5 02/61.E1 +1CP02 -1X3 :98 =902C002 +EX902C002 -M1 :U
2261 2 GN 2.5 02/61.E2 +1CP02 -1X3 :99 =902C002 +EX902C002 -M1 :V
2262 3 RD 2.5 02/61.E2 +1CP02 -1X3 :100 =902C002 +EX902C002 -M1 :W
2263 PE GN/YE 1.5 02/61.E2 +1CP02 -1X3 :101 =902C002 +EX902C002 -M1 :PE
2264 +EX902CC02 -JB1 =902C002 -W1 ( ZR-RVVP 4*0.5 35.00 m ) 1 BK 0.5 02/61.A5 =1CP20 +1CP20 -X4 :43 +EX902CC02 -JB1 -X1 :1
2265 2 BK 0.5 02/61.A5 =1CP20 +1CP20 -X4 :44 +EX902CC02 -JB1 -X1 :3
2266 3 BK 0.5 02/61.D5 =1CP20 +1CP20 -X4 :45 +EX902CC02 -JB1 -X1 :5
B B
2267 4 BK 0.5
2268 Shield
2269 +EX902CC02 -JB2 =902C002 -W1 ( ZR-RVVP 4*0.5 40.00 m ) 1 BK 0.5 02/61.A6 =1CP20 +1CP20 -X4 :46 +EX902CC02 -JB2 -X1 :1
2270 2 BK 0.5 02/61.A6 =1CP20 +1CP20 -X4 :47 +EX902CC02 -JB2 -X1 :3
2271 3 BK 0.5 02/61.D6 =1CP20 +1CP20 -X4 :48 +EX902CC02 -JB2 -X1 :5
2272 4 BK 0.5 +EX902CC02 -JB2 -X1 :6
2273 Shield
C 2274 +EX902CC02 =902C002 -B1-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/61.B5 +EX902CC02 -JB1 -X1 :1 =902C002 +EX902CC02 -B1 :1/BN C
2275 BU BU
2276 3/BU BU 0.34 02/61.B5 +EX902CC02 -JB1 -X1 :3 =902C002 +EX902CC02 -B1 :3/BU
2277 4/BK BK 0.34 02/61.D5 +EX902CC02 -JB1 -X1 :5 =902C002 +EX902CC02 -B1 :4/BK
2278 GY GY
2279 PK PK
2280 VI VI
2281 OG OG
D 2282 +EX902CC02 =902C002 -B2-W1 ( Sensor cable 2.00 m ) 1/BN BN 0.34 02/61.B6 +EX902CC02 -JB2 -X1 :1 =902C002 +EX902CC02 -B2 :1/BN D
2283 BU BU
2284 3/BU BU 0.34 02/61.B6 +EX902CC02 -JB2 -X1 :3 =902C002 +EX902CC02 -B2 :3/BU
2285 4/BK BK 0.34 02/61.D6 +EX902CC02 -JB2 -X1 :5 =902C002 +EX902CC02 -B2 :4/BK
2286 GY GY
2287 PK PK
2288 VI VI
2289 OG OG
E 2290 +EX902E001 -JB2 =902E001 -W3 ( ZR-RVVP 10*0.5 30.00 m ) 1 BK 0.5 02/87.A1 =1CP20 +1CP20 -X5 :33 +EX902E001 -JB2 -X2 :1 E

2291 2 BK 0.5 02/87.A2 =1CP20 +1CP20 -X5 :34 +EX902E001 -JB2 -X2 :2
2292 3 BK 0.5 02/87.E1 =1CP20 +1CP20 -X5 :35 +EX902E001 -JB2 -X2 :3
2293 4 BK 0.5 02/87.E2 =1CP20 +1CP20 -X5 :36 +EX902E001 -JB2 -X2 :4
2294 5 BK 0.5 02/87.E3 =1CP20 +1CP20 -X5 :37 +EX902E001 -JB2 -X2 :5
62 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2295 6 BK 0.5 02/87.E4 =1CP20 +1CP20 -X5 :38 +EX902E001 -JB2 -X2 :6
A A
2296 7 BK 0.5 02/87.E5 =1CP20 +1CP20 -X5 :39 +EX902E001 -JB2 -X2 :7
2297 8 BK 0.5 02/87.E5 =1CP20 +1CP20 -X5 :40 +EX902E001 -JB2 -X2 :8
2298 9 BK 0.5
2299 10 BK 0.5
2300 Shield
2301 +EX902E001 -JB2 =902E001 -W4 ( 5.00 m ) 1 BK 0.5 02/87.B1 +EX902E001 -X :1 +EX902E001 -JB2 -X2 :1
2302 2 BK 0.5 02/87.B2 +EX902E001 -X :2 +EX902E001 -JB2 -X2 :2
2303 3 BK 0.5 02/87.D1 +EX902E001 -X :3 +EX902E001 -JB2 -X2 :3
B B
2304 4 BK 0.5 02/87.D2 +EX902E001 -X :4 +EX902E001 -JB2 -X2 :4
2305 5 BK 0.5 02/87.D3 +EX902E001 -X :5 +EX902E001 -JB2 -X2 :5
2306 6 BK 0.5 02/87.D4 +EX902E001 -X :6 +EX902E001 -JB2 -X2 :6
2307 7 BK 0.5
2308 +EX902E001 =902E001 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C1 +EX902E001 -X :1 =902E001 +EX902E001 -B1 :1/BN
2309 BU BU 02/87.C2 +EX902E001 -X :2 =902E001 +EX902E001 -B1 :3/BU
2310 BK BK 02/87.D1 +EX902E001 -X :3 =902E001 +EX902E001 -B1 :4/BK
C 2311 BK BK C
2312 GY GY
2313 PK PK
2314 VI VI
2315 OG OG
2316 +EX902E001 =902E001 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C2 +EX902E001 -X :1 =902E001 +EX902E001 -B2 :1/BN
2317 BU BU 02/87.C2 +EX902E001 -X :2 =902E001 +EX902E001 -B2 :3/BU
2318 BK BK 02/87.D2 +EX902E001 -X :4 =902E001 +EX902E001 -B2 :4/BK
D 2319 BK BK D
2320 GY GY
2321 PK PK
2322 VI VI
2323 OG OG
2324 +EX902E001 =902E001 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C3 +EX902E001 -X :1 =902E001 +EX902E001 -B3 :1/BN
2325 BU BU 02/87.C3 +EX902E001 -X :2 =902E001 +EX902E001 -B3 :3/BU
2326 BK BK 02/87.D3 +EX902E001 -X :5 =902E001 +EX902E001 -B3 :4/BK
E 2327 BK BK E

2328 GY GY
2329 PK PK
2330 VI VI
2331 OG OG
63 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2332 +EX902E001 =902E001 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C4 +EX902E001 -X :1 =902E001 +EX902E001 -B4 :1/BN
A A
2333 BU BU 02/87.C4 +EX902E001 -X :2 =902E001 +EX902E001 -B4 :3/BU
2334 BK BK 02/87.D4 +EX902E001 -X :6 =902E001 +EX902E001 -B4 :4/BK
2335 BK BK
2336 GY GY
2337 PK PK
2338 VI VI
2339 OG OG
2340 +EX902E001 =902E001 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C5 +EX902E001 -JB2 -X2 :1 =902E001 +EX902E001 -B5 :1/棕
B B
2341 BU BU 02/87.C5 +EX902E001 -JB2 -X2 :2 =902E001 +EX902E001 -B5 :3/蓝
2342 BK BK 02/87.D5 +EX902E001 -JB2 -X2 :7 =902E001 +EX902E001 -B5 :4/黑
2343 BK BK
2344 GY GY
2345 PK PK
2346 VI VI
2347 OG OG
C 2348 +EX902E001 =902E001 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/87.C5 +EX902E001 -JB2 -X2 :1 =902E001 +EX902E001 -B6 :1/棕 C
2349 BU BU 02/87.C5 +EX902E001 -JB2 -X2 :2 =902E001 +EX902E001 -B6 :3/蓝
2350 BK BK 02/87.D5 +EX902E001 -JB2 -X2 :8 =902E001 +EX902E001 -B6 :4/黑
2351 BK BK
2352 GY GY
2353 PK PK
2354 VI VI
2355 OG OG
D 2356 +EX902E001 =902E001 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.0… 1 YE 2.5 02/85.C5 +EX902E001 -JB1 -X1 :1 +1CP02 -2X3 :51 D
2357 2 GN 2.5 02/85.C5 +EX902E001 -JB1 -X1 :2 +1CP02 -2X3 :52
2358 3 RD 2.5 02/85.C5 +EX902E001 -JB1 -X1 :3 +1CP02 -2X3 :53
2359 PE GN/YE 1.5 02/85.C5 +EX902E001 -JB1 -X1 :4 +1CP02 -2X3 :54
2360 +EX902E001 =902E001 -JB1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/85.C6 +1CP02 -2X3 :55 +EX902E001 -JB1 -X1 :5
2361 2 BK 0.75 02/85.C6 +1CP02 -2X3 :56 +EX902E001 -JB1 -X1 :6
2362 +EX902E001 =902E001 -JB1-W3 ( ZR-RVV-500V 4*0.75 20.00 m ) 1 BK 0.75 02/85.C7 +1CP02 -2X3 :77 +EX902E001 -JB1 -X1 :7
2363 2 BK 0.75 02/85.C7 +1CP02 -2X3 :78 +EX902E001 -JB1 -X1 :8
E 2364 3 BK 0.75 02/85.C8 +1CP02 -2X3 :79 +EX902E001 -JB1 -X1 :9 E

2365 4 BK 0.75 02/85.C8 +EX902E001 -JB1 -X1 :10 +1CP02 -2X3 :80
2366 +EX902E001 =902E001 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/85.E2 =902E001 +EX902E001 -Q1 :2 =902E001 +EX902E001 -M1 :U
2367 2 GN 2.5 02/85.E2 =902E001 +EX902E001 -Q1 :4 =902E001 +EX902E001 -M1 :V
2368 3 RD 2.5 02/85.E2 =902E001 +EX902E001 -Q1 :6 =902E001 +EX902E001 -M1 :W
64 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2369 PE GN/YE 1.5 02/85.E2 =902E001 +EX902E001 -Q1 :PE =902E001 +EX902E001 -M1 :PE
A A
2370 +EX902E001 =902E001 -M1-W2 ( ZR-RVV-500V 2*0.75 30.00 m ) 1 BK 0.75 02/85.C3 +1CP02 -2X3 :49 =902E001 +EX902E001 -M1 :AC1
2371 2 BK 0.75 02/85.C3 +1CP02 -2X3 :50 =902E001 +EX902E001 -M1 :AC2
2372 +EX902E001 =902E001 -M2-W1 ( ) 1 YE 1.5 02/85.E5 +EX902E001 -JB1 -X1 :1 =902E001 +EX902E001 -M2 :U
2373 2 GN 1.5 02/85.E5 +EX902E001 -JB1 -X1 :2 =902E001 +EX902E001 -M2 :V
2374 3 RD 1.5 02/85.E5 +EX902E001 -JB1 -X1 :3 =902E001 +EX902E001 -M2 :W
2375 4 BK 1 02/85.E5 +EX902E001 -JB1 -X1 :4 =902E001 +EX902E001 -M2 :PE
2376 5 BK 1 02/85.E6 =902E001 +EX902E001 -M2 :AC1 +EX902E001 -JB1 -X1 :5
2377 6 BK 1 02/85.E6 =902E001 +EX902E001 -M2 :AC2 +EX902E001 -JB1 -X1 :6
B B
2378 7 BK 1
2379 +EX902E001 =902E001 -M2-W2 ( ) 1 YE 1.5 02/85.E7 +EX902E001 -JB1 -X1 :7 =902E001 +EX902E001 -M2 Fan :U
2380 2 GN 1.5 02/85.E7 +EX902E001 -JB1 -X1 :8 =902E001 +EX902E001 -M2 Fan :V
2381 3 RD 1.5 02/85.E8 +EX902E001 -JB1 -X1 :9 =902E001 +EX902E001 -M2 Fan :W
2382 4 BK 1 02/85.E8 =902E001 +EX902E001 -M2 Fan :PE +EX902E001 -JB1 -X1 :10
2383 +EX902E001 =902E001 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 30.00… 1 YE 2.5 02/85.C2 +1CP02 -2X3 :45 =902E001 +EX902E001 -Q1 :1
2384 2 GN 2.5 02/85.C2 +1CP02 -2X3 :46 =902E001 +EX902E001 -Q1 :3
C 2385 3 RD 2.5 02/85.C2 +1CP02 -2X3 :47 =902E001 +EX902E001 -Q1 :5 C
2386 PE GN/YE 1.5 02/85.C2 +1CP02 -2X3 :48 =902E001 +EX902E001 -Q1 :PE
2387 +EX902E003 -JB2 =902E003 -W3 ( ZR-RVVP 10*0.5 35.00 m ) 1 BK 0.5 02/91.A1 =1CP20 +1CP20 -X5 :41 +EX902E003 -JB2 -X2 :1
2388 2 BK 0.5 02/91.A2 =1CP20 +1CP20 -X5 :42 +EX902E003 -JB2 -X2 :2
2389 3 BK 0.5 02/91.E1 =1CP20 +1CP20 -X5 :43 +EX902E003 -JB2 -X2 :3
2390 4 BK 0.5 02/91.E2 =1CP20 +1CP20 -X5 :44 +EX902E003 -JB2 -X2 :4
2391 5 BK 0.5 02/91.E3 =1CP20 +1CP20 -X5 :45 +EX902E003 -JB2 -X2 :5
2392 6 BK 0.5 02/91.E4 =1CP20 +1CP20 -X5 :46 +EX902E003 -JB2 -X2 :6
D 2393 7 BK 0.5 02/91.E5 =1CP20 +1CP20 -X5 :47 +EX902E003 -JB2 -X2 :7 D
2394 8 BK 0.5 02/91.E5 =1CP20 +1CP20 -X5 :48 +EX902E003 -JB2 -X2 :8
2395 9 BK 0.5
2396 10 BK 0.5
2397 Shield
2398 +EX902E003 -JB2 =902E003 -W4 ( 5.00 m ) 1 BK 0.5 02/91.B1 +EX902E003 -X :1 +EX902E003 -JB2 -X2 :1
2399 2 BK 0.5 02/91.B2 +EX902E003 -X :2 +EX902E003 -JB2 -X2 :2
2400 3 BK 0.5 02/91.D1 +EX902E003 -X :3 +EX902E003 -JB2 -X2 :3
E 2401 4 BK 0.5 02/91.D2 +EX902E003 -X :4 +EX902E003 -JB2 -X2 :4 E

2402 5 BK 0.5 02/91.D3 +EX902E003 -X :5 +EX902E003 -JB2 -X2 :5


2403 6 BK 0.5 02/91.D4 +EX902E003 -X :6 +EX902E003 -JB2 -X2 :6
2404 7 BK 0.5
2405 +EX902E003 =902E003 -B1-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C1 +EX902E003 -X :1 =902E003 +EX902E003 -B1 :1/BN
65 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2406 BU BU 02/91.C2 +EX902E003 -X :2 =902E003 +EX902E003 -B1 :3/BU
A A
2407 BK BK 02/91.D1 +EX902E003 -X :3 =902E003 +EX902E003 -B1 :4/BK
2408 BK BK
2409 GY GY
2410 PK PK
2411 VI VI
2412 OG OG
2413 +EX902E003 =902E003 -B2-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C2 +EX902E003 -X :1 =902E003 +EX902E003 -B2 :1/BN
2414 BU BU 02/91.C2 +EX902E003 -X :2 =902E003 +EX902E003 -B2 :3/BU
B B
2415 BK BK 02/91.D2 +EX902E003 -X :4 =902E003 +EX902E003 -B2 :4/BK
2416 BK BK
2417 GY GY
2418 PK PK
2419 VI VI
2420 OG OG
2421 +EX902E003 =902E003 -B3-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C3 +EX902E003 -X :1 =902E003 +EX902E003 -B3 :1/BN
C 2422 BU BU 02/91.C3 +EX902E003 -X :2 =902E003 +EX902E003 -B3 :3/BU C
2423 BK BK 02/91.D3 +EX902E003 -X :5 =902E003 +EX902E003 -B3 :4/BK
2424 BK BK
2425 GY GY
2426 PK PK
2427 VI VI
2428 OG OG
2429 +EX902E003 =902E003 -B4-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C4 +EX902E003 -X :1 =902E003 +EX902E003 -B4 :1/BN
D 2430 BU BU 02/91.C4 +EX902E003 -X :2 =902E003 +EX902E003 -B4 :3/BU D
2431 BK BK 02/91.D4 +EX902E003 -X :6 =902E003 +EX902E003 -B4 :4/BK
2432 BK BK
2433 GY GY
2434 PK PK
2435 VI VI
2436 OG OG
2437 +EX902E003 =902E003 -B5-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C5 +EX902E003 -JB2 -X2 :1 =902E003 +EX902E003 -B5 :1/棕
E 2438 BU BU 02/91.C5 +EX902E003 -JB2 -X2 :2 =902E003 +EX902E003 -B5 :3/蓝 E

2439 BK BK 02/91.D5 +EX902E003 -JB2 -X2 :7 =902E003 +EX902E003 -B5 :4/黑


2440 BK BK
2441 GY GY
2442 PK PK
66 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2443 VI VI
A A
2444 OG OG
2445 +EX902E003 =902E003 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/91.C5 +EX902E003 -JB2 -X2 :1 =902E003 +EX902E003 -B6 :1/棕
2446 BU BU 02/91.C5 +EX902E003 -JB2 -X2 :2 =902E003 +EX902E003 -B6 :3/蓝
2447 BK BK 02/91.D5 +EX902E003 -JB2 -X2 :8 =902E003 +EX902E003 -B6 :4/黑
2448 BK BK
2449 GY GY
2450 PK PK
2451 VI VI
B B
2452 OG OG
2453 +EX902E003 =902E003 -JB1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.0… 1 YE 2.5 02/89.C4 +EX902E003 -JB1 -X1 :1 +1CP02 -2X3 :63
2454 2 GN 2.5 02/89.C5 +EX902E003 -JB1 -X1 :2 +1CP02 -2X3 :64
2455 3 RD 2.5 02/89.C5 +EX902E003 -JB1 -X1 :3 +1CP02 -2X3 :65
2456 PE GN/YE 1.5 02/89.C5 +EX902E003 -JB1 -X1 :4 +1CP02 -2X3 :66
2457 +EX902E003 =902E003 -JB1-W2 ( ZR-RVV-500V 2*0.75 20.00 m ) 1 BK 0.75 02/89.C6 +1CP02 -2X3 :67 +EX902E003 -JB1 -X1 :5
2458 2 BK 0.75 02/89.C6 +1CP02 -2X3 :68 +EX902E003 -JB1 -X1 :6
C 2459 +EX902E003 =902E003 -JB1-W3 ( ZR-RVV-500V 4*0.75 20.00 m ) 1 BK 0.75 02/89.C7 +EX902E003 -JB1 -X1 :7 +1CP02 -2X3 :81 C
2460 2 BK 0.75 02/89.C7 +EX902E003 -JB1 -X1 :8 +1CP02 -2X3 :82
2461 3 BK 0.75 02/89.C7 +EX902E003 -JB1 -X1 :9 +1CP02 -2X3 :83
2462 4 BK 0.75 02/89.C7 +EX902E003 -JB1 -X1 :10 +1CP02 -2X3 :84
2463 +EX902E003 =902E003 -M1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 5.00 … 1 YE 2.5 02/89.E2 =902E003 +EX902E003 -Q1 :2 =902E003 +EX902E003 -M1 :U
2464 2 GN 2.5 02/89.E2 =902E003 +EX902E003 -Q1 :4 =902E003 +EX902E003 -M1 :V
2465 3 RD 2.5 02/89.E2 =902E003 +EX902E003 -Q1 :6 =902E003 +EX902E003 -M1 :W
2466 PE GN/YE 1.5 02/89.E2 =902E003 +EX902E003 -Q1 :PE =902E003 +EX902E003 -M1 :PE
D 2467 +EX902E003 =902E003 -M1-W2 ( ZR-RVV-500V 2*0.75 35.00 m ) 1 BK 0.75 02/89.C3 +1CP02 -2X3 :61 =902E003 +EX902E003 -M1 :AC1 D
2468 2 BK 0.75 02/89.C3 +1CP02 -2X3 :62 =902E003 +EX902E003 -M1 :AC2
2469 +EX902E003 =902E003 -M2-W1 ( ) 1 YE 1.5 02/89.E4 +EX902E003 -JB1 -X1 :1 =902E003 +EX902E003 -M2 :U
2470 2 GN 1.5 02/89.E5 +EX902E003 -JB1 -X1 :2 =902E003 +EX902E003 -M2 :V
2471 3 RD 1.5 02/89.E5 +EX902E003 -JB1 -X1 :3 =902E003 +EX902E003 -M2 :W
2472 4 BK 1 02/89.E5 +EX902E003 -JB1 -X1 :4 =902E003 +EX902E003 -M2 :PE
2473 5 BK 1 02/89.E6 =902E003 +EX902E003 -M2 :AC1 +EX902E003 -JB1 -X1 :5
2474 6 BK 1 02/89.E6 =902E003 +EX902E003 -M2 :AC2 +EX902E003 -JB1 -X1 :6
E 2475 7 BK 1 E

2476 +EX902E003 =902E003 -M2-W2 ( ) 1 YE 1.5 02/89.E7 =902E003 +EX902E003 -M2 Fan :U +EX902E003 -JB1 -X1 :7
2477 2 GN 1.5 02/89.E7 =902E003 +EX902E003 -M2 Fan :V +EX902E003 -JB1 -X1 :8
2478 3 RD 1.5 02/89.E7 =902E003 +EX902E003 -M2 Fan :W +EX902E003 -JB1 -X1 :9
2479 4 BK 1 02/89.E7 =902E003 +EX902E003 -M2 Fan :PE +EX902E003 -JB1 -X1 :10
67 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2480 +EX902E003 =902E003 -Q1-W1 ( ZR-VV-1KV 3*2.5+1*1.5 35.00… 1 YE 2.5 02/89.C2 +1CP02 -2X3 :57 =902E003 +EX902E003 -Q1 :1
A A
2481 2 GN 2.5 02/89.C2 +1CP02 -2X3 :58 =902E003 +EX902E003 -Q1 :3
2482 3 RD 2.5 02/89.C2 +1CP02 -2X3 :59 =902E003 +EX902E003 -Q1 :5
2483 PE GN/YE 1.5 02/89.C2 +1CP02 -2X3 :60 =902E003 +EX902E003 -Q1 :PE
2484 +EX.DO16 -CB1 =DO16 -CB1-W1 ( ZR-RVVP 7*0.5 35.00 m ) 1 BK 0.5 03/7.B2 =1CP20 +1CP20 -X6 :1 =DO16 +EX.DO16 -CB1 -S01 :13
2485 2 BK 0.5 03/7.B2 =1CP20 +1CP20 -X6 :2 =DO16 +EX.DO16 -CB1 -S01 :1
2486 3 BK 0.5 03/7.D2 =1CP20 +1CP20 -X6 :3 =DO16 +EX.DO16 -CB1 -S01 :14
2487 4 BK 0.5 03/7.D2 =1CP20 +1CP20 -X6 :4 =DO16 +EX.DO16 -CB1 -S01 :2
2488 5 BK 0.5 03/7.D2 =1CP20 +1CP20 -X6 :5 =DO16 +EX.DO16 -CB1 -S02 :12
B B
2489 6 BK 0.5
2490 7 BK 0.5
2491 Shield
2492 +EX.DO16 -JB1 =DO16 -W1 ( ZR-RVVP 3*0.5 35.00 m ) 1 BK 0.5 03/7.B3 =1CP20 +1CP20 -X6 :6 +EX.DO16 -JB1 -X1 :1
2493 2 BK 0.5 03/7.B3 =1CP20 +1CP20 -X6 :7 +EX.DO16 -JB1 -X1 :3
2494 3 BK 0.5 03/7.D3 =1CP20 +1CP20 -X6 :8 +EX.DO16 -JB1 -X1 :5
2495 Shield
C 2496 +EX.DO16 =DO16 -B6-W1 ( Sensor cable 5.00 m ) BN BN 03/7.C3 +EX.DO16 -JB1 -X1 :1 =DO16 +EX.DO16 -B6 :1/棕 C
2497 BU BU 03/7.C3 +EX.DO16 -JB1 -X1 :3 =DO16 +EX.DO16 -B6 :3/蓝
2498 BK BK 03/7.D3 +EX.DO16 -JB1 -X1 :5 =DO16 +EX.DO16 -B6 :4/黑
2499 BK BK
2500 GY GY
2501 PK PK
2502 VI VI
2503 OG OG
D 2504 +EX.DO17 -CB1 =DO17 -CB1-W1 ( ZR-RVVP 7*0.5 25.00 m ) 1 BK 0.5 03/8.B2 =1CP20 +1CP20 -X6 :9 =DO17 +EX.DO17 -CB1 -S01 :13 D
2505 2 BK 0.5 03/8.B2 =1CP20 +1CP20 -X6 :10 =DO17 +EX.DO17 -CB1 -S01 :1
2506 3 BK 0.5 03/8.D2 =1CP20 +1CP20 -X6 :11 =DO17 +EX.DO17 -CB1 -S01 :14
2507 4 BK 0.5 03/8.D2 =1CP20 +1CP20 -X6 :12 =DO17 +EX.DO17 -CB1 -S01 :2
2508 5 BK 0.5 03/8.D2 =1CP20 +1CP20 -X6 :13 =DO17 +EX.DO17 -CB1 -S02 :12
2509 6 BK 0.5
2510 7 BK 0.5
2511 Shield
E 2512 +EX.DO17 -JB1 =DO17 -W1 ( ZR-RVVP 3*0.5 25.00 m ) 1 BK 0.5 03/8.B3 +EX.DO17 -JB1 -X1 :1 =1CP20 +1CP20 -X6 :14 E

2513 2 BK 0.5 03/8.B3 =1CP20 +1CP20 -X6 :15 +EX.DO17 -JB1 -X1 :3
2514 3 BK 0.5 03/8.D3 =1CP20 +1CP20 -X6 :16 +EX.DO17 -JB1 -X1 :5
2515 Shield
2516 +EX.DO17 =DO17 -B6-W1 ( Sensor cable 5.00 m ) BN BN 03/8.C3 +EX.DO17 -JB1 -X1 :1 =DO17 +EX.DO17 -B6 :1/棕
68 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2517 BU BU 03/8.C3 +EX.DO17 -JB1 -X1 :3 =DO17 +EX.DO17 -B6 :3/蓝
A A
2518 BK BK 03/8.D3 +EX.DO17 -JB1 -X1 :5 =DO17 +EX.DO17 -B6 :4/黑
2519 BK BK
2520 GY GY
2521 PK PK
2522 VI VI
2523 OG OG
2524 +EX.DO18 -CB1 =DO18 -CB1-W1 ( ZR-RVVP 7*0.5 45.00 m ) 1 BK 0.5 03/9.B2 =1CP20 +1CP20 -X6 :17 =DO18 +EX.DO18 -CB1 -S01 :13
2525 2 BK 0.5 03/9.B2 =1CP20 +1CP20 -X6 :18 =DO18 +EX.DO18 -CB1 -S01 :1
B B
2526 3 BK 0.5 03/9.D2 =1CP20 +1CP20 -X6 :19 =DO18 +EX.DO18 -CB1 -S01 :14
2527 4 BK 0.5 03/9.D2 =1CP20 +1CP20 -X6 :20 =DO18 +EX.DO18 -CB1 -S01 :2
2528 5 BK 0.5 03/9.D2 =1CP20 +1CP20 -X6 :21 =DO18 +EX.DO18 -CB1 -S02 :12
2529 6 BK 0.5
2530 7 BK 0.5
2531 Shield
2532 +EX.DO18 -JB1 =DO18 -W1 ( ZR-RVVP 3*0.5 45.00 m ) 1 BK 0.5 03/9.B3 +EX.DO18 -JB1 -X1 :1 =1CP20 +1CP20 -X6 :22
C 2533 2 BK 0.5 03/9.B3 +EX.DO18 -JB1 -X1 :3 =1CP20 +1CP20 -X6 :23 C
2534 3 BK 0.5 03/9.D3 =1CP20 +1CP20 -X6 :24 +EX.DO18 -JB1 -X1 :5
2535 Shield
2536 +EX.DO18 =DO18 -B6-W1 ( Sensor cable 5.00 m ) BN BN 03/9.C3 +EX.DO18 -JB1 -X1 :1 =DO18 +EX.DO18 -B6 :1/棕
2537 BU BU 03/9.C3 +EX.DO18 -JB1 -X1 :3 =DO18 +EX.DO18 -B6 :3/蓝
2538 BK BK 03/9.D3 +EX.DO18 -JB1 -X1 :5 =DO18 +EX.DO18 -B6 :4/黑
2539 BK BK
2540 GY GY
D 2541 PK PK D
2542 VI VI
2543 OG OG
2544 +EX.DO19 -CB1 =DO19 -CB1-W1 ( ZR-RVVP 7*0.5 65.00 m ) 1 BK 0.5 03/10.B2 =DO19 +EX.DO19 -CB1 -S01 :13 =1CP20 +1CP20 -X6 :25
2545 2 BK 0.5 03/10.B2 =DO19 +EX.DO19 -CB1 -S01 :1 =1CP20 +1CP20 -X6 :26
2546 3 BK 0.5 03/10.D2 =1CP20 +1CP20 -X6 :27 =DO19 +EX.DO19 -CB1 -S01 :14
2547 4 BK 0.5 03/10.D2 =1CP20 +1CP20 -X6 :28 =DO19 +EX.DO19 -CB1 -S01 :2
2548 5 BK 0.5 03/10.D2 =1CP20 +1CP20 -X6 :29 =DO19 +EX.DO19 -CB1 -S02 :12
E 2549 6 BK 0.5 E

2550 7 BK 0.5
2551 Shield
2552 +EX.DO19 -JB1 =DO19 -W1 ( ZR-RVVP 3*0.5 65.00 m ) 1 BK 0.5 03/10.B3 =1CP20 +1CP20 -X6 :30 +EX.DO19 -JB1 -X1 :1
2553 2 BK 0.5 03/10.B3 =1CP20 +1CP20 -X6 :31 +EX.DO19 -JB1 -X1 :3
69 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2554 3 BK 0.5 03/10.D3 =1CP20 +1CP20 -X6 :32 +EX.DO19 -JB1 -X1 :5
A A
2555 Shield
2556 +EX.DO19 =DO19 -B6-W1 ( Sensor cable 5.00 m ) BN BN 03/10.C3 +EX.DO19 -JB1 -X1 :1 =DO19 +EX.DO19 -B6 :1/棕
2557 BU BU 03/10.C3 +EX.DO19 -JB1 -X1 :3 =DO19 +EX.DO19 -B6 :3/蓝
2558 BK BK 03/10.D3 +EX.DO19 -JB1 -X1 :5 =DO19 +EX.DO19 -B6 :4/黑
2559 BK BK
2560 GY GY
2561 PK PK
2562 VI VI
B B
2563 OG OG
2564 +EX.DO22 -CB1 =DO22 -CB1-W1 ( ZR-RVVP 7*0.5 25.00 m ) 1 BK 0.5 02/122.B2 =1CP03.2 +1CP03 -2X5 :1 =DO22 +EX.DO22 -CB1 -S01 :13
2565 2 BK 0.5 02/122.B2 =1CP03.2 +1CP03 -2X5 :2 =DO22 +EX.DO22 -CB1 -S01 :1
2566 3 BK 0.5 02/122.D2 =1CP03.2 +1CP03 -2X5 :3 =DO22 +EX.DO22 -CB1 -S01 :14
2567 4 BK 0.5 02/122.D2 =1CP03.2 +1CP03 -2X5 :4 =DO22 +EX.DO22 -CB1 -S01 :2
2568 5 BK 0.5 02/122.D2 =1CP03.2 +1CP03 -2X5 :5 =DO22 +EX.DO22 -CB1 -S02 :12
2569 6 BK 0.5
C 2570 7 BK 0.5 C
2571 Shield
2572 +EX.DO22 -JB1 =DO22 -W1 ( ZR-RVVP 3*0.5 25.00 m ) 1 BK 0.5 02/122.B3 =1CP03.2 +1CP03 -2X5 :6 +EX.DO22 -JB1 -X1 :1
2573 2 BK 0.5 02/122.B3 =1CP03.2 +1CP03 -2X5 :7 +EX.DO22 -JB1 -X1 :3
2574 3 BK 0.5 02/122.D3 =1CP03.2 +1CP03 -2X5 :8 +EX.DO22 -JB1 -X1 :5
2575 Shield
2576 +EX.DO22 =DO22 -B6-W1 ( Sensor cable 5.00 m ) BN BN 02/122.C3 +EX.DO22 -JB1 -X1 :1 =DO22 +EX.DO22 -B6 :1/棕
2577 BU BU 02/122.C3 +EX.DO22 -JB1 -X1 :3 =DO22 +EX.DO22 -B6 :3/蓝
D 2578 BK BK 02/122.D3 +EX.DO22 -JB1 -X1 :5 =DO22 +EX.DO22 -B6 :4/黑 D
2579 BK BK
2580 GY GY
2581 PK PK
2582 VI VI
2583 OG OG
2584 +EXFJJ =WIND1 -VMT-W1 ( ZR-RVVP 10*1 100.00 m ) 1 BK 1 09/46.D1 =WIND1 +1CD01 -X5 :1
2585 2 BK 1 09/46.D1 =WIND1 +1CD01 -X5 :2
E 2586 3 BK 1 09/46.D2 =WIND1 +1CD01 -X5 :3 E

2587 4 BK 1 09/46.D2 =WIND1 +1CD01 -X5 :4


2588 5 BK 1 09/46.D3 =WIND1 +1CD01 -X5 :5
2589 6 BK 1 09/46.D3 =WIND1 +1CD01 -X5 :6
2590 7 BK 1 09/46.D3 =WIND1 +1CD01 -X5 :7
70 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row Cable Designation Wire No. Colour Wire Dia. Circuit D… Wire Origin Wire Destination
2591 8 BK 1 09/46.D4 =WIND1 +1CD01 -X5 :8
A A
2592 9 BK 1
2593 10 BK 1
2594 shield
2595 +EXFJJ =WIND1 -VMT-W2 ( ZR-RVVP 10*1 100.00 m ) 1 BK 1 09/46.E5 =WIND1 +1CD01 -X5 :11
2596 2 BK 1 09/46.E5 =WIND1 +1CD01 -X5 :12
2597 3 BK 1 09/46.E6 =WIND1 +1CD01 -X5 :13
2598 4 BK 1 09/46.E6 =WIND1 +1CD01 -X5 :14
2599 5 BK 1 09/46.E6 =WIND1 +1CD01 -X5 :15
B B
2600 6 BK 1 09/46.E7 =WIND1 +1CD01 -X5 :16
2601 7 BK 1 09/46.E7 =WIND1 +1CD01 -X5 :17
2602 8 BK 1 09/46.E7 =WIND1 +1CD01 -X5 :18
2603 9 BK 1 09/46.E8 =WIND1 +1CD01 -X5 :19
2604 10 BK 1 09/46.E8 =WIND1 +1CD01 -X5 :20
2605 shield

C C

D D

E E

71 / 71
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cable wiring list 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 M4 02
APPROVED DWG. NO: PAGE : REV.
Cable wiring list 001-M4-02 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


1 +CP10 -CP10 Cabinet 2000X600X600
A 2 +CP10 =CP10 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER A
3 +CP10 =CP10 -1F2 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
4 +CP10 =CP10 -1F3 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
5 +CP10 =CP10 -1F4 Circuit Breaker NSC100S3100N SCHNEIDER
6 +CP10 =CP10 -1F5 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
7 +CP10 =CP10 -1F6 Circuit Breaker NSC100S3080N SCHNEIDER
8 +CP10 =CP10 -1F7 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
9 +CP10 =CP10 -1F8 Circuit Breaker NSC160S3160N SCHNEIDER
B 10 +CP10 =CP10 -1F9 Circuit Breaker NSC100S3100N SCHNEIDER B

11 +CP10 =CP10 -1F10 Circuit Breaker NSC100S3100N SCHNEIDER


12 +CP10 =CP10 -1F11 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
13 +CP10 =CP10 -1F12 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
14 +CP10 =CP10 -1F13 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
15 +CP10 =CP10 -1F14 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
16 +CP10 =CP10 -1F15 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
17 +CP10 =CP10 -1F16 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
C C
18 +CP10 =CP10 -2F1 Circuit Breaker iC65N,10A/1P SCHNEIDER
19 +CP10 =CP10 -2F2 Circuit Breaker iC65N,10A/1P SCHNEIDER
20 +CP10 =CP10 -2F3 Circuit Breaker iC65N,10A/1P SCHNEIDER
21 +CP10 =CP10 -2F4 Circuit Breaker iC65N,10A/1P SCHNEIDER
22 +CP10 =CP10 -F1 Circuit Breaker NSC630K3630K SCHNEIDER
23 +CP10 =CP10 -E1 Control cabinet lighting Set of factory orders - cabinet lighting
24 +CP10 =CP10 -X1 Terminal Block 220
25 +CP10 =CP10 -X2 Terminal Block 220
D D

E E

1/ 1
Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Device list (non-extended) 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 5
APPROVED DWG. NO: PAGE : REV.
Device list (non-extended) 001-01-5 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

250.00

B 控制电源指

系统运行指

B
绿色 绿色
GN GN

100.01 系统运行按钮(1) 系统停止(1)

绿色 红色
GN RD

70.00

`
2000

C C
1500.00

Points to note:
1. Side door
D D
2. Brake resistance is placed at the top
3.1CP01 is located near the tail of 900C106

E E

1000

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 1
APPROVED DWG. NO: PAGE : REV.
All Cabinet arrangement 001-01-1 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

CP10 1CP20 1CP02

250.00

B B
控制电源指 系统运行指
示 示

绿色 绿色
GN GN

100.01
系统运行按钮(1) 系统停止(1)

绿色 红色
GN RD

70.00
2000

C C

D D
Points to note:
1.CP10 is installed independently in the main power
supply inlet cabinet
2.1CP20 and 1CP02 are installed together
3. Double-sided doors
4. Brake resistance is placed on top

E E
600 600.00 1000.00

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 2
APPROVED DWG. NO: PAGE : REV.
All Cabinet arrangement 001-01-2 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

1CP03 1CP04

B B

` `
C C

D D
Points to note:
1.1CP03 and 1CP04 are installed together
2. Double-sided doors
3. Brake resistance is placed on top

E E

1000 1000

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 3
APPROVED DWG. NO: PAGE : REV.
All Cabinet arrangement 001-01-3 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
600

A A

600
B B

-F1
2000

-1F1

-1F2
-2F1
-2F2
-2F3
-2F4
-X1

-X2
C C

-1F10
-1F8

-1F3
-1F4

-1F6

-1F9
220
D D

160

-1F11

-1F12

-1F13

-1F14

-1F15

-1F16
-1F5

-1F7
430
E E

600
600
Note that the inlet line of the main switch shall be led out with a copper bar, which shall be properly insulated, and the
wiring hole shall be laid. The size of the copper bar shall match the current of the main switch. And configure the N and PE
bars that match the current. Instead of using a whole mounting plate, use a guide groove beam to install.
Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 4
APPROVED DWG. NO: PAGE : REV.
CP10 Cabinet arrangement 001-01-4 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
From the
customer

B B
1

C -F1 C
2

NSC630K3630K

PEPE Busbar
PE

D D

-L1 Busbar L1.01


/7.A1

-L2 Busbar L2.01


/7.A1

-L3 Busbar L3.01


/7.A1

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 6
APPROVED DWG. NO: PAGE : REV.
Main power distribution 001-01-6 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1.01 L1.01
/6.D8 /8.A1

A A
L2.01 L2.01
/6.E8 /8.A1

L3.01 L3.01
/6.E8 /8.A1

L1.03
B B

/11.A1
1

5
-1F1 -1F2 -1F3 -1F5

5
-1F4
iC65N-C,63A/3P iC65N-C,63A/3P iC65N-C,63A/3P iC65N-C,63A/3P

6
NSC100S3100N
2

6
C C

N PE N PE N PE N PE N PE
PE

PE

PE

PE

PE
D -W1 -W3 -W5 -W7 -W9 D
1

3
ZR-YJV-1KV 4*25 ZR-YJV-1KV 4*25 ZR-YJV-1KV 4*25 ZR-YJV-1KV 4*35 ZR-YJV-1KV 4*25
90 15 15 80 95
PE

PE

PE

PE

PE
-W2 -W4 -W6 -W8 -W10
BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN)
90 15 15 80 95

E E

1CP01#Control cabinet 1CP02#Front of control cabinet 1CP03#Front of control cabinet 1CP04#Control cabinet 2CP01#Control cabinet

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 7
APPROVED DWG. NO: PAGE : REV.
External Power distribution 001-01-7 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1.01 L1.01
/7.A8 /9.A1

A A
L2.01 L2.01
/7.A8 /9.A1

L3.01 L3.01
/7.A8 /9.A1

B B
1

5
-1F6 -1F7

5
-1F8 -1F9 -1F10
NSC100S3080N iC65N-C,63A/3P

6
NSC160S3160N NSC100S3100N NSC100S3100N
2

6
C C

N PE N PE N PE N PE N PE
PE

PE

PE

PE

PE
D -W11 -W13 -W15 -W17 -W19 D
1

3
ZR-YJV-1KV 4*35 ZR-YJV-1KV 4*25 ZR-YJV-1KV 4*70 ZR-YJV-1KV 4*50 ZR-YJV-1KV 4*50
110 110 160 155 150
PE

PE

PE

PE

PE
-W12 -W14 -W16 -W18 -W20
BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN) BVR 16 (YE/GN)
110 110 160 155 150

E E

2CP02#Front of control cabinet 2CP03#Front of control cabinet 2CP04 900E115#Materials lift 900E116#Materials lift

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 8
APPROVED DWG. NO: PAGE : REV.
External Power distribution 001-01-8 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1.01 L1.01
/8.A8 /10.A1

A A
L2.01 L2.01
/8.A8 /10.A1

L3.01 L3.01
/8.A8 /10.A1

B B

5
-1F14 -1F15
iC65N-C,63A/3P iC65N-C,63A/3P
1

5
-1F11 -1F12 -1F13
2

6
iC65N-C,20A/3P iC65N-C,63A/3P iC65N-C,63A/3P
C C

N PE N PE N PE N PE N PE
PE

PE

PE

PE

PE
D -W21 -W23 -W25 -W27 -W29 D
1

3
ZR-VV-1KV 3*2.5+1*1.5 ZR-YJV-1KV 4*16 ZR-YJV-1KV 4*16 ZR-YJV-1KV 4*16 ZR-YJV-1KV 4*16
30 35 50 45 95
PE

PE

PE

PE

PE
-W22 -W24 -W26 -W28 -W30
BVR 6 (YE/GN) BVR 6 (YE/GN) BVR 6 (YE/GN) BVR 6 (YE/GN) BVR 6 (YE/GN)
30 35 50 45 95

E E

901E002 901E005 902E006 900E112/113/114 900E212/213/214

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 9
APPROVED DWG. NO: PAGE : REV.
External Power distribution 001-01-9 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1.01
/9.A8

A A
L2.01
/9.A8

L3.01
/9.A8

B B
1

-1F16
iC65N-C,63A/3P
2

C C

N PE
PE

D -W31 D
1

ZR-YJV-1KV 4*10
185
PE

-W32
BVR 6 (YE/GN)
185

E E

Coiling cutting machine

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 10
APPROVED DWG. NO: PAGE : REV.
External Power distribution 001-01-10 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
L1.03 N
/7.B8

-X1
1

5
L1 L1 L1 L1 L1

10
6

9
N N N N N
B B
1

1
-2F1 -2F2 -2F3 -2F4
iC65N,10A/1P iC65N,10A/1P iC65N,10A/1P iC65N,10A/1P
2

2
-X2
1

6
C C
1

PE
-E1
2

Set of factory orders - cabinet lighting


Control cabinet lighting
PE.1CP20

D D
L1.1CP20

N.1CP20
03/3.B2

03/3.B2

03/3.B1

1CP20

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =CP10
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +CP10 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 01 11
APPROVED DWG. NO: PAGE : REV.
External Power distribution 001-01-11 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

端子排 概要标注

A A

外部电缆

内部电缆
多层端子

端子编号

电路图
跳线

电线

注释
类型
外部连接点 内部连接点

端子排: +CP10 -X1


器件注释 =功能 +位置 -器件 :针脚 =功能 +位置 -器件 :针脚 器件注释
端子数量: 10
B +CP10 -2F1 1 1 JUT14-2.5/GY L1 01/11.B1 +CP10 -1F7 1
B
2 JUT14-2.5/GY L1 01/11.B2 +CP10 -2F2 1
+CP10 -2F4 1 3 JUT14-2.5/GY L1 01/11.B3 +CP10 -2F3 1
4 JUT14-2.5/GY L1 01/11.B4
5 JUT14-2.5/GY L1 01/11.B4
+CP10 N 6 JUT14-2.5/GY N 01/11.B2 +CP10 -E1 2 Control cabinet lighting
7 JUT14-2.5/GY N 01/11.B2 +CP10 -X2 2
+CP10 -X2 6 8 JUT14-2.5/GY N 01/11.B3 +CP10 -X2 4
9 JUT14-2.5/GY N 01/11.B4
10 JUT14-2.5/GY N 01/11.B4
C C

D D

E E

页 1/1
审查 比例 APRIL 绘图编号 组号 页号 系统: BM1-900-E-
F
长沙长泰智能装备有限公司 审核 会签 001 01 12 功能: 2005
=CP10
F
BM1 Roll Handling and PE Wrapping System
校核 阶段 位置: +CP10-X1
湖南省长沙市雨花经济开发区新兴路268号
设计 吴毅丰 日期 2022/1/7 +CP10 -X1 001-01-12 图数: 13
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

端子排 概要标注

A A

外部电缆

内部电缆
多层端子

端子编号

电路图
跳线

电线

注释
类型
外部连接点 内部连接点

端子排: +CP10 -X2


器件注释 =功能 +位置 -器件 :针脚 =功能 +位置 -器件 :针脚 器件注释
端子数量: 8
B L1 =1CP20 +1CP20 -X1 1 1 JUT14-2.5/GY 01/11.C2 +CP10 -2F2 2
B
=1CP20 +1CP20 N 2 JUT14-2.5/GY 01/11.C2 +CP10 -X1 7 N
3 JUT14-2.5/GY 01/11.C3 +CP10 -2F3 2
4 JUT14-2.5/GY 01/11.C3 +CP10 -X1 8 N
5 JUT14-2.5/GY 01/11.C3 +CP10 -2F4 2
6 JUT14-2.5/GY 01/11.C4 +CP10 -X1 8 N
7 JUT14-2.5/GY
8 JUT14-2.5/GY

