BETWEEN
AND
SEPTEMBER,2023
This agreement is made on the 11 SEPTEMBER, 2023 between BRAVE ELECTROMECHANICAL
AND CONSULTANCY PLC (TIN: 0076053489) hereinafter called the Contractor) of the one part and
SHOA HOMES REAL ESTATE PLC (TIN: 0059994481) (Hereinafter called the Employer) of the other
part.
ARTICLE 1
DEFINITION OF TERMS
1.2 “The Employer" means SHOA HOMES REAL ESTATE PLC, its authorized representative
1.4 “Contract price means the total price, which is stated in Proforma invoice except including
15% vat Birr 430,000.00 (Four Hundred Thirty Thousand Birr and 00/100 Cent).
1.6 “Elevator" means Two Simplex Passengers Elevator with a capacity of 11 stops with 630KG.
ARTICLE 2
OBJECTIVE OF CONTRACT
The objective of this contract is for the installation of two simplex passenger Elevator with 11
stops with 630KG of the new building of the Employer around location of Bole bulbulla, Addis
Ababa.
ARTICLE 3
1. "Contractor" shall install two simplex passenger elevators in the building of the EMPLOYER
2. "Contractor" agrees to finish installation within 60 working days for each of the elevator from
3. If the Contractor completes the works as required by the Employer, the Employer shall issue a
certificate of completion within one week from the date of completion.
ARTICLE 4
1. "EMPLOYER" agrees to supply two simplex passenger’s elevators including the whole
installation accessories.
• 40% of the total price shall be paid after Completion of motor installation.
20% of the total price shall be paid after Completion of electrical installation.
10% of the total price shall be paid after Completion of test and commissioning.
personnel.
4. The "EMPLOYER" shall accomplish "The site absolutes” indicated under the general terms of
5. Employer shall avail electric power at the start of the installation work and provide the
7. The “CLIENT “shall make available lockable, space for keeping Contractor’s material,
8. The “CLIENT “shall be responsible for the arrangement of scaffolding, Chiseling and Civil
works.
ARTICLE 5
TERMINATION
"EMPLOYER" may without prejudice to any other remedy for breach of contract, by written
notice of default sent to CONTRACTOR, terminate this contract in whole or in part where
CONTRACTOR fails to achieve completeness of the contract works sufficient for the
ARTICLE 6
2. The Ethiopian Law shall be applicable in all aspects and govern this contract.
ARTICLE 7
FORCE MAJEURE
1. The relevant provision of the Ethiopian Civil Code relating to Force Majeure shall apply to
this contract.
2. Each party shall notify the occurrence of Force Majeure within five days of its occurrence.
ARTICLE 8
SETTLEMENT OF DISPUTES
Both parties shall settle dispute that may arise between EMPLOYER and CONTRACTOR
regarding the execution of this contract amicably. If dispute cannot be settled amicably within
Ethiopia.
ARTICLE 9
EFFECTIVE DATE
This contract shall have a binding effect on both parties as of the date of signature, by duly
IN WITNESS, hereof the authorized representatives of the parties here to have signed the