22.01.2024 - 26.01.2024
Report prepared by: Approved and Issued for Action by: Received and understood:
Name: Abraham Kiragu Kabere Name: Arch. Kiseong Song Name: _________________________
ENGINEER’S REPRESENTATIVE ENGINEER’S REPRESENTATIVE CONTRACTOR’S REPRESENTATIVE
Designation: HSE Officer Designation: Team Leader Designation: _____________________
Date: _______________________ Date: _________________________ Date:___________________________
COPIES;
Contractor Consultant KoTDA Employer
1|Page
WEEKLY STATUS REPORT: ENVIRONMENT HEALTH AND SAFETY
Toolbox Talks 1 1 1 1 1
Orientations
(New/Returning workers)
Other Trainings
Incidents
Near Miss 0 0 0 0 0
Accidents 0 0 0 0 0
Fatality 0 0 0 0 0
Page 2 of 18
Table 3: Risk Rating Matrix
LIKELIHOOD Risk Level Range Grade/Code
RISK LEVEL Unlikely Remote Quite Possible Likely Very Likely Negligible/Low 1-5
1 2 3 4 5 Considerable 6-9
Negligible 1 1 2 3 4 5 Unwelcoming 10-15
SERVERITY
Page 3 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 4 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 5 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 6 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 7 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 8 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 9 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 10 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 11 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 12 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 13 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 14 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
circumstances of
each case.
16. Work at 12 Education B Emphasize on work 24/01/2024 24/01/2024
height at height Training at
Work at Height tool box talk
12 A worker working without
fastening his body harness
and, lack of edge
protection on the
platform.
Risk of Fall from height.
Worker was instructed to
get a body harness and
resume work.
17. Outer 12 SH 1 Instruction was given 25/01/2024 pending
scalfolding Unstable scaffolding to reinforce with
lacking enough support. extra support at
12 Risk/Hazard of;
every floor and with
falls/slips,
Instruction was given to adjacent scaffolding
reinforce with extra structure.
support at every floor and
with adjacent scaffolding
structure.
Page 15 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 16 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 17 of 18
S/N EHS Issue Risk Picture Location &Description Recommendations Date Closing
Level Raised Date
Page 18 of 18