C C

D D

E E

页 1/1
审查 比例 APRIL 绘图编号 组号 页号 系统: BM1-900-E-
F
长沙长泰智能装备有限公司 审核 会签 001 01 13 功能: 2005
=CP10
F
BM1 Roll Handling and PE Wrapping System
校核 阶段 位置: +CP10-X2
湖南省长沙市雨花经济开发区新兴路268号
设计 吴毅丰 日期 2022/1/7 +CP10 -X2 001-01-13 图数: 13
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


1 +1CP01 -F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
A 2 +1CP01 -F2 Circuit Breaker iC65N,6A/1P SCHNEIDER A
3 +1CP01 -F3 Circuit Breaker iC65N,6A/1P SCHNEIDER
4 +1CP01 -F4 Circuit Breaker iC65N,10A/1P SCHNEIDER
5 +1CP01 -F5 Circuit Breaker iC65N,20A/1P SCHNEIDER
6 +1CP01 -F6 Circuit Breaker iC65N,20A/1P SCHNEIDER
7 +1CP01 =900C101 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
8 +1CP01 =900C102 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
9 +1CP01 =900C103 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
B 10 +1CP01 =900C104 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER B

11 +1CP01 =900C105 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER


12 +1CP01 =900C106 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
13 +1CP01 =900C107 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
14 +1CP01 =900C108 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER
15 +1CP01 =900C109 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
16 +1CP01 =900C111 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
17 +1CP01 =900E105 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
C C
18 +1CP01 =900E106 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
19 +1CP01 =900E106 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
20 +1CP01 =900E111 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
21 +1CP01 =900E111 -Q3 Switch-Disconnector JFD11-32/310111 25A JUCHE
22 +1CP01 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
23 +1CP01 -Q1 Contactor LC1-N65M5N SCHNEIDER
24 +1CP01 =900C101 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
D
25 +1CP01 =900C102 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER D
26 +1CP01 =900C103 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
27 +1CP01 =900C105 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
28 +1CP01 =900C106 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
29 +1CP01 =900C108 -F2 Thermal Overload Relay LRN05N SCHNEIDER
30 +1CP01 =900C108 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
31 +1CP01 =900C108 -K2 Auxiliary Relay DRW270024LT WEIDMUELLER
32 +1CP01 =900C108 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
E 33 +1CP01 =900C108 -K4 Auxiliary Relay DRM270024L WEIDMUELLER E
34 +1CP01 =900C108 -Q1 Contactor LC1-N1201M5N SCHNEIDER
35 +1CP01 =900C108 -Q2 Contactor LC1-N1201M5N SCHNEIDER
36 +1CP01 =900E105 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
37 +1CP01 =900E106 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
1/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 2
APPROVED DWG. NO: PAGE : REV.
1CP01 Parts List 001-02-2 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


38 +1CP01 =900E111 -F2 Thermal Overload Relay LRN08N SCHNEIDER
A 39 +1CP01 =900E111 -K1 Auxiliary Relay DRM270024L WEIDMUELLER A
40 +1CP01 =900E111 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
41 +1CP01 =900E111 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
42 +1CP01 =900E111 -Q1 Contactor LC1-N1201M5N SCHNEIDER
43 +1CP01 =900E111 -Q2 Contactor LC1-N1201M5N SCHNEIDER
44 +1CP01 =900C101 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
45 +1CP01 =900C102 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
46 +1CP01 =900C103 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
B 47 +1CP01 =900C104 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS B

48 +1CP01 =900C105 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS


49 +1CP01 =900C106 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
50 +1CP01 =900C107 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
51 +1CP01 =900C108 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS
52 +1CP01 =900C109 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
53 +1CP01 =900C111 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
54 +1CP01 =900E105 -T1 Frequency Inverter 6SL3210-1KE13-2UF2 SIEMENS
C C
55 +1CP01 =900E106 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
56 +1CP01 =900E106 -T2 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
57 +1CP01 =900E111 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
58 +1CP01 =900C101 -R1 Braking Resistor 400W,100Ω
59 +1CP01 =900C102 -R1 Braking Resistor 400W,100Ω
60 +1CP01 =900C103 -R1 Braking Resistor 160Ω,200W EAGTOP
61 +1CP01 =900C104 -R1 Braking Resistor 160Ω,200W EAGTOP
D
62 +1CP01 =900C105 -R1 Braking Resistor 400W,100Ω D
63 +1CP01 =900C106 -R1 Braking Resistor 400W,100Ω
64 +1CP01 =900C107 -R1 Braking Resistor 160Ω,200W EAGTOP
65 +1CP01 =900C108 -R1 Braking Resistor 160Ω,200W EAGTOP
66 +1CP01 =900C109 -R1 Braking Resistor 160Ω,200W EAGTOP
67 +1CP01 =900C111 -R1 Braking Resistor 160Ω,200W EAGTOP
68 +1CP01 =900E105 -R1 Braking Resistor 390Ω,100W
69 +1CP01 =900E106 -R1 Braking Resistor 390Ω,100W
E 70 +1CP01 =900E106 -R2 Braking Resistor 160Ω,200W EAGTOP E
71 +1CP01 =900E111 -R1 Braking Resistor 160Ω,200W
72 +1CP01 -JHJ SWITCH MODULE 6GK5 005-0BA00-1AB2 SIEMENS
73 +1CP01 -G1 24VDC Power Supply NDR-240-24 MEAN WELL
74 +1CP01 -E1 Control cabinet lighting Set of factory orders - cabinet lighting
2/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 2
APPROVED DWG. NO: PAGE : REV.
1CP01 Parts List 001-02-2 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


75 +1CP01 -L1 Terminal UTD-300I/18×6
A 76 +1CP01 -L2 Terminal UTD-300I/18×6 A
77 +1CP01 -L3 Terminal UTD-300I/18×6
78 +1CP01 -X0 Terminal Block ES
79 +1CP01 -X1 Terminal Block 220
80 +1CP01 -X2 Terminal Block 24
81 +1CP01 -X3 Terminal Block
82 +1CP01 -X4 Terminal Block
83 +1CP01 =1CP01 -P01 Indicator Lamp #Control power XB2BVB3C SCHNEIDER
B 84 +1CP01 =1CP01 -P02 Indicator Lamp #System operation XB2BVB3C SCHNEIDER B

85 +1CP01 =1CP01 -S01 Pushbutton #System 1 operation XB2-BA31C SCHNEIDER


86 +1CP01 =1CP01 -S02 Pushbutton #System 1 stop XB2-BA42C SCHNEIDER

C C

D D

E E

3/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 2
APPROVED DWG. NO: PAGE : REV.
1CP01 Parts List 001-02-2 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-1CP01
A A

225

=900E111-F1
-Q1
-F1

-F2
-F3
-F4
-F5
-F6
-L1

-L2

-L3

-X1
245

=900C101-F1

=900C102-F1

=900C103-F1

=900C104-F1

=900C105-F1

=900C106-F1

=900C107-F1

=900C109-F1

=900C111-F1

=900C108-F1
=900E106-F1

=900E106-F2

=900E105-F1
250

B =1CP01-P02
=1CP01-P01
#Control
power
#System
operation
B
绿色 绿色
GN GN

280
=1CP01=1CP01
100

-S01 -S02
#System 1 #System 1 stop
operation

=900C105-T1

=900C107-T1

=900C106-T1
绿色 红色

=900C103-T1

=900C104-T1
=900C101-T1

=900C102-T1
GN RD

70

350
`
2000

2000
C C

=900C111-T1

=900C108-T1
=900E106-T1

=900E106-T2

=900E105-T1

=900E111-T1
=900C109-T1
270
1500

-X0
-X2
-G1

-K1
D D
230

=900E111-Q1

=900E111-Q2
=900C108-Q1

=900C108-Q2
=900C103-K1

=900C108-K1
=900E106-K1

=900E111-K1
=900E111-K2
=900E111-K3
=900C101-K1
=900C102-K1
=900C105-K1
=900C106-K1
=900C108-K2

=900C108-K3
=900C108-K4
=900E105-K1

=900C108-F2

=900E111-F2
180

-X4
-X3

E E
55

1000 600 600


1000

Brake resistors are placed at the top Configure internal network cables
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 1
APPROVED DWG. NO: PAGE : REV.
1CP01 Cabinet arrangement 001-02-1 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL
From the power

-F2
iC65N,6A/1P
distribution cabinet

Control cabinet lighting


-E1
-X1

1
1
2 1 2 1 1

L1
6

N
N

-X1

Air conditioner

3370.320
-F3
iC65N,6A/1P
2 1 2

L
L1

Main power distribution


Zone, Changsha, Hunan, China

BM1 Roll Handling and PE Wrapping System


7

N
N

PE

2
2

PE

268 Xinxing Road, Yuhua Economic Development


-F4
iC65N,10A/1P

CHAINT CORPORATION
L+.01 +V L 2 1 3
/4.A1

L1
N 8

Project:

001
127~370VAC

Location:
Function:
24VDC
M.01 -V

Drawing
/4.A1

02
001-02-3
-G1

+1CP01
240W

PE

Group
NDR-240-24
-F5
iC65N,20A/1P

3
L.1CD01 2 1 4

BM1-900-E-2005
09/4.A2

Page
L1

3
3

N.1CD01 9
09/4.A2 N

1CD01
+CP10 PE.1CD01
09/4.A1

PE

REVISION
-F6
iC65N,20A/1P
L.1CD02 2 1 5
09/22.A2
L1

MARK
N.1CD02 10
09/22.A2
N

+CP10 PE.1CD02
09/22.A1

1CD02

DATE
4
4

PE
N.Q01
/6.E2

L.Q01
/6.A2

DRAWN
/6.D2
-Q1
iC65N-C,63A/3P
-F1

1L1.MPS 1L1.MPS -L1 2 1 2 1


/7.A1 /8.A1

1L2.MPS 1L2.MPS -L2 4 3 4 3

CHK’D
/7.A1 /8.A1

1L3.MPS 1L3.MPS -L3 6 5 6 5


/7.A1 /8.A1

ENG’R
1L1.MPS 1L1.MPS

5
5

/9.A1 /11.A1
UTD-300I/18×6

1L2.MPS 1L2.MPS
/9.A1 /11.A1
N

APP’D
PE

1L3.MPS 1L3.MPS
/9.A1 /11.A1

1L1.MPS 1L1.MPS
/14.A1 /14.A5

1L2.MPS 1L2.MPS
/14.A1 /14.A5

1L3.MPS 1L3.MPS
/14.A1 /14.A5

6
6

1L1.MPS 1L1.MPS
/16.A1 /17.A1
SCALE.
DRAWN
PROJECT:

1L2.MPS 1L2.MPS
CHECHED

/16.A1 /17.A1
ENGINEER
APPROVED

1L3.MPS 1L3.MPS
/16.A1 /17.A1
DATE

1 mm : 1 mm
2022/1/7

1L1.MPS 1L1.MPS
/18.A1 /19.A1

1L2.MPS 1L2.MPS
INITIAL

/18.A1 /19.A1
ORIG.SIZE

1L3.MPS 1L3.MPS
/18.A1 /19.A1
SIGN

吴毅丰

7
7

1L1.MPS 1L1.MPS
/20.A1 /27.A1
TYPE
AREA

DETAIL
DETAIL

1L2.MPS 1L2.MPS
DWG. NO:

/20.A1 /27.A1

1L3.MPS 1L3.MPS
/20.A1 /27.A1

1L1.MPS
/28.A1
1L1.MPS
/29.A1
1L2.MPS
Schematic diagram

/28.A1
1L2.MPS
/29.A1
1L3.MPS
/28.A1
1L3.MPS
/29.A1
8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
F
E
B
A

D
C

APRIL
/3.E2
/3.E2

M.01
L+.01

1
1

-X2
L+.Q01 1
/22.C2

L+
M.K01 17
/7.D3

M
L+.T01

24V power
/7.D3

M.T01 18

Zone, Changsha, Hunan, China


/7.B3

BM1 Roll Handling and PE Wrapping System


M

L+.T01 2
/7.B3
L+

M.T01
/8.B3

2
2

L+.T01

268 Xinxing Road, Yuhua Economic Development


/8.D2

CHAINT CORPORATION
M.T01 19
/9.B3
M

Project:
L+.T01 3

001
/8.B3

Location:
Function:

Drawing
L+

M.T01
/11.B3

02
001-02-4
L+.T01

+1CP01
/9.D2

Group
M.T01 20
/14.B3

4
M

BM1-900-E-2005

Page
L+.T01 4

3
3

/9.B3
L+

L+.T01
/11.B3

L+.T01 5
/14.D2
L+

REVISION
L+.T01
/14.B3

M.T01 21
/14.B7
M

MARK
L+.T01 6
/14.B7
L+

M.T01 22
/16.B3
M

DATE
4
4

L+.T01
/16.B3

M.T01
/17.B3

DRAWN
L+.T01 7
/17.D3
L+

M.T01 23
/19.B3
M

CHK’D
L+.T01
/17.B3

M.T01
/20.C3

ENG’R
L+.T01 8

5
5

/18.D3
L+

M.T01 24
/27.B3
M

APP’D
L+.T01
/18.C3

L+.T01 9
/18.C3
L+

L+.T01
/19.B3

L+.T01 10
/20.C3
L+

M.T01 25
/28.C3
M

6
6

L+.T01
/27.B3
SCALE.
DRAWN
PROJECT:

M.T01
CHECHED

/29.C3
ENGINEER
APPROVED

L+.T01 11
/28.C3
L+

DATE

1 mm : 1 mm

L+.T01
2022/1/7

/29.D3

M.T01 26
M

INITIAL
-JHJ

0BA00-1AB2
6GK5 005-

L+.T01 12
ORIG.SIZE

/29.C3
L+

L+.JHJ L+.ES01
SIGN

吴毅丰

.B8 /5.A1
L+

7
7

M.ES01 27 13
/5.E1
M

TYPE
AREA

M.JHJ
L+

.B8
DETAIL
DETAIL
M

L+.ES02 14
DWG. NO:

/6.A4
L+

M.ES02
/6.E5
PE
PE

L+.JHJ 15
.D7
L+

M.JHJ
Schematic diagram

.D7

L+.X01 16
L+

8
8

M.X01 28
PAGE :
M

REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

L+.ES01 -X0

9
/4.B7

A A

-W1 -W2 =1CB01-W3

2
ZR-RVV-500V 3*1 ZR-RVV-500V 3*1 ZR-RVV-500V 3*1
45 30 60

=1CP01

13

73
-S01
-Q1
/6.E2
+1CB01+1CB01
-SE1 -SE1

14
+1CD01 +1CD02

74
XB2-BA31C
#System 1 operation -X4 -X0

2
11 12
B B

1CD01 1CD02 1CB01


Spare2
Estop Estop Estop

C C
=1CP01
21

-S02
22

XB2-BA42C
#System 1 stop

D D

14
-K1
E E

13
DRM270024L

M.ES01
/4.B7

5 /6.B2
1 9
8 /6.B3
4 12

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 5
APPROVED DWG. NO: PAGE : REV.
Emergency stop 001-02-5 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

L.Q01 L+.ES02
/3.E4 /4.B7

53

63
-Q1 -Q1
.E2 .E2

54

64
B B

13

15
1 -X4
5

4
8
-K1 -Q1
/5.E7 /5.E7 .D2
9

12

14
+1CD02

15
-W2

+1CD02
=1CP01 =1CP01

15
-X5
C C

1
-P01 -P02

2
#Control power XB2BVB3C
#System operation

9
I 20.0
L.K01

-Power_on_1
Power_on_1
/22.A5

+1CD02 -DI3
04/2.C2

D D
A1

-Q1
A2

LC1-N65M5N
N.Q01 N.Q01
/3.C4 /22.E5
1 2
3 4
/3.B4
5 6
13 14
.B3
21 22 /4.B7
M.ES02
E 53 54 E
.B5
63 64
.B6
LAN-N40N 73 74
/5.A3
83 84

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP01 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 6
APPROVED DWG. NO: PAGE : REV.
Emergency stop 001-02-6 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.E4
+1CD01
+1CP01 1L2.MPS +1CD01 L+.X01 -X3 +1CD01 L+.X01

4
/3.E5 09/4.B7 /8.A5
A L+ L+ A
+1CP01 1L3.MPS +1CD01 M.X01 +1CD01 M.X01

5
/3.E5 09/4.B5 /8.A5
M M

+1CP01
1

5
-F1
+EX900C101-JB1-W1 +EX900C101-JB2-W1

2
iC65N-C,20A/3P ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
30 20

+EX900C101 +EX900C101
2

6
-JB1 -JB2
-X1 -X1 +EX900C101 -JB2 L+

1
/8.B5
L+ L+
B +EX900C101 -JB2 M B

3
/8.B5

/4.B2

/4.B2
M M

1/BN

3/BU

1/BN

3/BU
+1CP01 L+.T01

+1CP01 M.T01
+EX900C101-B1-W1 +EX900C101-B2-W1
+1CP01 Sensor cable Sensor cable
-R1 2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C101 +EX900C101
1

400W,100Ω -B1 -B2


+1CP01
-T1 +1CP01
C -K1 ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
PNP NO
6SL3210-1KE21-3UF1
.D3 .D3

12
U2 V2 W2 PE 20 18 19

+EX900C101 +EX900C101

4/BK

4/BK
+1CP01 L+.T01

-B1-W1 -B2-W1

+EX900C101 +EX900C101
D D
14

+1CP01 -JB1 -JB2


-K1 -X1 -X1
/4.B1

5
13

+1CP01 +1CP01
DRW270024LT
-X3 -X3 +EX900C101 +EX900C101
1

6
PE
/4.B1
+1CP01 M.K01 +1CP01 M.K01
/8.D2 -JB1 -JB2
-W1 -W1

3
5 .C4
1 9
8 .C5
PE

+EX900C101-M1-W1 4 12 =900C102-M1-W2 +1CD01 +1CD01


1

ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 2 -X3 -X3

6
65 55

E +EX900C101 E

2
-M1 I 4.0 I 4.1
AC1

=900C101-Ps.Come =900C101-Ps.Leave
PE

=900C101Ps.Come =900C101Ps.Leave
W
U

M Brake +1CD01 -DI3 +1CD01 -DI3


AC2

Motor 3AC
Conveyer Motor 04/1.A5 04/1.A5
400VAC
5.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C101
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 7
APPROVED DWG. NO: PAGE : REV.
900C101#Conveyer 001-02-7 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D4

+1CP01 1L2.MPS +1CD01 L+.X01 +1CD01 L+.X01

8
/3.D5 /7.A8 /9.A5
A L+ A
+1CP01 1L3.MPS +1CD01 M.X01 +1CD01 M.X01

9
/3.D5 /7.A8 /9.A5
M

+1CP01
1

-F1 5
+EX900C102-JB1-W1

2
iC65N-C,20A/3P ZR-RVVP 4*0.5
15

+EX900C101 +EX900C102
2

-JB2 -JB1
+EX900C101 -JB2 L+ -X1 -X1 +EX900C102 -JB1 L+

1
/7.B8 /9.B5
L+ L+
B +EX900C101 -JB2 M +EX900C102 -JB1 M B

3
/7.B8 /9.B5

/4.B2

/4.B2
M M

1/BN

3/BU

1/BN

3/BU
+1CP01 L+.T01

+1CP01 M.T01
+EX900C102-B1-W1 +EX900C102-B2-W1
+1CP01 Sensor cable Sensor cable
-R1 2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C102 +EX900C102
1

400W,100Ω -B1 -B2


+1CP01
-T1 +1CP01
C -K1 ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
PNP NO
6SL3210-1KE21-3UF1
.D3 .D3

12
U2 V2 W2 PE 20 18 19

+EX900C102 +EX900C102

4/BK

4/BK
+1CP01 L+.T01

-B1-W1 -B2-W1

+EX900C101 +EX900C102
D D
14

+1CP01 -JB2 -JB1


-K1 -X1 -X1
/4.B2

5
13

+1CP01 +1CP01
DRW270024LT
10

11

12
-X3 -X3 +EX900C101 +EX900C102
7

PE
/7.D3
+1CP01 M.K01 +1CP01 M.K01
/9.D2 -JB2 -JB1
-W1 -W1

3
5 .C4
1 9
8 .C4
PE

+EX900C102-M1-W1 4 12 +EX900C102-M1-W2 +1CD01 +1CD01


1

10
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 -X3 -X3

7
55 55

E +EX900C102 E

4
-M1 I 4.2 I 4.3
AC1

=900C102-Ps.Come =900C102-Ps.Leave
PE

=900C102Ps.Come =900C102Ps.Leave
W
U

M Brake +1CD01 -DI3 +1CD01 -DI3


AC2

Motor 3AC
Conveyer Motor 04/1.A5 04/1.A5
400VAC
5.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C102
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 8
APPROVED DWG. NO: PAGE : REV.
900C102#Conveyer 001-02-8 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.E5
+1CD01

12
/3.E5
+1CP01 1L2.MPS
/8.A8
+1CD01 L+.X01 -X3 +1CD01 L+.X01
/12.A2
A L+ A

13
+1CP01 1L3.MPS +1CD01 M.X01 +1CD01 M.X01
/3.E5 /8.A8 /12.A2
M

+1CP01
1

-F1 5
+EX900C103-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5
20

+EX900C102 +EX900C103
2

-JB1 -JB2
+EX900C102 -JB1 L+ -X1 -X1

1
/8.B8
L+ L+
B +EX900C102 -JB1 M B

3
/8.B8
M M

/4.B3

/4.B2

1/BN

3/BU

1/BN

3/BU
+EX900C103-B1-W1 +EX900C103-B2-W1

+1CP01 L+.T01

+1CP01 M.T01
+1CP01 Sensor cable Sensor cable
-R1 2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C103 +EX900C103
1

160Ω,200W -B1 -B2


+1CP01
-T1 +1CP01
C -K1 ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
PNP NO
6SL3210-1KE15-8UF2
.D3 .D3

12
U2 V2 W2 PE 20 18 19

+EX900C103 +EX900C103

4/BK

4/BK
+1CP01 L+.T01

-B1-W1 -B2-W1

+EX900C102 +EX900C103
D N D
14

+1CP01 -JB1 -JB2


-K1 -X1 -X1
/4.B3

5
13

+1CP01 +1CP01
DRM270024L
13

14

15

16

17

18
-X3 -X3 +EX900C102 +EX900C103
PE
/8.D3
+1CP01 M.K01 +1CP01 M.K01
/11.E5 -JB1 -JB2
-W1 -W1

3
5 .C4
1 9
8 .C4
PE

+EX900C103-M1-W1 4 12 +EX900C103-M1-W2 +1CD01 +1CD01


1

11

14
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 -X3 -X3
45 45

E +EX900C103 E

5
-M1 I 4.5 I 4.4
AC1

=900C103-Ps.Come =900C103-Ps.Leave
PE

=900C103Ps.Come =900C103Ps.Leave
W
U

M Brake +1CD01 -DI3 +1CD01 -DI3


AC2

Motor 3AC
Conveyer Motor 04/1.A5 04/1.A5
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C103
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 9
APPROVED DWG. NO: PAGE : REV.
900C103#Conveyer 001-02-9 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD02 +1CD02
+1CD02 L+.X02 -X4 -X4 +1CD02 L+.X02

5
09/22.B6 /13.A6
L+ L+

A +1CD02 M.X02 +1CD02 M.X02 A

7
09/22.B6 /13.A6
M M M

+EX900E104-JB1-W1 +EX900E104-JB2-W1

2
ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
60 60

+EX900E104 +EX900E104
-JB1 -JB2
-X1 -X2

2
L+ L+

4
M
B B

RD/红

棕/BN

蓝/BU
BK/黑
+EX900E104-B1-W1 +EX900E104-B2-W1
Sensor cable Sensor cable
1 2
+EX900E104
-B1 +EX900E104
RI50-0/1000ES.12KA UB/Red -B2 +
1/BN
Measurement of width UC2000-30GM-IUR2-V15
GND/Black Diameter measurement 3/BU
U -

A/Green Sync.
5/GY

B/White 2/WH
C 0~10V
C
Z/Yellow 4~ 4/BK
20mA
WH/白

白/WH
GN/绿

+EX900E104 +EX900E104
-B1-W1 -B2-W1

+EX900E104 +EX900E104
-JB1 -JB2
-X1 -X2
5

5
D D
+EX900E104 +EX900E104
-JB1 -JB2
-W1 -W1
3

3
PE

+1CD02 +1CD02

PE
-X4 -X4
3

8
E E
DIa.0

DIa.1

2M
0
+
I0.0 I0.1
=900E104-#Runing detect.A =900E104-#Runing detect.B I 14.0
=900E104#Width detection pulse A =900E104#Width detection pulse B AI0
=900E104-#Dia detect
=900E104#Dia detect
+1CD02 -CPU 2 +1CD02 -CPU 2 +1CD02 -CPU 2
04/2.C4 04/2.C4 04/2.C4

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E104
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Roll specification measurement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 10
APPROVED DWG. NO: PAGE : REV.
900E104#Roll specification measurement 001-02-10 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D5

+1CP01 1L2.MPS
/3.D5
A A
+1CP01 1L3.MPS
/3.D5

+1CP01
-F1
1

I> I> I>


2

iC65N-C,10A/3P
10A
B B
05/2.A1

/4.B3

/4.B3
+1CD02 -DO1
Q 14.4
=900E105-Brake

+1CP01 M.T01
+1CP01

+1CP01 L+.T01
=900E105#Brake

1
5

4
8
-K1
2

.D6 .D6

13
PE

12
-R1
+1CD02
1

390Ω,100W
+1CP01 -X5

8
-T1
L1 L2 L3 PE R1 R2 24V COM =900E111
C C
+1CD02
6SL3210-1KE13-2UF2 -W2

8
U2 V2 W2 PE 20 18 19

+1CP01
-X4

8
+1CP01

18
19
-T1
D D

20
N

14
+1CP01 +1CP01 +1CP01
71

72

73

74

75

76

77

78
-X3 -X3 -K1

13
PE
DRM270024L
+1CP01 M.K01 +1CP01 M.K01
/9.D3 /14.D3
PE

+EX900E105-M1-W1
1

ZR-VV-1KV 3*1.5+1*1.0 +EX900E105-M1-W2 5


1

.B4
E 35 ZR-RVV-500V 4*0.75 1 9 E
35
8 .B4
+EX900E105 4 12
-M1
PE
W

AC1 AC2 NO1 NO2


U

Brake
M
3AC
Automatic labeling Motor
400VAC Motor
0.75KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E105
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Automatic labeling 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 11
APPROVED DWG. NO: PAGE : REV.
900E105#Automatic labeling 001-02-11 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD01

16

17
/9.A8
+1CD01 L+.X01 -X3 +1CD01 L+.X01
/13.A1
A L+ L+
+1CD01 +1CD01 A

18

1
5

1
5
+1CD01 M.X01 +1CD01 M.X01
/9.A8 /13.A1 -K3 -K4
M
.C4 .C5
-JB2-W1

9
1

2
ZR-RVVP 10*0.5
15
09/4.E5
+1CD01 L.01 05/1.A1 05/1.A1 05/1.A1 +1CD01

23

24

25
+1CD01 -DO1 +1CD01 -DO1 +1CD01 -DO1 -X3
-JB2 Q 1.1 Q 1.2 Q 1.3
+1CD01 N.01 -X1

1
09/4.E5 =900E105-Lable =900E105-Output.Spare =900E105-Lable Failure
=900E105#Lable =900E105#Output.Spare =900E105#Lable Failure
-JB2

10

11

12
-W1

8
B B

-JB2 L+

-JB2 M
-JB2
+1CD01 -X1
1

9
-F5 +1CD01

4
8

1
5
-K2
.E6

iC65N,10A/1P .D4 .C5 .C5

12

9
-TBJ-W1
2

6
PE -TBJ

+24V ACC+
14

14

14
+1CD01 +1CD01 +1CD01 +1CD01
C C

1X3 21

DI:预留
19 .E1
-X3 -K3 -K4 -K2
Labeling machine

13

13

13
DRM270024L
DRM270024L DRM270024L
+1CD01 M.K01
09/4.B7

29

31

33

34
5 .A7 5 .A7 8 .B3
-JB2 1 9 1 9 4 12

.B3
-W1 8 8 5
3

.B3
-JB1 4 12 4 12 1 9 -TBJ-W1

7
-JB2 M TRVVP-JQ-10*0.5
-W2
1

ZR-RVV-500V 4*0.75 15
15
D -JB2 D
-X1 -JB2
4

10
-X1

6
-JB2 -P1-W1
1

3
11

12

13

-X1 ZR-RVVP 4*0.5 -JB2


5
-W1

9
-JB2 L+
10

-TBJ-W1 +1CD01
8

20

21

22
-X3

.B2
蜂鸣器

2绿/GN 1红/RD 灰/GY 红


E E

3
Green Red Buzzer
-TBJ L PE N 绿 I 12.0 I 12.1 I 12.2
COM
.C6 =900E105-Ready =900E105-Lable.Finish =900E105-Alarm
Labeling machine 黑/BK =900E105#Ready =900E105#Lable.Finish =900E105Alarm

-P1 XVGB2SM
+1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7
04/1.C5 04/1.C5 04/1.C5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E105
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E105 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Automatic labeling 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 12
APPROVED DWG. NO: PAGE : REV.
900E105#Automatic labeling 001-02-12 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD01 +1CD02

26
+1CD01 L+.X01 -X3 +1CD01 L+.X01 +1CD02 L+.X02 -X4 +1CD02 L+.X02

9
/12.A4 /15.A1 /10.A7 /24.A1
L+ L+

10
A /10.A7
+1CD02 M.X02 +1CD02 M.X02
/24.A1 A

27
+1CD01 M.X01 +1CD01 M.X01 M
/12.A4 /15.A1
M
-JB3-W1

2
-JB1-W1 1 ZR-RVVP 4*0.5

2
ZR-RVVP 10*0.5 60
15
-JB3
-X1

2
-JB1 -JB1 -JB1 L+ L+
-X1 -X1 -X1
1

4
L+ L+ L+ L+ M

RD/红

BK/黑
5

8
B M M M M -B8-W1 B
Sensor cable
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
1
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1 -B7-W1
2 2 2 2 Sensor cable 2 Sensor cable
2 2
-B8
RI50-0/1000ES.12KA UB/Red
Measurement of width

BN/棕

BN/棕

BN/棕
BU/蓝

BU/蓝

BU/蓝

1/BN

1/BN
3/BU

3/BU
1/棕

1/棕
3/蓝

3/蓝

GND/Black
-B1 -B2 -B3 -B4 -B5 -B6 -B7
Bi8-M18- Bi8-M18- E3JK-DP11- E3JK-DP11- E3JK-DP11- ET5.3/4P ET5.3/4P
A/Green
AP6X-7m AP6X-7m C 2M C 2M C 2M Roll detection Roll detection
Upper limit Drop limit Drop to label Labeling Labeling 1 2
4/黑

4/黑

BK/黑

BK/黑

BK/黑

4/BK

4/BK
PNP NO PNP NO position protection 1 protection 2 Export Export B/White
photoelectric NC NC detection detection
C NC
Z/Yellow
C
BK

BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1 -B7-W1

WH/白
GN/绿
-B8-W1
-JB1
10

11

12

13

16

17
-X1
9

-JB3
-X1

6
D D
-JB1 -JB3
-W1 -W1
3

PE
+1CD02

11

12
+1CD01 -X4
28

29

30

31

32

33

34
-X3

DIa.4

DIa.5
E E

10
4

9
I 12.3 I 12.4 I 12.5 I 12.6 I 12.7 I 13.0 I 13.1 I0.4 I0.5
=900E105-Ps.Up =900E105-Ps.Down =900E105-Pc.Down.Label =900E105-Pc.Protect1 =900E105-Pc.Protect2 =900E105-Pc.Arrive =900E105-Pc.Arrive2 =900E105-#Runing detect.A =900E105-#Runing detect.B
=900E105#Ps. Up =900E105#Ps.Down =900E105#Pc.Down.Label =900E105#Pc.Protect1 =900E105#Pc.Protect2 =900E105Pc.Arrive =900E105Pc.Arrive2 =900E105#Width detection pulse A =900E105#Width detection pulse B

+1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7 +1CD01 -DI7 +1CD02 -CPU 2 +1CD02 -CPU 2
04/1.C5 04/1.C5 04/1.C5 04/1.C5 04/1.C5 04/1.C5 04/1.C5 04/2.C4 04/2.C4

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E105
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E105 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Automatic labeling 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 13
APPROVED DWG. NO: PAGE : REV.
900E105#Automatic labeling 001-02-13 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS +1CP01 1L1.MPS


/3.E6 /3.D6

+1CP01 1L2.MPS +1CP01 1L2.MPS


/3.E6 /3.D6
A A
+1CP01 1L3.MPS +1CP01 1L3.MPS
/3.E6 /3.D6

+1CP01 +1CP01
1

5
-F1 -F2
iC65N-C,10A/3P iC65N-C,10A/3P
2

6
B B

/4.B3

/4.B3

/4.B4

/4.B4
+1CP01 L+.T01

+1CP01 M.T01

+1CP01 L+.T01

+1CP01 M.T01
+1CP01 +1CP01
-R1 -R2
2

2
PE PE
+1CP01
1

1
390Ω,100W -K1 160Ω,200W
+1CP01 +1CP01

1
5

4
8
-T1 -T2
C C
L1 L2 L3 PE R1 R2 24V COM .D3 .D3 L1 L2 L3 PE R1 R2 24V COM

12
6SL3210-1KE14-3UF2 6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19 U2 V2 W2 PE
N
+1CP01 L+.T01

+1CP01 +1CP01 +1CP01


47

48

49

50

51

52

53

54

55

56
-X3 -X3 -X3
PE PE
PE

PE
D D
14

+EX900E106-Q1-W1 +1CP01 +EX900E106-JB1-W1


1

3
-K1
/4.B3

ZR-VV-1KV 3*1.5+1*1.0 ZR-VV-1KV 3*1.5+1*1.0


30 30
13

DRM270024L
+EX900E106
+EX900E106 -JB1
1

+1CP01 M.K01 +1CP01 M.K01


/11.E6 /17.E3
-Q1 -X1

4
JFD11-32/310111 25A
5 U V W PE
2

25A .C4
1 9
8 .C4
PE

+EX900E106-M1-W1 4 12 +EX900E106-M1-W2 +EX900E106-M2-W1


1

4
ZR-VV-1KV 3*1.5+1*1.0 ZR-RVV-500V 2*0.75 1
5 30

E +EX900E106 +EX900E106 E
-M1 -M2
AC1
PE

PE
W

W
U

U
V

V
M Brake M
AC2

Motor 3AC Motor 3AC


Rotary Motor Conveyer Motor
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E106
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 14
APPROVED DWG. NO: PAGE : REV.
900C106#Rotary conveyer 001-02-14 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD01

35
/13.A2
+1CD01 L+.X01-X3
L+

36
A /13.A2
+1CD01 M.X01 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
15

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
37

38

39

40

41

42
E E
10

11

12
7

I 4.6 I 4.7 I 5.0 I 5.1 I 5.2 I 5.3


=900E106-#Pc.Leave =900E106-#Pc.Leave.Safe =900E106-#Pc.Come =900E106-#Pc.Come.Safe =900E106-#Ps.Pos.0 =900E106-#Ps.Pos.90
=900E106#Pc.Leave =900E106#Pc.Leave.Safe =900E106#Pc.Come =900E106#Pc.Come.Safe =900E106#Ps.Pos.0 =900E106#Ps.Pos.90

+1CD01 -DI3 +1CD01 -DI3 +1CD01 -DI3 +1CD01 -DI3 +1CD01 -DI3 +1CD01 -DI3
04/1.A5 04/1.A5 04/1.A5 04/1.A5 04/1.A5 04/1.A5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E106
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E106 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 15
APPROVED DWG. NO: PAGE : REV.
900C107#Rotary conveyer 001-02-15 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/3.E6
+1CP01 1L1.MPS +1CD02
+1CD02 L+.X01 -X3 +1CD02 L+.X01

1
09/22.B5 /17.A6
+1CP01 1L2.MPS L+
/3.E6
A +1CD02 M.X01 +1CD02 M.X01 A

2
09/22.B6 /17.A6
+1CP01 1L3.MPS M
/3.E6

+EX900C104-JB1-W1

2
ZR-RVVP 3*0.5
+1CP01 55
1

5
-F1
+EX900C104
iC65N-C,10A/3P -JB1
-X1

1
L+
2

3
B M B

/4.B4

/4.B4

1/BN

3/BU
+EX900C104-B1-W1
Sensor cable

+1CP01 L+.T01

+1CP01 M.T01
2
+1CP01
-R1

1/BN

3/BU
+EX900C104
2

PE -B1
1

160Ω,200W ET5.3/4P
+1CP01
C Inspection for
C

4/BK
-T1 export
PNP NO
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2
U2 V2 W2 PE
+EX900C104

4/BK
-B1-W1

+EX900C104
-JB1
D -X1 D

5
+1CP01 +EX900C104
19

20

21

22

-X3 -JB1
PE -W1

3
+1CD02
PE

+EX900C104-M1-W1 -X3

3
1

ZR-VV-1KV 3*2.5+1*1.5
30

3
E +EX900C104 I 15.2 E
-M1 =900C104-#Ps.Leave
=900C104#Ps.Leave
PE
W
U

+1CD02 -DI1
M 04/2.A2
Motor 3AC
Conveyer Motor
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C104
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 16
APPROVED DWG. NO: PAGE : REV.
900C104#Conveyer 001-02-16 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D6

/3.D6
+1CP01 1L2.MPS +1CD02
A +1CD02 L+.X01 -X3 +1CD02 L+.X01 A

4
/16.A7 /18.A6
+1CP01 1L3.MPS L+
/3.D6
+1CD02 M.X01 +1CD02 M.X01

5
/16.A7 /18.A6
M
+1CP01
1

5
-F1
iC65N-C,20A/3P +EX900C105-JB1-W1

2
ZR-RVVP 3*0.5
40
2

+EX900C105
-JB1
-X1

1
B L+ B

/4.B5

/4.B4

3
M

+1CP01 L+.T01

+1CP01 M.T01

1/BN

3/BU
+1CP01 +EX900C105-B1-W1
-R1 Sensor cable
2
2

PE

1/BN

3/BU
1

400W,100Ω
+1CP01 +EX900C105
-T1 +1CP01 -B1
C -K1 C
L1 L2 L3 PE R1 R2 24V COM
ET5.3/4P

1
5

4
8
Inspection for

4/BK
6SL3210-1KE21-3UF1 export
.D3 .D3 PNP NO

12
U2 V2 W2 PE 20 18 19
+1CP01 L+.T01

+EX900C105

4/BK
-B1-W1

D +EX900C105 D
/4.B4

-JB1
-X1
14

+1CP01 +1CP01 +1CP01

5
23

24

25

26

27

-X3 -K1 -X3 28


13

PE +EX900C105
DRW270024LT
-JB1
+1CP01 M.K01 +1CP01 M.K01 -W1

3
/14.D3 /18.E3

5 .C4
PE

+EX900C105-M1-W1 1 9 +EX900C105-M1-W2
1

ZR-VV-1KV 3*2.5+1*1.5 8 .C4


ZR-RVV-500V 2*0.75 +1CD02
15 15 -X3
4 12

6
E +EX900C105 E
-M1

4
I 15.3
AC1
PE
W
U

=900C105-#Ps.Leave
V

=900C105#Ps.Leave
M Brake
AC2

Motor 3AC
Conveyer Motor +1CD02 -DI1
400VAC
5.5KW 04/2.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C105
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 17
APPROVED DWG. NO: PAGE : REV.
900C105#Conveyer 001-02-17 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.E7
+1CD02
+1CP01 1L2.MPS +1CD02 L+.X01 -X3 +1CD02 L+.X01

7
/3.E7 /17.A7 /19.A6
A L+ A
+1CP01 1L3.MPS +1CD02 M.X01 +1CD02 M.X01

8
/3.E7 /17.A7 /19.A6
M

+1CP01 1

5
-F1
+EX900C106-JB1-W1

2
iC65N-C,20A/3P ZR-RVVP 3*0.5
20

+EX900C106
2

-JB1
-X1

1
L+
B B

3
M

/4.B5

/4.B5

1/BN

3/BU
+EX900C106-B1-W1
Sensor cable

+1CP01 L+.T01

+1CP01 L+.T01
+1CP01 2
-R1

1/BN

3/BU
2

PE +EX900C106
-B1
1

400W,100Ω
+1CP01 +1CP01
C -K1 ET5.3/4P C
-T1 Inspection for

4/BK
export

1
5

4
8
L1 L2 L3 PE R1 R2 R2 PNP NO
.D3 .D3
6SL3210-1KE21-3UF1

12
U2 V2 W2 PE 20 18 19
+EX900C106

4/BK
-B1-W1
+1CP01 L+.T01

+EX900C106
D -JB1 D
-X1

5
14
/4.B5

+1CP01 +1CP01 +1CP01


41

42

43

44

45

46
-X3 -K1 -X3 +EX900C106
13

PE -JB1
DRW270024LT
-W1

3
+1CP01 M.K01 +1CP01 M.K01
/17.E3 /22.C2

5 .C4
PE

+EX900C106-M1-W1 1 9 +EX900C106-M1-W2 +1CD02


1

ZR-VV-1KV 3*2.5+1*1.5 8 ZR-RVV-500V 2*0.75 -X3

9
20
.C5 20
4 12
E +EX900C106 E

5
-M1 I 15.4
AC1

=900C106-#Ps.Leave
PE

=900C106#Ps.Leave
W
U

M Brake +1CD02 -DI1


AC2

Motor 3AC
Conveyer Motor 04/2.A2
400VAC
5.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C106
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 18
APPROVED DWG. NO: PAGE : REV.
900C106#Conveyer 001-02-18 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D7

/3.D7
+1CP01 1L2.MPS +1CD02

10
A /18.A8
+1CD02 L+.X01 -X3 +1CD02 L+.X01
/23.A3 A
+1CP01 1L3.MPS L+
/3.D7

11
+1CD02 M.X01 +1CD02 M.X01
/18.A8 /23.A3
M

+1CP01
1

5
-F1
+EX900C107-JB1-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5
15

+EX900C107
2

-JB1
-X1 +EX900C107 L+

1
/23.B2
B L+ B

/4.B6

/4.B5
+EX900C107 M

3
/23.B2
M

+1CP01 L+.T01

+1CP01 M.T01

1/BN

3/BU
+1CP01 +EX900C107-B1-W1
-R1 Sensor cable
2
2

PE

1/BN

3/BU
1

160Ω,200W
+1CP01 +EX900C107
-T1 -B1
C C
L1 L2 L3 PE R1 R2 24V COM
ET5.3/4P
Inspection for

4/BK
6SL3210-1KE15-8UF2 export
PNP NO
U2 V2 W2 PE

+EX900C107

4/BK
-B1-W1

D +EX900C107 D
-JB1
+1CP01 -X1

5
29

30

31

32

-X3
PE +EX900C107
-JB1
-W1

3
PE

+EX900C107-M1-W1
1

ZR-VV-1KV 3*2.5+1*1.5 +1CD02


25

12
-X3
E +EX900C107 E
-M1

6
I 15.5
PE
W
U

#Ps.Leave
V

#Ps.Leave
M
Motor 3AC
Conveyer Motor +1CD02 -DI1
400VAC
2.2KW 04/2.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C107
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 19
APPROVED DWG. NO: PAGE : REV.
900C107#Conveyer 001-02-19 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.E7

+1CP01 1L2.MPS
/3.E7
A A
+1CP01 1L3.MPS
/3.E7

+1CP01

5
-F1
iC65N-C,16A/3P
2

B 6 B

/4.B6

/4.B5
+1CP01 L+.T01

+1CP01 M.T01
C +1CP01 C
-R1
2

PE
+1CP01 +1CP01

1
5

4
8

1
5
-K2 -K1
1

160Ω,200W
+1CP01 /22.B3 /22.B3 /22.B2
-T1

12

9
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE17-5UF1
U2 V2 W2 PE 20 18 19
D D

-Break1.380V

-Break2.380V

-Break.220V
E E
-T1.W2

-T1.PE
-T1.U2

-T1.V2
/21.A2

/21.A2

/21.B2

/21.B2

/21.A2

/21.A2

/21.A6

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C108
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 20
APPROVED DWG. NO: PAGE : REV.
900C108(E110)#Inkjet Conveyer 001-02-20 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-Break1.380V -Break.220V
/20.E4 /20.E5

A /20.E5
-Break2.380V A

-T1.U2
/20.E2

-T1.V2
/20.E2

-T1.W2
/20.E2

-T1.PE
/20.E2

B +1CP01 B

53
-Q2
/22.E7

54
+1CP01 +1CP01
1

5
-Q1 -Q2
N
/22.E6 /22.E7
2

4
8
-K1
+1CP01

95
97
1

5
/22.B2
-F2

12
I> I> I> +1CP01
LRN05N

96
98

67

68

69

70
-X3

6
0.63~1.0A
C C

/22.D4
+1CP01 +1CP01 +1CP01
57

58

59

60

61

62

63

64

65

66
-X3 -X3 -X3
PE PE
PE

PE
+EX900C108-M1-W1 +EX900C108-M1-W2 +EX900E110-M1-W1 +EX900E110-M2-W2
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*1.5+1*1.0 ZR-RVV-500V 4*0.75
30 30 30 30

D D

E E

+EX900C108 +EX900E110
PE

PE
-M1 -M2
W

W
AC1 AC2 NO1 NO2
U

U
AC1
V

V
Brake
M M
Motor 3AC Motor 3AC
Conveyer Motor Brake Inkjet Move Motor
AC2

400VAC 400VAC
3.0KW 0.37KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C108
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 21
APPROVED DWG. NO: PAGE : REV.
900C108(E110)#Inkjet Conveyer 001-02-21 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/2.A1 05/2.A1 05/2.A1 05/2.A1


+1CD02 -DO1 +1CD02 -DO1 +1CD02 -DO1 +1CD02 -DO1 /6.C3
+1CP01 L.K01 +1CP01 L.K01
/31.A5
Q 14.1 Q 14.0 Q 14.2 Q 14.3
A =900C108-##Brake =900C108-##Brake =900C108-Set.Cov =900C108-Set.Rot A
=900C108##Brake =900C108#Brake =900C108Set.Cov =900C108Set.Rot

