A SITE CLEARANCE
Overall site clearing include excavate to soil, clearing of shrubs, trees, fencing and Remove all debris from site lot 1 15,500.00 15,500.00
with necessary license / permit and any premium according to local authority requirements
** Approximately ___m2
C1 To supply and construct 4000mm x 3000mm Mushroom Farm House c/w build in rack, electrical wiring & nos 9 20,000.00 180,000.00
piping works.
Specification
i) 150mmm thk reinforced concrete slab including 100mm thk crusher run
ii) RHS 100mm x 50mm x 3mm thk for Column & Beam including 1 layer primer and 2 layer MIO finish paint
iii) 75mm x 45mm x 0;75mm thk C Chanel as additional support roof
75mm x 45mm x 0;75mm thk C purlin 9 (blue), batern, G30 0.30mm thk GI Metal Deck including roof
accessories (screw,capping, angle)
iv) 900mm x 2100mm single leaf flush door including frame, lockser and painting
v) 300mm height clay brick
vi) GI wire mesh fence perimeterly on top of clay brick
vii) 90% Shading/Sunshade Netting Garden Mesh installed perimeterly and on top of metal deck
C2 To supply and install 4 tiers build in Rack to fit 3000 Mushroom block using GI C-Chanel Frame & GI batten lot 9 3,000.00 27,000.00
complete with necessary accessories for each mushroom shed
a) 1 no of 3800mm x 200mm x 2100mm (high)
b) 1 no of 2800mm x 200mm x 21000mm (high)
c) 2 nos of 3000mm x 400mm x 2100mm (high)
C3 PIPING WORKS
i) To supply and install piping works for farm sprinkler complete with pvc piping at rooftop and internal sprinkler lot 9 500.00 4,500.00
piping.
*1 nos of pvc farm sprinkler c/w external pvc piping to rooftop
*1 nos of pvc farm sprinkler c/w internal pvc piping at floor
* I nos pvc garden tap
iii) Provide and install meter position including air valve to the approval of the local authority no 1 1,800.00 1,800.00
296,800.00