Hose Patching Procedure
Hose Patching Procedure
NAME
DATE
Doc. Status (pls indicate in / FOR REVIEW
the check- box the right) / FOR APPROVAL
REVISED & RESUBMIT
REJECT
Prepared by:
TABLE OF CONTENT
1.0 INTRODUCTION
2.0 REFERENCE
6.0 INSPECTION
1.0 INTRODUCTION
1.1 This procedure will provide a guideline for BELZONA 2211 (MP HI-BUILD
ELASTOMER) and 2921 repair work for external application.
1.2 This procedure complies with Petronas Technical Specification and
Manufacturer recommendation.
1.3 Extend of repaired activity will be determined by Client’s inspection team
for any undesired result.
2.0 REFERENCE
2.1 Pts 30.48.00.31-P Protective Coating & Lining (February 1999)
2.2 Coral Malaysia (January Rev 0)
2.3 Manufacture Recommendation
Brush away
contamination
STEP 2
STEP 4
1. Using a knife cut the cover rubber and floatation materials to the depth of
the damage and removes the unwanted part.
Note:
a. Cut the edges of the cover rubber to be removed at an angle of
approximately 45 to the inside.
b. Round of the four corners of the cover rubber that is to be cut and
removed.
Contract Owner : DATE:
Contractor : TECHNICAL PROPOSAL REVISION : 0
HZNA (M) SDN BHD DOC. :
2. Using disc sander or wire brush remove marine algae and sea shell from
the cover rubber in the periphery of damaged portion, buff until a fresh
surface of the cover rubber appears. Remove extraneous substance
adhering to floatation material by using of the wire brush.
5. Apply Belzona 9111 to draw/remove the processing oils and waxes to the
surface of some rubbers, particularly when new, which then impairs
adhesion of Belzona 2211. Test for this on a small area. If, on rubbing with
Contract Owner : DATE:
Contractor : TECHNICAL PROPOSAL REVISION : 0
HZNA (M) SDN BHD DOC. :
a rag moistened with Belzona 9111, a greasy film is appears, the surface
should not be degreased, but simply abraded.
1. Complete mixing is the most important step in the use of Belzona® 2211.
a) Transfer the entire contents of the Base and Solidifier containers onto the
Belzona® Working Surface.
b) Mix together for at least 3 minutes until the material is of an even color and
consistency.
For mixing small quantities of Belzona® 2211 the mixing ratio is:
Note
1. From the commencement of mixing, Belzona® 2211 must be used within 10
minutes to 13 minutes within temperature range 25C to 30C.
5.0 INSPECTION
5.1 Surface preparation shall be checked using pictorial standards per
witnessed by Client representative.
5.2 Extend or repaired activity will be determined by Client’s inspection team
and finding or recommendation to be carried out depends on the
inspection result.
Contract Owner : DATE:
Contractor : TECHNICAL PROPOSAL REVISION : 0
HZNA (M) SDN BHD DOC. :
5.3 BELZONA procedure always on site (work area) during work carries out.