10

11

12
+1CD02
-X5

4
+1CD02-W2

1
ZR-RVVP 16*0.5 +1CP01 +1CP01

1
5

1
5
2

4
30 -K3 -K4
.B4 .B5
+1CP01

9
-X4

4
B +1CP01 B
18
19
-T1
20
14

14

14

14
+1CP01 +1CP01 +1CP01 +1CP01
-K1 -K2 -K3 -K4
13

13

13

13
DRM270024L DRW270024LT DRM270024L DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/18.E3 /29.E3 +1CP01 +1CP01

21

21
-Q2 -Q1
5 /20.C5 5 /20.C4 5 .B6 5 .B7 .E7 .E6
1 9 1 9 1 9 1 9

22

22
C 8 8 8 8
C
/21.C8 /20.C5
4 12 4 12 4 12 4 12

+1CP01 L+.Q01 +1CP01 L+.Q01


/4.B1 /31.C2

+1CP01 +1CP01 +1CP01


63

63

95
-Q1 -Q2 -F2
.E6 .E7 /21.C6
64

64

96

D +1CP01 D
-X4
5

+1CD02
-W2
5

A1

A1
+1CP01 +1CP01
-Q1 -Q2

A2

A2
+1CD02
LC1-N1201M5N LC1-N1201M5N
-X5
5

+1CP01 N.Q01 +1CP01 N.Q01


/6.E3 /31.E5
E E
1 2 1 2
1

I 19.0 I 19.1 I 19.2 3 4


/21.B2
3 4
/21.B6
=900C108-#Ready.Cov =900C108-#Ready.Rot =900C108-#Hw.Fault2 5 6 5 6
=900C108#Ready.Cov =900C108#Ready.Rot =900C108#Hw.Fault2
21 22 21 22
.C7 .C6
53 54 53 54
/21.B7
+1CD02 -DI3 +1CD02 -DI3 +1CD02 -DI3 63 64 63 64
.D2 .D3
04/2.C2 04/2.C2 04/2.C2 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C108
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 22
APPROVED DWG. NO: PAGE : REV.
900C108(E110)#Inkjet Conveyer 001-02-22 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

13
+1CD02 L+.X01 +1CD02 L+.X01
/19.A7 /27.A5
A L+ A

14
+1CD02 M.X01 +1CD02 M.X01
/19.A7 /27.A5
M

+EX900C107 +EX900C108-JB1-W1

2
-JB1 ZR-RVVP 7*0.5
-X1 10
+EX900C107 L+

2
/19.B7
L+ +EX900C108 +EX900C108
+EX900C107 M -JB1 -JB1

4
/19.B7
M -X1 -X1

2
L+ L+
B B

4
M M

1/BN

3/BU

1/BN

3/BU

BN

BU

BN

BU
+EX900C108-B2-W1 +EX900C108-B1-W1 +EX900C108-B3-W1 +EX900C108-B4-W1
Sensor cable Sensor cable Sensor cable Sensor cable
2 2 2 2
1/BN

3/BU

1/BN

3/BU

1/BN

3/BU

1/BN

3/BU
+EX900C108 +EX900C108 +EX900C108 +EX900C108
-B2 -B1 -B3 -B4
C ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P C
Inspection of entry Inspection for Inkjet Inkjet slow
4/BK

4/BK

4/BK

4/BK
PNP NO export NC NC
PNP NO

=900E110 =900E110
+EX900C108 +EX900C108 +EX900C108 +EX900C108
4/BK

4/BK

BK

BK
-B2-W1 -B1-W1 -B3-W1 -B4-W1

+EX900C107 +EX900C108 +EX900C108 +EX900C108


D -JB1 -JB1 -JB1 -JB1 D
-X1 -X1 -X1 -X1
6

7
=900E110 =900E110 =900E110
+EX900C107 +EX900C108 +EX900C108 +EX900C108
-JB1 -JB1 -JB1 -JB1
-W1 -W1 -W1 -W1
4

5
+1CD02 +1CD02 +1CD02 +1CD02
20

15

16

17
-X3 -X3 -X3 -X3

E E
14

10

11
9

I 16.5 I 16.0 I 16.1 I 16.2


=900C108-#Ps.Come =900C108-#Ps.Leave =900E110-#Pc.Pos.Slow =900E110-#Pc.Ready.Ink
=900C108#Ps.Come =900C108#Ps.Leave =900E110#Pc.Pos.Slow =900E110#Pc.Ready.Ink

+1CD02 -DI1 +1CD02 -DI1 +1CD02 -DI1 +1CD02 -DI1


04/2.A2 04/2.A2 04/2.A2 04/2.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C108
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 23
APPROVED DWG. NO: PAGE : REV.
900C108(E110)#Inkjet Conveyer 001-02-23 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD02 09/22.E5
+1CD02 L.X01

13
/13.A8
+1CD02 L+.X02 -X4 +1CD02 L+.X02
/25.A1
L+ +1CD02 N.X01
09/22.E5

14
A /13.A8
+1CD02 M.X02 +1CD02 M.X02
.D7 A
M

-JB1-W1

2
ZR-RVVP 7*0.5 +1CD02

1
15 -F5
PE -CC1
-JB1

1
5
iC65N,10A/1P
-K4
-X1
1

4
.E6
L+ L+ L+ L+

9
2
1
+1CD02 -CC1
5

10

11
M M M M -X1 -X1

2
B B

PE
-PMJ-W1

2
TRVVP-JQ-4*1 -PMJ-W2

2
BN

BU

BN

BU

BN

BU

BN

BU
15 TRVVP-JQ-4*1
-B1-W1 -B2-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable 15
5 5 5 5 -PMJ1

PE
Injket
L N Plus+ Plus-
3/BU
The inkjet code controls the pulse
1/BN

1/BN
3/BU

3/蓝
1/棕

1/棕
3/蓝
-B1 -B2 -B5 -B6

C PRK5.M3/4P PRK5.M3/4P
Protection of export
Bi8-M18-AP6X-7m Bi8-M18-AP6X-7m
Drop limit 05/2.A1 C
Protection of entrance Upper limit
4/BK

4/黑
4/BK

4/黑
NC NC PNP NO PNP NO
+1CD02 -DO1
Q 13.7
=900E110-K.Inkjet
=900E110K.Inkjet
BK

BK

BK

BK
-B1-W1 -B2-W1 -B5-W1 -B6-W1

.A4
+1CD02 M.X02
-JB1
10

11

12
D -X1 D
9

+1CD02

+1CD02 M.X02
19

20
-JB1 -X4
-W1
3

6
-CC1-W1

2
ZR-RVVP 3*0.5
15

/25.A1
+1CD02 -CC1
15

16

17

18
-X4 -X1

5
14
-CC1
E -K4 E

13
10

11

12

13

DRM270024L
I 18.1 I 18.2 I 18.3 I 18.4
=900E110-#Pc.Head.Come.Safe =900E110-#Pc.Head.Leave.Safe =900E110-#Ps.Head.Pos.Up =900E110-#Ps.Head.Pos.Down
=900E110#Pc.Head.Come.Safe =900E110#Pc.Head.Leave.Safe =900E110#Ps.Head.Pos. Up =900E110#Ps.Head.Pos.Down
8
4 12
+1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 5 .A7
04/2.A4 04/2.A4 04/2.A4 04/2.A4 1 9

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E110
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E110 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Inkjet 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 24
APPROVED DWG. NO: PAGE : REV.
900E110#Inkjet 001-02-24 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD02

21
/24.A4
+1CD02 L+.X02 -X4 +1CD02 L+.X02
/26.A2
L+

A A

22
+1CD02 M.X02 +1CD02 M.X02
/24.D7 /26.A2
M

05/2.A1
-JB1-W1 +1CD02 -DO1

2
ZR-RVVP 4*0.5
15 Q 13.6
=900E108-Scan Failure
-JB1 -JB1 -JB1 =900E108#Scan Failure
-X2 -X2 -X2

7
L+ L+ L+

6
B M M M +1CD02 B

24
-X4
BN

BU
-B1-W1
5 -JB1

1
-F1

4
iC65N,10A/1P
1/BN

3/BU

-B1

2
-JB1
-JB1

4
8

1
5
-K2

10
-X2
.C5 .C5
4/BK

12

9
7/BN

8/BU
-A1-W1
C C

14
Scanner cable -JB1
5
-K2
-A1
BK

13
-B1-W1
scanner DRM270024L
+24 VDC GND
7 8
-JB1
-X2 8
9

.C4
-P1-W1 4 12

2
ZR-RVVP 3*0.5 5
5
.C4
1 9

D D
-JB1
-W1
3

+1CD02 蜂鸣器
23

-X4 红
2绿/GN 1红/RD 灰/GY
Green Red Buzzer
绿
COM
黑/BK
E -P1 XVGB2SM E
14

I 18.5
=900E108-#Pc.Scan
=900E108#Pc.Scan

+1CD02 -DI2
04/2.A4

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E108
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E108 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Fixed scan 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 25
APPROVED DWG. NO: PAGE : REV.
900E108#Fixed scan 001-02-25 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD02 +1CD02

25

29
/25.A7
+1CD02 L+.X02 -X4 -X4
L+ L+

26

30

31
A /25.A7
+1CD02 M.X02 A
M M M

-JB1-W1 -JB2-W1

2
ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
15 15

-JB1 -JB2
-X1 -X2

2
L+ L+

4
M
B B

RD/红

棕/BN

蓝/BU
BK/黑
-B1-W1 -B2-W1
Sensor cable Sensor cable
1 2

-B1
RI50-0/1000ES.12KA UB/Red -B2 +
1/BN
Measurement of width UC2000-30GM-IUR2-V15
GND/Black Diameter measurement 3/BU
U -

A/Green Sync.
5/GY

B/White 2/WH
C 0~10V
C
Z/Yellow 4~ 4/BK
20mA
WH/白

白/WH
GN/绿

-B1-W1 -B2-W1

-JB1 -JB2
-X1 -X2
5

5
D D

-JB1 -JB2
-W1 -W1
3

3
PE

+1CD02 +1CD02

PE
27

28

32
-X4 -X4

E E
DIa.2

DIa.3

2M
1
-
I0.2 I0.3
=900E109-#Runing detect.A =900E109-#Runing detect.B I 14.1
=900E109#Width detection pulse A =900E109#Width detection pulse B AI1
=900E109-#Dia detect
=900E109#Dia detect
+1CD02 -CPU 2 +1CD02 -CPU 2 +1CD02 -CPU 2
04/2.C4 04/2.C4 04/2.C4

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E109
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E109 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Roll specification measurement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 26
APPROVED DWG. NO: PAGE : REV.
900E109#Roll specification measurement 001-02-26 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D7
+1CD02 +1CD02

21

24
/3.D7
+1CP01 1L2.MPS
/23.A6
+1CD02 L+.X01 -X3 -X3 +1CD02 L+.X01
/28.A5
A L+ L+ A

22

25
+1CP01 1L3.MPS +1CD02 M.X01 +1CD02 M.X01
/3.D7 /23.A6 /28.A5
M M

+1CP01
+EX900C109-JB1-W1 +EX900C109-JB2-W1
1

2
-F1 ZR-RVVP 3*0.5 ZR-RVVP 3*0.5
20 15
iC65N-C,10A/3P
+EX900C109 +EX900C109
-JB1 -JB2
2

-X1 -X1

1
L+ L+
B B

3
M M

/4.B6

/4.B5

1/BN

3/BU

1/BN

3/BU
+EX900C109-B1-W1 +EX900C109-B2-W1

+1CP01 L+.T01

+1CP01 M.T01
+1CP01 Sensor cable Sensor cable
-R1 2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C109 +EX900C109
1

160Ω,200W -B1 -B2


+1CP01
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection for Inspection of entry

4/BK

4/BK
export PNP NO
PNP NO
6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19

+EX900C109 +EX900C109

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C109 +EX900C109
D -JB1 -JB2 D
-X1 -X1

5
+1CP01
33

34

35

36

-X3 +EX900C109 +EX900C109


PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C109-M1-W1 +1CD02 +1CD02


1

23

26
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
35

E E

15

16
+EX900C109
-M1 I 16.6 I 16.7
=900C109-#Ps.Leave =900C109-#Ps.Come
PE

=900C109#Ps.Leave =900C109#Ps.Come
W
U

M +1CD02 -DI1 +1CD02 -DI1


Motor 3AC
Conveyer Motor 04/2.A2 04/2.A2
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C109
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 27
APPROVED DWG. NO: PAGE : REV.
900C109#Conveyer 001-02-27 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.E8
+1CD02 +1CD02

27

30
/3.E8
+1CP01 1L2.MPS
/27.A8
+1CD02 L+.X01 -X3 -X3 +1CD02 L+.X01
/32.A1
A L+ A

28

31
+1CP01 1L3.MPS +1CD02 M.X01 +1CD02 M.X01
/3.E8 /27.A8 /32.A1
M

+1CP01
+EX900C111-JB1-W1 +EX900C111-JB2-W1
1

2
-F1 ZR-RVVP 3*0.5 ZR-RVVP 3*0.5
40 45
iC65N-C,10A/3P
+EX900C111 +EX900C111
-JB1 -JB2
2

6 -X1 -X1

1
L+ L+
B B

3
M M

/4.B6

/4.B6

1/BN

3/BU

1/BN

3/BU
+EX900C111-B1-W1 +EX900C111-B2-W1
+1CP01 Sensor cable Sensor cable
-R1

+1CP01 L+.T01

+1CP01 M.T01
2 2

2
PE

1/BN

3/BU

1/BN

3/BU
+EX900C111 +EX900C111
1

160Ω,200W -B1 -B2


+1CP01
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection for Inspection for

4/BK

4/BK
export export
PNP NO PNP NO
6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19

+EX900C111 +EX900C111

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C111 +EX900C111
D -JB1 -JB2 D
-X1 -X1

5
+1CP01
37

38

39

40

-X3 +EX900C111 +EX900C111


PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C111-M1-W1 +1CD02 +1CD02


1

29

32
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
40

E +EX900C111 E

2
-M1 I 17.0 I 17.1
=900C111-#Pc.Leave =900C111-#Pc.Come
PE

=900C111#Pc.Leave =900C111#Pc.Come
W
U

M +1CD02 -DI2 +1CD02 -DI2


Motor 3AC
Conveyer Motor 04/2.A4 04/2.A4
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C111
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 28
APPROVED DWG. NO: PAGE : REV.
900C111#Conveyer 001-02-28 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP01 1L1.MPS
/3.D8

+1CP01 1L2.MPS
/3.D8
A A
+1CP01 1L3.MPS
/3.D8

+1CP01
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B B

/4.B7

/4.B6
+1CP01 L+.T01

+1CP01 M.T01
+1CP01
-R1

2
PE
C C
1

160Ω,200W
+1CP01
-T1
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2 +1CP01

1
5

4
8
-K1 -K1
U2 V2 W2 PE 20 18 19 .D3 .D3

12
+1CP01 L+.T01

D D
/4.B7

14

+1CP01
-K1
13

DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/22.C5 /31.C2

E 5 E
-K3.220V

.C5
-T1.W2

-T1.PE
-T1.U2

-T1.V2

1 9
8 .C5
4 12
/30.A2

/30.A2

/30.A2

/30.B2

/30.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E111
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 29
APPROVED DWG. NO: PAGE : REV.
900E111#Rotary conveyer 001-02-29 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/29.E5

A /29.E2
-T1.U2 A
-T1.V2
/29.E2

-T1.W2
/29.E2

-T1.PE
/29.E2

+1CP01
1

5
-Q1
B
/31.E6 +1CP01 +1CP01 B

5
53
2

6
-Q1 -Q2
/31.E6 /31.E7
+1CP01

95
97

54

6
1

-F2 5
I> I> I> N
LRN08N

96
98
2

2.5~4.0A

/31.D4
+1CP01 +1CP01 +1CP01
79

80

81

82

83

84

85

86

87

88
-X3 -X3 -X3
PE PE

C C
PE

PE
+EX900E111-Q3-W1 +EX900E111-M1-W2 +EX900E111-JB1-W1
1

3
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5
45 45 45

+EX900E111
-JB1
-X1

4
U V W PE
+1CP01
1

D -Q3 D
JFD11-32/310111 25A
2

25A
PE

+EX900E111-M1-W1
1

ZR-VV-1KV 3*2.5+1*1.5
5

+EX900E111-M2-W1

4
1

E E

+EX900E111 +EX900E111
PE

PE
-M1 -M2
W

W
U

U
AC1
V

V
M M
Motor 3AC Motor 3AC
Rotary Motor Brake Conveyer Motor
AC2

400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E111
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 30
APPROVED DWG. NO: PAGE : REV.
900E111#Rotary conveyer 001-02-30 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/2.A1 05/2.A1
+1CD02 -DO1 +1CD02 -DO1 /22.A7
+1CP01 L.K01

Q 14.6 Q 14.7
A =900E111-Set.Rot =900E111-Set.Cov A
=900E111#Set.Rot =900E111Set.Cov

15

16
+1CD02

10

11
-X5
+1CP01 +1CP01

1
5

1
5
-K2 -K3
+1CD02 .B3 .B4

10

11
-W2

9
B +1CP01 B

10

11
-X4

14

14
+1CP01 +1CP01
-K2 -K3

13

13
DRM270024L DRM270024L

+1CP01 M.K01
/29.E4 +1CP01 +1CP01

21

21
-Q2 -Q1
5 .B6 5 .B7 .E7 .E6
1 9 1 9

22

22
C 8 8
C
4 12 4 12

+1CP01 L+.Q01
/22.C4

+1CP01 +1CP01 +1CP01


63

63

95
-Q1 -Q2 -F2
.E6 .E7 /30.B2
64

64

96

D +1CP01 D
12

13

14

-X4

+1CD02
12

13

14

-W2

A1

A1
+1CP01 +1CP01
-Q1 -Q2

A2

A2
+1CD02
LC1-N1201M5N LC1-N1201M5N
12

13

14

-X5
+1CP01 N.Q01
/22.E7
E E
1 2 1 2
6

I 19.5 I 19.6 I 19.7 3 4


/30.B2
3 4
/30.B6
=900E111-#Ready.Rot =900E111-#Ready.Cov =900E111-#Hw.Fault2 5 6 5 6
=900E111#Ready.Rot =900E111#Ready.Cov =900E111#Hw.Fault2
21 22 21 22
.C7 .C6
53 54 53 54
/30.B3
+1CD02 -DI3 +1CD02 -DI3 +1CD02 -DI3 63 64 63 64
.D2 .D3
04/2.C2 04/2.C2 04/2.C2 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E111
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 31
APPROVED DWG. NO: PAGE : REV.
900E111#Rotary conveyer 001-02-31 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD02

33
/28.A8
+1CD02 L+.X01-X3
L+

34
A /28.A8
+1CD02 M.X01 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
25

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1 -B7-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 -B7 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18- Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m AP6X-7m
entry entrance export export 90 proximity 270 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑

4/黑
NC NC NC NC switch switch
BK

BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1 -B7-W1
3

D D
3

6
3

9
3

9
35

36

37

38

39

40

41
E E
3

9
I 17.2 I 17.3 I 17.4 I 17.5 I 17.6 I 17.7 I 18.0
=900E111-#Pc.Leave =900E111-#Pc.Leave.Safe =900E111-#Pc.Come =900E111-#Pc.Come.Safe =900E111-#Ps.Pos.0 =900E111-#Ps.Pos.90 =900E111-#Ps.Pos.270
=900E111#Pc.Leave =900E111#Pc.Leave.Safe =900E111#Pc.Come =900E111#Pc.Come.Safe =900E111#Ps.Pos.0 =900E111#Ps.Pos.90 =900E111#Ps.Pos.270

+1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2 +1CD02 -DI2
04/2.A4 04/2.A4 04/2.A4 04/2.A4 04/2.A4 04/2.A4 04/2.A4

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E111
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E111 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 32
APPROVED DWG. NO: PAGE : REV.
900E111#Rotary conveyer 001-02-32 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
+1CD02 -W1

+1CD01 -W1
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X1


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 10
B +1CP01 -F2 1 1 JUT14-2.5/GY L1 02/3.C1 +1CP01 -F1 1
B
2 JUT14-2.5/GY L1 02/3.C2 +1CP01 -F3 1
3 JUT14-2.5/GY L1 02/3.C2 +1CP01 -F4 1
4 JUT14-2.5/GY L1 02/3.C3 +1CP01 -F5 1
1 +1CP01 -K1 5 5 JUT14-2.5/GY L1 02/3.C4 +1CP01 -F6 1
+1CP01 N 6 JUT14-2.5/GY N 02/3.C1 +1CP01 -E1 2 Control cabinet lighting
7 JUT14-2.5/GY N 02/3.C2 +1CP01 Air conditioner N
8 JUT14-2.5/GY N 02/3.C2 +1CP01 -G1 N
N 2 =1CD01 +1CD01 -X1 5 9 JUT14-2.5/GY N 02/3.C3
N 2 =1CD02 +1CD02 -X1 5 10 JUT14-2.5/GY N 02/3.C4 +1CP01 -Q1 A2
C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X1 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 33
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X1 001-02-33 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X2


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 28
B DO0 =900C101 +1CP01 -T1 20 1 JUT14-2.5/GY L+ 02/4.A1 +1CP01 -G1 +V
B
02/4.A1 =900C108 +1CP01 -Q1 63 2
DO0 =900C102 +1CP01 -T1 20 2 JUT14-2.5/GY L+ 02/4.A2 =900C101 +1CP01 -T1 24V
DO0 =900C103 +1CP01 -T1 20 3 JUT14-2.5/GY L+ 02/4.A2 =900C102 +1CP01 -T1 24V
=900C103 +1CP01 -T1 24V 4 JUT14-2.5/GY L+ 02/4.A3 =900E105 +1CP01 -T1 24V
DO0 =900E106 +1CP01 -T1 20 5 JUT14-2.5/GY L+ 02/4.A3 =900E106 +1CP01 -T1 24V
=900E106 +1CP01 -T2 24V 6 JUT14-2.5/GY L+ 02/4.A4 =900C104 +1CP01 -T1 24V
DO0 =900C105 +1CP01 -T1 20 7 JUT14-2.5/GY L+ 02/4.A4 =900C105 +1CP01 -T1 24V
DO0 =900C106 +1CP01 -T1 20 8 JUT14-2.5/GY L+ 02/4.A5 =900C106 +1CP01 -T1 R2
9 JUT14-2.5/GY L+ 02/4.A5 =900C107 +1CP01 -T1 24V
C C
=900C108 +1CP01 -T1 24V 10 JUT14-2.5/GY L+ 02/4.A6 =900C109 +1CP01 -T1 24V
DO0 =900E111 +1CP01 -T1 20 11 JUT14-2.5/GY L+ 02/4.A6 =900C111 +1CP01 -T1 24V
=900E111 +1CP01 -T1 24V 12 JUT14-2.5/GY L+ 02/4.A7 =1CP01 +1CP01 -S01 13 #System 1 operation
13 JUT14-2.5/GY L+ 02/4.A7
14 JUT14-2.5/GY L+ 02/4.A7 +1CP01 -Q1 53 1
15 JUT14-2.5/GY L+ 02/4.A8 +1CP01 -JHJ L+
16 JUT14-2.5/GY L+ 02/4.A8
=900C101 +1CP01 -K1 13 17 JUT14-2.5/GY M 02/4.A1 +1CP01 -G1 -V
=900C102 +1CP01 -T1 COM 18 JUT14-2.5/GY M 02/4.A2 =900C101 +1CP01 -T1 COM
=900C103 +1CP01 -T1 COM 19 JUT14-2.5/GY M 02/4.A2 =900E105 +1CP01 -T1 COM
D D
20 JUT14-2.5/GY M 02/4.A3 =900E106 +1CP01 -T1 COM
21 JUT14-2.5/GY M 02/4.A4 =900E106 +1CP01 -T2 COM
=900C105 +1CP01 -T1 COM 22 JUT14-2.5/GY M 02/4.A4 =900C104 +1CP01 -T1 COM
=900C107 +1CP01 -T1 COM 23 JUT14-2.5/GY M 02/4.A5 =900C108 +1CP01 -T1 COM
24 JUT14-2.5/GY M 02/4.A5 =900C109 +1CP01 -T1 COM
=900C111 +1CP01 -T1 COM 25 JUT14-2.5/GY M 02/4.A6 =900E111 +1CP01 -T1 COM
26 JUT14-2.5/GY M 02/4.A7
#Control power =1CP01 +1CP01 -P01 2 27 JUT14-2.5/GY M 02/4.A7 +1CP01 -JHJ M
02/4.A7 +1CP01 -K1 13
28 JUT14-2.5/GY M 02/4.A8
E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X2 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 34
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X2 001-02-34 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C105 -M1-W2

+EX900C105 -M1-W1

+EX900C104 -M1-W1

+EX900C103 -M1-W2

+EX900C103 -M1-W1

+EX900C102 -M1-W2

+EX900C102 -M1-W1

+EX900C101 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 88
B Motor 1 =900C101 +EX900C101 -M1 U 1 JUT14-2.5/GY 02/7.D2 =900C101 +1CP01 -T1 U2
B
Motor 2 =900C101 +EX900C101 -M1 V 2 JUT14-2.5/GY 02/7.D2 =900C101 +1CP01 -T1 V2
Motor 3 =900C101 +EX900C101 -M1 W 3 JUT14-2.5/GY 02/7.D2 =900C101 +1CP01 -T1 W2
Motor PE =900C101 +EX900C101 -M1 PE 4 JUT14-2.5PE PE 02/7.D2 =900C101 +1CP01 -T1 PE
5 JUT14-2.5/GY 02/7.D4 =900C101 +1CP01 -K1 9 1
6 JUT14-2.5/GY 02/7.D5 =900C101 +1CP01 -K1 12 2
Motor 1 =900C102 +EX900C102 -M1 U 7 JUT14-2.5/GY 02/8.D1 =900C102 +1CP01 -T1 U2
Motor 2 =900C102 +EX900C102 -M1 V 8 JUT14-2.5/GY 02/8.D1 =900C102 +1CP01 -T1 V2
Motor 3 =900C102 +EX900C102 -M1 W 9 JUT14-2.5/GY 02/8.D2 =900C102 +1CP01 -T1 W2
Motor PE =900C102 +EX900C102 -M1 PE 10 JUT14-2.5PE PE 02/8.D2 =900C102 +1CP01 -T1 PE
C C
Brake 1 =900C102 +EX900C102 -M1 AC1 11 JUT14-2.5/GY 02/8.D4 =900C102 +1CP01 -K1 9 1
Brake 2 =900C102 +EX900C102 -M1 AC2 12 JUT14-2.5/GY 02/8.D4 =900C102 +1CP01 -K1 12 2
Motor 1 =900C103 +EX900C103 -M1 U 13 JUT14-2.5/GY 02/9.D1 =900C103 +1CP01 -T1 U2
Motor 2 =900C103 +EX900C103 -M1 V 14 JUT14-2.5/GY 02/9.D1 =900C103 +1CP01 -T1 V2
Motor 3 =900C103 +EX900C103 -M1 W 15 JUT14-2.5/GY 02/9.D2 =900C103 +1CP01 -T1 W2
Motor PE =900C103 +EX900C103 -M1 PE 16 JUT14-2.5PE PE 02/9.D2
Brake 1 =900C103 +EX900C103 -M1 AC1 17 JUT14-2.5/GY 02/9.D4 =900C103 +1CP01 -K1 9 1
Brake 2 =900C103 +EX900C103 -M1 AC2 18 JUT14-2.5/GY 02/9.D4 =900C103 +1CP01 N
Motor 1 =900C104 +EX900C104 -M1 U 19 JUT14-2.5/GY 02/16.D2 =900C104 +1CP01 -T1 U2
Motor 2 =900C104 +EX900C104 -M1 V 20 JUT14-2.5/GY 02/16.D2 =900C104 +1CP01 -T1 V2
D D
Motor 3 =900C104 +EX900C104 -M1 W 21 JUT14-2.5/GY 02/16.D2 =900C104 +1CP01 -T1 W2
Motor PE =900C104 +EX900C104 -M1 PE 22 JUT14-2.5PE PE 02/16.D2
Motor 1 =900C105 +EX900C105 -M1 U 23 JUT14-2.5/GY 02/17.D1 =900C105 +1CP01 -T1 U2
Motor 2 =900C105 +EX900C105 -M1 V 24 JUT14-2.5/GY 02/17.D2 =900C105 +1CP01 -T1 V2
Motor 3 =900C105 +EX900C105 -M1 W 25 JUT14-2.5/GY 02/17.D2 =900C105 +1CP01 -T1 W2
Motor PE =900C105 +EX900C105 -M1 PE 26 JUT14-2.5PE PE 02/17.D2 =900C105 +1CP01 -T1 PE
Brake 1 =900C105 +EX900C105 -M1 AC1 27 JUT14-2.5/GY 02/17.D4 =900C105 +1CP01 -K1 9 1
Brake 2 =900C105 +EX900C105 -M1 AC2 28 JUT14-2.5/GY 02/17.D4 =900C105 +1CP01 -K1 12 2

E E

1/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 35
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X3 001-02-35 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E106 -JB1-W1

+EX900C106 -M1-W2

+EX900C106 -M1-W1

+EX900C111 -M1-W1

+EX900C109 -M1-W1

+EX900C107 -M1-W1
+EX900E106 -M1-W2

+EX900E106 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 88
B Motor 1 =900C107 +EX900C107 -M1 U 29 JUT14-2.5/GY 02/19.D2 =900C107 +1CP01 -T1 U2
B
Motor 2 =900C107 +EX900C107 -M1 V 30 JUT14-2.5/GY 02/19.D2 =900C107 +1CP01 -T1 V2
Motor 3 =900C107 +EX900C107 -M1 W 31 JUT14-2.5/GY 02/19.D2 =900C107 +1CP01 -T1 W2
Motor PE =900C107 +EX900C107 -M1 PE 32 JUT14-2.5PE PE 02/19.D2 =900C107 +1CP01 -T1 PE
Motor 1 =900C109 +EX900C109 -M1 U 33 JUT14-2.5/GY 02/27.D2 =900C109 +1CP01 -T1 U2
Motor 2 =900C109 +EX900C109 -M1 V 34 JUT14-2.5/GY 02/27.D2 =900C109 +1CP01 -T1 V2
Motor 3 =900C109 +EX900C109 -M1 W 35 JUT14-2.5/GY 02/27.D2 =900C109 +1CP01 -T1 W2
Motor PE =900C109 +EX900C109 -M1 PE 36 JUT14-2.5PE PE 02/27.D2 =900C109 +1CP01 -T1 PE
Motor 1 =900C111 +EX900C111 -M1 U 37 JUT14-2.5/GY 02/28.D2 =900C111 +1CP01 -T1 U2
Motor 2 =900C111 +EX900C111 -M1 V 38 JUT14-2.5/GY 02/28.D2 =900C111 +1CP01 -T1 V2
C C
Motor 3 =900C111 +EX900C111 -M1 W 39 JUT14-2.5/GY 02/28.D2 =900C111 +1CP01 -T1 W2
Motor PE =900C111 +EX900C111 -M1 PE 40 JUT14-2.5PE PE 02/28.D2 =900C111 +1CP01 -T1 PE
Motor 1 =900C106 +EX900C106 -M1 U 41 JUT14-2.5/GY 02/18.D2 =900C106 +1CP01 -T1 U2
Motor 2 =900C106 +EX900C106 -M1 V 42 JUT14-2.5/GY 02/18.D2 =900C106 +1CP01 -T1 V2
Motor 3 =900C106 +EX900C106 -M1 W 43 JUT14-2.5/GY 02/18.D2 =900C106 +1CP01 -T1 W2
Motor PE =900C106 +EX900C106 -M1 PE 44 JUT14-2.5PE PE 02/18.D2 =900C106 +1CP01 -T1 PE
Brake 1 =900C106 +EX900C106 -M1 AC1 45 JUT14-2.5/GY 02/18.D4 =900C106 +1CP01 -K1 9 1
Brake 2 =900C106 +EX900C106 -M1 AC2 46 JUT14-2.5/GY 02/18.D4 =900C106 +1CP01 -K1 12 2
1 =900E106 +EX900E106 -Q1 1 47 JUT14-2.5/GY 02/14.D1 =900E106 +1CP01 -T1 U2
2 =900E106 +EX900E106 -Q1 3 48 JUT14-2.5/GY 02/14.D2 =900E106 +1CP01 -T1 V2
D D
3 =900E106 +EX900E106 -Q1 5 49 JUT14-2.5/GY 02/14.D2 =900E106 +1CP01 -T1 W2
Motor PE =900E106 +EX900E106 -M1 PE 50 JUT14-2.5PE PE 02/14.D2 =900E106 +1CP01 -T1 PE
Brake 1 =900E106 +EX900E106 -M1 AC1 51 JUT14-2.5/GY 02/14.D4 =900E106 +1CP01 -K1 9 1
Brake 2 =900E106 +EX900E106 -M1 AC2 52 JUT14-2.5/GY 02/14.D4 =900E106 +1CP01 N
U 1 =900E106+EX900E106 -JB1 -X1 1 53 JUT14-2.5/GY 02/14.D6 =900E106 +1CP01 -T2 U2
V 2 =900E106+EX900E106 -JB1 -X1 2 54 JUT14-2.5/GY 02/14.D6 =900E106 +1CP01 -T2 V2
W 3 =900E106+EX900E106 -JB1 -X1 3 55 JUT14-2.5/GY 02/14.D6 =900E106 +1CP01 -T2 W2
PE PE =900E106+EX900E106 -JB1 -X1 4 56 JUT14-2.5PE PE 02/14.D6 =900E106 +1CP01 -T2 PE

E E

2/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 35
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X3 001-02-35 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C108 -M1-W2

+EX900C108 -M1-W1
+EX900E111 -M1-W2

+EX900E105 -M1-W2

+EX900E105 -M1-W1

+EX900E110 -M2-W2

+EX900E110 -M1-W1
+EX900E111 -Q3-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 88
B Motor 1 =900C108 +EX900C108 -M1 U 57 JUT14-2.5/GY 02/21.C2 =900C108 +1CP01 -Q1 2 1
B
Motor 2 =900C108 +EX900C108 -M1 V 58 JUT14-2.5/GY 02/21.C2 =900C108 +1CP01 -Q1 4 1
Motor 3 =900C108 +EX900C108 -M1 W 59 JUT14-2.5/GY 02/21.C2 =900C108 +1CP01 -Q1 6 1
Motor PE =900C108 +EX900C108 -M1 PE 60 JUT14-2.5PE PE 02/21.C3 =900C108 +1CP01 -T1 PE
Brake 1 =900C108 +EX900C108 -M1 AC1 61 JUT14-2.5/GY 02/21.C4
Brake 2 =900C108 +EX900C108 -M1 AC2 62 JUT14-2.5/GY 02/21.C4 =900C108 +1CP01 -K2 12 2
Motor 1 =900C108 +EX900E110 -M2 U 63 JUT14-2.5/GY 02/21.C6 =900C108 +1CP01 -F2 2
Motor 2 =900C108 +EX900E110 -M2 V 64 JUT14-2.5/GY 02/21.C6 =900C108 +1CP01 -F2 4
Motor 3 =900C108 +EX900E110 -M2 W 65 JUT14-2.5/GY 02/21.C6 =900C108 +1CP01 -F2 6
Motor PE =900C108 +EX900E110 -M2 PE 66 JUT14-2.5PE PE 02/21.C6
C C
Brake 1 =900C108 +EX900E110 -M2 AC1 67 JUT14-2.5/GY 02/21.C7 =900C108 +1CP01 -Q2 54 1
Brake 2 =900C108 +EX900E110 -M2 AC2 68 JUT14-2.5/GY 02/21.C7 =900C108 +1CP01 N
Brake 3 =900C108 +EX900E110 -M2 NO1 69 JUT14-2.5/GY 02/21.C7 =900C108 +1CP01 -K1 8 2
Brake 4 =900C108 +EX900E110 -M2 NO2 70 JUT14-2.5/GY 02/21.C8 =900C108 +1CP01 -K1 12 2
Motor 1 =900E105 +EX900E105 -M1 U 71 JUT14-2.5/GY 02/11.E1 =900E105 +1CP01 -T1 U2
Motor 2 =900E105 +EX900E105 -M1 V 72 JUT14-2.5/GY 02/11.E2 =900E105 +1CP01 -T1 V2
Motor 3 =900E105 +EX900E105 -M1 W 73 JUT14-2.5/GY 02/11.E2 =900E105 +1CP01 -T1 W2
Motor PE =900E105 +EX900E105 -M1 PE 74 JUT14-2.5PE PE 02/11.E2 =900E105 +1CP01 -T1 PE
Brake 1 =900E105 +EX900E105 -M1 AC1 75 JUT14-2.5/GY 02/11.E4 =900E105 +1CP01 -K1 9 1
Brake 2 =900E105 +EX900E105 -M1 AC2 76 JUT14-2.5/GY 02/11.E4 =900E105 +1CP01 N
D D
Brake 3 =900E105 +EX900E105 -M1 NO1 77 JUT14-2.5/GY 02/11.E4 =900E105 +1CP01 -K1 12 2
Brake 4 =900E105 +EX900E105 -M1 NO2 78 JUT14-2.5/GY 02/11.E4 =900E105 +1CP01 -K1 8 2
1 =900E111 +1CP01 -Q3 1 79 JUT14-2.5/GY 02/30.C2 =900E111 +1CP01 -F2 2
2 =900E111 +1CP01 -Q3 3 80 JUT14-2.5/GY 02/30.C2 =900E111 +1CP01 -F2 4
3 =900E111 +1CP01 -Q3 5 81 JUT14-2.5/GY 02/30.C2 =900E111 +1CP01 -F2 6
Motor PE =900E111 +EX900E111 -M1 PE 82 JUT14-2.5PE PE 02/30.C3 =900E111 +1CP01 -T1 PE
Brake 1 =900E111 +EX900E111 -M1 AC1 83 JUT14-2.5/GY 02/30.C3 =900E111 +1CP01 -Q1 54 1
Brake 2 =900E111 +EX900E111 -M1 AC2 84 JUT14-2.5/GY 02/30.C3 =900E111 +1CP01 N

E E

3/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 35
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X3 001-02-35 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E111 -JB1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 88
B U 1 =900E111+EX900E111 -JB1 -X1 1 85 JUT14-2.5/GY 02/30.C6 =900E111 +1CP01 -Q2 2 1
B
V 2 =900E111+EX900E111 -JB1 -X1 2 86 JUT14-2.5/GY 02/30.C6 =900E111 +1CP01 -Q2 4 1
W 3 =900E111+EX900E111 -JB1 -X1 3 87 JUT14-2.5/GY 02/30.C6 =900E111 +1CP01 -Q2 6 1
PE PE =900E111+EX900E111 -JB1 -X1 4 88 JUT14-2.5PE PE 02/30.C6

C C

D D

E E

4/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 35
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X3 001-02-35 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
+1CD02 -W2
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP01 -X4


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 15
B 1 =900C108 +1CD02 -X5 1 1 JUT14-2.5/GY 02/22.B2 =900C108 +1CP01 -T1 19 DO0
B
2 =900C108 +1CD02 -X5 2 2 JUT14-2.5/GY 02/22.B3 =900C108 +1CP01 -K2 14
3 =900C108 +1CD02 -X5 3 3 JUT14-2.5/GY 02/22.B4 =900C108 +1CP01 -K3 14
4 =900C108 +1CD02 -X5 4 4 JUT14-2.5/GY 02/22.B5 =900C108 +1CP01 -K4 14
5 =900C108 +1CD02 -X5 5 5 JUT14-2.5/GY 02/22.D2 =900C108 +1CP01 -Q1 64 2
6 =900C108 +1CD02 -X5 6 6 JUT14-2.5/GY 02/22.D3 =900C108 +1CP01 -Q2 64 2
7 =900C108 +1CD02 -X5 7 7 JUT14-2.5/GY 02/22.D4 =900C108 +1CP01 -F2 96 NC
8 =900E105 +1CD02 -X5 8 8 JUT14-2.5/GY 02/11.D6 =900E105 +1CP01 -T1 19 DO0
9 JUT14-2.5/GY
10 =900E111 +1CD02 -X5 10 10 JUT14-2.5/GY 02/31.B3 =900E111 +1CP01 -K2 14
C C
11 =900E111 +1CD02 -X5 11 11 JUT14-2.5/GY 02/31.B4 =900E111 +1CP01 -K3 14
12 =900E111 +1CD02 -X5 12 12 JUT14-2.5/GY 02/31.D2 =900E111 +1CP01 -Q1 64 2
13 =900E111 +1CD02 -X5 13 13 JUT14-2.5/GY 02/31.D3 =900E111 +1CP01 -Q2 64 2
14 =900E111 +1CD02 -X5 14 14 JUT14-2.5/GY 02/31.D4 =900E111 +1CP01 -F2 96 NC
15 +1CD02 -X5 15 15 JUT14-2.5/GY 02/6.B5 +1CP01 -Q1 54 1

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP01-X4 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 36
APPROVED DWG. NO: PAGE : REV.
+1CP01 -X4 001-02-36 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


1 +1CP02 Air Conditioner Air Conditioner SK 3370.520 RITTAL
A 2 +1CP02 -1CP02 Cabinet 2000X1000X600 A
3 +1CP02 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
4 +1CP02 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER
5 +1CP02 -1F3 Circuit Breaker iC65N,6A/1P SCHNEIDER
6 +1CP02 -2F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
7 +1CP02 -2F2 Circuit Breaker iC65N,6A/1P SCHNEIDER
8 +1CP02 =900C110 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER
9 +1CP02 =900C112 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
B 10 +1CP02 =900C113 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER B

11 +1CP02 =900C114 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER


12 +1CP02 =900C115 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
13 +1CP02 =900C116 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
14 +1CP02 =900C117 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
15 +1CP02 =900C118 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
16 +1CP02 =900C119 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
17 +1CP02 =900C301 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
C C
18 +1CP02 =900C302 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
19 +1CP02 =900C303 -F1 Circuit Breaker iC65N-C,16A/3P SCHNEIDER
20 +1CP02 =900E301 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
21 +1CP02 =900E304 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
22 +1CP02 =900E305 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
23 +1CP02 =900E306 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
24 +1CP02 =902C001 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
D
25 +1CP02 =902C002 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER D
26 +1CP02 =902E001 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
27 +1CP02 =902E003 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
28 +1CP02 -1Q1 Contactor LC1-N65M5N SCHNEIDER
29 +1CP02 -2Q1 Contactor LC1-N65M5N SCHNEIDER
30 +1CP02 =900C113 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
31 +1CP02 =900C114 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
32 +1CP02 =900C115 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
E 33 +1CP02 =900C116 -K1 Auxiliary Relay DRM270024L WEIDMUELLER E
34 +1CP02 =900C118 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
35 +1CP02 =900C301 -F2 Thermal Overload Relay LRN06N SCHNEIDER
36 +1CP02 =900C301 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
37 +1CP02 =900C301 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
1/ 5
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 38
APPROVED DWG. NO: PAGE : REV.
1CP02 Parts List 001-02-38 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


38 +1CP02 =900C301 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
A 39 +1CP02 =900C301 -K4 Auxiliary Relay DRM270024L WEIDMUELLER A
40 +1CP02 =900C301 -Q1 Contactor LC1-N1201M5N SCHNEIDER
41 +1CP02 =900C301 -Q2 Contactor LC1-N1201M5N SCHNEIDER
42 +1CP02 =900C302 -F2 Thermal Overload Relay LRN06N SCHNEIDER
43 +1CP02 =900C302 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
44 +1CP02 =900C302 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
45 +1CP02 =900C302 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
46 +1CP02 =900C302 -K4 Auxiliary Relay DRM270024L WEIDMUELLER
B 47 +1CP02 =900C302 -Q1 Contactor LC1-N1201M5N SCHNEIDER B

48 +1CP02 =900C302 -Q2 Contactor LC1-N1201M5N SCHNEIDER


49 +1CP02 =900E301 -F2 Thermal Overload Relay LRN08N SCHNEIDER
50 +1CP02 =900E301 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
51 +1CP02 =900E301 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
52 +1CP02 =900E301 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
53 +1CP02 =900E301 -Q1 Contactor LC1-N1201M5N SCHNEIDER
54 +1CP02 =900E301 -Q2 Contactor LC1-N1201M5N SCHNEIDER
C C
55 +1CP02 =900E304 -F2 Thermal Overload Relay LRN08N SCHNEIDER
56 +1CP02 =900E304 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
57 +1CP02 =900E304 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
58 +1CP02 =900E304 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
59 +1CP02 =900E304 -Q1 Contactor LC1-N1201M5N SCHNEIDER
60 +1CP02 =900E304 -Q2 Contactor LC1-N1201M5N SCHNEIDER
61 +1CP02 =900E305 -F2 Thermal Overload Relay LRN08N SCHNEIDER
D
62 +1CP02 =900E305 -F3 Thermal Overload Relay LRN01N SCHNEIDER D
63 +1CP02 =900E305 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
64 +1CP02 =900E305 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
65 +1CP02 =900E305 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
66 +1CP02 =900E305 -K4 Auxiliary Relay DRM270024L WEIDMUELLER
67 +1CP02 =900E305 -Q1 Contactor LC1-N1201M5N SCHNEIDER
68 +1CP02 =900E305 -Q2 Contactor LC1-N1201M5N SCHNEIDER
69 +1CP02 =900E305 -Q3 Contactor LC1-N1201M5N SCHNEIDER
E 70 +1CP02 =900E306 -F2 Thermal Overload Relay LRN08N SCHNEIDER E
71 +1CP02 =900E306 -F3 Thermal Overload Relay LRN01N SCHNEIDER
72 +1CP02 =900E306 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
73 +1CP02 =900E306 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
74 +1CP02 =900E306 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
2/ 5
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 38
APPROVED DWG. NO: PAGE : REV.
1CP02 Parts List 001-02-38 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


75 +1CP02 =900E306 -K4 Auxiliary Relay DRM270024L WEIDMUELLER
A 76 +1CP02 =900E306 -Q1 Contactor LC1-N1201M5N SCHNEIDER A
77 +1CP02 =900E306 -Q2 Contactor LC1-N1201M5N SCHNEIDER
78 +1CP02 =900E306 -Q3 Contactor LC1-N1201M5N SCHNEIDER
79 +1CP02 =902E001 -F2 Thermal Overload Relay LRN08N SCHNEIDER
80 +1CP02 =902E001 -F3 Thermal Overload Relay LRN01N SCHNEIDER
81 +1CP02 =902E001 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
82 +1CP02 =902E001 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
83 +1CP02 =902E001 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
B 84 +1CP02 =902E001 -K4 Auxiliary Relay DRM270024L WEIDMUELLER B

