You are on page 1of 1

GRID LOCATION BOTTOM ELEVATION

1/- +99.200 All Holes are: 22 mm U.N.O.


GENERAL NOTES:
5/C-D +99.200 All Welds are: 6 mm U.N.O.
MATERIAL LIST FOR ASSEMBLY EP-H2 2 Nos. REQD
Mark Profile Material No. Length Area Weight
EP-H2 PIPE1-1/2SCH40 A53-GR.B 2 1885 0 14
p1 PL6X100 A36 2 2148.2 0 20
p2 PL10X75 A36 4 200 0 5
h5 PIPE1-1/2SCH40 A53-GR.B 4 167.07 0 3
h6 PIPE1-1/2SCH40 A53-GR.B 4 177.07 0 3
h10 PIPE1-1/2SCH40 A53-GR.B 4 1089.9 0 17
h21 PIPE1-1/2SCH40 A53-GR.B 4 300 0 5

2148 h23 PIPE1-1/2SCH40 A53-GR.B 2 190 0 1


h24 PIPE1-1/2SCH40 A53-GR.B 2 579.99 0 4

100
h25 PIPE1-1/2SCH40 A53-GR.B 2 590 0 4
h26 PIPE1-1/2SCH40 A53-GR.B 2 195 0 1
h27 PIPE1-1/2SCH40 A53-GR.B 4 1500 0 23
TOTAL 2 50

BOLT LIST FOR ONE ASSEMBLY


BOLT SIZE NOS. CONNECTED ASSY.
BOLT M19.05*38.1-A307 2

PART DETAIL OF p1 + NUT M19.05-GR8-HEX


+ WASHER M19.05-FLAT-E
BOLT M19.05*38.1-A307
2
2
2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2

PIPE1-1/2SCH40 x 2100
200
300 1500 300 38 124 38

38
A
EP-H2 h6 2 Ø 19.05

75
38
R
h5 76
400

PART DETAIL OF p2
h21 h27 h21
1100

h24
h25 h10
400

h10 h10 A ISSUED FOR APPROVAL 10/19/2023


REV. DESCRIPTION DWN CHK DATE

CLIENT:
h5 h27

h6
h26 h23
100
300

p1 p1 CONTRACTOR:

p2
FABRICATOR:
p2 p2
62 62
10

62 62
A-A 324 324
A
Tekla structures

CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
2 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H2 HANDRAIL SHOP DRAWING

DWG NO: SCALE: REV:


A3
EP-H2 A

You might also like