MIKEL LASA

From: Yamileth Perez <yperez@hdec.co.kr>


Sent: jueves, 25 de enero de 2024 10:29
To: lguerra@hdec.co.kr; mario.him@hdec.co.kr; vanessam@hdec.co.kr;
jcentella@hdec.co.kr; d.romero@hdec.co.kr; 'MIKEL LASA'; 'Hernan Buitrago';
'REINALDO ALEXANDER RANGEL TAPIA(REINALDO ALEXANDER RANGEL TAPIA) 역사팀
[PAM3] STAFF'; mario.him@hdec.co.kr
Cc: 'GILBERTO GERARDO RINCON VERA(GILBERTO GERARDO RINCON VERA) 사업지원2팀
[PAM3] STAFF'; 'BRENDA ELIZABETH VERGARA MARTINEZ(BRENDA ELIZABETH
VERGARA MARTINEZ) 사업지원2팀[PAM3] STAFF'; '우병규(WOO, BYUNGKUE) 사업지원
2팀[PAM3] 파트장'; '김진호(JINHO KIM) 역사팀[PAM3] 책임매니저'; reneq@hdec.co.kr;
'HECTOR ANTONIO ARABA HOA STAFF'; '탁상준(TAK, SANGJUN) 역사팀[PAM3] 책임매
니저'; '김정동(KIM, JUNG DONG) 역사팀[PAM3] 파트장'; '이현준'; kdelcid@hdec.co.kr
Subject: RE: Pre-Inspection RFTR E-13 (comments)

Dear Station Team;

From yesterday's visit what we observed;

These are the pending points to be able to carry out the HO on January 30,2024.

Civil
 Closing of pending Channel in SIG/COM.

 Placing the locks on the temporary doors.


1
 Dustproof paint up to the height of the false floor.
 Marking of the level of the raised floor around the perimeter of the room and the raised floor supports
 Fire extinguishers

MEP
 Installation of grounding rods.
 Temporary air fans at doors
 Temporary room panels with GFCI outlets.

The above activities as well as those being performed inside the rooms should be completed by Monday, January 29,
2024 and deep cleaning performed.

I look forward to hearing from you if these activities will be completed before the partial HO for RFTR SIG/COM or if you
have any comments regarding the points, please let me know.

Best Regards

From: Yamileth Perez [mailto:yperez@hdec.co.kr]


Sent: lunes, 22 de enero de 2024 11:07 a. m.
To: 'lguerra@hdec.co.kr' <lguerra@hdec.co.kr>; 'mario.him@hdec.co.kr' <mario.him@hdec.co.kr>;
'vanessam@hdec.co.kr' <vanessam@hdec.co.kr>; 'jcentella@hdec.co.kr' <jcentella@hdec.co.kr>;
'd.romero@hdec.co.kr' <d.romero@hdec.co.kr>; 'MIKEL LASA' <mlasa@hdec.co.kr>; 'Hernan Buitrago'
<hbuitrago@hdec.co.kr>; 'REINALDO ALEXANDER RANGEL TAPIA(REINALDO ALEXANDER RANGEL TAPIA) 역사팀[PAM3]
STAFF' <reinaldo@hdec.co.kr>
Cc: 'GILBERTO GERARDO RINCON VERA(GILBERTO GERARDO RINCON VERA) 사업지원 2 팀[PAM3] STAFF'
<grincon@hdec.co.kr>; 'BRENDA ELIZABETH VERGARA MARTINEZ(BRENDA ELIZABETH VERGARA MARTINEZ)
사업지원 2 팀[PAM3] STAFF' <bvergara@hdec.co.kr>; '우병규(WOO, BYUNGKUE) 사업지원 2 팀[PAM3] 파트장'
<woobk02@hdec.co.kr>; '김진호(JINHO KIM) 역사팀[PAM3] 책임매니저' <jhkim226@hdec.co.kr>; 'reneq@hdec.co.kr'
<reneq@hdec.co.kr>; 'HECTOR ANTONIO ARABA HOA STAFF' <haraba@hdec.co.kr>; '탁상준(TAK, SANGJUN)
역사팀[PAM3] 책임매니저' <ddoltak@hdec.co.kr>; '김정동(KIM, JUNG DONG) 역사팀[PAM3] 파트장'
<inet@hdec.co.kr>
Subject: Pre-Inspection RFTR E-13

Dear All;

As requested, a pre-inspection with NSC will be carried out on Wednesday 24 at 10 am to the technical rooms of station
13(San Bernardino), in preparation for the HO(Partial RFTR).

Best Regards;