85 +1CP02 =902E001 -Q1 Contactor LC1-N1201M5N SCHNEIDER


86 +1CP02 =902E001 -Q2 Contactor LC1-N1201M5N SCHNEIDER
87 +1CP02 =902E001 -Q3 Contactor LC1-N1201M5N SCHNEIDER
88 +1CP02 =902E003 -F2 Thermal Overload Relay LRN08N SCHNEIDER
89 +1CP02 =902E003 -F3 Thermal Overload Relay LRN01N SCHNEIDER
90 +1CP02 =902E003 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
91 +1CP02 =902E003 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
C C
92 +1CP02 =902E003 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
93 +1CP02 =902E003 -K4 Auxiliary Relay DRM270024L WEIDMUELLER
94 +1CP02 =902E003 -Q1 Contactor LC1-N1201M5N SCHNEIDER
95 +1CP02 =902E003 -Q2 Contactor LC1-N1201M5N SCHNEIDER
96 +1CP02 =902E003 -Q3 Contactor LC1-N1201M5N SCHNEIDER
97 +1CP02 =900C110 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS
98 +1CP02 =900C112 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
D
99 +1CP02 =900C113 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS D
100 +1CP02 =900C114 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
101 +1CP02 =900C115 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
102 +1CP02 =900C116 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
103 +1CP02 =900C117 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
104 +1CP02 =900C118 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
105 +1CP02 =900C119 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
106 +1CP02 =900C301 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
E 107 +1CP02 =900C302 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS E
108 +1CP02 =900C303 -T1 Frequency Inverter 6SL3210-1KE17-5UF1 SIEMENS
109 +1CP02 =900E301 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
110 +1CP02 =900E304 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
111 +1CP02 =900E305 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
3/ 5
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 38
APPROVED DWG. NO: PAGE : REV.
1CP02 Parts List 001-02-38 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


112 +1CP02 =900E306 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
A 113 +1CP02 =902C001 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS A
114 +1CP02 =902C002 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
115 +1CP02 =902E001 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
116 +1CP02 =902E003 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
117 +1CP02 =900C110 -R1 Braking Resistor 160Ω,200W EAGTOP
118 +1CP02 =900C112 -R1 Braking Resistor 390Ω,100W EAGTOP
119 +1CP02 =900C113 -R1 Braking Resistor 390Ω,100W
120 +1CP02 =900C114 -R1 Braking Resistor 390Ω,100W EAGTOP
B 121 +1CP02 =900C115 -R1 Braking Resistor 390Ω,100W EAGTOP B

122 +1CP02 =900C116 -R1 Braking Resistor 390Ω,100W EAGTOP


123 +1CP02 =900C117 -R1 Braking Resistor 390Ω,100W EAGTOP
124 +1CP02 =900C118 -R1 Braking Resistor 390Ω,100W EAGTOP
125 +1CP02 =900C119 -R1 Braking Resistor 390Ω,100W EAGTOP
126 +1CP02 =900C301 -R1 Braking Resistor 160Ω,200W EAGTOP
127 +1CP02 =900C302 -R1 Braking Resistor 160Ω,200W EAGTOP
128 +1CP02 =900C303 -R1 Braking Resistor 160Ω,200W EAGTOP
C C
129 +1CP02 =900E301 -R1 Braking Resistor 160Ω,200W
130 +1CP02 =900E304 -R1 Braking Resistor 160Ω,200W
131 +1CP02 =900E305 -R1 Braking Resistor 160Ω,200W
132 +1CP02 =900E306 -R1 Braking Resistor 160Ω,200W
133 +1CP02 =902C001 -R1 Braking Resistor 160Ω,200W EAGTOP
134 +1CP02 =902C002 -R1 Braking Resistor 160Ω,200W EAGTOP
135 +1CP02 =902E001 -R1 Braking Resistor 160Ω,200W
D
136 +1CP02 =902E003 -R1 Braking Resistor 160Ω,200W D
137 +1CP02 -1E1 Control cabinet lighting Set of factory orders - cabinet lighting
138 +1CP02 -1L1 Terminal UTD-300I/18×6
139 +1CP02 -1L2 Terminal UTD-300I/18×6
140 +1CP02 -1L3 Terminal UTD-300I/18×6
141 +1CP02 -1X1 Terminal Block 220
142 +1CP02 -1X2 Terminal Block 24
143 +1CP02 -1X3 Terminal Block
E 144 +1CP02 -2E1 Control cabinet lighting Set of factory orders - cabinet lighting E
145 +1CP02 -2L1 Terminal UTD-300I/18×6
146 +1CP02 -2L2 Terminal UTD-300I/18×6
147 +1CP02 -2L3 Terminal UTD-300I/18×6
148 +1CP02 -2X1 Terminal Block 220
4/ 5
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 38
APPROVED DWG. NO: PAGE : REV.
1CP02 Parts List 001-02-38 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


149 +1CP02 -2X2 Terminal Block 24
A 150 +1CP02 -2X3 Terminal Block A

B B

C C

D D

E E

5/ 5
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 38
APPROVED DWG. NO: PAGE : REV.
1CP02 Parts List 001-02-38 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL

1
1
2000

Zone, Changsha, Hunan, China

BM1 Roll Handling and PE Wrapping System

1CP02 Cabinet arrangement

2
2

268 Xinxing Road, Yuhua Economic Development


CHAINT CORPORATION
`

1000

Project:

001
1CP02 Front

Location:
Function:

Drawing
02
001-02-37
+1CP02
Group
37
BM1-900-E-2005

Page

3
3

REVISION
MARK
-1CP02

2000

DATE
55 180 230 270 350 280 245 225

4
4

DRAWN
=900C110-F1
-1F1
=900C118-T1
=900C110-T1
=900C112-F1

CHK’D
=900C113-K1 =900C113-F1 -1Q1
=900C301-T1 =900C112-T1
=900C114-K1

Brake resistors are placed at the top


=900C115-K1 -1X2 =900C114-F1
=900C116-K1
=900C302-T1 -1L1
=900C118-K1 =900C113-T1 =900C115-F1
=900C301-K1

ENG’R
-1L2
-1X3 =900C301-K2
=900C116-F1
=900C301-K3

5
5

=900C301-Q1 =900C303-T1 =900C114-T1 -1L3


=900C301-K4
1000 =900C302-K1 =900C117-F1
=900C301-F2
=900C301-Q2
=900C302-K2
-1X1
=900C302-K3 =900C302-Q1 =900C118-F1

APP’D
=902C001-T1 =900C115-T1
=900C302-K4
=900C302-F2
=900C302-Q2
1CP02 Front =900C301-F1 -1F2
-1F3
=902C002-T1 =900C116-T1
=900C302-F1

=900C303-F1
=900C119-T1 =900C117-T1
=902C001-F1
=900C119-F1
=902C002-F1

6
6

SCALE.
DRAWN
PROJECT:

CHECHED
ENGINEER
APPROVED
DATE

1 mm : 10 mm
2022/1/7
INITIAL
Configure internal network cables

ORIG.SIZE
SIGN

吴毅丰

7
7

TYPE
AREA

DETAIL
DETAIL

DWG. NO:
600

Cabinet arrangement

8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

10
+1CP20 L.1CP02.1 -1X1 1L.K01
distribution cabinet

1
03/6.D3 /53.A5
From the power

TO 1CP02.2
A A

-1W3
ZR-VV-1KV 3*2.5+1*1.5
15
N PE

B B

A1
-1Q1

A2
1

5
-1F1 LC1-N65M5N

6
iC65N-C,63A/3P
1N.Q01 1N.Q01
.D2 /53.E5

5
N
-1Q1
1 2
.B7
3 4

6
.B4
-1X1 5 6
1

L1 L1 L1 L1 13 14

-1L1

-1L2

-1L3
-1X1 21 22
5

C N N N N UTD-300I/18×6
C
1

-1F2 -1F3
iC65N,6A/1P iC65N,6A/1P
2

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS
1N.Q01

D D
/41.A1

/41.A1

/41.A1

/42.A1

/42.A1

/42.A1

/43.A1

/43.A1

/43.A1

/45.A1

/45.A1

/45.A1

/47.A1

/47.A1

/47.A1

/50.A1

/50.A1

/50.A1

/55.A1

/55.A1

/55.A1

/60.A1

/60.A1

/60.A1
.B7

Air Conditioner
1

-1E1 SK 3370.520
L N
Control cabinet lighting
2

E E
1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS

1L1.MPS

1L2.MPS

1L3.MPS
/44.A1

/44.A1

/44.A1

/46.A1

/46.A1

/46.A1

/48.A1

/48.A1

/48.A1

/51.A1

/51.A1

/51.A1

/59.A1

/59.A1

/59.A1

/61.A1

/61.A1

/61.A1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 39
APPROVED DWG. NO: PAGE : REV.
Main power distribution 001-02-39 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL
03/4.B8
03/4.B8

1
1

+1CP20 M.OP
+1CP20 L+.OP
-1X2
1L+.Q01 1

24V power
/53.C2 L+

1M.K01 17

Zone, Changsha, Hunan, China


/43.D3

BM1 Roll Handling and PE Wrapping System


M

1L+.T01
/41.B3

1M.T01 18
/41.B3
M

2
2

1L+.T01 2

268 Xinxing Road, Yuhua Economic Development


/42.B3

CHAINT CORPORATION
L+

1M.T01
/42.B3

Project:
1L+.T01

001
/43.D3

Location:
Function:

Drawing
1M.T01 19
/43.C3
M

02
1L+.T01 3

001-02-40
+1CP02
/43.C3

Group
L+

1M.T01
/44.C3

40
BM1-900-E-2005

Page
1L+.T01

3
3

/44.D3

1M.T01 20
/45.C3
M

1L+.T01 4
/44.C3
L+

REVISION
1L+.T01
/45.D3

1L+.T01 5
/45.C3
L+

MARK
1L+.T01
/46.D3

1M.T01 21
/46.C3
M

DATE
4
4

1L+.T01 6
/46.C3
L+

1M.T01 22
/47.C3
M

DRAWN
1L+.T01
/47.C3

1M.T01
/48.C3

CHK’D
1L+.T01 7
/48.D3
L+

1M.T01 23
/50.C3
M

ENG’R
1L+.T01

5
5

/48.C3

1M.T01
/51.C3

APP’D
1L+.T01 8
/50.C3
L+

1M.T01 24
/55.C3
M

1L+.T01
/51.C3

1L+.T01 9
/55.C3
L+

1L+.T01
/59.B3

6
6

1L+.T01 10
/60.B3
L+

SCALE.
DRAWN
PROJECT:

1M.T01 25
CHECHED

/59.B3
ENGINEER
APPROVED
M

1L+.T01
/61.B3
DATE

1 mm : 1 mm

1M.T01
2022/1/7

/60.B3

1L+.T01 11
L+

INITIAL

1M.T01 26
ORIG.SIZE

/61.B3
M

1L+.X01 12
SIGN

吴毅丰

7
7

L+

1L+.X01
TYPE
AREA

DETAIL
DETAIL

1M.X01 27
DWG. NO:
M

1L+.T01 13
L+

2M.01 28 14
M
L+

1L+.T01 15
Schematic diagram
L+

2L+.01 16
L+

8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D4
+1CP20
+1CP02 1L2.MPS +1CP20 L+.X01 -X3 +1CP20 L+.X01

4
/39.D4 03/4.B4 /42.A5
A L+ L+ A
+1CP02 1L3.MPS +1CP20 M.X01 +1CP20 M.X01

5
/39.D4 03/4.B4 /42.A5
M M

+1CP02
+EX900C110-JB1-W1 +EX900C110-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
30 35
iC65N-C,16A/3P
+EX900C110 +EX900C110
-JB1 -JB2
2

-X1 -X1

1
L+ L+
B B

3
M M

/40.B2

/40.B2

1/BN

3/BU

1/BN

3/BU
+EX900C110-B1-W1 +EX900C110-B2-W1

+1CP02 1L+.T01

+1CP02 1M.T01
+1CP02 Sensor cable Sensor cable
-R1 2 2 2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C110 +EX900C110
1

160Ω,200W -B1 -B2


+1CP02
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export
PNP NO
6SL3210-1KE17-5UF1
U2 V2 W2 PE 20 18 19

+EX900C110 +EX900C110

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C110 +EX900C110
D -JB1 -JB2 D
-X1 -X1

5
+1CP02
-1X3 +EX900C110 +EX900C110
1

PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C110-M1-W1 +1CP20 +1CP20


1

ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3

6
30

E +EX900C110 E

2
-M1 I 42.0 I 42.1
=900C110-#Pc.Come =900C110-#Pc.Leave
PE

=900C110#Pc.Come =900C110#Pc.Leave
W
U

M +1CP20 -DI2 +1CP20 -DI2


Motor 3AC
Conveyer Motor 04/3.A3 04/3.A3
400VAC
3.0KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C110
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 41
APPROVED DWG. NO: PAGE : REV.
900C110#Conveyer 001-02-41 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D4

10
+1CP20 L+.X01 +1CP20 L+.X01

7
/41.A8 /43.A6
+1CP02 1L2.MPS L+ L+
/39.D4

11
A +1CP20 M.X01 +1CP20 M.X01 A

8
/41.A8 /43.A6
+1CP02 1L3.MPS M M
/39.D4

+EX900C112-JB1-W1 +EX900C112-JB2-W1

2
+1CP02 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
1

5
-F1 25 25

iC65N-C,10A/3P +EX900C112 +EX900C112


-JB1 -JB2
-X1 -X1 +EX900C112 -JB2 L+

1
2

6 /43.B5
L+ L+
+EX900C112 -JB2 M

3
/43.B5
B M M B

/40.B2

/40.B2

1/BN

3/BU

1/BN

3/BU
+EX900C112-B1-W1 +EX900C112-B2-W1
Sensor cable Sensor cable

+1CP02 1L+.T01

+1CP02 1M.T01
+1CP02 2 2
-R1

1/BN

3/BU

1/BN

3/BU
2
+EX900C112 +EX900C112
PE -B1 -B2
1

390Ω,100W
ET5.3/4P ET5.3/4P
+1CP02
C Inspection of entry Inspection for
C

4/BK

4/BK
-T1 PNP NO export
PNP NO
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE14-3UF2
U2 V2 W2 PE
+EX900C112 +EX900C112

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C112 +EX900C112
-JB1 -JB2
D -X1 -X1 D

5
+1CP02 +EX900C112 +EX900C112
10

11

12

-1X3 -JB1 -JB2


9

PE -W1 -W1

3
+1CP20 +1CP20
PE

12
+EX900C112-M1-W1 -X3 -X3

9
1

ZR-VV-1KV 3*2.5+1*1.5
25

4
E +EX900C112 I 42.2 I 42.3 E
-M1 =900C112-#Pc.Come =900C112-#Pc.Leave
=900C112#Pc.Come =900C112#Pc.Leave
PE
W
U

+1CP20 -DI2 +1CP20 -DI2


M 04/3.A3 04/3.A3
Motor 3AC
Conveyer Motor
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C112
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 42
APPROVED DWG. NO: PAGE : REV.
900C112#Conveyer 001-02-42 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D5

14
+1CP20 L+.X01 +1CP20 L+.X01
/42.A7 /44.A6
+1CP02 1L2.MPS L+
/39.D5

15
A /42.A7
+1CP20 M.X01 +1CP20 M.X01
/44.A6 A
+1CP02 1L3.MPS M
/39.D5

+EX900C113-JB2-W1

2
+1CP02 ZR-RVVP 4*0.5
1

5
-F1 30

iC65N-C,10A/3P +EX900C112 +EX900C113


-JB2 -JB2
+EX900C112 -JB2 L+ -X1 -X1 +EX900C113 -JB2 L+

1
2

/42.B7 /44.B5
L+ L+
+EX900C112 -JB2 M +EX900C113 -JB2 M

3
/42.B7 /44.B5
B M M B

1/BN

3/BU

1/BN

3/BU
/40.B3

/40.B3
+EX900C113-B1-W1 +EX900C113-B2-W1
Sensor cable Sensor cable
+1CP02 2 2
-R1

+1CP02 1L+.T01

+1CP02 1M.T01

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C113 +EX900C113
-B1 -B2
1

390Ω,100W
+1CP02
ET5.3/4P ET5.3/4P
-T1 +1CP02
C Inspection of entry Inspection for
C

4/BK

4/BK
L1 L2 L3 PE R1 R2 24V COM -K1 PNP NO export
PNP NO

1
5

4
8
6SL3210-1KE14-3UF2
.D3 .D3

12
U2 V2 W2 PE 20 18 19
+EX900C113 +EX900C113

4/BK

4/BK
+1CP02 1L+.T01

-B1-W1 -B2-W1

+EX900C112 +EX900C113
-JB2 -JB2
D N -X1 -X1 D

5
14
/40.B2

+1CP02
+1CP02 -K1 +1CP02 +EX900C112 +EX900C113
14

15

16

17

18

19
13

-1X3 -1X3 -JB2 -JB2


DRM270024L
PE -W1 -W1

3
+1CP02 1M.K01 +1CP02 1M.K01
/40.B2 /44.E3

5 .C4
1 9 +1CP20 +1CP20
PE

13

16
+EX900C113-M1-W1 8 +EX900C113-M1-W2 -X3 -X3
1

.C4
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75
30 30

6
E +EX900C113 I 42.4 I 42.5 E
-M1 =900C113-#Pc.Come =900C113-#Pc.Leave
=900C113#Pc.Come =900C113#Pc.Leave
AC1
PE
W
U

+1CP20 -DI2 +1CP20 -DI2


M Brake 04/3.A3 04/3.A3
AC2

Motor 3AC
Conveyer Motor
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C113
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 43
APPROVED DWG. NO: PAGE : REV.
900C113#Conveyer 001-02-43 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.E5

18
+1CP02 1L2.MPS +1CP20 L+.X01 +1CP20 L+.X01
/39.E5 /43.A8 /45.A6
A L+ A

19
+1CP02 1L3.MPS +1CP20 M.X01 +1CP20 M.X01
/39.E5 /43.A8 /45.A6
M

+1CP02

5
-F1
+EX900C114-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5
35

+EX900C113 +EX900C114
2

6
-JB2 -JB2
+EX900C113 -JB2 L+ -X1 -X1 +EX900C114 -JB2 L+

1
/43.B8 /45.B5
L+ L+
B +EX900C113 -JB2 M +EX900C114 -JB2 M B

3
/43.B8 /45.B5
M M

/40.B3

/40.B3

1/BN

3/BU

1/BN

3/BU
+EX900C114-B1-W1 +EX900C114-B2-W1
+1CP02 Sensor cable Sensor cable
-R1

+1CP02 1L+.T01

+1CP02 1M.T01
2 2

1/BN

3/BU

1/BN

3/BU
PE +EX900C114 +EX900C114
1

390Ω,100W -B1 -B2


+1CP02 +1CP02
C -K1 ET5.3/4P ET5.3/4P C
-T1 Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM PNP NO
.D3 .D3
6SL3210-1KE14-3UF2

12
U2 V2 W2 PE 20 18 19
+EX900C114 +EX900C114

4/BK

4/BK
+1CP02 1L+.T01

-B1-W1 -B2-W1

+EX900C113 +EX900C114
D N -JB2 -JB2 D
-X1 -X1

5
14
/40.B3

+1CP02 +1CP02 +1CP02


21

22

23

24

25

26
-1X3 -K1 -1X3 +EX900C113 +EX900C114
13

PE -JB2 -JB2
DRM270024L
-W1 -W1

3
+1CP02 1M.K01 +1CP02 1M.K01
/43.D3 /45.D3

5 .C4
PE

+EX900C114-M1-W1 1 9 +EX900C114-M1-W2 +1CP20 +1CP20


1

17

20
ZR-VV-1KV 3*2.5+1*1.5 8 .C5
ZR-RVV-500V 2*0.75 -X3 -X3
35 35
4 12
E +EX900C114 E

8
-M1 I 42.6 I 42.7
AC1

=900C114-#Pc.Come =900C114-#Pc.Leave
PE

=900C114#Pc.Come =900C114#Pc.Leave
W
U

M Brake +1CP20 -DI2 +1CP20 -DI2


AC2

Motor 3AC
Conveyer Motor 04/3.A3 04/3.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C114
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 44
APPROVED DWG. NO: PAGE : REV.
900C114#Conveyer 001-02-44 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D5

22
+1CP02 1L2.MPS +1CP20 L+.X01 +1CP20 L+.X01
/39.D5 /44.A8 /46.A6
A L+ A

23
+1CP02 1L3.MPS +1CP20 M.X01 +1CP20 M.X01
/39.D6 /44.A8 /46.A6
M

+1CP02
+EX900C115-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5
40
iC65N-C,10A/3P
+EX900C114 +EX900C115
-JB2 -JB2
2

+EX900C114 -JB2 L+ -X1 -X1 +EX900C115 -JB2 L+

1
/44.B8 /46.B5
L+ L+
B +EX900C114 -JB2 M +EX900C115 -JB2 M B

3
/44.B8 /46.B5
M M

/40.B4

/40.B3

1/BN

3/BU

1/BN

3/BU
+EX900C115-B1-W1 +EX900C115-B2-W1
+1CP02 Sensor cable Sensor cable
-R1

+1CP02 1L+.T01

+1CP02 1M.T01
2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C115 +EX900C115
1

390Ω,100W -B1 -B2


+1CP02
-T1 +1CP02
C -K1 ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
PNP NO
6SL3210-1KE14-3UF2
.D3 .D3

12
U2 V2 W2 PE 20 18 19
+1CP02 1L+.T01

+EX900C115 +EX900C115

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C114 +EX900C115
D N -JB2 -JB2 D
-X1 -X1
14
/40.B3

+1CP02

5
+1CP02 -K1 +1CP02
28

29

30

31

32

33
13

-1X3 -1X3 +EX900C114 +EX900C115


DRM270024L
PE -JB2 -JB2
+1CP02 1M.K01 +1CP02 1M.K01 -W1 -W1

3
/44.E4 /46.D3

5 .C4
1 9
PE

+EX900C115-M1-W1 8 +EX900C115-M1-W2 +1CP20 +1CP20


1

.C5

21

24
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75 -X3 -X3
40 40

E E

10
+EX900C115

9
-M1 I 43.0 I 43.1
AC1

=900C115-#Pc.Come =900C115-#Pc.Leave
PE

=900C115#Pc.Come =900C115#Pc.Leave
W
U

M Brake +1CP20 -DI2 +1CP20 -DI2


AC2

Motor 3AC
Conveyer Motor 04/3.A3 04/3.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C115
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 45
APPROVED DWG. NO: PAGE : REV.
900C115#Conveyer 001-02-45 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/39.E5
+1CP02 1L1.MPS +1CP20

25
/45.A8
+1CP20 L+.X01 -X3 +1CP20 L+.X01
/47.A5
+1CP02 1L2.MPS L+
/39.E5

26
A /45.A8
+1CP20 M.X01 +1CP20 M.X01
/47.A5 A
+1CP02 1L3.MPS M
/39.E6

+1CP02
+EX900C116-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5
45
iC65N-C,10A/3P
+EX900C115 +EX900C116
-JB2 -JB2
2

+EX900C115 -JB2 L+ -X1 -X1 +EX900C116 -JB2 L+

1
/45.B8 /47.B5
L+ L+
+EX900C115 -JB2 M +EX900C116 -JB2 M

3
/45.B8 /47.B5
B M M B

1/BN

3/BU

1/BN

3/BU
/40.B4

/40.B4
+EX900C116-B2-W1 +EX900C116-B1-W1
Sensor cable Sensor cable
2 2
+1CP02

+1CP02 1L+.T01

+1CP02 1M.T01
-R1

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C116 +EX900C116
-B2 -B1
1

390Ω,100W
+1CP02
ET5.3/4P ET5.3/4P
-T1 +1CP02
C Inspection of Inspection for
C

4/BK

4/BK
L1 L2 L3 PE R1 R2 24V COM -K1 entry export
PNP NO PNP NO

1
5

4
8
6SL3210-1KE14-3UF2
.D3 .D3

12
U2 V2 W2 PE 20 18 19
+EX900C116 +EX900C116

4/BK

4/BK
+1CP02 1L+.T01

-B2-W1 -B1-W1

+EX900C115 +EX900C116
-JB2 -JB2
D N -X1 -X1 D

5
14
/40.B4

+1CP02
+1CP02 -K1 +1CP02 +EX900C115 +EX900C116
35

36

37

38

39

40
13

-1X3 -1X3 -JB2 -JB2


DRM270024L
PE -W1 -W1

3
+1CP02 1M.K01 +1CP02 1M.K01
/45.D4 /48.E3

5 .C4
1 9 +1CP20 +1CP20
PE

29

27
+EX900C116-M1-W1 8 +EX900C116-M1-W2 -X3 -X3
1

.C5
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75
45 45

12

11
E +EX900C116 I 43.3 I 43.2 E
-M1 =900C116-#Pc.Come =900C116-#Pc.Leave
=900C116#Pc.Come =900C116#Pc.Leave
AC1
PE
W
U

+1CP20 -DI2 +1CP20 -DI2


M Brake 04/3.A3 04/3.A3
AC2

Motor 3AC
Conveyer Motor
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C116
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 46
APPROVED DWG. NO: PAGE : REV.
900C116#Conveyer 001-02-46 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D6

30
+1CP02 1L2.MPS +1CP20 L+.X01 +1CP20 L+.X01
/39.D6 /46.A8 /48.A6
A L+ A

31
+1CP02 1L3.MPS +1CP20 M.X01 +1CP20 M.X01
/39.D6 /46.A8 /48.A6
M

+EX900C117-JB2-W1

2
+1CP02 ZR-RVVP 4*0.5
1

-F1 5 50

iC65N-C,10A/3P +EX900C116 +EX900C117


-JB2 -JB2
+EX900C116 -JB2 L+ -X1 -X1 +EX900C117 -JB2 L+

1
2

/46.B8 /48.B6
L+ L+
B +EX900C116 -JB2 M +EX900C117 -JB2 M B

3
/46.B8 /48.B6
M M

/40.B4

/40.B4

1/BN

3/BU

1/BN

3/BU
+EX900C117-B1-W1 +EX900C117-B2-W1
+1CP02 Sensor cable Sensor cable
-R1

+1CP02 1L+.T01

+1CP02 1M.T01
2 2
2

1/BN

3/BU

1/BN

3/BU
PE +EX900C117 +EX900C117
1

390Ω,100W -B1 -B2


+1CP02
C ET5.3/4P ET5.3/4P C
-T1 Inspection of entry Inspection for

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE14-3UF2
U2 V2 W2 PE
+EX900C117 +EX900C117

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C116 +EX900C117
D -JB2 -JB2 D
-X1 -X1

5
+1CP02
42

43

44

45

-1X3 +EX900C116 +EX900C117


PE -JB2 -JB2
-W1 -W1

3
PE

+EX900C117-M1-W1 +1CP20 +1CP20


1

28

32
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
50

E E

13

14
+EX900C117
-M1 I 43.4 I 43.5
=900C117-#Pc.Come =900C117-#Pc.Leave
PE

=900C117#Pc.Come =900C117#Pc.Leave
W
U

M +1CP20 -DI2 +1CP20 -DI2


Motor 3AC
Conveyer Motor 04/3.A3 04/3.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C117
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 47
APPROVED DWG. NO: PAGE : REV.
900C117#Conveyer 001-02-47 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.E6

34
+1CP02 1L2.MPS +1CP20 L+.X01 +1CP20 L+.X01
/39.E6 /47.A8 /50.A5
A L+ A

35
+1CP02 1L3.MPS +1CP20 M.X01 +1CP20 M.X01
/39.E6 /47.A8 /50.A5
M

+1CP02
1

5
-F1
+EX900C118-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5
55

+EX900C117 +EX900C118
2

-JB2 -JB2
+EX900C117 -JB2 L+ -X1 -X1 +EX900C118 -JB2 L+

1
/47.B8 /50.B5
L+ L+
B +EX900C117 -JB2 M +EX900C118 -JB2 M B

3
/47.B8 /50.B5
M M

1/BN

3/BU

1/BN

3/BU
/40.B5

/40.B5
+EX900C118-B1-W1 +EX900C118-B2-W1
+1CP02 Sensor cable Sensor cable
-R1 2 2

+1CP02 1L+.T01

+1CP02 1M.T01
2

1/BN

3/BU

1/BN

3/BU
PE +EX900C118 +EX900C118
1

390Ω,100W -B1 -B2


+1CP02 +1CP02
C -K1 ET5.3/4P ET5.3/4P C
-T1 Inspection of entry Inspection for

4/BK

4/BK
PNP NO export

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM PNP NO
.D3 .D3
6SL3210-1KE14-3UF2

12
U2 V2 W2 PE 20 18 19
+EX900C118 +EX900C118

4/BK

4/BK
+1CP02 1L+.T01

-B1-W1 -B2-W1

+EX900C117 +EX900C118
D N -JB2 -JB2 D
-X1 -X1

5
14
/40.B5

+1CP02 +1CP02 +1CP02


47

48

49

50

51

52
-1X3 -K1 -1X3 +EX900C117 +EX900C118
13

PE -JB2 -JB2
DRM270024L
-W1 -W1

3
+1CP02 1M.K01 +1CP02 1M.K01
/46.D3 /53.C2

5 .C4
PE

+EX900C118-M1-W1 1 9 +EX900C118-M1-W2 +1CP20 +1CP20


1

33

36
ZR-VV-1KV 3*2.5+1*1.5 8 .C4
ZR-RVV-500V 2*0.75 -X3 -X3
55 55
4 12
E E

15

16
+EX900C118
-M1 I 43.6 I 43.7
AC1

=900C118-#Pc.Come =900C118-#Pc.Leave
PE

=900C118#Pc.Come =900C118#Pc.Leave
W
U

M Brake +1CP20 -DI2 +1CP20 -DI2


AC2

Motor 3AC
Conveyer Motor 04/3.A3 04/3.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C118
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 48
APPROVED DWG. NO: PAGE : REV.
900C118#Conveyer 001-02-48 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+EX900E112/113/114
-X2

5
Access the plugging system

12
A A

+EX900C118-JB3-W1

2
ZR-RVVP 4*0.5
30

+EX900C118
-JB3
-X1

2
L+ L+

4
M
B B

RD/红

BK/黑
+EX900C118-B3-W1
Sensor cable
1
+EX900C118
-B3
RI50-0/1000ES.12KA UB/Red
Measurement of width
GND/Black

A/Green

B/White
C C
Z/Yellow
WH/白
GN/绿

+EX900C118
-B3-W1

+EX900C118
-JB3
-X1
5

D D
+EX900C118
-JB3
-W1
3

PE

+EX900E112/113/114
27

28

-X5
DIa.2

DIa.3

E E
I0.2
-900E109#Runing detect.A
#幅宽检测脉冲A
Access the plugging system
I0.3
-#Runing detect.B
#幅宽检测脉冲B

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C118
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 49
APPROVED DWG. NO: PAGE : REV.
900C118#Conveyer 001-02-49 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D6
+1CP20

38
/39.D6
+1CP02 1L2.MPS
/48.A8
+1CP20 L+.X01 -X3
A L+ A

39
+1CP02 1L3.MPS +1CP20 M.X01
/39.D7 /48.A8
M

+1CP02
+EX900C119-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5
60
iC65N-C,10A/3P
+EX900C118 +EX900C119
-JB2 -JB2
2

+EX900C118 -JB2 L+ -X1 -X1

1
/48.B8
L+ L+
B +EX900C118 -JB2 M B

3
/48.B8
M M

/40.B5

/40.B5

1/BN

3/BU

1/BN

3/BU
+EX900C119-B1-W1 +EX900C119-B2-W1
+1CP02 Sensor cable Sensor cable
-R1

+1CP02 1L+.T01

+1CP02 1M.T01
2 2
2

1/BN

3/BU

1/BN

3/BU
PE +EX900C119 +EX900C119
1

390Ω,100W -B1 -B2


+1CP02
C ET5.3/4P ET5.3/4P C
-T1 Inspection of entry Inspection for

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE14-3UF2
U2 V2 W2 PE
+EX900C119 +EX900C119

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C118 +EX900C119
D -JB2 -JB2 D
-X1 -X1

5
+1CP02
54

55

56

57

-1X3 +EX900C118 +EX900C119


PE -JB2 -JB2
-W1 -W1

3
PE

+EX900C119-M1-W1 +1CP20 +1CP20


1

37

40
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
60

E +EX900C119 E

4
-M1 I 44.2 I 44.3
=900C119-#Pc.Come =900C119-#Pc.Leave
PE

=900C119#Pc.Come =900C119#Pc.Leave
W
U

M +1CP20 -DI3 +1CP20 -DI3


Motor 3AC
Conveyer Motor 04/3.A5 04/3.A5
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C119
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 50
APPROVED DWG. NO: PAGE : REV.
900C119#Conveyer 001-02-50 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.E6

+1CP02 1L2.MPS
/39.E7
A A
+1CP02 1L3.MPS
/39.E7

+1CP02
-F1
1

5
I> I> I>
B B
2

6
iC65N-C,10A/3P
10A

/40.B6

/40.B5
+1CP02
C -R1 C

+1CP02 1L+.T01

+1CP02 1M.T01
2

PE
+1CP02 +1CP02
1

160Ω,200W

1
5

1
5
-K1 -K2
+1CP02 /53.B2 /53.B3
-T1

9
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2
U2 V2 W2 PE
D D

E -K3.220V.Brake E
-K3.220V
-T1.W2

-T1.PE
-T1.U2

-T1.V2
/52.A2

/52.A2

/52.B2

/52.B2

/52.A2

/52.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 51
APPROVED DWG. NO: PAGE : REV.
900C301(E302)#End surface inspection Conveyer 001-02-51 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/51.E4

A /51.E5
-K3.220V.Brake A
-T1.U2
/51.E2

-T1.V2
/51.E2

-T1.W2
/51.E2

-T1.PE
/51.E2

B +1CP02 +1CP02 +1CP02 +1CP02 B


1

5
53

53
-Q1 -Q1 -Q2 -Q2
/53.E6 /53.E6 /53.E7 /53.E7
2

54

54
N N
+1CP02

95
97
1

5
-F2
I> I> I>

4
8
LRN06N -K1

96
98
2

6
1.0~1.6A

/53.D4
/53.B2

12
+1CP02 +1CP02 +1CP02 +1CP02
59

60

61

62

63

64

65

66

67

68

69

70

71

72
-1X3 -1X3 -1X3 -1X3
C PE PE
C
PE

PE
+EX900C301-M1-W1 +EX900C301-M1-W2 +EX900E302-M1-W1 +EX900E302-M2-W2
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*1.5+1*1.0 ZR-RVV-500V 4*0.75
20 20 25 25

D D

E E

+EX900C301 +EX900E302
AC1
PE

PE
-M1 -M2
W

W
AC1 AC2 NO1 NO2
U

U
V

V
Brake
M Brake M
AC2

Motor 3AC Motor 3AC


Conveyer Motor End surface inspection Move Motor
400VAC 400VAC
2.2KW 0.55KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 52
APPROVED DWG. NO: PAGE : REV.
900C301(E302)#End surface inspection Conveyer 001-02-52 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A1 05/3.A1 05/3.A1 05/3.A1


+1CP20 -DO1 +1CP20 -DO1 +1CP20 -DO1 +1CP20 -DO1 /39.A8
+1CP02 1L.K01 +1CP02 1L.K01
/57.A5
Q 24.0 Q 24.3 Q 24.1 Q 24.2
A =900C301-#Brake =900C301-#Brake_Cov =900C301-#Set.Cov =900C301-#Set.Lift A
=900C301#Brake =900C301#Brake_Cov =900C301#Set.Cov =900C301#Set.Lift

3
+1CP02 +1CP02

1
5

1
5
-K3 -K4
.B4 .B5

9
B +1CP02 B
18
19
-T1
20
14

14

14

14
+1CP02 +1CP02 +1CP02 +1CP02
-K1 -K2 -K3 -K4
13

13

13

13
DRM270024L DRM270024L DRM270024L DRM270024L

+1CP02 1M.K01 +1CP02 1M.K01


/48.E3 /57.C2 +1CP02 +1CP02

21

21
-Q2 -Q1
5 /51.C4 5 /51.C5 5 .B6 5 .B7 .E7 .E6
1 9 1 9 1 9 1 9

22

22
C 8 8 8 8
C
/52.C8
4 12 4 12 4 12 4 12

+1CP02 1L+.Q01 +1CP02 1L+.Q01


/40.B1 /57.C2

+1CP02 +1CP02 +1CP02


63

63

95
-Q1 -Q2 -F2
.E6 .E7 /52.B6
64

64

96

D D

A1

A1
+1CP02 +1CP02
-Q1 -Q2

A2

A2
LC1-N1201M5N LC1-N1201M5N

+1CP02 1N.Q01 +1CP02 1N.Q01


/39.B8 /57.E5
E E
1 2 1 2
1

I 54.0 I 54.1 I 54.2 3 4


/52.B2
3 4
/52.B6
=900C301-#Ready.Cov =900C301-#Ready.lift =900C301-#Hw.Fault2 5 6 5 6
=900C301#Ready.Cov =900C301#Ready.lift =900C301#Hw.Fault2
21 22 21 22
.C7 .C6
53 54 53 54
/52.B4 /52.B7
+1CP20 -DI8 +1CP20 -DI8 +1CP20 -DI8 63 64 63 64
.D2 .D3
04/3.C6 04/3.C6 04/3.C6 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 53
APPROVED DWG. NO: PAGE : REV.
900C301(E302)#End surface inspection Conveyer 001-02-53 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20 +1CP20 +1CP20


+1CP20 L+.X02 -X4 -X4 -X4 +1CP20 L+.X02

8
03/4.B5 /58.A1
L+ L+ L+ +1CP20

15
A +1CP20 M.X02 -X4 +1CP20 M.X02 A

9
03/4.B5 /58.A1
M M M M

+EX900C301-JB1-W1 +EX900C301-JB2-W1 -B5


1

2
ZR-RVVP 4*0.5 ZR-RVVP 4*0.5 Laser Measuring
20 20
-JB1-W1 1/BN 3/BU 4/BK 2/WH

2
+EX900C301 +EX900C301 ZR-RVVP 10*0.5
25
-JB1 -JB2

L+

Q1
M

Qa
-X1 -X1
1

WH
BN

BU
-B5-W1
Sensor cable
3

4
B -JB1 2 B
+EX900C301 +EX900C301 +EX900C301 -X1

3
BN

BU

BN

BU

BN

BU
-B1-W1 -B3-W1 -B2-W1 L+ L+ L+
5 5 5

6
M M M
3/BU
1/BN

1/BN

1/BN
3/BU

3/BU
+EX900C301 +EX900C301 +EX900C301
-B1

BN

BU

BN

BU

BN

BU

BN

BU
-B3 -B2 -B1-W1 -B2-W1 -B3-W1 -B4-W1
Sensor cable Sensor cable Sensor cable Sensor cable
ET5.3/4P ET5.3/4P ET5.3/4P 5 5 5 5
Inspection for export End Inspection of entry
4/BK

4/BK
4/BK

Export detection surface Entrance detection


inspection
C C

3/BU
1/BN

1/BN
3/BU

3/蓝

3/蓝
detect the

BN

BN
surface of
paper roll -B1 -B2 -B3 -B4
+EX900C301 +EX900C301 +EX900C301 PRK5.M3/4P PRK5.M
Bi8-M18- Bi8-M18-
BK

BK

BK
-B1-W1 -B3-W1 -B2-W1 Protection of entrance 3/4P AP6X-7m AP6X-7m

4/BK

4/BK
Protectio

BK

BK
Entrance protection Upper Drop limit
n of limit Lower limit
+EX900C301 +EX900C301 export Upper
limit
-JB1 -JB2 Export

BK

BK

BK
-X1 -X1 protectio
-B1-W1 -B3-W1 -B4-W1
5

BK
-B2-W1

D -JB1 D

10

11
+EX900C301 +EX900C301 +EX900C301 -X1

9
-JB1 -JB2 -JB2
-W1 -W1 -W1
3

-JB1
-W1 3

7
+1CP20 +1CP20 +1CP20
-X4 -X4 -X4 +1CP20
3

10

11

12

13

14
-X4

E E
1

7
U2+ U2-
I 46.0 I 46.2 I 46.1 I 46.4 I 46.5 I 46.6 I 46.7 PIW 164
=900E302-#Pc.Cov.Leave =900E302- =900E302-#Pc.Cov.Come =900E302-#Pc.Come.Safe =900E302-#Pc.Leave.Safe =900E302-#Ps.Pos.Up =900E302-#Ps.Pos.Down CH2
=900E302#Pc.Cov.Leave #Pc.Ready.Suface =900E302#Pc.Cov.Come =900E302#Pc.Come.Safe =900E302#Pc.Leave.Safe =900E302#Ps.Pos. Up =900E302#Ps.Pos.Down =900E302-Surface Measurement
=900E302#Pc.Ready.Sufac =900E302Surface Measurement
e
+1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -AI1
04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E302
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E302 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page End surface inspection 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 54
APPROVED DWG. NO: PAGE : REV.
900E302#End surface inspection 001-02-54 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D7

+1CP02 1L2.MPS
/39.D7
A A
+1CP02 1L3.MPS
/39.D7

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B B

/40.B6

/40.B5
+1CP02
C -R1 C

+1CP02 1L+.T01

+1CP02 1M.T01
2

PE
+1CP02 +1CP02
1

160Ω,200W

1
5

1
5
-K1 -K2
+1CP02 /57.B2 /57.B3
-T1

9
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2
U2 V2 W2 PE
D D

E -K3.220V.Brake E
-K3.220V
-T1.W2

-T1.PE
-T1.U2

-T1.V2
/56.A2

/56.A2

/56.B2

/56.B2

/56.A2

/56.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C302
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 55
APPROVED DWG. NO: PAGE : REV.
900C302(E303)#End surface inspection Conveyer 001-02-55 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/55.E4

A /55.E5
-K3.220V.Brake A
-T1.U2
/55.E2

-T1.V2
/55.E2

-T1.W2
/55.E2

-T1.PE
/55.E2

B +1CP02 +1CP02 +1CP02 +1CP02 B


1

5
53

53
-Q1 -Q1 -Q2 -Q2
/57.E6 /57.E6 /57.E7 /57.E7
2

54

54
N N
+1CP02

95
97
1

5
-F2
I> I> I>

4
8
LRN06N -K1

96
98
2

6
1.0~1.6A

/57.D4
/57.B2

12
+1CP02 +1CP02 +1CP02 +1CP02
73

74

75

76

77

78

79

80

81

82

83

84

85

86
-1X3 -1X3 -1X3 -1X3
C PE PE
C
PE

PE
+EX900C302-M1-W1 +EX900C302-M1-W2 +EX900E303-M1-W1 +EX900E303-M2-W2
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*1.5+1*1.0 ZR-RVV-500V 4*0.75
15 15 20 20

D D

E E

+EX900C302 +EX900E303
AC1
PE

PE
-M1 -M2
W

W
AC1 AC2 NO1 NO2
U

U
V

V
Brake
M Brake M
AC2

Motor 3AC Motor 3AC


Conveyer Motor End surface inspection Move Motor
400VAC 400VAC
2.2KW 0.55KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C302
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 56
APPROVED DWG. NO: PAGE : REV.
900C302(E303)#End surface inspection Conveyer 001-02-56 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A1 05/3.A1 05/3.A1 05/3.A1


+1CP20 -DO1 +1CP20 -DO1 +1CP20 -DO1 +1CP20 -DO1 /53.A7
+1CP02 1L.K01

Q 24.5 Q 25.0 Q 24.6 Q 24.7


A =900C302-#Brake =900C302-#Brake_Cov =900C302-#Set.Cov =900C302-#Set.Lift A
=900C302#Brake =900C302#Brake_Cov =900C302#Set.Cov =900C302#Set.Lift

8
+1CP02 +1CP02

1
5

1
5
-K3 -K4
.B4 .B5

9
B +1CP02 B
18
19
-T1
20
14

14

14

14
+1CP02 +1CP02 +1CP02 +1CP02
-K1 -K2 -K3 -K4
13

13

13

13
DRM270024L DRM270024L DRM270024L DRM270024L

+1CP02 1M.K01 +1CP02 1M.K01


/53.C5 +1CP02 +1CP02

21

21
-Q2 -Q1
5 /55.C4 5 /55.C5 5 .B6 5 .B7 .E7 .E6
1 9 1 9 1 9 1 9

22

22
C 8 8 8 8
C
/56.C8
4 12 4 12 4 12 4 12

+1CP02 1L+.Q01 +1CP02 1L+.Q01


/53.C4

+1CP02 +1CP02 +1CP02


63

63

95
-Q1 -Q2 -F2
.E6 .E7 /56.B6
64

64

96

D D

A1

A1
+1CP02 +1CP02
-Q1 -Q2

A2

A2
LC1-N1201M5N LC1-N1201M5N

+1CP02 1N.Q01
/53.E7
E E
1 2 1 2
6

I 54.5 I 54.6 I 54.7 3 4


/56.B2
3 4
/56.B6
=900C302-#Ready.Cov =900C302-#Ready.lift =900C302-#Hw.Fault2 5 6 5 6
=900C302#Ready.Cov =900C302#Ready.lift =900C302#Hw.Fault2
21 22 21 22
.C7 .C6
53 54 53 54
/56.B4 /56.B7
+1CP20 -DI8 +1CP20 -DI8 +1CP20 -DI8 63 64 63 64
.D2 .D3
04/3.C6 04/3.C6 04/3.C6 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C302
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 57
APPROVED DWG. NO: PAGE : REV.
900C302(E303)#End surface inspection Conveyer 001-02-57 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20 +1CP20 +1CP20

16

19

23
/54.A8
+1CP20 L+.X02 -X4 -X4 -X4 +1CP20 L+.X02
/59.A6
L+ L+ L+ +1CP20

17

20

24

30
A /54.A8
+1CP20 M.X02 -X4 +1CP20 M.X02
/59.A6 A
M M M M

+EX900C302-JB1-W1 +EX900C302-JB2-W1 -B5


1

2
ZR-RVVP 4*0.5 ZR-RVVP 4*0.5 Laser Measuring
15 15
-JB1-W1 1/BN 3/BU 4/BK 2/WH

2
+EX900C302 +EX900C302 ZR-RVVP 10*0.5
20
-JB1 -JB2

L+

Q1
M

Qa
-X1 -X1
1

WH
BN

BU
-B5-W1
Sensor cable
3

4
B -JB1 2 B
+EX900C302 +EX900C302 +EX900C302 -X1

3
BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 L+ L+ L+
5 5 5

6
M M M
3/BU
1/BN

1/BN

1/BN
3/BU

3/BU
+EX900C302 +EX900C302 +EX900C302
-B1

BN

BU

BN

BU

BN

BU

BN

BU
-B2 -B3 -B1-W1 -B2-W1 -B3-W1 -B4-W1
Sensor cable Sensor cable Sensor cable Sensor cable
ET5.3/4P ET5.3/4P ET5.3/4P 5 5 5 5
Inspection for export Inspection of entry End
4/BK

