EP-H2 - HANDRAIL - Rev A
EP-H2 - HANDRAIL - Rev A
100
h25 PIPE1-1/2SCH40 A53-GR.B 2 590 0 4
h26 PIPE1-1/2SCH40 A53-GR.B 2 195 0 1
h27 PIPE1-1/2SCH40 A53-GR.B 4 1500 0 23
TOTAL 2 50
PIPE1-1/2SCH40 x 2100
200
300 1500 300 38 124 38
38
A
EP-H2 h6 2 Ø 19.05
75
38
R
h5 76
400
PART DETAIL OF p2
h21 h27 h21
1100
h24
h25 h10
400
CLIENT:
h5 h27
h6
h26 h23
100
300
p1 p1 CONTRACTOR:
p2
FABRICATOR:
p2 p2
62 62
10
62 62
A-A 324 324
A
Tekla structures
CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
2 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H2 HANDRAIL SHOP DRAWING