4/BK
4/BK

Export detection Entrance detection surface


inspection
C C

3/BU
1/BN

1/BN
3/BU

3/蓝

3/蓝
detect the

BN

BN
surface of
paper roll -B1 -B2 -B3 -B4
+EX900C302 +EX900C302 +EX900C302 PRK5.M3/4P PRK5.M
Bi8-M18- Bi8-M18-
BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 Protection of entrance 3/4P AP6X-7m AP6X-7m

4/BK

4/BK
Protectio

BK

BK
Entrance protection Upper Drop limit
n of limit Lower limit
export Upper
Export limit
+EX900C302 +EX900C302

BK

BK

BK
protectio
-JB1 -JB2 -B1-W1 n
-B3-W1 -B4-W1

BK
-X1 -X1 -B2-W1
5

D -JB1 D

10

11
+EX900C302 +EX900C302 +EX900C302 -X1

9
-JB1 -JB2 -JB2
-W1 -W1 -W1
3

-JB1
-W1 3

7
+1CP20 +1CP20 +1CP20
18

21

22

-X4 -X4 -X4 +1CP20


25

26

27

28

29
-X4

E E
10

11

13

14

15

16
9

8
U3+ U3-
I 47.0 I 47.1 I 47.2 I 47.4 I 47.5 I 47.6 I 47.7 PIW 166
=900E303-#Pc.Cov.Leave =900E303-#Pc.Cov.Come =900E303- =900E303-#Pc.Come.Safe =900E303-#Pc.Leave.Safe =900E303-#Ps.Pos.Up =900E303-#Ps.Pos.Down CH3
=900E303#Pc.Cov.Leave =900E303#Pc.Cov.Come #Pc.Ready.Suface =900E303#Pc.Come.Safe =900E303#Pc.Leave.Safe =900E303#Ps.Pos. Up =900E303#Ps.Pos.Down =900E303-Surface Measurement
=900E303#Pc.Ready.Sufac =900E303Surface Measurement
e
+1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -DI4 +1CP20 -AI1
04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6 04/3.A6

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E303
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E303 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page End surface inspection 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 58
APPROVED DWG. NO: PAGE : REV.
900E303#End surface inspection 001-02-58 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.E7
+1CP20

31

34
/39.E7
+1CP02 1L2.MPS
/58.A8
+1CP20 L+.X02 -X4 +1CP20 L+.X02
/60.A5
A L+ L+ A

32

35
+1CP02 1L3.MPS +1CP20 M.X02 +1CP20 M.X02
/39.E7 /58.B8 /60.A5
M M

+1CP02
+EX900C303-JB1-W1 +EX900C303-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
15 15
iC65N-C,16A/3P
+EX900C303 +EX900C303
-JB1 -JB2
2

-X1 -X1

1
L+ L+
B B

3
M M

/40.B6

/40.B6

1/BN

3/BU

1/BN

3/BU
+EX900C303-B1-W1 +EX900C303-B2-W1

+1CP02 1L+.T01

+1CP02 1M.T01
+1CP02 Sensor cable Sensor cable
-R1 2 2 2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C303 +EX900C303
1

160Ω,200W -B1 -B2


+1CP02
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection for Inspection of

4/BK

4/BK
export entry
PNP NO PNP NO
6SL3210-1KE17-5UF1
U2 V2 W2 PE 20 18 19

+EX900C303 +EX900C303

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C303 +EX900C303
D -JB1 -JB2 D
-X1 -X1

5
+1CP02
87

88

89

90

-1X3 +EX900C303 +EX900C303


PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C303-M1-W1 +1CP20 +1CP20


1

33

36
ZR-VV-1KV 3*2.5+1*1.5 -X4 -X4
15

E +EX900C303 E

7
-M1 I 44.7 I 44.6
=900C303-#Pc.Leave =900C303-#Pc.Come
PE

=900C303#Pc.Leave =900C303#Pc.Come
W
U

M +1CP20 -DI3 +1CP20 -DI3


Motor 3AC
Conveyer Motor 04/3.A5 04/3.A5
400VAC
3.0KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C303
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 59
APPROVED DWG. NO: PAGE : REV.
900C303#Conveyer 001-02-59 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.D7
+1CP20 +1CP20

37

40
/39.D8
+1CP02 1L2.MPS
/59.A8
+1CP20 L+.X02 -X4 -X4 +1CP20 L+.X02
/61.A5
A L+ L+ A

38

41
+1CP02 1L3.MPS +1CP20 M.X02 +1CP20 M.X02
/39.D8 /59.A8 /61.A5
M M

+1CP02
+EX902C001-JB1-W1 +EX902C001-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
25 20
iC65N-C,10A/3P
+EX902C001 +EX902C001
-JB1 -JB2
2

-X1 -X1

1
L+ L+
B B

3
M M

/40.B6

/40.B7

1/BN

3/BU

1/BN

3/BU
+EX902C001-B1-W1 +EX902C001-B2-W1

+1CP02 1L+.T01

+1CP02 1M.T01
+1CP02 Sensor cable Sensor cable
-R1 2 2
2

1/BN

3/BU

1/BN

3/BU
PE +EX902C001 +EX902C001
1

160Ω,200W -B1 -B2


+1CP02
C ET5.3/4P ET5.3/4P C
-T1 Inspection for Inspection of entry

4/BK

4/BK
24V COM export PNP NO
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE15-8UF2
U2 V2 W2 PE
+EX902C001 +EX902C001

4/BK

4/BK
-B1-W1 -B2-W1

+EX902C001 +EX902C001
D -JB1 -JB2 D
-X1 -X1

5
+1CP02
93

94

95

96

-1X3 +EX902C001 +EX902C001


PE -JB1 -JB2
-W1 -W1

3
PE

+EX902C001-M1-W1 +1CP20 +1CP20


1

39

42
ZR-VV-1KV 3*2.5+1*1.5 -X4 -X4
25

E E

10
+EX902C001

9
-M1 I 45.1 I 45.0
=902C001-#Pc.Leave =902C001-#Pc.Come
PE

=902C001#Pc.Leave =902C001#Pc.Come
W
U

M +1CP20 -DI3 +1CP20 -DI3


Motor 3AC
Conveyer Motor 04/3.A5 04/3.A5
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902C001
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 60
APPROVED DWG. NO: PAGE : REV.
902C001#Conveyer 001-02-60 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 1L1.MPS
/39.E7
+1CP20 +1CP20

43

46
/39.E8
+1CP02 1L2.MPS
/60.A7
+1CP20 L+.X02 -X4 -X4
A L+ L+ A

44

47
+1CP02 1L3.MPS +1CP20 M.X02
/39.E8 /60.A7
M M

+1CP02
+EX902CC02-JB1-W1 +EX902CC02-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
35 40
iC65N-C,10A/3P
+EX902CC02 +EX902CC02
-JB1 -JB2
2

-X1 -X1

1
L+ L+
B B

3
M M

/40.B6

/40.B7

1/BN

3/BU

1/BN

3/BU
+EX902CC02-B1-W1 +EX902CC02-B2-W1

+1CP02 1L+.T01

+1CP02 1M.T01
+1CP02 Sensor cable Sensor cable
-R1 2 2
2

1/BN

3/BU

1/BN

3/BU
PE +EX902CC02 +EX902CC02
1

160Ω,200W -B1 -B2


+1CP02
C ET5.3/4P ET5.3/4P C
-T1 Inspection for Inspection of entry

4/BK

4/BK
24V COM export PNP NO
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE15-8UF2
U2 V2 W2 PE
+EX902CC02 +EX902CC02

4/BK

4/BK
-B1-W1 -B2-W1

+EX902CC02 +EX902CC02
D -JB1 -JB2 D
-X1 -X1

5
+1CP02
100

101
98

99

-1X3 +EX902CC02 +EX902CC02


PE -JB1 -JB2
-W1 -W1

3
PE

+EX902C002-M1-W1 +1CP20 +1CP20


1

45

48
ZR-VV-1KV 3*2.5+1*1.5 -X4 -X4
35

E E

12

11
+EX902C002
-M1 I 45.3 I 45.2
=902C002-#Pc.Leave =902C002-#Pc.Come
PE

=902C002#Pc.Leave =902C002#Pc.Come
W
U

M +1CP20 -DI3 +1CP20 -DI3


Motor 3AC
Conveyer Motor 04/3.A5 04/3.A5
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902C002
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 61
APPROVED DWG. NO: PAGE : REV.
902C002#Conveyer 001-02-61 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X1


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 10
B +1CP02 -1F2 1 1 JUT14-2.5/GY L1 02/39.C1 +1CP02 -1F1 1
B
2 JUT14-2.5/GY L1 02/39.C2 +1CP02 -1F3 1
3 JUT14-2.5/GY L1 02/39.C2
4 JUT14-2.5/GY L1 02/39.C3
+1CP02 N 5 JUT14-2.5/GY N 02/39.C1 +1CP02 -1E1 2 Control cabinet lighting
6 JUT14-2.5/GY N 02/39.C2 +1CP02 Air Conditioner N
7 JUT14-2.5/GY N 02/39.C2 +1CP02 -1Q1 A2
8 JUT14-2.5/GY N 02/39.C3
9 JUT14-2.5/GY
1 =900C301 +1CP02 -K3 5 10 JUT14-2.5/GY 02/39.A8 +1CP02 -1Q1 A1
C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X1 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 62
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X1 001-02-62 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X2


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 28
B L+ =1CP20 +1CP20 -X2 15 1 JUT14-2.5/GY L+ 02/40.A1 =900C110 +1CP02 -T1 24V
B
02/40.A1 =900C301 +1CP02 -Q1 63 2
DO0 =900C113 +1CP02 -T1 20 2 JUT14-2.5/GY L+ 02/40.A2 =900C112 +1CP02 -T1 24V
DO0 =900C114 +1CP02 -T1 20 3 JUT14-2.5/GY L+ 02/40.A3 =900C113 +1CP02 -T1 24V
DO0 =900C115 +1CP02 -T1 20 4 JUT14-2.5/GY L+ 02/40.A3 =900C114 +1CP02 -T1 24V
DO0 =900C116 +1CP02 -T1 20 5 JUT14-2.5/GY L+ 02/40.A4 =900C115 +1CP02 -T1 24V
=900C116 +1CP02 -T1 24V 6 JUT14-2.5/GY L+ 02/40.A4 =900C117 +1CP02 -T1 24V
DO0 =900C118 +1CP02 -T1 20 7 JUT14-2.5/GY L+ 02/40.A5 =900C118 +1CP02 -T1 24V
=900C119 +1CP02 -T1 24V 8 JUT14-2.5/GY L+ 02/40.A5 =900C301 +1CP02 -T1 24V
=900C302 +1CP02 -T1 24V 9 JUT14-2.5/GY L+ 02/40.A6 =900C303 +1CP02 -T1 24V
C C
=902C001 +1CP02 -T1 24V 10 JUT14-2.5/GY L+ 02/40.A6 =902C002 +1CP02 -T1 24V
11 JUT14-2.5/GY L+ 02/40.A7
12 JUT14-2.5/GY L+ 02/40.A7
13 JUT14-2.5/GY L+ 02/40.A7
14 JUT14-2.5/GY L+ 02/40.A8
15 JUT14-2.5/GY L+ 02/40.A8
16 JUT14-2.5/GY L+ 02/40.A8
M =1CP20 +1CP20 -X2 27 17 JUT14-2.5/GY M 02/40.A2 =900C113 +1CP02 -K1 13
=900C112 +1CP02 -T1 COM 18 JUT14-2.5/GY M 02/40.A2 =900C110 +1CP02 -T1 COM
=900C113 +1CP02 -T1 COM 19 JUT14-2.5/GY M 02/40.A3 =900C114 +1CP02 -T1 COM
D D
20 JUT14-2.5/GY M 02/40.A3 =900C115 +1CP02 -T1 COM
21 JUT14-2.5/GY M 02/40.A4 =900C116 +1CP02 -T1 COM
=900C118 +1CP02 -T1 COM 22 JUT14-2.5/GY M 02/40.A4 =900C117 +1CP02 -T1 COM
=900C119 +1CP02 -T1 COM 23 JUT14-2.5/GY M 02/40.A5 =900C301 +1CP02 -T1 COM
24 JUT14-2.5/GY M 02/40.A5 =900C302 +1CP02 -T1 COM
=900C303 +1CP02 -T1 COM 25 JUT14-2.5/GY M 02/40.A6 =902C001 +1CP02 -T1 COM
26 JUT14-2.5/GY M 02/40.A7 =902C002 +1CP02 -T1 COM
27 JUT14-2.5/GY M 02/40.A7
28 JUT14-2.5/GY M 02/40.A8

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X2 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 63
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X2 001-02-63 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C115 -M1-W2

+EX900C115 -M1-W1

+EX900C114 -M1-W2

+EX900C114 -M1-W1

+EX900C113 -M1-W2

+EX900C113 -M1-W1

+EX900C112 -M1-W1

+EX900C110 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 102
B Motor 1 =900C110 +EX900C110 -M1 U 1 JUT14-2.5/GY 02/41.D2 =900C110 +1CP02 -T1 U2
B
Motor 2 =900C110 +EX900C110 -M1 V 2 JUT14-2.5/GY 02/41.D2 =900C110 +1CP02 -T1 V2
Motor 3 =900C110 +EX900C110 -M1 W 3 JUT14-2.5/GY 02/41.D2 =900C110 +1CP02 -T1 W2
Motor PE =900C110 +EX900C110 -M1 PE 4 JUT14-2.5PE PE 02/41.D2 =900C110 +1CP02 -T1 PE
5 JUT14-2.5/GY
6 JUT14-2.5/GY
7 JUT14-2.5/GY
8 JUT14-2.5/GY
Motor 1 =900C112 +EX900C112 -M1 U 9 JUT14-2.5/GY 02/42.D2 =900C112 +1CP02 -T1 U2
Motor 2 =900C112 +EX900C112 -M1 V 10 JUT14-2.5/GY 02/42.D2 =900C112 +1CP02 -T1 V2
C C
Motor 3 =900C112 +EX900C112 -M1 W 11 JUT14-2.5/GY 02/42.D2 =900C112 +1CP02 -T1 W2
Motor PE =900C112 +EX900C112 -M1 PE 12 JUT14-2.5PE PE 02/42.D2 =900C112 +1CP02 -T1 PE
13 JUT14-2.5/GY
Motor 1 =900C113 +EX900C113 -M1 U 14 JUT14-2.5/GY 02/43.D2 =900C113 +1CP02 -T1 U2
Motor 2 =900C113 +EX900C113 -M1 V 15 JUT14-2.5/GY 02/43.D2 =900C113 +1CP02 -T1 V2
Motor 3 =900C113 +EX900C113 -M1 W 16 JUT14-2.5/GY 02/43.D2 =900C113 +1CP02 -T1 W2
Motor PE =900C113 +EX900C113 -M1 PE 17 JUT14-2.5PE PE 02/43.D2 =900C113 +1CP02 -T1 PE
Brake 1 =900C113 +EX900C113 -M1 AC1 18 JUT14-2.5/GY 02/43.D4 =900C113 +1CP02 -K1 9 1
Brake 2 =900C113 +EX900C113 -M1 AC2 19 JUT14-2.5/GY 02/43.D4 =900C113 +1CP02 N
20 JUT14-2.5/GY
D D
Motor 1 =900C114 +EX900C114 -M1 U 21 JUT14-2.5/GY 02/44.D2 =900C114 +1CP02 -T1 U2
Motor 2 =900C114 +EX900C114 -M1 V 22 JUT14-2.5/GY 02/44.D2 =900C114 +1CP02 -T1 V2
Motor 3 =900C114 +EX900C114 -M1 W 23 JUT14-2.5/GY 02/44.D2 =900C114 +1CP02 -T1 W2
Motor PE =900C114 +EX900C114 -M1 PE 24 JUT14-2.5PE PE 02/44.D2
Brake 1 =900C114 +EX900C114 -M1 AC1 25 JUT14-2.5/GY 02/44.D5 =900C114 +1CP02 -K1 9 1
Brake 2 =900C114 +EX900C114 -M1 AC2 26 JUT14-2.5/GY 02/44.D5 =900C114 +1CP02 N
27 JUT14-2.5/GY 02/43.
Motor 1 =900C115 +EX900C115 -M1 U 28 JUT14-2.5/GY 02/45.D2 =900C115 +1CP02 -T1 U2
Motor 2 =900C115 +EX900C115 -M1 V 29 JUT14-2.5/GY 02/45.D2 =900C115 +1CP02 -T1 V2
Motor 3 =900C115 +EX900C115 -M1 W 30 JUT14-2.5/GY 02/45.D2 =900C115 +1CP02 -T1 W2
E E
Motor PE =900C115 +EX900C115 -M1 PE 31 JUT14-2.5PE PE 02/45.D2 =900C115 +1CP02 -T1 PE
Brake 1 =900C115 +EX900C115 -M1 AC1 32 JUT14-2.5/GY 02/45.D4 =900C115 +1CP02 -K1 9 1
Brake 2 =900C115 +EX900C115 -M1 AC2 33 JUT14-2.5/GY 02/45.D5 =900C115 +1CP02 N
34 JUT14-2.5/GY 02/45.

1/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 64
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X3 001-02-64 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C301 -M1-W2

+EX900C301 -M1-W1

+EX900C119 -M1-W1

+EX900C118 -M1-W2

+EX900C118 -M1-W1

+EX900C117 -M1-W1

+EX900C116 -M1-W2

+EX900C116 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 102
B Motor 1 =900C116 +EX900C116 -M1 U 35 JUT14-2.5/GY 02/46.D2 =900C116 +1CP02 -T1 U2
B
Motor 2 =900C116 +EX900C116 -M1 V 36 JUT14-2.5/GY 02/46.D2 =900C116 +1CP02 -T1 V2
Motor 3 =900C116 +EX900C116 -M1 W 37 JUT14-2.5/GY 02/46.D2 =900C116 +1CP02 -T1 W2
Motor PE =900C116 +EX900C116 -M1 PE 38 JUT14-2.5PE PE 02/46.D2
Brake 1 =900C116 +EX900C116 -M1 AC1 39 JUT14-2.5/GY 02/46.D4 =900C116 +1CP02 -K1 9 1
Brake 2 =900C116 +EX900C116 -M1 AC2 40 JUT14-2.5/GY 02/46.D4 =900C116 +1CP02 N
41 JUT14-2.5/GY
Motor 1 =900C117 +EX900C117 -M1 U 42 JUT14-2.5/GY 02/47.D1 =900C117 +1CP02 -T1 U2
Motor 2 =900C117 +EX900C117 -M1 V 43 JUT14-2.5/GY 02/47.D2 =900C117 +1CP02 -T1 V2
Motor 3 =900C117 +EX900C117 -M1 W 44 JUT14-2.5/GY 02/47.D2 =900C117 +1CP02 -T1 W2
C C
Motor PE =900C117 +EX900C117 -M1 PE 45 JUT14-2.5PE PE 02/47.D2
46 JUT14-2.5/GY 02/47.
Motor 1 =900C118 +EX900C118 -M1 U 47 JUT14-2.5/GY 02/48.D1 =900C118 +1CP02 -T1 U2
Motor 2 =900C118 +EX900C118 -M1 V 48 JUT14-2.5/GY 02/48.D2 =900C118 +1CP02 -T1 V2
Motor 3 =900C118 +EX900C118 -M1 W 49 JUT14-2.5/GY 02/48.D2 =900C118 +1CP02 -T1 W2
Motor PE =900C118 +EX900C118 -M1 PE 50 JUT14-2.5PE PE 02/48.D2 =900C118 +1CP02 -T1 PE
Brake 1 =900C118 +EX900C118 -M1 AC1 51 JUT14-2.5/GY 02/48.D4 =900C118 +1CP02 -K1 9 1
Brake 2 =900C118 +EX900C118 -M1 AC2 52 JUT14-2.5/GY 02/48.D4 =900C118 +1CP02 N
53 JUT14-2.5/GY
Motor 1 =900C119 +EX900C119 -M1 U 54 JUT14-2.5/GY 02/50.D1 =900C119 +1CP02 -T1 U2
D D
Motor 2 =900C119 +EX900C119 -M1 V 55 JUT14-2.5/GY 02/50.D2 =900C119 +1CP02 -T1 V2
Motor 3 =900C119 +EX900C119 -M1 W 56 JUT14-2.5/GY 02/50.D2 =900C119 +1CP02 -T1 W2
Motor PE =900C119 +EX900C119 -M1 PE 57 JUT14-2.5PE PE 02/50.D2
58 JUT14-2.5/GY 02/50.
Motor 1 =900C301 +EX900C301 -M1 U 59 JUT14-2.5/GY 02/52.C2 =900C301 +1CP02 -Q1 2 1
Motor 2 =900C301 +EX900C301 -M1 V 60 JUT14-2.5/GY 02/52.C2 =900C301 +1CP02 -Q1 4 1
Motor 3 =900C301 +EX900C301 -M1 W 61 JUT14-2.5/GY 02/52.C2 =900C301 +1CP02 -Q1 6 1
Motor PE =900C301 +EX900C301 -M1 PE 62 JUT14-2.5PE PE 02/52.C3 =900C301 +1CP02 -T1 PE
Brake 1 =900C301 +EX900C301 -M1 AC1 63 JUT14-2.5/GY 02/52.C4 =900C301 +1CP02 -Q1 54 1
Brake 2 =900C301 +EX900C301 -M1 AC2 64 JUT14-2.5/GY 02/52.C4 =900C301 +1CP02 N
E E

2/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 64
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X3 001-02-64 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX902C001 -M1-W1

+EX900C303 -M1-W1

+EX900C302 -M1-W2

+EX900C302 -M1-W1
+EX900E303 -M2-W2

+EX900E303 -M1-W1

+EX900E302 -M2-W2

+EX900E302 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 102
B Motor 1 =900C301 +EX900E302 -M2 U 65 JUT14-2.5/GY 02/52.C6 =900C301 +1CP02 -F2 2
B
Motor 2 =900C301 +EX900E302 -M2 V 66 JUT14-2.5/GY 02/52.C6 =900C301 +1CP02 -F2 4
Motor 3 =900C301 +EX900E302 -M2 W 67 JUT14-2.5/GY 02/52.C6 =900C301 +1CP02 -F2 6
Motor PE =900C301 +EX900E302 -M2 PE 68 JUT14-2.5PE PE 02/52.C6
Brake 1 =900C301 +EX900E302 -M2 AC1 69 JUT14-2.5/GY 02/52.C7 =900C301 +1CP02 -Q2 54 1
Brake 2 =900C301 +EX900E302 -M2 AC2 70 JUT14-2.5/GY 02/52.C7 =900C301 +1CP02 N
Brake 3 =900C301 +EX900E302 -M2 NO1 71 JUT14-2.5/GY 02/52.C7 =900C301 +1CP02 -K1 8 2
Brake 4 =900C301 +EX900E302 -M2 NO2 72 JUT14-2.5/GY 02/52.C8 =900C301 +1CP02 -K1 12 2
Motor 1 =900C302 +EX900C302 -M1 U 73 JUT14-2.5/GY 02/56.C2 =900C302 +1CP02 -Q1 2 1
Motor 2 =900C302 +EX900C302 -M1 V 74 JUT14-2.5/GY 02/56.C2 =900C302 +1CP02 -Q1 4 1
C C
Motor 3 =900C302 +EX900C302 -M1 W 75 JUT14-2.5/GY 02/56.C2 =900C302 +1CP02 -Q1 6 1
Motor PE =900C302 +EX900C302 -M1 PE 76 JUT14-2.5PE PE 02/56.C3 =900C302 +1CP02 -T1 PE
Brake 1 =900C302 +EX900C302 -M1 AC1 77 JUT14-2.5/GY 02/56.C4 =900C302 +1CP02 -Q1 54 1
Brake 2 =900C302 +EX900C302 -M1 AC2 78 JUT14-2.5/GY 02/56.C4 =900C302 +1CP02 N
Motor 1 =900C302 +EX900E303 -M2 U 79 JUT14-2.5/GY 02/56.C6 =900C302 +1CP02 -F2 2
Motor 2 =900C302 +EX900E303 -M2 V 80 JUT14-2.5/GY 02/56.C6 =900C302 +1CP02 -F2 4
Motor 3 =900C302 +EX900E303 -M2 W 81 JUT14-2.5/GY 02/56.C6 =900C302 +1CP02 -F2 6
Motor PE =900C302 +EX900E303 -M2 PE 82 JUT14-2.5PE PE 02/56.C6
Brake 1 =900C302 +EX900E303 -M2 AC1 83 JUT14-2.5/GY 02/56.C7 =900C302 +1CP02 -Q2 54 1
Brake 2 =900C302 +EX900E303 -M2 AC2 84 JUT14-2.5/GY 02/56.C7 =900C302 +1CP02 N
D D
Brake 3 =900C302 +EX900E303 -M2 NO1 85 JUT14-2.5/GY 02/56.C7 =900C302 +1CP02 -K1 8 2
Brake 4 =900C302 +EX900E303 -M2 NO2 86 JUT14-2.5/GY 02/56.C8 =900C302 +1CP02 -K1 12 2
Motor 1 =900C303 +EX900C303 -M1 U 87 JUT14-2.5/GY 02/59.D2 =900C303 +1CP02 -T1 U2
Motor 2 =900C303 +EX900C303 -M1 V 88 JUT14-2.5/GY 02/59.D2 =900C303 +1CP02 -T1 V2
Motor 3 =900C303 +EX900C303 -M1 W 89 JUT14-2.5/GY 02/59.D2 =900C303 +1CP02 -T1 W2
Motor PE =900C303 +EX900C303 -M1 PE 90 JUT14-2.5PE PE 02/59.D2 =900C303 +1CP02 -T1 PE
91 JUT14-2.5/GY
92 JUT14-2.5/GY
Motor 1 =902C001 +EX902C001 -M1 U 93 JUT14-2.5/GY 02/60.D1 =902C001 +1CP02 -T1 U2
Motor 2 =902C001 +EX902C001 -M1 V 94 JUT14-2.5/GY 02/60.D2 =902C001 +1CP02 -T1 V2
E E
Motor 3 =902C001 +EX902C001 -M1 W 95 JUT14-2.5/GY 02/60.D2 =902C001 +1CP02 -T1 W2
Motor PE =902C001 +EX902C001 -M1 PE 96 JUT14-2.5PE PE 02/60.D2
97 JUT14-2.5/GY 02/60.

3/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 64
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X3 001-02-64 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX902C002 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 102
B Motor 1 =902C002 +EX902C002 -M1 U 98 JUT14-2.5/GY 02/61.D1 =902C002 +1CP02 -T1 U2
B
Motor 2 =902C002 +EX902C002 -M1 V 99 JUT14-2.5/GY 02/61.D2 =902C002 +1CP02 -T1 V2
Motor 3 =902C002 +EX902C002 -M1 W 100 JUT14-2.5/GY 02/61.D2 =902C002 +1CP02 -T1 W2
Motor PE =902C002 +EX902C002 -M1 PE 101 JUT14-2.5PE PE 02/61.D2
102 JUT14-2.5/GY 02/61.

C C

D D

E E

4/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 64
APPROVED DWG. NO: PAGE : REV.
+1CP02 -1X3 001-02-64 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL

1
1

Zone, Changsha, Hunan, China

BM1 Roll Handling and PE Wrapping System

1CP02 Cabinet arrangement


2000

2
2

268 Xinxing Road, Yuhua Economic Development


CHAINT CORPORATION
Project:

001
Location:
Function:

Drawing
02
001-02-65
+1CP02
Group
65
BM1-900-E-2005

Page

3
3

1000

1CP02 Reverse

REVISION
MARK
DATE
4
4

DRAWN
CHK’D
ENG’R
5
5

2000.00

APP’D
180.00 230.00 270.00 350.00 280.00 245.00 225.00
55.00

=902E003-F2
=902E003-Q1 =900E301-Q1
=900E301-F2
=900E301-T1 -2F1
=900E301-F1
=902E003-Q2 =900E301-Q2
=902E003-F3 =900E304-F1
=902E003-Q3 =900E304-Q1
=900E304-F2 =900E304-T1 -2Q1
=900E301-K1 =900E305-F1
=900E304-Q2
=900E301-K2

6
6

=900E301-K3 =900E305-Q1
=900E305-F2 =900E306-F1
=900E305-T1 -2L1
=900E304-K1
=900E304-K2 =900E305-Q2
SCALE.

=902E001-F1 -2L2
DRAWN

=900E304-K3
PROJECT:

CHECHED
ENGINEER

=900E305-K1 =900E305-Q3
=900E305-F3 =900E306-T1
APPROVED

=902E003-F1 -2L3
=900E305-K2
-2X3 =900E305-K3 =900E306-Q1
=900E306-F2
1000.00

=900E305-K4 -2X1
=900E306-Q2 =902E001-T1
=900E306-K1
DATE

=900E306-K2
1 mm : 10 mm
2022/1/7

=900E306-Q3
=900E306-F3
=900E306-K3 -2F2
=900E306-K4 =902E003-T1
=902E001-F2
=902E001-Q1
1CP02 Reverse

=902E001-K1
-2X2
=902E001-K2 =902E001-Q2
=902E001-K3
INITIAL

=902E001-K4 =902E001-F3
=902E001-Q3
ORIG.SIZE

=902E003-K1
=902E003-K2
=902E003-K3
SIGN

吴毅丰

=902E003-K4
7
7

TYPE
AREA

DETAIL
DETAIL

DWG. NO:
Cabinet arrangement
Configure internal network cables

8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

10
03/6.D3
+1CP20 L.1CP02.2 -2X1 2L.K01
/70.A5
From 1CP02.1

A A

N -2W3

1
ZR-VV-1KV 3*2.5+1*1.5
PE 15

B B

A1
-2Q1

A2
1

5
-2F1 LC1-N65M5N

6
iC65N-C,63A/3P
2N.Q01 2N.Q01
.C3 /70.E5

5
N
-2Q1
1 2
.B6
3 4

6
.B4
-2X1 5 6
1

L1 L1 L1 L1 13 14

-2L1

-2L2

-2L3
-2X1 2N.Q01 21 22
5

C N N N N
.B6
UTD-300I/18×6
C
1

-2F2
iC65N,6A/1P
2

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS

2L1.MPS

2L2.MPS

2L3.MPS
D D
/68.A1

/68.A1

/68.A1

/72.A1

/72.A1

/72.A1

/76.A1

/76.A1

/76.A1

/80.A1

/80.A1

/80.A1

/84.A1

/84.A1

/84.A1

/88.A1

/88.A1

/88.A1
1

-2E1
Control cabinet lighting
2

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 66
APPROVED DWG. NO: PAGE : REV.
Main power distribution 001-02-66 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

10

11

12

13

14

15

16
+1CP20 L+.OP -2X2

9
03/4.B8
L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+ L+

17

18

19

20

21

22

23

24

25

26

27

28
+1CP20 M.OP
03/4.B8
M M M M M M M M M M M M

B B
2L+.Q01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01

2L+.T01
2M.K01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01

2M.T01
/70.C2

/68.E3

/68.D3

/68.C3

/68.C3

/72.C3

/72.D3

/76.C3

/72.C3

/80.C3

/76.E3

/84.C3

/76.C3

/80.E3

/80.C3

/84.E3

/88.C3

/84.C3

/88.D3

/88.C3
C C

D D

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP02 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 67
APPROVED DWG. NO: PAGE : REV.
24V power 001-02-67 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D4

+1CP02 2L2.MPS
/66.D4
A A
+1CP02 2L3.MPS
/66.D4

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B B

/67.B2

/67.B2
+1CP02
-R1

+1CP02 2L+.T01

+1CP02 2M.T01
2

C PE C
1

160Ω,200W

+1CP02
-T1 +1CP02

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM -K1 -K1
.E3 .E3
6SL3210-1KE15-8UF2

12
U2 V2 W2 PE 20 18 19

D D
+1CP02 2L+.T01
/67.B2

14

+1CP02
-K1
13

DRM270024L

E +1CP02 2M.K01 +1CP02 2M.K01 E


-K3.220V

/67.B2 /70.C2
-T1.W2

-T1.PE
-T1.U2

-T1.V2

5 .C4
1 9
/69.A2

/69.A2

/69.A2

/69.B2

/69.A2

8 .C5
4 12

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 68
APPROVED DWG. NO: PAGE : REV.
900E301#Rotary conveyer 001-02-68 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/68.E4

A /68.E2
-T1.U2 A
-T1.V2
/68.E2

-T1.W2
/68.E2

-T1.PE
/68.E2

+1CP02
1

5
-Q1
B
/70.E6 +1CP02 +1CP02 B

5
53
2

6
-Q1 -Q2
/70.E6 /70.E7
+1CP02

95
97

54

6
1

-F2 5
I> I> I> N
LRN08N
96
98
2

2.5~4.0A
/70.D2
+1CP02 +1CP02 +1CP02

10
-2X3 -2X3 -2X3
1

9
PE PE

C C
PE

PE
+EX900E301-Q1-W1 +EX900E301-M1-W2 +EX900E301-JB1-W1
1

3
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5
25 25 25

+EX900E301
-JB1
-X1

4
U V W PE
PE
1

+EX900E301
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX900E301-M1-W1
1

ZR-VV-1KV 3*2.5+1*1.5 +EX900E301-M2-W1

4
5 1

E E

+EX900E301 +EX900E301
PE

PE
-M1 -M2
W

W
U

U
AC1
V

V
M M
Motor 3AC Motor 3AC
Rotary Motor Brake Conveyer Motor
AC2

400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 69
APPROVED DWG. NO: PAGE : REV.
900E301#Rotary conveyer 001-02-69 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A1 05/3.A1 +1CP02 2L.K01 +1CP02 2L.K01


/66.A7 /74.A5
+1CP20 -DO1 +1CP20 -DO1
A Q 25.2 Q 25.3 A
=900E301-#Set.Rot =900E301-#Set.Cov
=900E301#Set.Rot =900E301#Set.Cov

11

12
+1CP02 +1CP02

1
5

1
5
-K2 -K3
.B3 .B4

9
B B

14

14
+1CP02 +1CP02
-K2 -K3

13

13
DRM270024L DRM270024L

+1CP02 2M.K01 +1CP02 2M.K01


/68.E4 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 .E7 .E6
1 9 1 9

22

22
C 8 8
C
4 12 4 12

+1CP02 2L+.Q01 +1CP02 2L+.Q01


/67.B2 /74.C2

+1CP02 +1CP02 +1CP02


95

63

63
-F2 -Q1 -Q2
/69.B2 .E6 .E7
96

64

64

D D

A1

A1
+1CP02 +1CP02
-Q1 -Q2

A2

A2
LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01 +1CP02 2N.Q01


/66.B7 /74.E5
E E
11

12

13

1 2 1 2
I 55.2 I 55.3 I 55.4 3 4
/69.B2
3 4
/69.B6
=900E301-#Hw.Fault2 =900E301-#Ready.Rot =900E301-#Ready.Cov 5 6 5 6
=900E301#Hw.Fault2 =900E301#Ready.Rot =900E301#Ready.Cov
21 22 21 22
.C7 .C6
53 54 53 54
/69.B3
+1CP20 -DI8 +1CP20 -DI8 +1CP20 -DI8 63 64 63 64
.D3 .D4
04/3.C6 04/3.C6 04/3.C6 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 70
APPROVED DWG. NO: PAGE : REV.
900E301#Rotary conveyer 001-02-70 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20
+1CP20 L+.X03 -X5 +1CP20 L+.X03

1
03/4.B2 /75.A1
L+

A +1CP20 M.X03 +1CP20 M.X03 A

2
03/4.B2 /75.A1
M

-JB2-W3
1

2
ZR-RVVP 10*0.5
25

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
3

8
E E
1

6
I 48.0 I 48.1 I 48.2 I 48.3 I 48.4 I 48.5
=900E301-#Pc.Leave =900E301-#Pc.Leave.Safe =900E301-#Pc.Come =900E301-#Pc.Come.Safe =900E301-#Ps.Pos.0 =900E301-#Ps.Pos.90
=900E301#Pc.Leave =900E301#Pc.Leave.Safe =900E301#Pc.Come =900E301#Pc.Come.Safe =900E301#Ps.Pos.0 =900E301#Ps.Pos.90

+1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5
04/3.C1 04/3.C1 04/3.C1 04/3.C1 04/3.C1 04/3.C1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E301
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E301 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 71
APPROVED DWG. NO: PAGE : REV.
900E301#Rotary conveyer 001-02-71 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D4

+1CP02 2L2.MPS
/66.D4
A A
+1CP02 2L3.MPS
/66.D4

+1CP02
-F1
1

5
I> I> I>
2

6
iC65N-C,10A/3P
B 10A B

/67.B3

/67.B2
+1CP02
-R1

+1CP02 2L+.T01

+1CP02 2M.T01
2
PE
1
160Ω,200W
C C
+1CP02
-T1
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2 +1CP02

1
5

4
8
-K1 -K1
U2 V2 W2 PE 20 18 19 .D3 .D3

12
+1CP02 2L+.T01

D D
/67.B3

14

+1CP02
-K1
13

DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/74.C2
-T1.W2

-T1.PE
-T1.U2

-T1.V2

E 5 E
-K3.220V

.C4
1 9
/73.A2

/73.A2

/73.A2

/73.B2

8 .C5
4 12
/73.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E304
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 72
APPROVED DWG. NO: PAGE : REV.
900E304#Rotary conveyer 001-02-72 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/72.E5

A /72.E2
-T1.U2 A
-T1.V2
/72.E2

-T1.W2
/72.E2

-T1.PE
/72.E2

+1CP02
1

5
-Q1
B
/74.E6 +1CP02 +1CP02 B

5
53
2

6
-Q1 -Q2
/74.E6 /74.E7
+1CP02

95
97

54

6
1

-F2 5
I> I> I> N
LRN08N 96
98
2

2.5~4.0A /74.D2

+1CP02 +1CP02 +1CP02


11

12

13

14

15

16

17

18

19

20
-2X3 -2X3 -2X3
PE PE

C C
PE

PE
+EX900E304-Q1-W1 +EX900E304-M1-W2 +EX900E304-JB1-W1
1

3
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5
15 15 15

+EX900E304
-JB1
-X1

4
U V W PE
PE
1

+EX900E304
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX900E304-M1-W1
1

ZR-VV-1KV 3*2.5+1*1.5 +EX900E304-M2-W1

4
5 1

E E

+EX900E304 +EX900E304
PE

PE
-M1 -M2
W

W
U

U
AC1
V

V
M M
Motor 3AC Motor 3AC
Rotary Motor Brake Conveyer Motor
AC2

400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E304
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 73
APPROVED DWG. NO: PAGE : REV.
900E304#Rotary conveyer 001-02-73 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A1 05/3.A1 +1CP02 2L.K01 +1CP02 2L.K01


/70.A7 /78.A5
+1CP20 -DO1 +1CP20 -DO1
A Q 25.5 Q 25.6 A
=900E304-#Set.Rot =900E304-#Set.Cov
=900E304#Set.Rot =900E304#Set.Cov

14

15
+1CP02 +1CP02

1
5

1
5
-K2 -K3
.B3 .B4

9
B B

14

14
+1CP02 +1CP02
-K2 -K3

13

13
DRM270024L DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/72.E4 /76.E3 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 .E7 .E6
1 9 1 9

22

22
C 8 8
C
4 12 4 12

+1CP02 2L+.Q01 +1CP02 2L+.Q01


/70.C4 /78.C1

+1CP02 +1CP02 +1CP02


95

63

63
-F2 -Q1 -Q2
/73.B2 .E6 .E7
96

64

64

D D

A1

A1
+1CP02 +1CP02
-Q1 -Q2

A2

A2
LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01 +1CP02 2N.Q01


/70.E7 /78.E5
E E
14

15

16

1 2 1 2
I 55.5 I 55.6 I 55.7 3 4
/73.B2
3 4
/73.B6
=900E304-#Hw.Fault2 =900E304-#Ready.Rot =900E304-#Ready.Cov 5 6 5 6
=900E304#Hw.Fault2 =900E304#Ready.Rot =900E304#Ready.Cov
21 22 21 22
.C7 .C6
53 54 53 54
/73.B3
+1CP20 -DI8 +1CP20 -DI8 +1CP20 -DI8 63 64 63 64
.D3 .D4
04/3.C6 04/3.C6 04/3.C6 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E304
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 74
APPROVED DWG. NO: PAGE : REV.
900E304#Rotary conveyer 001-02-74 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20
+1CP20 L+.X03-X5 +1CP20 L+.X03

9
/71.A7 /79.A1
L+

10
A /71.A7
+1CP20 M.X03 +1CP20 M.X03
/79.A1 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
15

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
11

12

13

14

15

16
E E
10

11

12

13

14

15
I 49.1 I 49.2 I 49.3 I 49.4 I 49.5 I 49.6
=900E304-#Pc.Leave =900E304-#Pc.Leave.Safe =900E304-#Pc.Come =900E304-#Pc.Come.Safe =900E304-#Ps.Pos.0 =900E304-#Ps.Pos.90
=900E304#Pc.Leave =900E304#Pc.Leave.Safe =900E304#Pc.Come =900E304#Pc.Come.Safe =900E304#Ps.Pos.0 =900E304#Ps.Pos.90

+1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5 +1CP20 -DI5
04/3.C1 04/3.C1 04/3.C1 04/3.C1 04/3.C1 04/3.C1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E304
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E304 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 75
APPROVED DWG. NO: PAGE : REV.
900E304#Rotary conveyer 001-02-75 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D5

+1CP02 2L2.MPS
/66.D5
A A
+1CP02 2L3.MPS
/66.D5

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B +1CP02 L1.01
/77.A7
B

+1CP02 L2.01
/77.A7

+1CP02 L3.01
/77.A7

/67.B3

/67.B3
+1CP02
C -R1 C

+1CP02 2L+.T01

+1CP02 2M.T01
2

PE
+1CP02
1

160Ω,200W

1
5

4
8
-K1 -K1
+1CP02 .E3 .E3
-T1

12
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19
D D
+1CP02 2L+.T01

14

+1CP02
-K1
/67.B3

13

DRM270024L

E +1CP01 M.K01 +1CP01 M.K01 E


-K3.220V

/74.C4 /78.C1
-T1.W2

-T1.PE
-T1.U2

-T1.V2

5 .C4
1 9
/77.A1

/77.A1

/77.A1

/77.B1

/77.A1

8 .C5
4 12

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E305
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 76
APPROVED DWG. NO: PAGE : REV.
900E305#Rotary conveyer 001-02-76 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/76.E4

A /76.E2
-T1.U2
/76.B3
+1CP02 L1.01 A
-T1.V2 +1CP02 L2.01
/76.E2 /76.B3

-T1.W2 +1CP02 L3.01


/76.E2 /76.B3

-T1.PE
/76.E2 +1CP02

5
-Q3
/78.E7

6
+1CP02
1

-Q1 5
+1CP02

95
97
1

5
B
/78.E6 +1CP02 +1CP02 +1CP02 B

5
53

53
-F3
2

-Q1 -Q2 -Q2


I> I> I>
/78.E6 /78.E7 /78.E7 LRN01N

96
98
2

6
+1CP02
95
97

54

54
0.10~0.16A
1

/78.D4
-F2
I> I> I> N N
LRN08N
96
98
2

2.5~4.0A
/78.D2

PE
+1CP02 +1CP02 +1CP02 +1CP02
21

22

23

24

25

26

27

28

29

30

31

32
-2X3 -2X3 -2X3 -2X3

69

70

71

72
PE PE
PE

C C
PE

PE
+EX900E305-Q1-W1 +EX900E305-M1-W2 +EX900E305-JB1-W1 +EX900E305-JB1-W2 +EX900E305-JB1-W3
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-RVV-500V 4*0.75
20 20 20 20 20

+EX900E305 +EX900E305 +EX900E305


-JB1 -JB1 -JB1

10
-X1 -X1 -X1

9
U V W PE B+ B-
PE
1

+EX900E305
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX900E305-M1-W1 +EX900E305
1

ZR-VV-1KV 3*2.5+1*1.5 +EX900E305-M2-W1 -M2-W1 +EX900E305-M2-W2


1

4
5 1 1

E E

+EX900E305 +EX900E305
PE

PE

PE
-M1 -M2
W

W
U

U
AC1

AC1
V

V
Fan
M M M
Motor 3AC Motor 3AC 3AC
Rotary Motor Brake Conveyer Motor Brake
AC2

AC2
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E305
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 77
APPROVED DWG. NO: PAGE : REV.
900E305#Rotary conveyer 001-02-77 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A3 05/3.A3 05/3.A3 +1CP02 2L.K01 +1CP02 2L.K01


/74.A7 /82.A5
+1CP20 -DO2 +1CP20 -DO2 +1CP20 -DO2
A Q 26.0 Q 26.1 Q 26.2 A
=900E305-#Set.Rot =900E305-#Set.Cov =900E305-#FAN
=900E305#Set.Rot =900E305#Set.Cov =900E305#FAN

3
+1CP02 +1CP02 +1CP02

1
5

1
5

1
5
-K2 -K3 -K4
.B2 .B3 .B3

9
B B
14

14

14
+1CP02 +1CP02 +1CP02
-K2 -K3 -K4
13

13

13
DRM270024L DRM270024L DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/76.E4 /80.E3 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 5 .B7 .E7 .E6
1 9 1 9 1 9

22

22
C 8 8 8
C
4 12 4 12 4 12

+1CP02 2L+.Q01 +1CP02 2L+.Q01


/74.C4 /82.C1

+1CP02 +1CP02 +1CP02 +1CP02


95

63

63

95
-F2 -Q1 -Q2 -F3
/77.B2 .E6 .E7 /77.B7
96

64

64

96
D D

A1

A1

A1
+1CP02 +1CP02 +1CP02
-Q1 -Q2 -Q3

A2

A2

A2
LC1-N1201M5N LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01 +1CP02 2N.Q01


/74.E7 /82.E5
E E
1 2 1 2 1 2
1

I 56.0 I 56.1 I 56.2 I 56.6 3 4


/77.B2
3 4
/77.B5
3 4
/77.B7
=900E305-#Hw.Fault2 =900E305-#Ready.Rot =900E305-#Ready.Cov =900E305-#FAN.Fault 5 6 5 6 5 6
=900E305#Hw.Fault2 =900E305#Ready.Rot =900E305#Ready.Cov =900E305#FAN.Fault
21 22 21 22 21 22
.C7 .C6
53 54 53 54
/77.B3 /77.B6
+1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 63 64 63 64
.D3 .D3
04/4.A1 04/4.A1 04/4.A1 04/4.A1 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E305
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 78
APPROVED DWG. NO: PAGE : REV.
900E305#Rotary conveyer 001-02-78 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20

17
/75.A7
+1CP20 L+.X03-X5 +1CP20 L+.X03
/83.A1
L+

18
A /75.A7
+1CP20 M.X03 +1CP20 M.X03
/83.A1 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
20

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
19

20

21

22

23

24
E E
1

6
I 50.0 I 50.1 I 50.2 I 50.3 I 50.4 I 50.5
=900E305-#Pc.Leave =900E305-#Pc.Leave.Safe =900E305-#Pc.Come =900E305-#Pc.Come.Safe =900E305-#Ps.Pos.0 =900E305-#Ps.Pos.90
=900E305#Pc.Leave =900E305#Pc.Leave.Safe =900E305#Pc.Come =900E305#Pc.Come.Safe =900E305#Ps.Pos.0 =900E305#Ps.Pos.90

+1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6
04/3.C3 04/3.C3 04/3.C3 04/3.C3 04/3.C3 04/3.C3

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E305
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E305 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 79
APPROVED DWG. NO: PAGE : REV.
900E305#Rotary conveyer 001-02-79 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D5

+1CP02 2L2.MPS
/66.D5
A A
+1CP02 2L3.MPS
/66.D6

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B +1CP02 L1.01
/81.A7
B

+1CP02 L2.01
/81.A7

+1CP02 L3.01
/81.A7

/67.B4

/67.B3
+1CP02
C -R1 C

+1CP02 2L+.T01

+1CP02 2M.T01
2

PE
1

160Ω,200W

+1CP02
-T1
L1 L2 L3 PE R1 R2 24V COM

6SL3210-1KE15-8UF2 +1CP02

1
5

4
8
-K1 -K1
U2 V2 W2 PE 20 18 19 .E3 .E3
D D

12
+1CP02 2L+.T01

14

+1CP02
-K1
/67.B4

13

DRM270024L

E /78.C4
+1CP01 M.K01 +1CP01 M.K01
/82.C1
E

5
-K3.220V

.D4
-T1.W2

-T1.PE
-T1.U2

-T1.V2

1 9
8 .D5
4 12
/81.A2

/81.A2

/81.A2

/81.B2

/81.A2

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E306
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 80
APPROVED DWG. NO: PAGE : REV.
900E306#Rotary conveyer 001-02-80 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/80.E4

A /80.E2
-T1.U2
/80.B3
+1CP02 L1.01 A
-T1.V2 +1CP02 L2.01
/80.E2 /80.B3

-T1.W2 +1CP02 L3.01


/80.E2 /80.B3

-T1.PE
/80.E2 +1CP02

5
-Q3
/82.E7

6
+1CP02
1

5
-Q1
+1CP02

95
97
1

5
B
/82.E6 +1CP02 +1CP02 +1CP02 B

5
53

53
-F3
2

6
-Q1 -Q2 -Q2
I> I> I>
/82.E6 /82.E7 /82.E7 LRN01N

96
98
2

6
+1CP02

95
97

54

54
0.10~0.16A
1

/82.D4
-F2
I> I> I> N N
LRN08N 96
98
PE
2

2.5~4.0A /82.D2

+1CP02 +1CP02 +1CP02 +1CP02


33

34

35

36

37

38

39

40

41

42

43

44

73

74

75

76
-2X3 -2X3 -2X3 -2X3
PE PE PE

C C
PE

PE
+EX900E306-Q1-W1 +EX900E306-M1-W2 +EX900E306-JB1-W1 +EX900E306-JB1-W2 +EX900E306-JB1-W3
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-RVV-500V 4*0.75
30 30 30 20 20

+EX900E306 +EX900E306 +EX900E306


-JB1 -JB1 -JB1

10
-X1 -X1 -X1

9
U V W PE B+ B-
PE
1

+EX900E306
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX900E306-M1-W1 +EX900E306
1

ZR-VV-1KV 3*2.5+1*1.5 +EX900E306-M2-W1 -M2-W1 +EX900E306-M2-W2

4
5 1 1

E E

+EX900E306 +EX900E306
PE

PE

PE
-M1 -M2
W

W
U

U
AC1

AC1
V

V
Fan
M M M
Motor 3AC Motor 3AC 3AC
Rotary Motor Brake Conveyer Motor Brake
AC2

AC2
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E306
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 81
APPROVED DWG. NO: PAGE : REV.
900E306#Rotary conveyer 001-02-81 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A3 05/3.A3 05/3.A3 +1CP02 2L.K01 +1CP02 2L.K01


/78.A8 /86.A5
+1CP20 -DO2 +1CP20 -DO2 +1CP20 -DO2
A Q 26.3 Q 26.4 Q 26.5 A
=900E306-#Set.Rot =900E306-#Set.Cov =900E306-#FAN
=900E306#Set.Rot =900E306#Set.Cov =900E306#FAN

6
+1CP02 +1CP02 +1CP02

1
5

1
5

1
5
-K2 -K3 -K4
.B2 .B3 .B3

9
B B
14

14

14
+1CP02 +1CP02 +1CP02
-K2 -K3 -K4
13

13

13
DRM270024L DRM270024L DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/80.E4 /84.E3 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 5 .B7 .E7 .E6
1 9 1 9 1 9

22

22
C 8 8 8
C
4 12 4 12 4 12

+1CP02 2L+.Q01 +1CP02 2L+.Q01


/78.C4 /86.C1

+1CP02 +1CP02 +1CP02 +1CP02


95

63

63

95
-F2 -Q1 -Q2 -F3
/81.B2 .E6 .E7 /81.B7
96

64

64

96
D D

A1

A1

A1
+1CP02 +1CP02 +1CP02
-Q1 -Q2 -Q3

A2

A2

A2
LC1-N1201M5N LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01 +1CP02 2N.Q01


/78.E8 /86.E5
E E
1 2 1 2 1 2
4

I 56.3 I 56.4 I 56.5 I 56.7 3 4


/81.B2
3 4
/81.B5
3 4
/81.B7
=900E306-#Hw.Fault2 =900E306-#Ready.Rot =900E306-#Ready.Cov =900E306-#FAN.Fault 5 6 5 6 5 6
=900E306#Hw.Fault2 =900E306#Ready.Rot =900E306#Ready.Cov =900E306#FAN.Fault
21 22 21 22 21 22
.C7 .C6
53 54 53 54
/81.B3 /81.B6
+1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 63 64 63 64
.D3 .D3
04/4.A1 04/4.A1 04/4.A1 04/4.A1 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E306
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 82
APPROVED DWG. NO: PAGE : REV.
900E306#Rotary conveyer 001-02-82 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20

25
/79.A7
+1CP20 L+.X03-X5 +1CP20 L+.X03
/87.A1
L+

26
A /79.A7
+1CP20 M.X03 +1CP20 M.X03
/87.A1 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
30

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
27

28

29

30

31

32
E E
10

11

12

13

14

15
I 51.1 I 51.2 I 51.3 I 51.4 I 51.5 I 51.6
=900E306-#Pc.Leave =900E306-#Pc.Leave.Safe =900E306-#Pc.Come =900E306-#Pc.Come.Safe =900E306-#Ps.Pos.0 =900E306-#Ps.Pos.90
=900E306#Pc.Leave =900E306#Pc.Leave.Safe =900E306#Pc.Come =900E306#Pc.Come.Safe =900E306#Ps.Pos.0 =900E306#Ps.Pos.90

+1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6 +1CP20 -DI6
04/3.C3 04/3.C3 04/3.C3 04/3.C3 04/3.C3 04/3.C3

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E306
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E306 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 83
APPROVED DWG. NO: PAGE : REV.
900E306#Rotary conveyer 001-02-83 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D6

+1CP02 2L2.MPS
/66.D6
A A
+1CP02 2L3.MPS
/66.D6

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B +1CP02 L1.01
/85.A7
B

+1CP02 L2.01
/85.A7

+1CP02 L3.01
/85.A7

/67.B4

/67.B3
C +1CP02 C
-R1
+1CP02 2L+.T01

+1CP02 2M.T01
2

PE
1

160Ω,200W

+1CP02
-T1 +1CP02

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM -K1 -K1
.E3 .E3
6SL3210-1KE15-8UF2

12
D U2 V2 W2 PE 20 18 19 D
+1CP02 2L+.T01

14

+1CP02
-K1
/67.B4

E E
13

DRM270024L

+1CP01 M.K01 +1CP01 M.K01


-K3.220V

/82.C4 /86.C1
-T1.W2

-T1.PE
-T1.U2

-T1.V2

5 .D4
1 9
/85.A1

/85.A1

/85.A1

/85.B1

/85.A1

8 .D5
4 12

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E001
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 84
APPROVED DWG. NO: PAGE : REV.
902E001#Rotary conveyer 001-02-84 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/84.E4

A /84.E2
-T1.U2
/84.B3
+1CP02 L1.01 A
-T1.V2 +1CP02 L2.01
/84.E2 /84.B3

-T1.W2 +1CP02 L3.01


/84.E2 /84.B3

-T1.PE
/84.E2 +1CP02

5
-Q3
/86.E7

6
+1CP02 1

5
-Q1
+1CP02

95
97
1

5
B
/86.E6 +1CP02 +1CP02 +1CP02 B

5
53

53
-F3
2

6
-Q1 -Q2 -Q2
I> I> I>
/86.E6 /86.E7 /86.E7 LRN01N

96
98
2

6
+1CP02
95
97

54

54
0.10~0.16A
1

/86.D4
-F2
I> I> I> N N
LRN08N
96
98
2

2.5~4.0A
/86.D2

PE
+1CP02 +1CP02 +1CP02 +1CP02
45

46

47

48

49

50

51

52

53

54

55

56
-2X3 -2X3 -2X3 -2X3

77

78

79

80
PE PE
PE

C C
PE

PE
+EX902E001-Q1-W1 +EX902E001-M1-W2 +EX902E001-JB1-W1 +EX902E001-JB1-W2 +EX902E001-JB1-W3
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-RVV-500V 4*0.75
30 30 30 20 20

+EX902E001 +EX902E001 +EX902E001


-JB1 -JB1 -JB1

10
-X1 -X1 -X1

9
U V W PE B+ B-
PE
1

+EX902E001
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX902E001-M1-W1 +EX902E001
1

ZR-VV-1KV 3*2.5+1*1.5 +EX902E001-M2-W1 1


-M2-W1 +EX902E001-M2-W2
2

4
5 1 1

E E

+EX902E001 +EX902E001
PE

PE

PE
-M1 -M2
W

W
U

U
AC1

AC1
V

V
Fan
M M M
Motor 3AC Motor 3AC 3AC
Rotary Motor Brake Conveyer Motor Brake
AC2

AC2
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E001
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 85
APPROVED DWG. NO: PAGE : REV.
902E001#Rotary conveyer 001-02-85 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A3 05/3.A3 05/3.A3 +1CP02 2L.K01 +1CP02 2L.K01


/82.A8 /90.A5
+1CP20 -DO2 +1CP20 -DO2 +1CP20 -DO2
A Q 26.6 Q 26.7 Q 27.0 A
=902E001-#Set.Rot =902E001-#Set.Cov =902E001-#FAN
=902E001#Set.Rot =902E001#Set.Cov =902E001#FAN

9
+1CP02 +1CP02 +1CP02

1
5

1
5

1
5
-K2 -K3 -K4
.B2 .B3 .B3

9
B B
14

14

14
+1CP02 +1CP02 +1CP02
-K2 -K3 -K4
13

13

13
DRM270024L DRM270024L DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/84.E4 /88.E3 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 5 .B7 .E7 .E6
1 9 1 9 1 9

22

22
C 8 8 8
C
4 12 4 12 4 12

+1CP02 2L+.Q01 +1CP02 2L+.Q01


/82.C4 /90.C1

+1CP02 +1CP02 +1CP02 +1CP02


95

63

63

95
-F2 -Q1 -Q2 -F3
/85.B2 .E6 .E7 /85.B7
96

64

64

96
D D

A1

A1

A1
+1CP02 +1CP02 +1CP02
-Q1 -Q2 -Q3

A2

A2

A2
LC1-N1201M5N LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01 +1CP02 2N.Q01


/82.E8 /90.E5
E E
10

11

15
9

I 57.0 I 57.1 I 57.2 I 57.6 1 2 1 2 1 2


=902E001-#Hw.Fault2 =902E001-#Ready.Rot =902E001-#Ready.Cov =902E001-#FAN.Fault 3 4 3 4 3 4
=902E001#Hw.Fault2 =902E001#Ready.Rot =902E001#Ready.Cov =902E001#FAN.Fault /85.B2 /85.B5 /85.B7
5 6 5 6 5 6
21 22 21 22 21 22
.C7 .C6
+1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 53 54 53 54
/85.B3 /85.B6
04/4.A1 04/4.A1 04/4.A1 04/4.A1 63 64 63 64
.D3 .D3
LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E001
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 86
APPROVED DWG. NO: PAGE : REV.
902E001#Rotary conveyer 001-02-86 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20

33
/83.A7
+1CP20 L+.X03-X5 +1CP20 L+.X03
/91.A1
L+

34
A /83.A7
+1CP20 M.X03 +1CP20 M.X03
/91.A1 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
30

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
35

36

37

38

39

40
E E
1

6
I 52.0 I 52.1 I 52.2 I 52.3 I 52.4 I 52.5
=902E001-#Pc.Leave =902E001-#Pc.Leave.Safe =902E001-#Pc.Come =902E001-#Pc.Come.Safe =902E001-#Ps.Pos.0 =902E001-#Ps.Pos.90
=902E001#Pc.Leave =902E001#Pc.Leave.Safe =902E001#Pc.Come =902E001#Pc.Come.Safe =902E001#Ps.Pos.0 =902E001#Ps.Pos.90

+1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7
04/3.C5 04/3.C5 04/3.C5 04/3.C5 04/3.C5 04/3.C5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E001
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX902E001 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 87
APPROVED DWG. NO: PAGE : REV.
902E001#Rotary conveyer 001-02-87 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP02 2L1.MPS
/66.D6

+1CP02 2L2.MPS
/66.D6
A A
+1CP02 2L3.MPS
/66.D7

+1CP02
-F1

5
I> I> I>
2

6
iC65N-C,10A/3P
10A
B +1CP02 L1.01
/89.A7
B

+1CP02 L2.01
/89.A7

+1CP02 L3.01
/89.A7

/67.B5

/67.B4
+1CP02
C -R1 C

+1CP02 2L+.T01

+1CP02 2M.T01
2

PE
1

160Ω,200W

+1CP02
-T1
L1 L2 L3 PE R1 R2 24V COM
+1CP02

1
5

4
8
-K1 -K1
6SL3210-1KE15-8UF2
.E3 .E3

12
U2 V2 W2 PE 20 18 19
D D
+1CP02 2L+.T01

14

+1CP02
-K1
/67.B5

13

DRM270024L

+1CP01 M.K01 +1CP01 M.K01


/86.C4 /90.C1
E E
5 .D4
1 9
-K3.220V
-T1.W2

-T1.PE
-T1.U2

-T1.V2

8 .D5
4 12
/89.A1

/89.A1

/89.A1

/89.B1

/89.A1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E003
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 88
APPROVED DWG. NO: PAGE : REV.
902E003#Rotary conveyer 001-02-88 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-K3.220V
/88.E4

A /88.E2
-T1.U2
/88.B3
+1CP02 L1.01 A
-T1.V2 +1CP02 L2.01
/88.E2 /88.B3

-T1.W2 +1CP02 L3.01


/88.E2 /88.B3

-T1.PE
/88.E2 +1CP02

5
-Q3
/90.E7

6
+1CP02
1

-Q1
+1CP02

95
97
1

5
B
/90.E6 +1CP02 +1CP02 +1CP02 B

5
53

53
-F3
2

-Q1 -Q2 -Q2


I> I> I>
/90.E6 /90.E7 /90.E7 LRN01N

96
98
2

6
+1CP02
95
97

54

54
0.10~0.16A
1

/90.D4
-F2
I> I> I> N N
LRN08N
96
98
2

2.5~4.0A
/90.D2

PE
+1CP02 +1CP02 +1CP02 +1CP02
57

58

59

60

61

62

63

64

65

66

67

68
-2X3 -2X3 -2X3 -2X3

81

82

83

84
PE PE
PE

C C
PE

PE
+EX902E003-Q1-W1 +EX902E003-M1-W2 +EX902E003-JB1-W1 +EX902E003-JB1-W2 +EX902E003-JB1-W3
1

4
ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-VV-1KV 3*2.5+1*1.5 ZR-RVV-500V 2*0.75 ZR-RVV-500V 4*0.75
35 35 35 20 20

+EX902E003 +EX902E003 +EX902E003


-JB1 -JB1 -JB1

10
-X1 -X1 -X1

9
U V W PE B+ B-
PE
1

+EX902E003
D -Q1 D
PE
2

JFD11-32/310111 25A
25A
PE

+EX902E003-M1-W1 +EX902E003
1

ZR-VV-1KV 3*2.5+1*1.5 +EX902E003-M2-W1 -M2-W1 +EX902E003-M2-W2


1

4
5 1 1

E E

+EX902E003 +EX902E003
PE

PE

PE
-M1 -M2
W

W
U

U
AC1

AC1
V

V
Fan
M M M
Motor 3AC Motor 3AC 3AC
Rotary Motor Brake Conveyer Motor Brake
AC2

AC2
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E003
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 89
APPROVED DWG. NO: PAGE : REV.
902E003#Rotary conveyer 001-02-89 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/3.A3 05/3.A3 05/3.A3 +1CP02 2L.K01


/86.A8
+1CP20 -DO2 +1CP20 -DO2 +1CP20 -DO2
A Q 27.1 Q 27.2 Q 27.3 A
=902E003-#Set.Rot =902E003-#Set.Cov =902E003-#FAN
=902E003#Set.Rot =902E003#Set.Cov =902E003#FAN

10

11

12
+1CP02 +1CP02 +1CP02

1
5

1
5

1
5
-K2 -K3 -K4
.B2 .B3 .B3

9
B B
14

14

14
+1CP02 +1CP02 +1CP02
-K2 -K3 -K4
13

13

13
DRM270024L DRM270024L DRM270024L

+1CP01 M.K01
/88.E4 +1CP02 +1CP02

21

21
-Q2 -Q1
5 .B6 5 .B7 5 .B7 .E7 .E6
1 9 1 9 1 9

22

22
C 8 8 8
C
4 12 4 12 4 12

+1CP02 2L+.Q01
/86.C4

+1CP02 +1CP02 +1CP02 +1CP02


95

63

63

95
-F2 -Q1 -Q2 -F3
/89.B2 .E6 .E7 /89.B7
96

64

64

96
D D

A1

A1

A1
+1CP02 +1CP02 +1CP02
-Q1 -Q2 -Q3

A2

A2

A2
LC1-N1201M5N LC1-N1201M5N LC1-N1201M5N

+1CP02 2N.Q01
/86.E8
E E
12

13

14

16

1 2 1 2 1 2
I 57.3 I 57.4 I 57.5 I 57.7 3 4
/89.B2
3 4
/89.B4
3 4
/89.B7
=902E003-#Hw.Fault2 =902E003-#Ready.Rot =902E003-#Ready.Cov =902E003-#FAN.Fault 5 6 5 6 5 6
=902E003#Hw.Fault2 =902E003#Ready.Rot =902E003#Ready.Cov =902E003#FAN.Fault
21 22 21 22 21 22
.C7 .C6
53 54 53 54
/89.B3 /89.B6
+1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 +1CP20 -DI9 63 64 63 64
.D3 .D3
04/4.A1 04/4.A1 04/4.A1 04/4.A1 LAN-N20N LAN-N20N

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E003
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 90
APPROVED DWG. NO: PAGE : REV.
902E003#Rotary conveyer 001-02-90 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP20

41
/87.A7
+1CP20 L+.X03-X5
L+

42
A /87.A7
+1CP20 M.X03 A
M

-JB2-W3
1

ZR-RVVP 10*0.5 2
35

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
43

44

45

46

47

48
E E
10

11

12

13

14

15
I 53.1 I 53.2 I 53.3 I 53.4 I 53.5 I 53.6
=902E003-#Pc.Leave =902E003-#Pc.Leave.Safe =902E003-#Pc.Come =902E003-#Pc.Come.Safe =902E003-#Ps.Pos.0 =902E003-#Ps.Pos.90
=902E003#Pc.Leave =902E003#Pc.Leave.Safe =902E003#Pc.Come =902E003#Pc.Come.Safe =902E003#Ps.Pos.0 =902E003#Ps.Pos.90

+1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7 +1CP20 -DI7
04/3.C5 04/3.C5 04/3.C5 04/3.C5 04/3.C5 04/3.C5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =902E003
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX902E003 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 91
APPROVED DWG. NO: PAGE : REV.
902E003#Rotary conveyer 001-02-91 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X1


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 10
B +1CP02 -2F2 1 1 JUT14-2.5/GY L1 02/66.C1 +1CP02 -2F1 1
B
2 JUT14-2.5/GY L1 02/66.C2
3 JUT14-2.5/GY L1 02/66.C2
4 JUT14-2.5/GY L1 02/66.C3
+1CP02 N 5 JUT14-2.5/GY N 02/66.C1 +1CP02 -2E1 2 Control cabinet lighting
6 JUT14-2.5/GY N 02/66.C2
7 JUT14-2.5/GY N 02/66.C3
8 JUT14-2.5/GY N 02/66.C3 +1CP02 -2Q1 A2
9 JUT14-2.5/GY
10 JUT14-2.5/GY 02/66.A7 =900E301 +1CP02 -K2 5 1
C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X1 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 92
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X1 001-02-92 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X2


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 28
B L+ =1CP20 +1CP20 -X2 16 1 JUT14-2.5/GY L+ 02/67.A2 =900E301 +1CP02 -T1 20 DO0
B
02/67.A2 =900E301 +1CP02 -F2 95 NC
DO0 =900E304 +1CP02 -T1 20 2 JUT14-2.5/GY L+ 02/67.A2 =900E301 +1CP02 -T1 24V
DO0 =900E305 +1CP02 -T1 20 3 JUT14-2.5/GY L+ 02/67.A3 =900E304 +1CP02 -T1 24V
DO0 =900E306 +1CP02 -T1 20 4 JUT14-2.5/GY L+ 02/67.A3 =900E305 +1CP02 -T1 24V
DO0 =902E001 +1CP02 -T1 20 5 JUT14-2.5/GY L+ 02/67.A4 =900E306 +1CP02 -T1 24V
DO0 =902E003 +1CP02 -T1 20 6 JUT14-2.5/GY L+ 02/67.A4 =902E001 +1CP02 -T1 24V
7 JUT14-2.5/GY L+ 02/67.A5 =902E003 +1CP02 -T1 24V
8 JUT14-2.5/GY L+ 02/67.A5
9 JUT14-2.5/GY L+ 02/67.A6
C C
10 JUT14-2.5/GY L+ 02/67.A6
11 JUT14-2.5/GY L+ 02/67.A7
12 JUT14-2.5/GY L+ 02/67.A7
13 JUT14-2.5/GY L+ 02/67.A7
14 JUT14-2.5/GY L+ 02/67.A7
15 JUT14-2.5/GY L+ 02/67.A8
16 JUT14-2.5/GY L+ 02/67.A8
M =1CP20 +1CP20 -X2 28 17 JUT14-2.5/GY M 02/67.A2 =900E301 +1CP02 -K1 13
=900E304 +1CP02 -T1 COM 18 JUT14-2.5/GY M 02/67.A2 =900E301 +1CP02 -T1 COM
=900E305 +1CP02 -T1 COM 19 JUT14-2.5/GY M 02/67.A3 =900E306 +1CP02 -T1 COM
D D
20 JUT14-2.5/GY M 02/67.A3 =902E001 +1CP02 -T1 COM
21 JUT14-2.5/GY M 02/67.A4 =902E003 +1CP02 -T1 COM
22 JUT14-2.5/GY M 02/67.A4
23 JUT14-2.5/GY M 02/67.A5
24 JUT14-2.5/GY M 02/67.A6
25 JUT14-2.5/GY M 02/67.A6
26 JUT14-2.5/GY M 02/67.A7
27 JUT14-2.5/GY M 02/67.A7
28 JUT14-2.5/GY M 02/67.A8

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X2 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 93
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X2 001-02-93 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E304 -JB1-W1

+EX900E301 -JB1-W1
+EX900E305 -M1-W2

+EX900E304 -M1-W2

+EX900E301 -M1-W2
+EX900E305 -Q1-W1

+EX900E304 -Q1-W1

+EX900E301 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 84
B 1 =900E301 +EX900E301 -Q1 1 1 JUT14-2.5/GY 02/69.C2 =900E301 +1CP02 -F2 2
B
2 =900E301 +EX900E301 -Q1 3 2 JUT14-2.5/GY 02/69.C2 =900E301 +1CP02 -F2 4
3 =900E301 +EX900E301 -Q1 5 3 JUT14-2.5/GY 02/69.C2 =900E301 +1CP02 -F2 6
PE =900E301 +EX900E301 -Q1 PE 4 JUT14-2.5PE PE 02/69.C3 =900E301 +1CP02 -T1 PE
Brake 1 =900E301 +EX900E301 -M1 AC1 5 JUT14-2.5/GY 02/69.C3 =900E301 +1CP02 -Q1 54 1
Brake 2 =900E301 +EX900E301 -M1 AC2 6 JUT14-2.5/GY 02/69.C3 =900E301 +1CP02 N
U 1 =900E301+EX900E301 -JB1 -X1 1 7 JUT14-2.5/GY 02/69.C6 =900E301 +1CP02 -Q2 2 1
V 2 =900E301+EX900E301 -JB1 -X1 2 8 JUT14-2.5/GY 02/69.C6 =900E301 +1CP02 -Q2 4 1
W 3 =900E301+EX900E301 -JB1 -X1 3 9 JUT14-2.5/GY 02/69.C6 =900E301 +1CP02 -Q2 6 1
PE PE =900E301+EX900E301 -JB1 -X1 4 10 JUT14-2.5PE PE 02/69.C6
C C
1 =900E304 +EX900E304 -Q1 1 11 JUT14-2.5/GY 02/73.C2 =900E304 +1CP02 -F2 2
2 =900E304 +EX900E304 -Q1 3 12 JUT14-2.5/GY 02/73.C2 =900E304 +1CP02 -F2 4
3 =900E304 +EX900E304 -Q1 5 13 JUT14-2.5/GY 02/73.C2 =900E304 +1CP02 -F2 6
PE =900E304 +EX900E304 -Q1 PE 14 JUT14-2.5PE PE 02/73.C3 =900E304 +1CP02 -T1 PE
Brake 1 =900E304 +EX900E304 -M1 AC1 15 JUT14-2.5/GY 02/73.C3 =900E304 +1CP02 -Q1 54 1
Brake 2 =900E304 +EX900E304 -M1 AC2 16 JUT14-2.5/GY 02/73.C3 =900E304 +1CP02 N
U 1 =900E304+EX900E304 -JB1 -X1 1 17 JUT14-2.5/GY 02/73.C6 =900E304 +1CP02 -Q2 2 1
V 2 =900E304+EX900E304 -JB1 -X1 2 18 JUT14-2.5/GY 02/73.C6 =900E304 +1CP02 -Q2 4 1
W 3 =900E304+EX900E304 -JB1 -X1 3 19 JUT14-2.5/GY 02/73.C6 =900E304 +1CP02 -Q2 6 1
PE PE =900E304+EX900E304 -JB1 -X1 4 20 JUT14-2.5PE PE 02/73.C6
D D
1 =900E305 +EX900E305 -Q1 1 21 JUT14-2.5/GY 02/77.C2 =900E305 +1CP02 -F2 2
2 =900E305 +EX900E305 -Q1 3 22 JUT14-2.5/GY 02/77.C2 =900E305 +1CP02 -F2 4
3 =900E305 +EX900E305 -Q1 5 23 JUT14-2.5/GY 02/77.C2 =900E305 +1CP02 -F2 6
PE =900E305 +EX900E305 -Q1 PE 24 JUT14-2.5PE PE 02/77.C2 =900E305 +1CP02 -T1 PE
Brake 1 =900E305 +EX900E305 -M1 AC1 25 JUT14-2.5/GY 02/77.C3 =900E305 +1CP02 -Q1 54 1
Brake 2 =900E305 +EX900E305 -M1 AC2 26 JUT14-2.5/GY 02/77.C3 =900E305 +1CP02 N

E E

1/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 94
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X3 001-02-94 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E306 -JB1-W2

+EX900E306 -JB1-W1

+EX900E305 -JB1-W2

+EX900E305 -JB1-W1
+EX902E001 -M1-W2

+EX900E306 -M1-W2
+EX902E001 -Q1-W1

+EX900E306 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 84
B U 1 =900E305+EX900E305 -JB1 -X1 1 27 JUT14-2.5/GY 02/77.C5 =900E305 +1CP02 -Q2 2 1
B
V 2 =900E305+EX900E305 -JB1 -X1 2 28 JUT14-2.5/GY 02/77.C5 =900E305 +1CP02 -Q2 4 1
W 3 =900E305+EX900E305 -JB1 -X1 3 29 JUT14-2.5/GY 02/77.C5 =900E305 +1CP02 -Q2 6 1
PE PE =900E305+EX900E305 -JB1 -X1 4 30 JUT14-2.5PE PE 02/77.C5
B+ 1 =900E305+EX900E305 -JB1 -X1 5 31 JUT14-2.5/GY 02/77.C6 =900E305 +1CP02 -Q2 54 1
B- 2 =900E305+EX900E305 -JB1 -X1 6 32 JUT14-2.5/GY 02/77.C6 =900E305 +1CP02 N
1 =900E306 +EX900E306 -Q1 1 33 JUT14-2.5/GY 02/81.C2 =900E306 +1CP02 -F2 2
2 =900E306 +EX900E306 -Q1 3 34 JUT14-2.5/GY 02/81.C2 =900E306 +1CP02 -F2 4
3 =900E306 +EX900E306 -Q1 5 35 JUT14-2.5/GY 02/81.C2 =900E306 +1CP02 -F2 6
PE =900E306 +EX900E306 -Q1 PE 36 JUT14-2.5PE PE 02/81.C3 =900E306 +1CP02 -T1 PE
C C
Brake 1 =900E306 +EX900E306 -M1 AC1 37 JUT14-2.5/GY 02/81.C3 =900E306 +1CP02 -Q1 54 1
Brake 2 =900E306 +EX900E306 -M1 AC2 38 JUT14-2.5/GY 02/81.C3 =900E306 +1CP02 N
U 1 =900E306+EX900E306 -JB1 -X1 1 39 JUT14-2.5/GY 02/81.C5 =900E306 +1CP02 -Q2 2 1
V 2 =900E306+EX900E306 -JB1 -X1 2 40 JUT14-2.5/GY 02/81.C5 =900E306 +1CP02 -Q2 4 1
W 3 =900E306+EX900E306 -JB1 -X1 3 41 JUT14-2.5/GY 02/81.C5 =900E306 +1CP02 -Q2 6 1
PE PE =900E306+EX900E306 -JB1 -X1 4 42 JUT14-2.5PE PE 02/81.C5
B+ 1 =900E306+EX900E306 -JB1 -X1 5 43 JUT14-2.5/GY 02/81.C6 =900E306 +1CP02 -Q2 54 1
B- 2 =900E306+EX900E306 -JB1 -X1 6 44 JUT14-2.5/GY 02/81.C6 =900E306 +1CP02 N
1 =902E001 +EX902E001 -Q1 1 45 JUT14-2.5/GY 02/85.C2 =902E001 +1CP02 -F2 2
2 =902E001 +EX902E001 -Q1 3 46 JUT14-2.5/GY 02/85.C2 =902E001 +1CP02 -F2 4
D D
3 =902E001 +EX902E001 -Q1 5 47 JUT14-2.5/GY 02/85.C2 =902E001 +1CP02 -F2 6
PE =902E001 +EX902E001 -Q1 PE 48 JUT14-2.5PE PE 02/85.C2 =902E001 +1CP02 -T1 PE
Brake 1 =902E001 +EX902E001 -M1 AC1 49 JUT14-2.5/GY 02/85.C3 =902E001 +1CP02 -Q1 54 1
Brake 2 =902E001 +EX902E001 -M1 AC2 50 JUT14-2.5/GY 02/85.C3 =902E001 +1CP02 N

E E

2/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 94
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X3 001-02-94 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E306 -JB1-W3

+EX900E305 -JB1-W3

+EX902E003 -JB1-W2

+EX902E003 -JB1-W1

+EX902E001 -JB1-W2

+EX902E001 -JB1-W1
+EX902E003 -M1-W2

+EX902E003 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 84
B U 1 =902E001+EX902E001 -JB1 -X1 1 51 JUT14-2.5/GY 02/85.C5 =902E001 +1CP02 -Q2 2 1
B
V 2 =902E001+EX902E001 -JB1 -X1 2 52 JUT14-2.5/GY 02/85.C5 =902E001 +1CP02 -Q2 4 1
W 3 =902E001+EX902E001 -JB1 -X1 3 53 JUT14-2.5/GY 02/85.C5 =902E001 +1CP02 -Q2 6 1
PE PE =902E001+EX902E001 -JB1 -X1 4 54 JUT14-2.5PE PE 02/85.C5
B+ 1 =902E001+EX902E001 -JB1 -X1 5 55 JUT14-2.5/GY 02/85.C6 =902E001 +1CP02 -Q2 54 1
B- 2 =902E001+EX902E001 -JB1 -X1 6 56 JUT14-2.5/GY 02/85.C6 =902E001 +1CP02 N
1 =902E003 +EX902E003 -Q1 1 57 JUT14-2.5/GY 02/89.C2 =902E003 +1CP02 -F2 2
2 =902E003 +EX902E003 -Q1 3 58 JUT14-2.5/GY 02/89.C2 =902E003 +1CP02 -F2 4
3 =902E003 +EX902E003 -Q1 5 59 JUT14-2.5/GY 02/89.C2 =902E003 +1CP02 -F2 6
PE =902E003 +EX902E003 -Q1 PE 60 JUT14-2.5PE PE 02/89.C2 =902E003 +1CP02 -T1 PE
C C
Brake 1 =902E003 +EX902E003 -M1 AC1 61 JUT14-2.5/GY 02/89.C3 =902E003 +1CP02 -Q1 54 1
Brake 2 =902E003 +EX902E003 -M1 AC2 62 JUT14-2.5/GY 02/89.C3 =902E003 +1CP02 N
U 1 =902E003+EX902E003 -JB1 -X1 1 63 JUT14-2.5/GY 02/89.C4 =902E003 +1CP02 -Q2 2 1
V 2 =902E003+EX902E003 -JB1 -X1 2 64 JUT14-2.5/GY 02/89.C5 =902E003 +1CP02 -Q2 4 1
W 3 =902E003+EX902E003 -JB1 -X1 3 65 JUT14-2.5/GY 02/89.C5 =902E003 +1CP02 -Q2 6 1
PE PE =902E003+EX902E003 -JB1 -X1 4 66 JUT14-2.5PE PE 02/89.C5
B+ 1 =902E003+EX902E003 -JB1 -X1 5 67 JUT14-2.5/GY 02/89.C6 =902E003 +1CP02 -Q2 54 1
B- 2 =902E003+EX902E003 -JB1 -X1 6 68 JUT14-2.5/GY 02/89.C6 =902E003 +1CP02 N
1 =900E305+EX900E305 -JB1 -X1 7 69 JUT14-2.5/GY 02/77.C7 =900E305 +1CP02 -F3 2
2 =900E305+EX900E305 -JB1 -X1 8 70 JUT14-2.5/GY 02/77.C7 =900E305 +1CP02 -F3 4
D D
3 =900E305+EX900E305 -JB1 -X1 9 71 JUT14-2.5/GY 02/77.C8 =900E305 +1CP02 -F3 6
4 =900E305+EX900E305 -JB1 -X1 10 72 JUT14-2.5PE PE 02/77.C8 =900E305 +1CP02 PE
1 =900E306+EX900E306 -JB1 -X1 7 73 JUT14-2.5/GY 02/81.C7 =900E306 +1CP02 -F3 2
2 =900E306+EX900E306 -JB1 -X1 8 74 JUT14-2.5/GY 02/81.C7 =900E306 +1CP02 -F3 4
3 =900E306+EX900E306 -JB1 -X1 9 75 JUT14-2.5/GY 02/81.C8 =900E306 +1CP02 -F3 6
4 =900E306+EX900E306 -JB1 -X1 10 76 JUT14-2.5PE PE 02/81.C8 =900E305 +1CP02 PE

E E

3/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 94
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X3 001-02-94 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX902E003 -JB1-W3

+EX902E001 -JB1-W3

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP02 -2X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 84
B 1 =902E001+EX902E001 -JB1 -X1 7 77 JUT14-2.5/GY 02/85.C7 =902E001 +1CP02 -F3 2
B
2 =902E001+EX902E001 -JB1 -X1 8 78 JUT14-2.5/GY 02/85.C7 =902E001 +1CP02 -F3 4
3 =902E001+EX902E001 -JB1 -X1 9 79 JUT14-2.5/GY 02/85.C8 =902E001 +1CP02 -F3 6
4 =902E001+EX902E001 -JB1 -X1 10 80 JUT14-2.5PE PE 02/85.C8 =900E305 +1CP02 PE
1 =902E003+EX902E003 -JB1 -X1 7 81 JUT14-2.5/GY 02/89.C7 =902E003 +1CP02 -F3 2
2 =902E003+EX902E003 -JB1 -X1 8 82 JUT14-2.5/GY 02/89.C7 =902E003 +1CP02 -F3 4
3 =902E003+EX902E003 -JB1 -X1 9 83 JUT14-2.5/GY 02/89.C7 =902E003 +1CP02 -F3 6
4 =902E003+EX902E003 -JB1 -X1 10 84 JUT14-2.5PE PE 02/89.C7 =900E305 +1CP02 PE

C C

D D

E E

4/4
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP02-2X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 94
APPROVED DWG. NO: PAGE : REV.
+1CP02 -2X3 001-02-94 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


1 +1CP03 Air Conditioner Air Conditioner SK 3370.520 RITTAL
A 2 +1CP03 -1CP03 Cabinet 2000X1000X600 A
3 +1CP03 -1F1 Circuit Breaker iC65N-C,63A/3P SCHNEIDER
4 +1CP03 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER
5 +1CP03 -1F3 Circuit Breaker iC65N,6A/1P SCHNEIDER
6 +1CP03 =1CP03.2 -2F1 Circuit Breaker iC65N,6A/1P SCHNEIDER
7 +1CP03 =1CP03.2 -2F2 Circuit Breaker iC65N,6A/1P SCHNEIDER
8 +1CP03 =1CP03.2 -2F3 Circuit Breaker iC65N,6A/1P SCHNEIDER
9 +1CP03 =1CP03.2 -2F4 Circuit Breaker iC65N,10A/1P SCHNEIDER
B 10 +1CP03 =900C120 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER B

11 +1CP03 =900C304 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER


12 +1CP03 =900C305 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
13 +1CP03 =900C306 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
14 +1CP03 =900C307 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
15 +1CP03 =900C345 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
16 +1CP03 =900C425 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
17 +1CP03 =900C426 -F1 Circuit Breaker iC65N-C,20A/3P SCHNEIDER
C C
18 +1CP03 =900C427 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
19 +1CP03 =900C428 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
20 +1CP03 =900C429 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
21 +1CP03 =900E410 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
22 +1CP03 =900E410 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
23 +1CP03 =900E411 -F1 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
24 +1CP03 =900E411 -F2 Circuit Breaker iC65N-C,10A/3P SCHNEIDER
D
25 +1CP03 -1Q1 Contactor LC1-N65M5N SCHNEIDER D
26 +1CP03 =900C120 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
27 +1CP03 =900C305 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
28 +1CP03 =900C306 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
29 +1CP03 =900C307 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
30 +1CP03 =900C426 -K1 Auxiliary Relay DRW270024LT WEIDMUELLER
31 +1CP03 =900E410 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
32 +1CP03 =900E411 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
E 33 +1CP03 =900C120 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS E
34 +1CP03 =900C304 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
35 +1CP03 =900C305 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
36 +1CP03 =900C306 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
37 +1CP03 =900C307 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
1/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP03 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 96
APPROVED DWG. NO: PAGE : REV.
1CP03 Parts List 001-02-96 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


38 +1CP03 =900C345 -T1 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS
A 39 +1CP03 =900C425 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS A
40 +1CP03 =900C426 -T1 Frequency Inverter 6SL3210-1KE21-3UF1 SIEMENS
41 +1CP03 =900C427 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
42 +1CP03 =900C428 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
43 +1CP03 =900C429 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
44 +1CP03 =900E410 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
45 +1CP03 =900E410 -T2 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
46 +1CP03 =900E411 -T1 Frequency Inverter 6SL3210-1KE14-3UF2 SIEMENS
B 47 +1CP03 =900E411 -T2 Frequency Inverter 6SL3210-1KE15-8UF2 SIEMENS B

48 +1CP03 =900C120 -R1 Braking Resistor 390Ω,100W EAGTOP


49 +1CP03 =900C304 -R1 Braking Resistor 160Ω,200W EAGTOP
50 +1CP03 =900C305 -R1 Braking Resistor 400W,100Ω
51 +1CP03 =900C306 -R1 Braking Resistor 400W,100Ω
52 +1CP03 =900C307 -R1 Braking Resistor 160Ω,200W EAGTOP
53 +1CP03 =900C345 -R1 Braking Resistor 160Ω,200W EAGTOP
54 +1CP03 =900C425 -R1 Braking Resistor 390Ω,100W EAGTOP
C C
55 +1CP03 =900C426 -R1 Braking Resistor 400W,100Ω
56 +1CP03 =900C427 -R1 Braking Resistor 390Ω,100W EAGTOP
57 +1CP03 =900C428 -R1 Braking Resistor 390Ω,100W EAGTOP
58 +1CP03 =900C429 -R1 Braking Resistor 390Ω,100W EAGTOP
59 +1CP03 =900E410 -R1 Braking Resistor 390Ω,100W
60 +1CP03 =900E410 -R2 Braking Resistor 390Ω,100W
61 +1CP03 =900E411 -R1 Braking Resistor 390Ω,100W
D
62 +1CP03 =900E411 -R2 Braking Resistor 160Ω,200W D
63 +1CP03 -DI1 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
64 +1CP03 -DI2 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
65 +1CP03 -DI3 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
66 +1CP03 -DI4 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
67 +1CP03 -DI5 DI Module 1.7W 6ES7 131-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
68 +1CP03 -IM3 ET200SP Interface Module 6ES7 155-6AA01-0BN0 SIEMENS
69 +1CP03 -JHJ SWITCH MODULE 6GK5 008-0BA10-1AB2 SIEMENS
E 70 +1CP03 =1CP03.2 -DO1 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16+A0+2B SIEMENS E
71 +1CP03 =1CP03.2 -DO2 DO Module 1W 6ES7 132-6BH01-0BA0+BU15-P16+A0+2B SIEMENS
72 +1CP03 =900E307.1 -CPU 3 CPU 6ES7 211-1AE40-0XB0 SIEMENS
73 +1CP03 =1CP03.2 -2G1 24VDC Power Supply NDR-240-24 MEAN WELL
74 +1CP03 -1L1 Terminal UTD-300I/18×6
2/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP03 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 96
APPROVED DWG. NO: PAGE : REV.
1CP03 Parts List 001-02-96 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


75 +1CP03 -1L2 Terminal UTD-300I/18×6
A 76 +1CP03 -1L3 Terminal UTD-300I/18×6 A
77 +1CP03 -1X1 Terminal Block 220
78 +1CP03 -1X2 Terminal Block 24
79 +1CP03 -1X3 Terminal Block
80 +1CP03 -E1 Control cabinet lighting Set of factory orders - cabinet lighting
81 +1CP03 =1CP03.2 -2E1 Control cabinet lighting Set of factory orders - cabinet lighting
82 +1CP03 =1CP03.2 -2X1 Terminal Block 220
83 +1CP03 =1CP03.2 -2X2 Terminal Block 24
B 84 +1CP03 =1CP03.2 -2X3 Terminal Block B

85 +1CP03 =1CP03.2 -2X4 Terminal Block


86 +1CP03 =1CP03.2 -2X5
87 +1CP03 =1CP03.2 -2XB1 Power Socket Three hole socket Three hole socket
88 +1CP03 =1CP03.2 -2XB2 Power Socket Three hole socket Three hole socket
89 +1CP03 =900E307.1 -2X6
90 +1CP03 =900E307.1 -2X7

C C

D D

E E

3/ 3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP03 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 96
APPROVED DWG. NO: PAGE : REV.
1CP03 Parts List 001-02-96 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-1CP03
A A

225

=900C345-F1
-1Q1
-1F1

-1F2
-1F3
-1L1

-1L2

-1L3

-1X1
245

=900E410-F1

=900E410-F2
=900C304-F1

=900C305-F1

=900C306-F1

=900C307-F1

=900C429-F1

=900C428-F1

=900C427-F1

=900C426-F1

=900C425-F1

=900C120-F1

=900E411-F1

=900E411-F2
B B

280

=900C429-T1

=900C428-T1

=900C427-T1
=900C306-T1

=900C307-T1
=900C304-T1

=900C305-T1
350
C ` C
2000

2000

=900C345-T1
=900C426-T1

=900C425-T1

=900C120-T1

=900E411-T1

=900E411-T2

=900E410-T1

=900E410-T2
270

-1X2
D D
230

=900C305-K1
=900C306-K1
=900C307-K1

=900C426-K1
=900C120-K1
=900E411-K1
=900E410-K1
180

-1X3
E E
55

1000
1000 600

Brake resistors are placed at the top


Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP03 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 95
APPROVED DWG. NO: PAGE : REV.
1CP03 Cabinet arrangement 001-02-95 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL
From the power
distribution cabinet

-1F2
iC65N,6A/1P

Control cabinet lighting


-E1
-1X1

1
1
2 1 2 1 1

L1
5

N
N

-1X1

Air Conditioner

SK 3370.520
-1F3
iC65N,6A/1P
2 1 2

L
L1

Main power distribution


Zone, Changsha, Hunan, China

BM1 Roll Handling and PE Wrapping System


6

N
N
3

L1

2
2

268 Xinxing Road, Yuhua Economic Development


CHAINT CORPORATION
1L.01 4
/120.B1

L1
8

Project:

001
Location:
Function:

Drawing
1N.Q01

02
001-02-97
+1CP03
Group
.B6

97
BM1-900-E-2005

Page

3
3

REVISION
.B6
-1Q1
iC65N-C,63A/3P
-1F1

1L1.MPS -1L1 2 1 2 1
/99.A1

MARK
1L2.MPS -1L2 4 3 4 3
/99.A1

1L3.MPS -1L3 6 5 6 5
/99.A1

DATE
4
4

1L1.MPS
/100.A1
1L1.MPS
/101.A1
UTD-300I/18×6

1L2.MPS
/100.A1

DRAWN
N

1L2.MPS
/101.A1
PE

1L3.MPS
/100.A1
1L3.MPS
/101.A1

CHK’D
1L1.MPS
/102.A1
1L1.MPS
/103.A1
1L2.MPS
/102.A1
1L2.MPS

ENG’R
/103.A1
1L3.MPS

5
5

/102.A1
1L3.MPS
/103.A1

1L1.MPS

APP’D
/104.A1
1L1.MPS
/105.A1
1L2.MPS
/104.A1
1L2.MPS
/105.A1
1L3.MPS
/104.A1
1L3.MPS
/105.A1
.C3
03/6.D3

1L1.MPS
/106.A1
1L1.MPS
/107.A1
1L2.MPS
1N.Q01

/106.A1
1L2.MPS
/107.A1

6
6

1L3.MPS
/106.A1
+1CP20 L.1CP03

1L3.MPS
/107.A1
SCALE.
LC1-N65M5N
-1Q1

DRAWN
80
ZR-VV-1KV 3*2.5+1*1.5
-W3

PROJECT:
21
13
5
3
1

CHECHED
ENGINEER
APPROVED

1L1.MPS A2 A1 1
/108.A1
1L1.MPS
6
4
2

/109.A1
22
14

1L2.MPS
/108.A1
DATE
.B4

1 mm : 1 mm

1L2.MPS
2022/1/7

/109.A1
1L3.MPS
/108.A1
1L3.MPS
/109.A1
INITIAL

1L1.MPS
1N.Q01

ORIG.SIZE

/110.A1
1L1.MPS
/110.A5
1L2.MPS
SIGN

吴毅丰

/110.A1
7
7

1L2.MPS
/110.A5
1L3.MPS
/110.A1
TYPE
AREA

1L3.MPS
/110.A5
DETAIL
DETAIL

DWG. NO:

1L1.MPS
/112.A1
1L1.MPS
/112.A5
1L2.MPS
/112.A1
1L2.MPS
/112.A5
1L3.MPS
/112.A1
1L3.MPS
Schematic diagram

/112.A5
8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
F
E
B
A

D
C

APRIL
/121.B6
/121.B6

1
1

2M.OP
2L+.OP
-1X2
1L+.Q01 1

L+
1M.K01 17
/100.D3

24V power
1L+.T01
/99.B3

Zone, Changsha, Hunan, China

BM1 Roll Handling and PE Wrapping System


1M.T01 18
/99.B3
M

1L+.T01 2
/100.D3
L+

2
2

1M.T01
/100.B3

268 Xinxing Road, Yuhua Economic Development


CHAINT CORPORATION
1L+.T01
/100.B3

1M.T01 19
/101.B3
M

Project:

001
Location:
Function:
1L+.T01 3

Drawing
/101.D3
L+

1M.T01
/102.C3

02
001-02-98
+1CP03
Group
1L+.T01
/101.B3

98
1M.T01 20

BM1-900-E-2005
/103.B3

Page
M

3
3

1L+.T01 4
/102.D3
L+

1L+.T01
/102.C3

1L+.T01 5

REVISION
/103.B3
L+

1L+.T01
/104.D3

1M.T01 21
/104.C3

MARK
M

1L+.T01 6
/104.C3
L+

DATE
1M.T01 22

4
4

/105.C3
M

1L+.T01
/105.C3

1M.T01
/106.C3

DRAWN
1L+.T01 7
/106.D3
L+

1M.T01 23

CHK’D
/107.C3
M

1L+.T01
/106.C3

1M.T01

ENG’R
/108.C3

5
5

1L+.T01 8
/107.C3
L+

1M.T01 24

APP’D
/109.C3
M

1L+.T01
/108.C3

1L+.T01 9
/109.C3
L+

1L+.T01
/110.D3

1L+.T01 10
/110.B3
L+

1M.T01 25
/110.B3

6
6

1L+.T01
/110.B7
SCALE.
DRAWN
PROJECT:

CHECHED
ENGINEER
APPROVED

1M.T01
/110.B7

1L+.T01 11
/112.D3
DATE

1 mm : 1 mm
L+

2022/1/7

1M.T01 26
/112.B3
M

1L+.T01 12
INITIAL

/112.B3
L+

ORIG.SIZE

1L+.T01
/112.B7
SIGN

吴毅丰

7
7

1M.T01 27
/112.B7
M

TYPE
AREA

1L+.T01 13
DETAIL
DETAIL
L+

DWG. NO:

1L+.T01

1L+.T01 14
L+

1L+.T01
Schematic diagram

1L+.T01 15
L+

8
8

1L+.T01
PAGE :

28 16
M

REV.
L+

CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.D4
+1CP03 2L+.X01 +1CP03 2L+.X01

4
/121.B6 /100.A6
+1CP03 1L2.MPS L+ L+
/97.D4
A +1CP03 2M.X01 +1CP03 2M.X01 A

5
/121.B7 /100.A6
+1CP03 1L3.MPS M M
/97.D4

+EX900C304-JB1-W1 +EX900C304-JB2-W1

2
+1CP03 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
1

5
-F1 50 50

iC65N-C,10A/3P +EX900C304 +EX900C304


-JB1 -JB2
-X1 -X1 +EX900C304 -JB2 L+

1
2

6
/100.B5
L+ L+
+EX900C304 -JB2 M

3
/100.B5
B M M B

/98.B2

/98.B2

1/BN

3/BU

1/BN

3/BU
+EX900C304-B1-W1 +EX900C304-B2-W1
Sensor cable Sensor cable

+1CP03 1L+.T01

+1CP03 1M.T01
2 2
+1CP03
-R1

1/BN

3/BU

1/BN

3/BU
PE 2
+EX900C304 +EX900C304
-B1 -B2
1

160Ω,200W
+1CP03
ET5.3/4P ET5.3/4P
-T1
C Inspection of entry Inspection for
C

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19
+EX900C304 +EX900C304

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C304 +EX900C304
-JB1 -JB2
D -X1 -X1 D

5
+1CP03 +EX900C304 +EX900C304
-1X3 -JB1 -JB2
1

PE -W1 -W1

3
+1CP03 +1CP03
PE

+EX900C304-M1-W1 -2X3 -2X3

6
1

ZR-VV-1KV 3*2.5+1*1.5
50

1
E +EX900C304 I 38.1 I 38.0 E
-M1 =900C304-#Pc.Come =900C304-#Pc.Leave
=900C304#Pc.Come =900C304#Pc.Leave
PE
W
U

+1CP03 -DI5 +1CP03 -DI5


M 04/5.C1 04/5.C1
Motor 3AC
Conveyer Motor
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C304
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 99
APPROVED DWG. NO: PAGE : REV.
900C304#Conveyer 001-02-99 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.D4

+1CP03 1L2.MPS +1CP03 2L+.X01 +1CP03 2L+.X01

8
/97.D4 /99.A8 /101.A5
A L+ A
+1CP03 1L3.MPS +1CP03 2M.X01 +1CP03 2M.X01

9
/97.D4 /99.A8 /101.A5
M

+1CP03 1

5
-F1
+EX900C305-JB2-W1

2
iC65N-C,20A/3P ZR-RVVP 4*0.5
40

+EX900C304 +EX900C305
2

-JB2 -JB2
+EX900C304 -JB2 L+ -X1 -X1 +EX900C305 -JB2 L+

1
/99.B8 /101.B5
L+ L+
B +EX900C304 -JB2 M +EX900C305 -JB2 M B

3
/99.B8 /101.B5
M M

/98.B2

/98.B2

1/BN

3/BU

1/BN

3/BU
+EX900C305-B1-W1 +EX900C305-B2-W1

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 Sensor cable Sensor cable
-R1 2 2 2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C305 +EX900C305
1

400W,100Ω -B1 -B2


+1CP03
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM +1CP03 Inspection of entry Inspection for

4/BK

4/BK
-K1 PNP NO export
PNP NO
6SL3210-1KE21-3UF1

1
5

4
8
U2 V2 W2 PE 20 18 19 .D3 .D3

12
+1CP03 1L+.T01

+EX900C305 +EX900C305

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C304 +EX900C305
D -JB2 -JB2 D
-X1 -X1
14
/98.B2

+1CP03

5
+1CP03 -K1 +1CP03

10
13

-1X3 -1X3 +EX900C304 +EX900C305


5

9
DRW270024LT
PE -JB2 -JB2
+1CP03 1M.K01 +1CP03 1M.K01 -W1 -W1

3
/98.B1 /101.D3

5 .C4
1 9
PE

+EX900C305-M1-W1 8 +EX900C305-M1-W2 +1CP03 +1CP03


1

2
.C5

10
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75 -2X3 -2X3

7
40 40

E +EX900C305 E

3
-M1 I 38.3 I 38.2
AC1

=900C305-#Pc.Come =900C305-#Pc.Leave
PE

=900C305#Pc.Come =900C305#Pc.Leave
W
U

M Brake +1CP03 -DI5 +1CP03 -DI5


AC2

Motor 3AC
Conveyer Motor 04/5.C1 04/5.C1
400VAC
5.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C305
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 100
APPROVED DWG. NO: PAGE : REV.
900C305#Conveyer 001-02-100 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.E4

12
+1CP03 2L+.X01 +1CP03 2L+.X01
/100.A8 /102.A6
+1CP03 1L2.MPS L+
/97.E4

13
A /100.A8
+1CP03 2M.X01 +1CP03 2M.X01
/102.A6 A
+1CP03 1L3.MPS M
/97.E5

+1CP03
+EX900C306-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5
30
iC65N-C,20A/3P
+EX900C305 +EX900C306
-JB2 -JB2
2

+EX900C305 -JB2 L+ -X1 -X1 +EX900C306 -JB2 L+

1
/100.B8 /102.B5
L+ L+
+EX900C305 -JB2 M +EX900C306 -JB2 M

3
/100.B8 /102.B5
B M M B

/98.B3

/98.B2

1/BN

3/BU

1/BN

3/BU
+EX900C306-B1-W1 +EX900C306-B2-W1
Sensor cable Sensor cable

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 2 2
-R1

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C306 +EX900C306
-B1 -B2
1

400W,100Ω
+1CP03
ET5.3/4P ET5.3/4P
-T1 +1CP03
C Inspection of entry Inspection for
C

4/BK

4/BK
L1 L2 L3 PE R1 R2 24V COM -K1 PNP NO export
PNP NO

1
5

4
8
6SL3210-1KE21-3UF1
.D3 .D3

12
U2 V2 W2 PE 20 18 19
+EX900C306 +EX900C306

4/BK

4/BK
+1CP03 1L+.T01

-B1-W1 -B2-W1

+EX900C305 +EX900C306
-JB2 -JB2
D -X1 -X1 D

5
14
/98.B2

+1CP03
+1CP03 -K1 +1CP03 +EX900C305 +EX900C306
11

12

13

14

15

16
13

-1X3 -1X3 -JB2 -JB2


DRW270024LT
PE -W1 -W1

3
+1CP03 1M.K01 +1CP03 1M.K01
/100.D3 /102.E3

5 .C4
1 9 +1CP03 +1CP03
PE

11

14
+EX900C306-M1-W1 8 +EX900C306-M1-W2 -2X3 -2X3
1

.C4
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75
30 30

5
E +EX900C306 I 38.5 I 38.4 E
-M1 =900C306-#Pc.Come =900C306-#Pc.Leave
=900C306#Pc.Come =900C306#Pc.Leave
AC1
PE
W
U

+1CP03 -DI5 +1CP03 -DI5


M Brake 04/5.C1 04/5.C1
AC2

Motor 3AC
Conveyer Motor
400VAC
5.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C306
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 101
APPROVED DWG. NO: PAGE : REV.
900C306#Conveyer 001-02-101 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.D5

+1CP03 1L2.MPS
/97.D5

16
A /101.A8
+1CP03 2L+.X01 A
+1CP03 1L3.MPS L+
/97.D5

17
+1CP03 2M.X01
/101.A8
M
+1CP03 1

5
-F1
iC65N-C,10A/3P +EX900C307-JB2-W1

2
ZR-RVVP 4*0.5
25
2

+EX900C306 +EX900C307
-JB2 -JB2
+EX900C306 -JB2 L+ -X1 -X1

1
/101.B8
B L+ L+ B
+EX900C306 -JB2 M

3
/101.B8
M M

/98.B3

/98.B3

1/BN

3/BU

1/BN

3/BU
+1CP03 +EX900C307-B1-W1 +EX900C307-B2-W1
-R1

+1CP03 1L+.T01

+1CP03 1M.T01
Sensor cable Sensor cable
2 2
2

PE

1/BN

3/BU

1/BN

3/BU
1

160Ω,200W
+1CP03 +EX900C307 +EX900C307
-T1 +1CP03 -B1 -B2
C -K1 C
L1 L2 L3 PE R1 R2 24V COM
ET5.3/4P ET5.3/4P

1
5

4
8
Inspection of entry Inspection for

4/BK

4/BK
6SL3210-1KE15-8UF2 PNP NO export
.D3 .D3 PNP NO

12
U2 V2 W2 PE 20 18 19
+1CP03 1L+.T01

+EX900C307 +EX900C307

4/BK

4/BK
-B1-W1 -B2-W1
/98.B3

D N +EX900C306 +EX900C307 D
-JB2 -JB2
-X1 -X1
14

+1CP03 +1CP03 +1CP03

5
17

18

19

20

21

22
-1X3 -K1 -1X3
13

PE +EX900C306 +EX900C307
DRM270024L
-JB2 -JB2
+1CP03 1M.K01 +1CP03 1M.K01 -W1 -W1

3
/101.D3 /104.D3

5 .C4
PE

+EX900C307-M1-W1 1 9 +EX900C307-M1-W2
1

ZR-VV-1KV 3*2.5+1*1.5 8 .C4


ZR-RVV-500V 2*0.75 +1CP03 +1CP03
25 25

15

18
4 12 -2X3 -2X3
E +EX900C307 E
-M1

7
I 38.7 I 38.6
AC1
PE
W
U

=900C307-#Pc.Come =900C307-#Pc.Leave
V

=900C307#Pc.Come =900C307#Pc.Leave
M Brake
AC2

Motor 3AC
Conveyer Motor +1CP03 -DI5 +1CP03 -DI5
400VAC
2.2KW 04/5.C1 04/5.C1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C307
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 102
APPROVED DWG. NO: PAGE : REV.
900C307#Conveyer 001-02-102 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/97.E5
+1CP03 1L1.MPS +1CD03
+1CD03 L+.X01 -X3 +1CD03 L+.X01

4
09/32.B6 /104.A5
+1CP03 1L2.MPS L+ L+
/97.E5
A +1CD03 M.X01 +1CD03 M.X01 A

5
09/32.B5 /104.A5
+1CP03 1L3.MPS M M
/97.E5

+EX900C345-JB1-W1 +EX900C345-JB2-W1

2
+1CP03 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
1

5
-F1 30 30

iC65N-C,10A/3P +EX900C345 +EX900C345


-JB1 -JB2
-X1 -X1

1
2

6 L+ L+

3
B M M B

/98.B3

/98.B3

1/BN

3/BU

1/BN

3/BU
+EX900C345-B1-W1 +EX900C345-B2-W1
Sensor cable Sensor cable

+1CP03 1L+.T01

+1CP03 1M.T01
2 2
+1CP03
-R1

1/BN

3/BU

1/BN

3/BU
PE 2
+EX900C345 +EX900C345
-B1 -B2
1

160Ω,200W
+1CP03
ET5.3/4P ET5.3/4P
-T1
C Inspection of entry Inspection for
C

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE15-8UF2
U2 V2 W2 PE 20 18 19
+EX900C345 +EX900C345

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C345 +EX900C345
-JB1 -JB2
D -X1 -X1 D

5
+1CP03 +EX900C345 +EX900C345
23

24

25

26

-1X3 -JB1 -JB2


PE -W1 -W1

3
+1CD03 +1CD03
PE

+EX900C345-M1-W1 -X3 -X3

6
1

ZR-VV-1KV 3*2.5+1*1.5
25

1
E +EX900C345 I 23.1 I 23.0 E
-M1 =900C345-#Pc.Come =900C345-#Pc.Leave
=900C345#Pc.Come =900C345#Pc.Leave
PE
W
U

+1CD03 -DI2 +1CD03 -DI2


M 04/6.A3 04/6.A3
Motor 3AC
Conveyer Motor
400VAC
2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C345
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 103
APPROVED DWG. NO: PAGE : REV.
900C345#Conveyer 001-02-103 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/97.D5
+1CP03 1L1.MPS +1CD03

10
+1CD03 L+.X01 -X3 +1CD03 L+.X01

7
/103.A8 /105.A5
+1CP03 1L2.MPS L+ L+
/97.D5

11
A +1CD03 M.X01 +1CD03 M.X01 A

8
/103.A8 /105.A5
+1CP03 1L3.MPS M M
/97.D6

+1CP03
+EX900C120-JB1-W1 +EX900C120-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
15 20
iC65N-C,10A/3P
+EX900C120 +EX900C120
-JB1 -JB2
2

-X1 -X1

1
L+ L+

3
B M M B

1/BN

3/BU

1/BN

3/BU
/98.B4

/98.B4
+EX900C120-B1-W1 +EX900C120-B2-W1
Sensor cable Sensor cable
2 2
+1CP03

+1CP03 1L+.T01

+1CP03 1M.T01
-R1

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C120 +EX900C120
-B1 -B2
1

390Ω,100W
+1CP03
ET5.3/4P ET5.3/4P
-T1 +1CP03
C Inspection for Inspection of entry
C

4/BK

4/BK
L1 L2 L3 PE R1 R2 24V COM -K1 export PNP NO
PNP NO

1
5

4
8
6SL3210-1KE14-3UF2
.D3 .D3

12
U2 V2 W2 PE 20 18 19
+EX900C120 +EX900C120

4/BK

4/BK
+1CP03 1L+.T01

-B1-W1 -B2-W1

+EX900C120 +EX900C120
-JB1 -JB2
D N -X1 -X1 D

5
14
/98.B4

+1CP03
+1CP03 -K1 +1CP03 +EX900C120 +EX900C120
64

65

66

67

68

69
13

-1X3 -1X3 -JB1 -JB2


DRM270024L
PE -W1 -W1

3
+1CP03 1M.K01 +1CP03 1M.K01
/102.E3 /106.E3

5 .C4
1 9 +1CD03 +1CD03
PE

12
+EX900C120-M1-W1 8 +EX900C120-M1-W2 -X3 -X3

9
1

.C4
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75
35 35

11

12
E +EX900C120 I 24.2 I 24.3 E
-M1 =900C120-#Pc.Leave =900C120-#Pc.Come
=900C120#Pc.Leave =900C120#Pc.Come
AC1
PE
W
U

+1CD03 -DI2 +1CD03 -DI2


M Brake 04/6.A3 04/6.A3
AC2

Motor 3AC
Conveyer Motor
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C120
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 104
APPROVED DWG. NO: PAGE : REV.
900C120#Conveyer 001-02-104 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.E5
+1CD03

13

16
/97.E5
+1CP03 1L2.MPS
/104.A8
+1CD03 L+.X01 -X3 +1CD03 L+.X01
/106.A5
A L+ L+ A

14

17
+1CP03 1L3.MPS +1CD03 M.X01 +1CD03 M.X01
/97.E6 /104.A8 /106.A5
M M

+1CP03
1

5
-F1
+EX900C425-JB1-W1 +EX900C425-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
30 35

+EX900C425 +EX900C425
2

6
-JB1 -JB2
-X1 -X1 +EX900C425 -JB2 L+

1
/106.B5
L+ L+
B +EX900C425 -JB2 M B

3
/106.B5
M M

/98.B4

/98.B4

1/BN

3/BU

1/BN

3/BU
+EX900C425-B1-W1 +EX900C425-B2-W1
+1CP03 Sensor cable Sensor cable
-R1

+1CP03 1L+.T01

+1CP03 1M.T01
2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C425 +EX900C425
1

390Ω,100W -B1 -B2


+1CP03
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of entry Inspection for

4/BK

4/BK
PNP NO export
PNP NO
6SL3210-1KE14-3UF2
U2 V2 W2 PE 20 18 19

+EX900C425 +EX900C425

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C425 +EX900C425
D -JB1 -JB2 D
-X1 -X1

5
+1CP03
60

61

62

63

-1X3 +EX900C425 +EX900C425


PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C425-M1-W1 +1CD03 +1CD03


1

15

18
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
50

E +EX900C425 E

3
-M1 I 23.3 I 23.2
=900C425-#Pc.Come =900C425-#Pc.Leave
PE

=900C425#Pc.Come =900C425#Pc.Leave
W
U

M +1CD03 -DI2 +1CD03 -DI2


Motor 3AC
Conveyer Motor 04/6.A3 04/6.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C425
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 105
APPROVED DWG. NO: PAGE : REV.
900C425#Conveyer 001-02-105 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.D6

+1CP03 1L2.MPS
/97.D6

20
A /105.A8
+1CD03 L+.X01 +1CD03 L+.X01
/107.A6 A
+1CP03 1L3.MPS L+
/97.D6

21
+1CD03 M.X01 +1CD03 M.X01
/105.A8 /107.A6
M
+1CP03
1

5
-F1
iC65N-C,20A/3P +EX900C426-JB2-W1

2
ZR-RVVP 4*0.5
20
2

6
+EX900C425 +EX900C426
-JB2 -JB2
+EX900C425 -JB2 L+ -X1 -X1 +EX900C426 -JB2 L+

1
/105.B8 /107.B6
B L+ L+ B
+EX900C425 -JB2 M +EX900C426 -JB2 M

3
/105.B8 /107.B6
M M

/98.B5

/98.B4

1/BN

3/BU

1/BN

3/BU
+EX900C426-B1-W1 +EX900C426-B2-W1
Sensor cable Sensor cable

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 2 2
-R1

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C426 +EX900C426
+1CP03 -B1 -B2
C C
1

400W,100Ω -K1
+1CP03
ET5.3/4P ET5.3/4P

1
5

4
8
-T1 Inspection of entry Inspection for

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 .D3 .D3 PNP NO

12
6SL3210-1KE21-3UF1
U2 V2 W2 PE 20 18 19
+EX900C426 +EX900C426

4/BK

4/BK
+1CP03 1L+.T01

-B1-W1 -B2-W1

D +EX900C425 +EX900C426 D
-JB2 -JB2
-X1 -X1
14

+1CP03 +1CP03 +1CP03

5
43

44

45

46

47

48
-1X3 -K1 -1X3
/98.B4

13

PE +EX900C425 +EX900C426
DRW270024LT
-JB2 -JB2
+1CP03 1M.K01 +1CP03 1M.K01 -W1 -W1

3
/104.D3 /110.D3

5 .C4
PE

+EX900C426-M1-W1 1 9 +EX900C426-M1-W2
1

ZR-VV-1KV 3*2.5+1*1.5 8 .C4


ZR-RVV-500V 2*0.75 +1CD03 +1CD03
35 35

19

22
4 12 -X3 -X3
E +EX900C426 E
-M1

5
I 23.5 I 23.4
AC1
PE
W
U

=900C426-#Pc.Come =900C426-#Pc.Leave
V

=900C426#Pc.Come =900C426#Pc.Leave
M Brake
AC2

Motor 3AC
Conveyer Motor +1CD03 -DI2 +1CD03 -DI2
400VAC
5.5KW 04/6.A3 04/6.A3

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C426
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 106
APPROVED DWG. NO: PAGE : REV.
900C426#Conveyer 001-02-106 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/97.E6
+1CP03 1L1.MPS +1CD03

24
/106.A8
+1CD03 L+.X01 -X3 +1CD03 L+.X01
/108.A5
+1CP03 1L2.MPS L+
/97.E6

25
A /106.A8
+1CD03 M.X01 +1CD03 M.X01
/108.A5 A
+1CP03 1L3.MPS M
/97.E6

+1CP03
+EX900C427-JB2-W1
1

2
-F1 ZR-RVVP 4*0.5
15
iC65N-C,10A/3P
+EX900C426 +EX900C427
-JB2 -JB2
2

6 -X1 -X1
+EX900C426 -JB2 L+

1
/106.B8
L+ L+
+EX900C426 -JB2 M

3
/106.B8
B M M B

1/BN

3/BU

1/BN

3/BU
/98.B5

/98.B5
+EX900C427-B1-W1 +EX900C427-B2-W1
Sensor cable Sensor cable
+1CP03 2 2
-R1

+1CP03 1L+.T01

+1CP03 1M.T01

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C427 +EX900C427
-B1 -B2
1

390Ω,100W
+1CP03
ET5.3/4P ET5.3/4P
-T1
C Inspection of entry Inspection for
C

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE14-3UF2
U2 V2 W2 PE 20 18 19
+EX900C427 +EX900C427

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C426 +EX900C427
-JB2 -JB2
D -X1 -X1 D

5
+1CP03 +EX900C426 +EX900C427
39

40

41

42

-1X3 -JB2 -JB2


PE -W1 -W1

3
+1CD03 +1CD03
PE

23

26
+EX900C427-M1-W1 -X3 -X3
1

ZR-VV-1KV 3*2.5+1*1.5
30

7
E +EX900C427 I 23.7 I 23.6 E
-M1 =900C427-#Pc.Come =900C427-#Pc.Leave
=900C427#Pc.Come =900C427#Pc.Leave
PE
W
U

+1CD03 -DI2 +1CD03 -DI2


M 04/6.A3 04/6.A3
Motor 3AC
Conveyer Motor
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C427
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 107
APPROVED DWG. NO: PAGE : REV.
900C427#Conveyer 001-02-107 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.D6

27

30
+1CP03 1L2.MPS +1CD03 L+.X01 +1CD03 L+.X01
/97.D6 /107.A8 /109.A5
A L+ L+ A

28

31
+1CP03 1L3.MPS +1CD03 M.X01 +1CD03 M.X01
/97.D7 /107.A8 /109.A5
M M

+1CP03 1

5
-F1
+EX900C428-JB1-W1 +EX900C428-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
10 10

+EX900C428 +EX900C428
2

-JB1 -JB2
-X1 -X1 +EX900C428 -JB2 L+

1
/109.B5
L+ L+
B +EX900C428 -JB2 M B

3
/109.B5
M M

/98.B5

/98.B5

1/BN

3/BU

1/BN

3/BU
+EX900C428-B2-W1 +EX900C428-B1-W1
Sensor cable Sensor cable

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 2 2
-R1

1/BN

3/BU

1/BN

3/BU
2

PE +EX900C428 +EX900C428
-B2 -B1
1

390Ω,100W
+1CP03
C ET5.3/4P ET5.3/4P C
-T1 Inspection of entry Inspection for

4/BK

4/BK
24V COM PNP NO export
L1 L2 L3 PE R1 R2 PNP NO

6SL3210-1KE14-3UF2
U2 V2 W2 PE 20 18 19
+EX900C428 +EX900C428

4/BK

4/BK
-B2-W1 -B1-W1

+EX900C428 +EX900C428
D -JB1 -JB2 D
-X1 -X1

5
+1CP03
35

36

37

38

-1X3 +EX900C428 +EX900C428


PE -JB1 -JB2
-W1 -W1

3
PE

+EX900C428-M1-W1 +1CD03 +1CD03


1

29

32
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
20

E E

10
+EX900C428

9
-M1 I 24.1 I 24.0
=900C428-#Pc.Come =900C428-#Pc.Leave
PE

=900C428#Pc.Come =900C428#Pc.Leave
W
U

M +1CD03 -DI2 +1CD03 -DI2


Motor 3AC
Conveyer Motor 04/6.A3 04/6.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C428
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 108
APPROVED DWG. NO: PAGE : REV.
900C428#Conveyer 001-02-108 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS
/97.E6

34
+1CP03 1L2.MPS +1CD03 L+.X01
/97.E7 /108.A7
A L+ A

35
+1CP03 1L3.MPS +1CD03 M.X01
/97.E7 /108.A7
M

+1CP03
1

5
-F1
+EX900C429-JB2-W1

2
iC65N-C,10A/3P ZR-RVVP 4*0.5
15

+EX900C428 +EX900C429
2

-JB2 -JB2
+EX900C428 -JB2 L+ -X1 -X1

1
/108.B7
L+ L+
B +EX900C428 -JB2 M B

3
/108.B7
M M

/98.B6

/98.B5

1/BN

3/BU

1/BN

3/BU
+EX900C429-B1-W1 +EX900C429-B2-W1
+1CP03 Sensor cable Sensor cable
-R1

+1CP03 1L+.T01

+1CP03 1M.T01
2 2
2

PE

1/BN

3/BU

1/BN

3/BU
+EX900C429 +EX900C429
1

390Ω,100W -B2 -B1


+1CP03
-T1
C ET5.3/4P ET5.3/4P C
L1 L2 L3 PE R1 R2 24V COM Inspection of Inspection for

4/BK

4/BK
entry export
PNP NO PNP NO
6SL3210-1KE14-3UF2
U2 V2 W2 PE 20 18 19

+EX900C429 +EX900C429

4/BK

4/BK
-B1-W1 -B2-W1

+EX900C428 +EX900C429
D -JB2 -JB2 D
-X1 -X1

5
+1CP03
30

31

32

33

-1X3 +EX900C428 +EX900C429


PE -JB2 -JB2
-W1 -W1

3
PE

+EX900C429-M1-W1 +1CD03 +1CD03


1

33

36
ZR-VV-1KV 3*2.5+1*1.5 -X3 -X3
15

E E

14

13
+EX900C429
-M1 I 24.5 I 24.4
=900C429-#Pc.Come =900C429-#Pc.Leave
PE

=900C429#Pc.Come =900C429#Pc.Leave
W
U

M +1CD03 -DI2 +1CD03 -DI2


Motor 3AC
Conveyer Motor 04/6.A3 04/6.A3
400VAC
1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900C429
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 109
APPROVED DWG. NO: PAGE : REV.
900C429#Conveyer 001-02-109 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS +1CP03 1L1.MPS


/97.D7 /97.E7

+1CP03 1L2.MPS +1CP03 1L2.MPS


/97.D7 /97.E7
A A
+1CP03 1L3.MPS +1CP03 1L3.MPS
/97.D7 /97.E7

+1CP03 1 +1CP03

5
-F1 -F2
iC65N-C,10A/3P iC65N-C,10A/3P
2

6
B B

/98.B6

/98.B6

/98.B6

/98.B6
+1CP03 1L+.T01

+1CP03 1M.T01

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 +1CP03
-R1 -R2
2

2
PE PE
1

1
390Ω,100W 390Ω,100W
+1CP03 +1CP03 +1CP03
-T1 -K1 -T2

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM L1 L2 L3 PE R1 R2 24V COM
C C
.D3 .D3
6SL3210-1KE14-3UF2 6SL3210-1KE14-3UF2

12
U2 V2 W2 PE 20 18 19 U2 V2 W2 PE

N
+1CP03 1L+.T01

+1CP03 +1CP03 +1CP03


70

71

72

73

74

75

76

77

78

79
-1X3 -1X3 -1X3
PE PE
PE

PE
D D
/98.B6

+EX900E410-Q1-W1 +EX900E410-JB1-W1
1

3
14

ZR-VV-1KV 3*2.5+1*1.5 +1CP03 ZR-VV-1KV 3*2.5+1*1.5


30 30
-K1
13

DRM270024L
+EX900E410
-JB1
+EX900E410 -X1
1

+1CP03 1M.K01 +1CP03 1M.K01

4
/106.E4 /112.D3
-Q1 U V W PE
JFD11-32/310111 25A
5
2

25A .C4
1 9
PE

+EX900E410-M1-W1 8 +EX900E410-M1-W2 +EX900E410-M2-W1


1

4
.C4
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75 1
5 30

E +EX900E410 +EX900E410 E
-M1 -M2
AC1
PE

PE
W

W
U

U
V

V
M Brake M
AC2

Motor 3AC Motor 3AC


Rotary Motor Conveyer Motor
400VAC 400VAC
1.5KW 1.5KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E410
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 110
APPROVED DWG. NO: PAGE : REV.
900E410#Rotary conveyer 001-02-110 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD03

37
09/32.B6
+1CD03 L+.X03 -X3 +1CD03 L+.X03
/113.A1
L+

38
A 09/32.B6
+1CD03 M.X03 +1CD03 M.X03
/113.A1 A
M

-JB2-W3
1

2
ZR-RVVP 10*0.5
15

-JB2-X2
1

L+
2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
39

40

41

42

43

44
E E
1

6
I 25.0 I 25.1 I 25.2 I 25.3 I 25.4 I 25.5
=900E410-#Pc.Leave =900E410-#Pc.Leave.Safe =900E410-#Pc.Come =900E410-#Pc.Come.Safe =900E410-#Ps.Pos.0 =900E410-#Ps.Pos.90
=900E410#Pc.Leave =900E410#Pc.Leave.Safe =900E410#Pc.Come =900E410#Pc.Come.Safe =900E410#Ps.Pos.0 =900E410#Ps.Pos.90

+1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3
04/6.A5 04/6.A5 04/6.A5 04/6.A5 04/6.A5 04/6.A5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E410
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E410 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 111
APPROVED DWG. NO: PAGE : REV.
900E410#Rotary conveyer 001-02-111 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 1L1.MPS +1CP03 1L1.MPS


/97.D7 /97.E7

+1CP03 1L2.MPS +1CP03 1L2.MPS


/97.D8 /97.E8
A A
+1CP03 1L3.MPS +1CP03 1L3.MPS
/97.D8 /97.E8

+1CP03 +1CP03
1

5
-F1 -F2
iC65N-C,10A/3P iC65N-C,10A/3P
2

6
B B

/98.B7

/98.B7

/98.B7

/98.B7
+1CP03 1L+.T01

+1CP03 1M.T01

+1CP03 1L+.T01

+1CP03 1M.T01
+1CP03 +1CP03
-R1 2
-R2

2
PE PE
1

1
390Ω,100W 160Ω,200W
+1CP03 +1CP03 +1CP03
-T1 -K1 -T2

1
5

4
8
L1 L2 L3 PE R1 R2 24V COM L1 L2 L3 PE R1 R2 24V COM
C C
.D3 .D3
6SL3210-1KE14-3UF2 6SL3210-1KE15-8UF2

12
U2 V2 W2 PE 20 18 19 U2 V2 W2 PE

N
+1CP03 1L+.T01

+1CP03 +1CP03 +1CP03


49

50

51

52

53

54

56

57

58

59
-1X3 -1X3 -1X3
PE PE
PE

PE
D +EX900E411-Q1-W1 +EX900E411-JB1-W1 D
1

3
14
/98.B6

ZR-VV-1KV 3*2.5+1*1.5 +1CP03 ZR-VV-1KV 3*2.5+1*1.5


15 15
-K1
13

DRM270024L
+EX900E411
-JB1
+EX900E411 -X1
1

+1CP03 1M.K01 +1CP03 1M.K01

4
/110.D3
-Q1 U V W PE
JFD11-32/310111 25A
5
2

25A .C4
1 9
PE

+EX900E411-M1-W1 8 +EX900E411-M1-W2 +EX900E411-M2-W1


1

4
.C4
ZR-VV-1KV 3*2.5+1*1.5 4 12 ZR-RVV-500V 2*0.75 1
5 15

E +EX900E411 +EX900E411 E
-M1 -M2
AC1
PE

PE
W

W
U

U
V

V
M Brake M
AC2

Motor 3AC Motor 3AC


Rotary Motor Conveyer Motor
400VAC 400VAC
1.5KW 2.2KW

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E411
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 112
APPROVED DWG. NO: PAGE : REV.
900E411#Rotary conveyer 001-02-112 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD03

48
/111.A7
+1CD03 L+.X03 -X3 +1CD03 L+.X03
/115.A1
L+

49
A /111.A7
+1CD03 M.X03 +1CD03 M.X03
/115.A1 A
M

-JB2-W3

2
ZR-RVVP 10*0.5
15

-JB2-X2
1

L+ 2

M
-JB2-W4
1

B 5 B

-X
1

2
BN

BU

BN

BU

BN

BU

BN

BU

BN

BU

BN

BU
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable Sensor cable
5 5 5 5 5 5
1/BN

1/BN

1/BN

1/BN
3/BU

3/BU

3/BU

3/BU

1/棕

3/蓝

1/棕

3/蓝
C -B1 -B2 -B3 -B4 -B5 -B6 C
ET5.3/4P ET5.3/4P ET5.3/4P ET5.3/4P Bi8-M18-AP6X-7m Bi8-M18-
Inspection of Protection of Inspection for Protection of 0 proximity switch AP6X-7m
entry entrance export export 90 proximity
4/BK

4/BK

4/BK

4/BK

4/黑

4/黑
NC NC NC NC switch
BK

BK

BK

BK

BK

BK
-B1-W1 -B2-W1 -B3-W1 -B4-W1 -B5-W1 -B6-W1
3

D D
3

6
3

8
3

8
50

51

52

53

54

55
E E
10

11

12

13

14

15
I 26.1 I 26.2 I 26.3 I 26.4 I 26.5 I 26.6
=900E411-#Pc.Leave =900E411-#Pc.Leave.Safe =900E411-#Pc.Come =900E411-#Pc.Come.Safe =900E411-#Ps.Pos.0 =900E411-#Ps.Pos.90
=900E411#Pc.Leave =900E411#Pc.Leave.Safe =900E411#Pc.Come =900E411#Pc.Come.Safe =900E411#Ps.Pos.0 =900E411#Ps.Pos.90

+1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3 +1CD03 -DI3
04/6.A5 04/6.A5 04/6.A5 04/6.A5 04/6.A5 04/6.A5

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E411
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E411 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 113
APPROVED DWG. NO: PAGE : REV.
900E411#Rotary conveyer 001-02-113 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CP03 +1CP03
+1CP03 2L+.X03 -2X4 -2X4

5
/121.B2
L+

A +1CP03 2M.X03 A

7
/121.B2
M M

+EX900E413-JB1-W1 +EX900E413-JB2-W1

2
ZR-RVVP 4*0.5 ZR-RVVP 4*0.5
10 10

+EX900E413 +EX900E413
-JB1 -JB2
-X1 -X2

2
L+ L+

4
M
B B

RD/红

棕/BN

蓝/BU
BK/黑
+EX900E413-B1-W1 +EX900E413-B2-W1
Sensor cable Sensor cable
1 2
+EX900E413
-B1 +EX900E413
RI50-0/1000ES.12KA UB/Red -B2 +
1/BN
Measurement of width UC2000-30GM-IUR2-V15
GND/Black Diameter measurement 3/BU
U -

A/Green Sync.
5/GY

B/White 2/WH
C 0~10V
C
Z/Yellow 4~ 4/BK
20mA
WH/白

白/WH
GN/绿

+EX900E413 +EX900E413
-B1-W1 -B2-W1

+EX900E413 +EX900E413
-JB1 -JB2
-X1 -X2
5

5
D D
+EX900E413 +EX900E413
-JB1 -JB2
-W1 -W1
3

3
PE

+1CP03 +1CP03

PE
-2X4 -2X4
3

8
E E
DIa.0

DIa.1

2M
0
+
I0.0 I0.1
=900E413-#Runing detect.A =900E413-#Runing detect.B I 29.0
=900E413#Width detection pulse A =900E413#Width detection pulse B AI0
=900E413-#Dia detect
=900E413#Dia detect
+1CP03 -CPU 3 +1CP03 -CPU 3 +1CP03 -CPU 3

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E413
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Roll specification measurement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 114
APPROVED DWG. NO: PAGE : REV.
900E413#Roll specification measurement 001-02-114 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+1CD03

59
/113.A7
+1CD03 L+.X03 -X3
L+

A A

60
+1CD03 M.X03
/113.A7
M

-JB1-W1 05/5.A1

2
ZR-RVVP 4*0.5 +1CD03 -DO1
10
Q 15.0
=900E414-Scan Failure
-JB1 -JB1 -JB1 =900E414#Scan Failure
-X2 -X2 -X2

1
L+ L+ L+

6
B M M M +1CD03 B

37
-X3
BN

BU
-B1-W1
5 -JB1

1
-F1
-JB1
iC65N,10A/1P -W1

4
1/BN

3/BU

-B1

2
-JB1
-JB1

4
8

1
5
-K2

10
-X2
.C5 .C5
4/BK

12

9
8/BU
7BN
-A1-W1
C C

14
Scanner cable -JB1
5
-K2
-A1
BK

13
-B1-W1
scanner DRM270024L
+24 VDC GND
7 8
-JB1
-X2 8
9

.C4
-P1-W1 4 12

2
ZR-RVVP 3*0.5 5
5
.C4
1 9

D D
-JB1
-W1
3

蜂鸣器

+1CD03 2绿/GN 1红/RD 灰/GY 红


61

-X3 Green Red Buzzer


绿
COM
黑/BK
E -P1 XVGB2SM E
8

I 21.7
=900E414-#Pc.Scan
=900E414#Pc.Scan

+1CD03 -DI1
04/6.A1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =900E414
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +EX900E414 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Fixed scan 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 115
APPROVED DWG. NO: PAGE : REV.
900E414#Fixed scan 001-02-115 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -1X1


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 10
B +1CP03 -1F2 1 1 JUT14-2.5/GY L1 02/97.C1 +1CP03 -1F1 1
B
2 JUT14-2.5/GY L1 02/97.C2 +1CP03 -1F3 1
3 JUT14-2.5/GY L1 02/97.C2
4 JUT14-2.5/GY L1 02/97.C2 =1CP03.2 +1CP03 -2X1 1 L1
+1CP03 N 5 JUT14-2.5/GY N 02/97.C1 +1CP03 -E1 2 Control cabinet lighting
6 JUT14-2.5/GY N 02/97.C2 +1CP03 Air Conditioner N
7 JUT14-2.5/GY N 02/97.C2
8 JUT14-2.5/GY N 02/97.C2 +1CP03 -1Q1 A2
9 JUT14-2.5/GY
10 JUT14-2.5/GY
C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-1X1 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 116
APPROVED DWG. NO: PAGE : REV.
+1CP03 -1X1 001-02-116 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -1X2


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 28
B L+ =1CP03.2 +1CP03 -2X2 10 1 JUT14-2.5/GY L+ 02/98.A1 =900C304 +1CP03 -T1 24V
B
DO0 =900C305 +1CP03 -T1 20 2 JUT14-2.5/GY L+ 02/98.A2 =900C305 +1CP03 -T1 24V
DO0 =900C306 +1CP03 -T1 20 3 JUT14-2.5/GY L+ 02/98.A2 =900C306 +1CP03 -T1 24V
DO0 =900C307 +1CP03 -T1 20 4 JUT14-2.5/GY L+ 02/98.A3 =900C307 +1CP03 -T1 24V
5 JUT14-2.5/GY L+ 02/98.A3 =900C345 +1CP03 -T1 24V
DO0 =900C120 +1CP03 -T1 20 6 JUT14-2.5/GY L+ 02/98.A4 =900C120 +1CP03 -T1 24V
DO0 =900C426 +1CP03 -T1 20 7 JUT14-2.5/GY L+ 02/98.A4 =900C425 +1CP03 -T1 24V
=900C426 +1CP03 -T1 24V 8 JUT14-2.5/GY L+ 02/98.A5 =900C427 +1CP03 -T1 24V
=900C428 +1CP03 -T1 24V 9 JUT14-2.5/GY L+ 02/98.A6 =900C429 +1CP03 -T1 24V
DO0 =900E410 +1CP03 -T1 20 10 JUT14-2.5/GY L+ 02/98.A6 =900E410 +1CP03 -T1 24V
C C
11 JUT14-2.5/GY L+ 02/98.A6 =900E410 +1CP03 -T2 24V
DO0 =900E411 +1CP03 -T1 20 12 JUT14-2.5/GY L+ 02/98.A7 =900E411 +1CP03 -T1 24V
13 JUT14-2.5/GY L+ 02/98.A7 =900E411 +1CP03 -T2 24V
14 JUT14-2.5/GY L+ 02/98.A8
15 JUT14-2.5/GY L+ 02/98.A8
16 JUT14-2.5/GY L+ 02/98.A8
M =1CP03.2 +1CP03 -2X2 20 17 JUT14-2.5/GY M 02/98.A1 =900C305 +1CP03 -K1 13
=900C305 +1CP03 -T1 COM 18 JUT14-2.5/GY M 02/98.A2 =900C304 +1CP03 -T1 COM
=900C306 +1CP03 -T1 COM 19 JUT14-2.5/GY M 02/98.A2 =900C307 +1CP03 -T1 COM
20 JUT14-2.5/GY M 02/98.A3 =900C345 +1CP03 -T1 COM
D D
21 JUT14-2.5/GY M 02/98.A4 =900C120 +1CP03 -T1 COM
=900C426 +1CP03 -T1 COM 22 JUT14-2.5/GY M 02/98.A4 =900C425 +1CP03 -T1 COM
=900C427 +1CP03 -T1 COM 23 JUT14-2.5/GY M 02/98.A5 =900C428 +1CP03 -T1 COM
24 JUT14-2.5/GY M 02/98.A5 =900C429 +1CP03 -T1 COM
=900E410 +1CP03 -T2 COM 25 JUT14-2.5/GY M 02/98.A6 =900E410 +1CP03 -T1 COM
26 JUT14-2.5/GY M 02/98.A7 =900E411 +1CP03 -T1 COM
27 JUT14-2.5/GY M 02/98.A7 =900E411 +1CP03 -T2 COM
28 JUT14-2.5/GY M 02/98.A8

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-1X2 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 117
APPROVED DWG. NO: PAGE : REV.
+1CP03 -1X2 001-02-117 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C345 -M1-W1

+EX900C307 -M1-W2

+EX900C307 -M1-W1

+EX900C306 -M1-W2

+EX900C306 -M1-W1

+EX900C305 -M1-W2

+EX900C305 -M1-W1

+EX900C304 -M1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 79
B Motor 1 =900C304 +EX900C304 -M1 U 1 JUT14-2.5/GY 02/99.D2 =900C304 +1CP03 -T1 U2
B
Motor 2 =900C304 +EX900C304 -M1 V 2 JUT14-2.5/GY 02/99.D2 =900C304 +1CP03 -T1 V2
Motor 3 =900C304 +EX900C304 -M1 W 3 JUT14-2.5/GY 02/99.D2 =900C304 +1CP03 -T1 W2
Motor PE =900C304 +EX900C304 -M1 PE 4 JUT14-2.5PE PE 02/99.D2 =900C304 +1CP03 -T1 PE
Motor 1 =900C305 +EX900C305 -M1 U 5 JUT14-2.5/GY 02/100.D2 =900C305 +1CP03 -T1 U2
Motor 2 =900C305 +EX900C305 -M1 V 6 JUT14-2.5/GY 02/100.D2 =900C305 +1CP03 -T1 V2
Motor 3 =900C305 +EX900C305 -M1 W 7 JUT14-2.5/GY 02/100.D2 =900C305 +1CP03 -T1 W2
Motor PE =900C305 +EX900C305 -M1 PE 8 JUT14-2.5PE PE 02/100.D2 =900C305 +1CP03 -T1 PE
Brake 1 =900C305 +EX900C305 -M1 AC1 9 JUT14-2.5/GY 02/100.D4 =900C305 +1CP03 -K1 9 1
Brake 2 =900C305 +EX900C305 -M1 AC2 10 JUT14-2.5/GY 02/100.D5 =900C305 +1CP03 -K1 12 2
C C
Motor 1 =900C306 +EX900C306 -M1 U 11 JUT14-2.5/GY 02/101.D2 =900C306 +1CP03 -T1 U2
Motor 2 =900C306 +EX900C306 -M1 V 12 JUT14-2.5/GY 02/101.D2 =900C306 +1CP03 -T1 V2
Motor 3 =900C306 +EX900C306 -M1 W 13 JUT14-2.5/GY 02/101.D2 =900C306 +1CP03 -T1 W2
Motor PE =900C306 +EX900C306 -M1 PE 14 JUT14-2.5PE PE 02/101.D2 =900C306 +1CP03 -T1 PE
Brake 1 =900C306 +EX900C306 -M1 AC1 15 JUT14-2.5/GY 02/101.D4 =900C306 +1CP03 -K1 9 1
Brake 2 =900C306 +EX900C306 -M1 AC2 16 JUT14-2.5/GY 02/101.D5 =900C306 +1CP03 -K1 12 2
Motor 1 =900C307 +EX900C307 -M1 U 17 JUT14-2.5/GY 02/102.D2 =900C307 +1CP03 -T1 U2
Motor 2 =900C307 +EX900C307 -M1 V 18 JUT14-2.5/GY 02/102.D2 =900C307 +1CP03 -T1 V2
Motor 3 =900C307 +EX900C307 -M1 W 19 JUT14-2.5/GY 02/102.D2 =900C307 +1CP03 -T1 W2
Motor PE =900C307 +EX900C307 -M1 PE 20 JUT14-2.5PE PE 02/102.D2 =900C307 +1CP03 -T1 PE
D D
Brake 1 =900C307 +EX900C307 -M1 AC1 21 JUT14-2.5/GY 02/102.D4 =900C307 +1CP03 -K1 9 1
Brake 2 =900C307 +EX900C307 -M1 AC2 22 JUT14-2.5/GY 02/102.D4 =900C307 +1CP03 N
Motor 1 =900C345 +EX900C345 -M1 U 23 JUT14-2.5/GY 02/103.D2 =900C345 +1CP03 -T1 U2
Motor 2 =900C345 +EX900C345 -M1 V 24 JUT14-2.5/GY 02/103.D2 =900C345 +1CP03 -T1 V2
Motor 3 =900C345 +EX900C345 -M1 W 25 JUT14-2.5/GY 02/103.D2 =900C345 +1CP03 -T1 W2
Motor PE =900C345 +EX900C345 -M1 PE 26 JUT14-2.5PE PE 02/103.D2 =900C345 +1CP03 -T1 PE
27 JUT14-2.5/GY
28 JUT14-2.5/GY
29 JUT14-2.5/GY 02/101.

E E

1/3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 118
APPROVED DWG. NO: PAGE : REV.
+1CP03 -1X3 001-02-118 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E411 -JB1-W1

+EX900C426 -M1-W2

+EX900C426 -M1-W1

+EX900C427 -M1-W1

+EX900C428 -M1-W1

+EX900C429 -M1-W1
+EX900E411 -M1-W2

+EX900E411 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 79
B Motor 1 =900C429 +EX900C429 -M1 U 30 JUT14-2.5/GY 02/109.D1 =900C429 +1CP03 -T1 U2
B
Motor 2 =900C429 +EX900C429 -M1 V 31 JUT14-2.5/GY 02/109.D2 =900C429 +1CP03 -T1 V2
Motor 3 =900C429 +EX900C429 -M1 W 32 JUT14-2.5/GY 02/109.D2 =900C429 +1CP03 -T1 W2
Motor PE =900C429 +EX900C429 -M1 PE 33 JUT14-2.5PE PE 02/109.D2
34 JUT14-2.5/GY 02/109.
Motor 1 =900C428 +EX900C428 -M1 U 35 JUT14-2.5/GY 02/108.D2 =900C428 +1CP03 -T1 U2
Motor 2 =900C428 +EX900C428 -M1 V 36 JUT14-2.5/GY 02/108.D2 =900C428 +1CP03 -T1 V2
Motor 3 =900C428 +EX900C428 -M1 W 37 JUT14-2.5/GY 02/108.D2 =900C428 +1CP03 -T1 W2
Motor PE =900C428 +EX900C428 -M1 PE 38 JUT14-2.5PE PE 02/108.D2 =900C428 +1CP03 -T1 PE
Motor 1 =900C427 +EX900C427 -M1 U 39 JUT14-2.5/GY 02/107.D2 =900C427 +1CP03 -T1 U2
C C
Motor 2 =900C427 +EX900C427 -M1 V 40 JUT14-2.5/GY 02/107.D2 =900C427 +1CP03 -T1 V2
Motor 3 =900C427 +EX900C427 -M1 W 41 JUT14-2.5/GY 02/107.D2 =900C427 +1CP03 -T1 W2
Motor PE =900C427 +EX900C427 -M1 PE 42 JUT14-2.5PE PE 02/107.D2 =900C427 +1CP03 -T1 PE
Motor 1 =900C426 +EX900C426 -M1 U 43 JUT14-2.5/GY 02/106.D2 =900C426 +1CP03 -T1 U2
Motor 2 =900C426 +EX900C426 -M1 V 44 JUT14-2.5/GY 02/106.D2 =900C426 +1CP03 -T1 V2
Motor 3 =900C426 +EX900C426 -M1 W 45 JUT14-2.5/GY 02/106.D2 =900C426 +1CP03 -T1 W2
Motor PE =900C426 +EX900C426 -M1 PE 46 JUT14-2.5PE PE 02/106.D2 =900C426 +1CP03 -T1 PE
Brake 1 =900C426 +EX900C426 -M1 AC1 47 JUT14-2.5/GY 02/106.D4 =900C426 +1CP03 -K1 9 1
Brake 2 =900C426 +EX900C426 -M1 AC2 48 JUT14-2.5/GY 02/106.D4 =900C426 +1CP03 -K1 12 2
1 =900E411 +EX900E411 -Q1 1 49 JUT14-2.5/GY 02/112.D1 =900E411 +1CP03 -T1 U2
D D
2 =900E411 +EX900E411 -Q1 3 50 JUT14-2.5/GY 02/112.D2 =900E411 +1CP03 -T1 V2
3 =900E411 +EX900E411 -Q1 5 51 JUT14-2.5/GY 02/112.D2 =900E411 +1CP03 -T1 W2
Motor PE =900E411 +EX900E411 -M1 PE 52 JUT14-2.5PE PE 02/112.D2 =900E411 +1CP03 -T1 PE
Brake 1 =900E411 +EX900E411 -M1 AC1 53 JUT14-2.5/GY 02/112.D4 =900E411 +1CP03 -K1 9 1
Brake 2 =900E411 +EX900E411 -M1 AC2 54 JUT14-2.5/GY 02/112.D4 =900E411 +1CP03 N
55 JUT14-2.5/GY 02/112.
U 1 =900E411+EX900E411 -JB1 -X1 1 56 JUT14-2.5/GY 02/112.D6 =900E411 +1CP03 -T2 U2
V 2 =900E411+EX900E411 -JB1 -X1 2 57 JUT14-2.5/GY 02/112.D6 =900E411 +1CP03 -T2 V2
W 3 =900E411+EX900E411 -JB1 -X1 3 58 JUT14-2.5/GY 02/112.D6 =900E411 +1CP03 -T2 W2
PE PE =900E411+EX900E411 -JB1 -X1 4 59 JUT14-2.5PE PE 02/112.D6 =900E411 +1CP03 -T2 PE
E E

2/3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 118
APPROVED DWG. NO: PAGE : REV.
+1CP03 -1X3 001-02-118 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E410 -JB1-W1

+EX900C120 -M1-W2

+EX900C120 -M1-W1

+EX900C425 -M1-W1
+EX900E410 -M1-W2

+EX900E410 -Q1-W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -1X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 79
B Motor 1 =900C425 +EX900C425 -M1 U 60 JUT14-2.5/GY 02/105.D2 =900C425 +1CP03 -T1 U2
B
Motor 2 =900C425 +EX900C425 -M1 V 61 JUT14-2.5/GY 02/105.D2 =900C425 +1CP03 -T1 V2
Motor 3 =900C425 +EX900C425 -M1 W 62 JUT14-2.5/GY 02/105.D2 =900C425 +1CP03 -T1 W2
Motor PE =900C425 +EX900C425 -M1 PE 63 JUT14-2.5PE PE 02/105.D2
Motor 1 =900C120 +EX900C120 -M1 U 64 JUT14-2.5/GY 02/104.D2 =900C120 +1CP03 -T1 U2
Motor 2 =900C120 +EX900C120 -M1 V 65 JUT14-2.5/GY 02/104.D2 =900C120 +1CP03 -T1 V2
Motor 3 =900C120 +EX900C120 -M1 W 66 JUT14-2.5/GY 02/104.D2 =900C120 +1CP03 -T1 W2
Motor PE =900C120 +EX900C120 -M1 PE 67 JUT14-2.5PE PE 02/104.D2 =900C120 +1CP03 -T1 PE
Brake 1 =900C120 +EX900C120 -M1 AC1 68 JUT14-2.5/GY 02/104.D4 =900C120 +1CP03 -K1 9 1
Brake 2 =900C120 +EX900C120 -M1 AC2 69 JUT14-2.5/GY 02/104.D4 =900C120 +1CP03 N
C C
1 =900E410 +EX900E410 -Q1 1 70 JUT14-2.5/GY 02/110.D2 =900E410 +1CP03 -T1 U2
2 =900E410 +EX900E410 -Q1 3 71 JUT14-2.5/GY 02/110.D2 =900E410 +1CP03 -T1 V2
3 =900E410 +EX900E410 -Q1 5 72 JUT14-2.5/GY 02/110.D2 =900E410 +1CP03 -T1 W2
Motor PE =900E410 +EX900E410 -M1 PE 73 JUT14-2.5PE PE 02/110.D2 =900E410 +1CP03 -T1 PE
Brake 1 =900E410 +EX900E410 -M1 AC1 74 JUT14-2.5/GY 02/110.D4 =900E410 +1CP03 -K1 9 1
Brake 2 =900E410 +EX900E410 -M1 AC2 75 JUT14-2.5/GY 02/110.D4 =900E410 +1CP03 N
U 1 =900E410+EX900E410 -JB1 -X1 1 76 JUT14-2.5/GY 02/110.D6 =900E410 +1CP03 -T2 U2
V 2 =900E410+EX900E410 -JB1 -X1 2 77 JUT14-2.5/GY 02/110.D6 =900E410 +1CP03 -T2 V2
W 3 =900E410+EX900E410 -JB1 -X1 3 78 JUT14-2.5/GY 02/110.D6 =900E410 +1CP03 -T2 W2
PE PE =900E410+EX900E410 -JB1 -X1 4 79 JUT14-2.5PE PE 02/110.D6 =900E410 +1CP03 -T2 PE
D D

E E

3/3
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-1X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 118
APPROVED DWG. NO: PAGE : REV.
+1CP03 -1X3 001-02-118 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

225

-2X1
-2F1
-2F2
-2F3
-2F4
245

-2XB1

-2XB2
-2G1

-2X2
B B

280

-CPU 3
-DO1
-DO2

-JHJ
-IM3
-DI1
-DI2
-DI3
-DI4
-DI5
350
C C

2000
`
2000

270
=900E307.1
=900E307.1
-2X6
-2X7

D D

230

-2X3

-2X4

-2X5
180
E E

55
600 1000

1000

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =1CP03.2
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: +1CP03 DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Cabinet arrangement 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 119
APPROVED DWG. NO: PAGE : REV.
1CP03 Back cabinet arrangement 001-02-119 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 10 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

N PE

+1CP03
+1CP03 1L.01 -2X1

6
/97.E2
B L1 +1CP03 L1 L1 L1 L1 L1 B
-2X1

10

11

12
7

9
N N N N N N

+1CP03 +1CP03 +1CP03 +1CP03


1

1
-2F1 -2F2 -2F3 -2F4
iC65N,6A/1P iC65N,6A/1P iC65N,6A/1P iC65N,10A/1P
2

2
C C

N
L
127~370VAC
PE +1CP03
PE -2G1
NDR-240-24
24VDC 240W

+1CP03 PE.1OP3
+1CP03 2N.1OP3
+1CP03 2L.1OP3
+1CP03 2L+.01 +V

-V
+1CP03 2M.01
+1CP03 PE
1

PE PE
-2E1
D +1CP03 +1CP03 D
PE

PE

Control cabinet lighting -2XB1 -2XB2


N

N
L

L
2

Three hole socket Three hole socket

09/32.A2

09/32.A2

09/32.A1
/121.A1

/121.A1
1CD03 POWER

E E

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =1CP03.2
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 120
APPROVED DWG. NO: PAGE : REV.
Main power distribution 001-02-120 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
F
E
B
A

D
C

APRIL
/120.D5
/120.D4

1
1

+1CP03 2M.01

24V power
+1CP03 2L+.01-2X2
+1CP03

+1CP03 2L+.CPU2 1

Zone, Changsha, Hunan, China


06/4.C6

BM1 Roll Handling and PE Wrapping System


L+

11
M

+1CP03 2L+.X01 2
/122.B1

2
2

L+

+1CP03 2M.X01 12

268 Xinxing Road, Yuhua Economic Development


/122.B1

CHAINT CORPORATION
M

+1CP03 2L+.X03 3
/114.A2
L+

Project:
+1CP03 2M.X03 13

001
/114.A2

Location:
M

Drawing
+1CP03 2M.PLC
06/4.E2

02
+1CP03 2L+.PLC 4

001-02-121
06/4.E1

Group
Function: =1CP03.2
L+

+1CP03 2M.PLC 14
06/4.E3
M

121
BM1-900-E-2005

Page
+1CP03 2L+.PLC

3
3

06/4.E2

+1CP03 2M.PLC

+1CP03 2L+.PLC 5
L+

REVISION
+1CP03 2M.PLC 15
M

+1CP03 2L+.K01

MARK
+1CP03 2M.M01

DATE
+1CP03 2L+.JHJ 6

4
4

06/4.A7
L+

+1CP03 2M.JHJ 16
06/4.A7
M

DRAWN
+1CP03 2M.CPU2
06/4.E6
7
L+

+1CP03 2M.CPU2 17

CHK’D
06/4.C7
M

+1CP03 2L+.K01

+1CP03 2M.M01

ENG’R
5
5

+1CP03 2L+.CPU2 8
06/4.E7
L+

APP’D
+1CP03 2M.CPU2 18
06/4.E7
M

+1CP03 2L+.X02 9
/144.A1
L+

+1CP03 2M.X02
/144.A1

+1CP03 2L+.OP
/135.A1

+1CP03 2M.OP 19
/135.A1
M

6
6

+1CP03 2L+.OP 10
/98.A1
L+

SCALE.
DRAWN
PROJECT:

+1CP03 2M.OP 20
CHECHED

/98.A1
ENGINEER
APPROVED
M

+1CP03 2L+.X01
/99.A5
DATE

1 mm : 1 mm

+1CP03 2M.X01
2022/1/7

/99.A5
INITIAL

ORIG.SIZE
SIGN

吴毅丰

7
7

TYPE
AREA

DETAIL
DETAIL

DWG. NO:
Schematic diagram

8
8

PAGE :
REV.
CODE:

TOTAL
PAGES

279
F
E
B
A

D
C
1 2 3 4 5 6 7 8

05/4.A3
+1CP03 -DO2
A Q 23.0 A
=DO22-P.**OK
DO22P.**OK

9
+1CP03 +1CP03
+1CP03 2L+.X01 -2X5 -2X5
1

6
/121.B2
L+ L+
+1CP03 2M.X01
2

7
/121.B2
M M

B B

-CB1-W1 +EX.DO22-JB1-W1
1

2
ZR-RVVP 7*0.5 ZR-RVVP 3*0.5
25 25
+EX.DO22
-JB1
-X1

3
L+ M

BN

BU
+EX.DO22-B6-W1
Sensor cable
C 5 C
+EX.DO22 +EX.DO22
1/棕

3/蓝
-CB1 -CB1 +EX.DO22
21
13

11

-S01 -S02 -B6


1
2
14

12

22

XB2-BW34B1C HL XB2-BS544C
#safety door closed
4/黑

#emergency

+EX.DO22
BK

-B6-W1

D -CB1-W1 D
5
3

4 5

+EX.DO22
+1CP03 -JB1
-2X5 -W1
3

3
8

E E
10
8

I 30.7 I 31.0 I 31.1


=DO22-Pb.Safe =DO22-Estop =DO22-Pc.Safe.Pos
DO22Pb.Safe DO22Estop DO22Pc.Safe.Pos

+1CP03 -DI1 +1CP03 -DI1 +1CP03 -DI1


04/5.A1 04/5.A1 04/5.A1

Project: BM1-900-E-2005
CHAINT CORPORATION Function: =DO22
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Safe door 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 122
APPROVED DWG. NO: PAGE : REV.
DO19#Safe door 001-02-122 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/5.A3 05/5.A3 05/5.A3 05/5.A3

A +1CD03 -DO2 +1CD03 -DO2 +1CD03 -DO2 +1CD03 -DO2 A


Q 17.0 Q 17.1 Q 17.2 Q 17.3
WS_1-Send_Exit roll ready WS_1-Send_Exiting roll WS_1-Send_Exit roll ok WS_1-Send_The standby
Send_Exit roll ready Send_Exiting roll Send_Exit roll ok Send_The standby
+1CD03 +1CD03 +1CD03 +1CD03

1
5

1
5

1
5

1
5
-K1 -K2 -K3 -K4
1

4
.B1 .B2 .B3 .B4

9
+1CD03 +1CD03 +1CD03 +1CD03 +1CD03

10
-X4 -X4 -X4 -X4 -X4

9
B B

+1CD03
14

14

14

14

10
+1CD03 +1CD03 +1CD03 +1CD03 -W1

9
-K1 -K2 -K3 -K4 ZR-RVVP 10*0.5
50
13

13

13

13
DRM270024L DRM270024L DRM270024L DRM270024L

09/32.B6
+1CD03 M.M01 -Packing machine

5 5 5 5
.A6 .A6 .A7 .A7
1 9 1 9 1 9 1 9

C 8 8 8 8 C
4 12 4 12 4 12 4 12

-Packing machine
03

03

03

03
04

04

04

04
D D

+1CD03-W1
1

5
ZR-RVVP 10*0.5
50

+1CD03 +1CD03 +1CD03 +1CD03 +1CD03


-X4 -X4 -X4 -X4 -X4
1

E E
+1CD03 L+.K01

I 27.0 I 27.1 I 27.2 I 27.3


WS_1-Receive_Enter roll enable WS_1-Receive_Conveyor forward WS_1-Receive_The standby1 WS_1-Receive_The standby2
Receive_Enter roll enable Receive_Conveyor forward Receive_The standby1 Receive_The standby2

+1CD03 -DI4 +1CD03 -DI4 +1CD03 -DI4 +1CD03 -DI4


09/32.B8

04/6.A6 04/6.A6 04/6.A6 04/6.A6

Project: BM1-900-E-2005
CHAINT CORPORATION Function: WS_1
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 123
APPROVED DWG. NO: PAGE : REV.
Packaging machine communication 001-02-123 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

05/5.A3 05/5.A3 05/5.A3 05/5.A3

A +1CD03 -DO2 +1CD03 -DO2 +1CD03 -DO2 +1CD03 -DO2 A


Q 17.4 Q 17.5 Q 17.6 Q 17.7
WS_1-Send_Enter roll enable WS_1-Send_Conveyor forward WS_1-Send_The standby1 WS_1-Send_The standby2
Send_Enter roll enable Send_Conveyor forward Send_The standby1 Send_The standby2
+1CD03 +1CD03 +1CD03 +1CD03

1
5

1
5

1
5

1
5
-K5 -K6 -K7 -K8
5

8
.B1 .B2 .B3 .B4

9
+1CD03 +1CD03 +1CD03 +1CD03 +1CD03

16

17

18

19

20
-X4 -X4 -X4 -X4 -X4

B B

+1CD03
14

14

14

14

10
+1CD03 +1CD03 +1CD03 +1CD03 -W2

9
-K5 -K6 -K7 -K8 ZR-RVVP 10*0.5
50
13

13

13

13
DRM270024L DRM270024L DRM270024L DRM270024L

09/32.B8
+1CD03 M.M01 -Packing machine

5 5 5 5
.A6 .A6 .A7 .A7
1 9 1 9 1 9 1 9

C 8 8 8 8 C
4 12 4 12 4 12 4 12

-Packing machine
03

03

03

03
04

04

04

04
D D

+1CD03-W2
1

5
ZR-RVVP 10*0.5
50

+1CD03 +1CD03 +1CD03 +1CD03 +1CD03


11

12

13

14

15

-X4 -X4 -X4 -X4 -X4


+1CD03 L+.K01

E E
10
7

I 27.6 I 27.7 I 28.0 I 28.1


WS_1-Receive_Exit roll ready WS_1-Receive_Exiting roll WS_1-Receive_Exit roll ok WS_1-Receive_The standby
Receive_Exit roll ready Receive_Exiting roll Receive_Exit roll ok Receive_The standby
09/32.B8

+1CD03 -DI4 +1CD03 -DI4 +1CD03 -DI4 +1CD03 -DI4


04/6.A6 04/6.A6 04/6.A6 04/6.A6

Project: BM1-900-E-2005
CHAINT CORPORATION Function: WS_1
PROJECT: CODE:

268 Xinxing Road, Yuhua Economic Development DATE INITIAL SIGN AREA TOTAL
F Zone, Changsha, Hunan, China Location: DRAWN 2022/1/7 吴毅丰
TYPE PAGES F
APRIL Drawing Group CHECHED DETAIL
Page Schematic diagram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 124
APPROVED DWG. NO: PAGE : REV.
Packaging machine communication 001-02-124 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
+1CD03 -W1
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X1


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 12
B L1 +1CP03 -1X1 4 1 JUT14-2.5/GY L1 02/120.B2 =1CP03.2 +1CP03 -2F1 1
B
=1CP03.2 +1CP03 -2F3 1 2 JUT14-2.5/GY L1 02/120.B3 =1CP03.2 +1CP03 -2F2 1
3 JUT14-2.5/GY L1 02/120.B4 =1CP03.2 +1CP03 -2F4 1
1 =1CD03 +1CD03 -F1 1 4 JUT14-2.5/GY L1 02/120.B6
5 JUT14-2.5/GY L1 02/120.B6
6 JUT14-2.5/GY L1 02/120.B7
=1CP03.2 +1CP03 N 7 JUT14-2.5/GY N 02/120.B2 =1CP03.2 +1CP03 -2E1 2 Control cabinet lighting
8 JUT14-2.5/GY N 02/120.B3
9 JUT14-2.5/GY N 02/120.B5 =1CP03.2 +1CP03 -2G1 N
N 2 =1CD03 +1CD03 -X1 5 10 JUT14-2.5/GY N 02/120.B6
C C
11 JUT14-2.5/GY N 02/120.B7
12 JUT14-2.5/GY N 02/120.B7

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X1 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 125
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X1 001-02-125 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X2


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 20
B =900E307.1 +1CP03 -CPU 3 L+ 1 JUT14-2.5/GY L+ 02/121.A2 =1CP03.2 +1CP03 -2G1 +V
B
2 JUT14-2.5/GY L+ 02/121.A2 =DO22 +1CP03 -2X5 1 L+
3 JUT14-2.5/GY L+ 02/121.A2 =900E413 +1CP03 -2X4 1
+1CP03 -IM3 1L+ 4 JUT14-2.5/GY L+ 02/121.A3 +1CP03 -DI1 L+ 1.7W
5 JUT14-2.5/GY L+ 02/121.A3
6 JUT14-2.5/GY L+ 02/121.A4 +1CP03 -JHJ L+
7 JUT14-2.5/GY L+ 02/121.A4
8 JUT14-2.5/GY L+ 02/121.A5 =900E307.1 +1CP03 -CPU 3 3L+
L+ =900E307.1 +1CP04 -1X2 1 9 JUT14-2.5/GY L+ 02/121.A5 =900E307.1 +1CP03 -2X6 1
L+ +1CP03 -1X2 1 10 JUT14-2.5/GY L+ 02/121.A6 +1CP03 -2X3 1 L+
C C
11 JUT14-2.5/GY M 02/121.A2 =1CP03.2 +1CP03 -2G1 -V
12 JUT14-2.5/GY M 02/121.A2 =DO22 +1CP03 -2X5 2 M
=900E413 +1CP03 -2X4 2 13 JUT14-2.5/GY M 02/121.A2 +1CP03 -IM3 1M
14 JUT14-2.5/GY M 02/121.A3 +1CP03 -DI1 M 1.7W
15 JUT14-2.5/GY M 02/121.A3
+1CP03 -JHJ M 16 JUT14-2.5/GY M 02/121.A4 =900E307.1 +1CP03 -CPU 3 3M
17 JUT14-2.5/GY M 02/121.A5 =900E307.1 +1CP03 -CPU 3 M
=900E307.1 +1CP03 -2X6 2 18 JUT14-2.5/GY M 02/121.A5 =900E307.1 +1CP03 -CPU 3 M
M =900E307.1 +1CP04 -1X2 11 19 JUT14-2.5/GY M 02/121.A6
M +1CP03 -1X2 17 20 JUT14-2.5/GY M 02/121.A6 +1CP03 -2X3 2 M
D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X2 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 126
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X2 001-02-126 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900C307 -JB2 -W1

+EX900C306 -JB2 -W1

+EX900C305 -JB2 -W1

+EX900C304 -JB2 -W1

+EX900C304 -JB1 -W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X3


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 18
B L+ 1 =1CP03.2+EX900C304 -JB1 -X1 1 1 JUT14-2.5/GY L+ 02/99.A6 =1CP03.2 +1CP03 -2X2 10 L+
B
M 2 =1CP03.2+EX900C304 -JB1 -X1 3 2 JUT14-2.5/GY M 02/99.A6 =1CP03.2 +1CP03 -2X2 20 M
3 =1CP03.2+EX900C304 -JB1 -X1 5 3 JUT14-2.5/GY 02/99.E6 =900C304 +1CP03 -DI5 2 2
L+ 1 =1CP03.2+EX900C304 -JB2 -X1 1 4 JUT14-2.5/GY L+ 02/99.A7
M 2 =1CP03.2+EX900C304 -JB2 -X1 3 5 JUT14-2.5/GY M 02/99.A7
3 =1CP03.2+EX900C304 -JB2 -X1 5 6 JUT14-2.5/GY 02/99.E7 =900C304 +1CP03 -DI5 1 1
4 =1CP03.2+EX900C304 -JB2 -X1 6 7 JUT14-2.5/GY 02/100.E6 =900C305 +1CP03 -DI5 4 4
L+ 1 =1CP03.2+EX900C305 -JB2 -X1 1 8 JUT14-2.5/GY L+ 02/100.A7
M 2 =1CP03.2+EX900C305 -JB2 -X1 3 9 JUT14-2.5/GY M 02/100.A7
3 =1CP03.2+EX900C305 -JB2 -X1 5 10 JUT14-2.5/GY 02/100.E7 =900C305 +1CP03 -DI5 3 3
C C
4 =1CP03.2+EX900C305 -JB2 -X1 6 11 JUT14-2.5/GY 02/101.E6
L+ 1 =1CP03.2+EX900C306 -JB2 -X1 1 12 JUT14-2.5/GY L+ 02/101.A7
M 2 =1CP03.2+EX900C306 -JB2 -X1 3 13 JUT14-2.5/GY M 02/101.A7
3 =1CP03.2+EX900C306 -JB2 -X1 5 14 JUT14-2.5/GY 02/101.E7
4 =1CP03.2+EX900C306 -JB2 -X1 6 15 JUT14-2.5/GY 02/102.E6 =900C307 +1CP03 -DI5 8 8
L+ 1 =1CP03.2+EX900C307 -JB2 -X1 1 16 JUT14-2.5/GY L+ 02/102.A7
M 2 =1CP03.2+EX900C307 -JB2 -X1 3 17 JUT14-2.5/GY M 02/102.A7
3 =1CP03.2+EX900C307 -JB2 -X1 5 18 JUT14-2.5/GY 02/102.E7 =900C307 +1CP03 -DI5 7 7

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X3 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 127
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X3 001-02-127 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

+EX900E413 -JB2 -W1

+EX900E413 -JB1 -W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X4


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 8
B L+ 1 =900E413+EX900E413 -JB1 -X1 1 1 JUT14-2.5/GY 02/114.A3 =1CP03.2 +1CP03 -2X2 3 L+
B
M 2 =900E413+EX900E413 -JB1 -X1 3 2 JUT14-2.5/GY 02/114.A3 =1CP03.2 +1CP03 -2X2 13 M
3 =900E413+EX900E413 -JB1 -X1 5 3 JUT14-2.5/GY 02/114.E3 =900E413 +1CP03 -CPU 3 DIa.0 I0.0
4 =900E413+EX900E413 -JB1 -X1 6 4 JUT14-2.5/GY 02/114.E3 =900E413 +1CP03 -CPU 3 DIa.1 I0.1
1 =900E413+EX900E413 -JB2 -X2 1 5 JUT14-2.5/GY L+ 02/114.A5
2 =900E413+EX900E413 -JB2 -X2 3 6 JUT14-2.5/GY M 02/114.A5
7 JUT14-2.5/GY M 02/114.A5 =900E413 +1CP03 -CPU 3 2M AI0
3 =900E413+EX900E413 -JB2 -X2 5 8 JUT14-2.5/GY 02/114.E5 =900E413 +1CP03 -CPU 3 0 AI0

C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X4 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 128
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X4 001-02-128 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

+EX.DO22 -CB1 -CB1-W1


A A

+EX.DO22 -JB1 -W1

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X5


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 8
B #safety door closed 1 =DO22 +EX.DO22 -CB1 -S01 13 1 JUT14-2.5/GY L+ 02/122.B2 =1CP03.2 +1CP03 -2X2 2 L+
B
HL 2 =DO22 +EX.DO22 -CB1 -S01 1 2 JUT14-2.5/GY M 02/122.B2 =1CP03.2 +1CP03 -2X2 12 M
#safety door closed 3 =DO22 +EX.DO22 -CB1 -S01 14 3 JUT14-2.5/GY 02/122.D2 =DO22 +1CP03 -DI1 8 8
HL 4 =DO22 +EX.DO22 -CB1 -S01 2 4 JUT14-2.5/GY 02/122.D2 =DO22 +1CP03 -DO2 9 9
#emergency 5 =DO22 +EX.DO22 -CB1 -S02 12 5 JUT14-2.5/GY 02/122.D2 =DO22 +1CP03 -DI1 9 9
L+ 1 =DO22 +EX.DO22 -JB1 -X1 1 6 JUT14-2.5/GY L+ 02/122.B3
M 2 =DO22 +EX.DO22 -JB1 -X1 3 7 JUT14-2.5/GY M 02/122.B3
3 =DO22 +EX.DO22 -JB1 -X1 5 8 JUT14-2.5/GY 02/122.E3 =DO22 +1CP03 -DI1 10 10

C C

D D

E E

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X5 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 129
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X5 001-02-129 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

+EX900E307.1 -CC1-1 -W1

+EX900E307.1 -CC1 -W1

+EX900E307.1 -JB6 -W1

+EX900E307.1 -JB5 -W1

+EX900E307.1 -JB4 -W1

+EX900E307.1 -JB1 -W1


A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X6


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 48
B L+ 1 =900E307.1
+EX900E307.1 -JB1 -X1 1 1 JUT14-2.5/GY 02/144.A1 =1CP03.2 +1CP03 -2X2 9 L+
B
M 2 =900E307.1
+EX900E307.1 -JB1 -X1 4 2 JUT14-2.5/GY 02/144.A2 =1CP03.2 +1CP03 -2X2 18 M
3 =900E307.1
+EX900E307.1 -JB1 -X1 7 3 JUT14-2.5/GY 02/144.E1 =900E307.1 +1CP03 -DI4 1 1
4 =900E307.1
+EX900E307.1 -JB1 -X1 8 4 JUT14-2.5/GY 02/144.E2 =900E307.1 +1CP03 -DI4 2 2
5 =900E307.2
+EX900E307.1 -JB1 -X1 9 5 JUT14-2.5/GY 02/148.E7 =900E307.2 +1CP03 -DI4 3 3
6 =900E307.2
+EX900E307.1 -JB1 -X1 10 6 JUT14-2.5/GY 02/148.E7 =900E307.2 +1CP03 -DI4 4 4
7 =900E307.2
+EX900E307.1 -JB1 -X1 11 7 JUT14-2.5/GY 02/148.E8 =900E307.2 +1CP03 -DI4 5 5
8 JUT14-2.5/GY
L+ 1 =900E307.1
+EX900E307.1 -JB4 -X4 1 9 JUT14-2.5/GY L+ 02/144.A3
M 2 =900E307.1
+EX900E307.1 -JB4 -X4 4 10 JUT14-2.5/GY M 02/144.A4
C C
3 =900E307.1
+EX900E307.1 -JB4 -X4 7 11 JUT14-2.5/GY 02/144.E3 =900E307.1 +1CP03 -DI4 8 8
4 =900E307.1
+EX900E307.1 -JB4 -X4 8 12 JUT14-2.5/GY 02/144.E4 =900E307.1 +1CP03 -DI4 9 9
13 JUT14-2.5/GY
L+ 1 =900E307.1
+EX900E307.1 -JB5 -X5 1 14 JUT14-2.5/GY L+ 02/144.A5
M 2 =900E307.1
+EX900E307.1 -JB5 -X5 3 15 JUT14-2.5/GY M 02/144.A5
3 =900E307.1
+EX900E307.1 -JB5 -X5 5 16 JUT14-2.5/GY 02/144.E5 =900E307.1 +1CP03 -DI4 10 10
4 =900E307.1
+EX900E307.1 -JB5 -X5 6 17 JUT14-2.5/GY 02/144.E6 =900E307.1 +1CP03 -DI4 11 11
18 JUT14-2.5/GY
L+ 1 =900E307.1
+EX900E307.1 -JB6 -X6 1 19 JUT14-2.5/GY L+ 02/144.A7
M 2 =900E307.1
+EX900E307.1 -JB6 -X6 3 20 JUT14-2.5/GY M 02/144.A7
D D
3 =900E307.1
+EX900E307.1 -JB6 -X6 5 21 JUT14-2.5/GY 02/144.E7 =900E307.1 +1CP03 -DI4 12 12
4 =900E307.1
+EX900E307.1 -JB6 -X6 6 22 JUT14-2.5/GY 02/144.E8 =900E307.1 +1CP03 -DI4 13 13
23 JUT14-2.5/GY
L+ 1 =900E307.1
+EX900E307.1 -CC1 -X1 1 24 JUT14-2.5/GY L+ 02/145.A1
M 2 =900E307.1
+EX900E307.1 -CC1 -X1 3 25 JUT14-2.5/GY M 02/145.A2
3 =900E307.1
+EX900E307.1 -CC1 -X1 6 26 JUT14-2.5/GY 02/145.E1 =900E307.1 +1CP03 -DI4 6 6
4 =900E307.1
+EX900E307.1 -CC1 -X1 7 27 JUT14-2.5/GY 02/145.E2 =900E307.1 +1CP03 -DI4 7 7
5 =900E307.1
+EX900E307.1 -CC1 -X1 8 28 JUT14-2.5/GY 02/146.B2 =900E307.1 +1CP03 -DO2 1 1
6 =900E307.1
+EX900E307.1 -CC1 -X1 9 29 JUT14-2.5/GY 02/146.B3 =900E307.1 +1CP03 -DO2 2 2
30 JUT14-2.5/GY
E E
L+ 1 =900E307.1
+EX900E307.1 -CC1-1 -X1 1 31 JUT14-2.5/GY L+ 02/145.A4
M 2 =900E307.1
+EX900E307.1 -CC1-1 -X1 3 32 JUT14-2.5/GY M 02/145.A4
3 =900E307.1
+EX900E307.1 -CC1-1 -X1 6 33 JUT14-2.5/GY 02/145.E4 =900E307.1 +1CP03 -DI5 11 11
4 =900E307.1
+EX900E307.1 -CC1-1 -X1 7 34 JUT14-2.5/GY 02/145.E4 =900E307.1 +1CP03 -DI5 12 12
5 =900E307.1
+EX900E307.1 -CC1-1 -X1 8 35 JUT14-2.5/GY 02/146.B4 =900E307.1 +1CP03 -DO2 3 3
6 =900E307.1
+EX900E307.1 -CC1-1 -X1 9 36 JUT14-2.5/GY 02/146.B5 =900E307.1 +1CP03 -DO2 4 4

1/2
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X6 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 130
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X6 001-02-130 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

+EX900E307.1 -CC2 -W1


+EX900E307.1 -JB7 -W1
A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X6


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 48
B 37 JUT14-2.5/GY
B
L+ 1 =900E307.1
+EX900E307.1 -CC2 -X1 1 38 JUT14-2.5/GY L+ 02/145.A6
M 2 =900E307.1
+EX900E307.1 -CC2 -X1 3 39 JUT14-2.5/GY M 02/145.A6
3 =900E307.1
+EX900E307.1 -CC2 -X1 6 40 JUT14-2.5/GY 02/145.E6 =900E307.1 +1CP03 -DI5 13 13
4 =900E307.1
+EX900E307.1 -CC2 -X1 7 41 JUT14-2.5/GY 02/145.E6 =900E307.1 +1CP03 -DI5 14 14
5 =900E307.1
+EX900E307.1 -CC2 -X1 8 42 JUT14-2.5/GY 02/146.B7 =900E307.1 +1CP03 -DO2 6 6
6 =900E307.1
+EX900E307.1 -CC2 -X1 9 43 JUT14-2.5/GY 02/146.B8 =900E307.1 +1CP03 -DO2 5 5
44 JUT14-2.5/GY
1 =900E307.1
+EX900E307.1 -JB7 -X7 1 45 JUT14-2.5/GY L+ 02/143.D6
2 =900E307.1
+EX900E307.1 -JB7 -X7 3 46 JUT14-2.5/GY M 02/143.D6
C C
3 =900E307.1
+EX900E307.1 -JB7 -X7 5 47 JUT14-2.5/GY 02/143.D6 =900E307.1 +1CP03 -CPU 3 DIa.2 I0.2
4 =900E307.1
+EX900E307.1 -JB7 -X7 6 48 JUT14-2.5/GY 02/143.D7 =900E307.1 +1CP03 -CPU 3 DIa.3 I0.3

D D

E E

2/2
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X6 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 130
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X6 001-02-130 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Terminal Block General Remarks

A A

Terminal Segment

Terminal Number

Circuit Diagram
External Cable

Internal Cable
+1OP2 -W2

+1OP1 -W3

+1OP1 -W1

+1OP1 -W2

Comment
Jumper

Type
Wire
External Destination Internal Destination

Terminal Block: +1CP03 -2X7


Device Comment =Function +Location -Device :Pin =Function +Location -Device :Pin Device Comment
Number of Terminals: 34
B 1 =900E307.1 +1OP1 -X1 6 1 JUT14-2.5/GY 02/139.E2 =900E307.1 +1CP03 -DI2 1 1
B
2 =900E307.1 +1OP1 -X1 7 2 JUT14-2.5/GY 02/139.E3 =900E307.1 +1CP03 -DI2 2 2
3 JUT14-2.5/GY
4 =900E307.1 +1OP1 -X1 9 4 JUT14-2.5/GY 02/140.E1 =900E307.1 +1CP03 -DI2 3 3
5 =900E307.1 +1OP1 -X1 10 5 JUT14-2.5/GY 02/140.E2 =900E307.1 +1CP03 -DI2 4 4
6 =900E307.1 +1OP1 -X1 11 6 JUT14-2.5/GY 02/140.E3 =900E307.1 +1CP03 -DI2 5 5
7 =900E307.1 +1OP1 -X1 12 7 JUT14-2.5/GY 02/140.E3 =900E307.1 +1CP03 -DI2 6 6
8 =900E307.1 +1OP1 -X1 13 8 JUT14-2.5/GY 02/140.E4 =900E307.1 +1CP03 -DI2 12 12
9 =900E307.1 +1OP1 -X1 14 9 JUT14-2.5/GY 02/140.E5 =900E307.1 +1CP03 -DI2 13 13
3 =900E307.1 +1OP1 -X1 15 10 JUT14-2.5/GY 02/140.E5 =900E307.1 +1CP03 -DI2 7 7
C C
4 =900E307.1 +1OP1 -X1 16 11 JUT14-2.5/GY 02/140.E6 =900E307.1 +1CP03 -DI2 8 8
5 =900E307.1 +1OP1 -X1 17 12 JUT14-2.5/GY 02/140.E7 =900E307.1 +1CP03 -DI2 9 9
13 JUT14-2.5/GY
1 =900E307.1 +1OP1 -X1 19 14 JUT14-2.5/GY 02/140.E7 =900E307.1 +1CP03 -DI2 10 10
2 =900E307.1 +1OP1 -X1 20 15 JUT14-2.5/GY 02/140.E8 =900E307.1 +1CP03 -DI2 11 11
3 =900E307.1 +1OP1 -X1 21 16 JUT14-2.5/GY 02/141.B3 =900E307.1 +1CP03 -DO1 4 4
4 =900E307.1 +1OP1 -X1 22 17 JUT14-2.5/GY 02/141.B4 =900E307.1 +1CP03 -DO1 5 5
5 =900E307.1 +1OP1 -X1 23 18 JUT14-2.5/GY 02/141.B5 =900E307.1 +1CP03 -DO1 6 6
6 =900E307.2 +1OP1 -X1 24 19 JUT14-2.5/GY 02/148.E1 =900E307.2 +1CP03 -DI3 6 6
7 =900E307.2 +1OP1 -X1 25 20 JUT14-2.5/GY 02/148.E2 =900E307.2 +1CP03 -DI3 7 7
D D
8 +1OP1 -X1 26 21 JUT14-2.5/GY 02/148.E2 =900C307 +1CP03 -DI3 8 8
9 =900E307.2 +1OP1 -X1 27 22 JUT14-2.5/GY 02/148.E3 =900C307 +1CP03 -DI3 9 9
23 JUT14-2.5/GY
1 =900E307.1 +1OP2 -X1 6 24 JUT14-2.5/GY 02/142.D3 =900E307.1 +1CP03 -DI3 1 1
2 =900E307.1 +1OP2 -X1 7 25 JUT14-2.5/GY 02/142.D4 =900E307.1 +1CP03 -DI3 2 2
3 =900E307.1 +1OP2 -X1 8 26 JUT14-2.5/GY 02/142.D5 =900E307.1 +1CP03 -DI3 3 3
4 =900E307.1 +1OP2 -X1 9 27 JUT14-2.5/GY 02/142.D5 =900E307.1 +1CP03 -DI3 4 4
5 =900E307.1 +1OP2 -X1 10 28 JUT14-2.5/GY 02/142.D6 =900E307.1 +1CP03 -DI3 5 5
6 +1OP2 -X1 11 29 JUT14-2.5/GY 02/148.E5 =900C001 +1CP03 -DI3 10 10
7 +1OP2 -X1 12 30 JUT14-2.5/GY 02/148.E5 =900C001 +1CP03 -DI3 11 11
E E
8 =900E307.1 +1OP2 -X1 13 31 JUT14-2.5/GY 02/143.C2 =900E307.1 +1CP03 -DO1 7 7
9 =900E307.1 +1OP2 -X1 14 32 JUT14-2.5/GY 02/143.C2 =900E307.1 +1CP03 -DO1 8 8
10 =900E307.1 +1OP2 -X1 15 33 JUT14-2.5/GY 02/143.C3 =900E307.1 +1CP03 -DO1 9 9
34 JUT14-2.5/GY

1/1
Project: BM1-900-E-2005
CHAINT CORPORATION Function:
PROJECT: CODE:
DATE INITIAL SIGN
F 268 Xinxing Road, Yuhua Economic Development
Location: +1CP03-2X7 DRAWN 2022/1/7 吴毅丰
AREA TOTAL F
Zone, Changsha, Hunan, China TYPE PAGES

APRIL Drawing Group CHECHED DETAIL


Page Terminal Block Digram 279
BM1 Roll Handling and PE Wrapping System ENGINEER DETAIL
001 02 131
APPROVED DWG. NO: PAGE : REV.
+1CP03 -2X7 001-02-131 REVISION MARK DATE DRAWN CHK’D ENG’R APP’D SCALE. 1 mm : 1 mm ORIG.SIZE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Row ▲1 Part of ▲3 Designation Description Comment Material Manufacturer


1 +1CP04 -1CP04 Cabinet 2000X1000X600
A 2 +1CP04 -1F1 Circuit Breaker NSC160S3100N SCHNEIDER A
3 +1CP04 -1F2 Circuit Breaker iC65N,6A/1P SCHNEIDER
4 +1CP04 =900E307.1 -F1 Circuit Breaker NSC100S3075N SCHNEIDER
5 +1CP04 =900E307.1 -F3 Circuit Breaker GV2-ME07C SCHNEIDER
6 +1CP04 =900E307.2 -F2 Circuit Breaker iC65N-C,16A/3P SCHNEIDER
7 +1CP04 -K1 Auxiliary Relay DRM270024L WEIDMUELLER
8 +1CP04 -K2 Auxiliary Relay DRM270024L WEIDMUELLER
9 +1CP04 -K3 Auxiliary Relay DRM270024L WEIDMUELLER
B 10 +1CP04 -K4 Auxiliary Relay DRM270024L WEIDMUELLER B

11 +1CP04 -Q1 Contactor

You might also like