"Construction of Gas Interconnector Serbia - Bulgaria on the Serbian territory" Republic of Serbia

Ministry of Mining and Energy


Ministry of Finance
Department for Contracting and
Financing of EU Funded Projects

Rest to Novembe
Total June July August Septemb October Novembe Decembe January Februar March April May June July August Septemb October
be r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 er 2023 2023
executed IPC 9
Estimated
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities

TELECOMUNICATION WORKS AND


PROCUREMENT OF MATERIALS FOR THE
CONSTRUCTION OF THE BI-DIRECTIONAL GAS
PIPELINE MG10 NIŠ - DIMITROVGRAD
(INTERCONNECTOR BULGARIA - SERBIA)

TELEMETRY

PROCUREMENT AND DELIVERY OF MATERIALS


AND EQUIPMENT

GMRS Niš 2
1. MICROPROCESSOR EQUIPMENT
1.1. ADVANTECH ADAM 6017 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.2. ADVANTECH ADAM 6050 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.3. ADVANTECH ADAM 4570 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 1 1.00 0.00 1.00

2. NETWORK COMMUNICATION EQUIPMENT


2.1. Network Communication Equipment: Industrial Switch, 8 Eth.
Port, mounting equipment and related cables, in all according to
the Technical conditions for the equipment, installation on the
facility according to Detailed Design
pcs 1 1.00 0.00 1.00
2.2. Network Communication Equipment: Router (2G / 2G
/3G/3.5G/3.75G/4G), CISCO C881G-4G-GA-K9 or equivalent
(in all according to the Technical Requirements for Equipment
and Specification), installation on the facility according to
Detailed Design
pcs 1 1.00 0.00 1.00

3. EQUIPMENT INSTALLATION CABINET


3.1.
Cabinet with wiring and assemblies that are the subject of this
procurement, with installation on the object, in accordance with
the technical conditions for equipment and specification,
installation on the facility according to Detailed Design

pcs 1 1.00 0.00 1.00

4. POWER SUPPLY EQUIPMENT


3.2. Uninterruptible power supply unit - complete set with mounting
and connection, with installation on the object, in all according
to the Technical conditions for equipment and specification,
installation on the object according to Detailed Design

pcs 1 1.00 0.00 1.00

5. METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT


5.1. Inlet pressure transmitter (Pin), set with support and three-way
valve II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012, SRPS
EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 1.00
5.2. Outlet pressure transmitter (Piz), set with support and three-
way valve, II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012,
SRPS EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 1.00
5.3. Working pressure transmitter for both operating branches (Pr1,
Pr2), set with support and three-way valve, II 1 G Ex ia IIA T4
Ga (SRPS EN 60079-11:2012, SRPS EN 60076-14:2015,
SRPS N.S8.321), in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 2 2.00 0.00 2.00
5.4. Inlet temperature transmitter (Tin) with support -II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 1.00
5.5. Outlet temperature transmitter (Tiz) with support- II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 1.00
5.6.
Working temperature transmitter in both operating branches
(Tr1, Tr2) with support, II 1 G Ex ia IIA T4 Ga (SRPS EN
60079-11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321), in
all according to Specifications for equipment and specification,
installation on the facility according to Detailed design

pcs 2 2.00 0.00 2.00


5.7. Differential pressure transmitter on the filter, both operating
branches (Pdif1, Pdif2) set with support and valve, II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321), in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 2 2.00 0.00 2.00
5.8. Gas pressure transmitter in Boiler plant (Pkiz), set with support
and three-way valve, II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-
11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321), in all
according to Specifications for equipment and specification,
installation on the facility according to Detailed design

pcs 1 1.00 0.00 1.00


5.9. Heat operating temperature transmitter in the Boiler plant with
support at entrance and exit from reheating system (Tkul, Tkiz),
II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN
60076-14:2015, SRPS N.S8.321), in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 2 2.00 0.00 2.00
5.10. Safety barriers ZB Z728 P Pepperl+Fuchs or
equivalent. II 3 G Ex ia IIC T4 Gc
pcs 15 14.00 0.00 14.00
5.11. Safety barriers ZB Z710 P Pepperl+Fuchs or equivalent. II 3 G
Ex ia IIC T4 Gc
pcs 15 14.00 0.00 14.00
5.12. Insulation amplifier for digital signalIM1-12Ex-R II 3 G Ex ia
IIC T4 Gc
pcs 15 20.00 0.00 20.00
5.13. Ex boxes in intrinsically safe circuit protection. II 1 G Ex ia IIA
T3 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-14:2015,
SRPS N.S8.321, SRPS N.S8.201, SRPS N.S8.301, SRPS
N.S8.221)
pcs 9 9.00 0.00 9.00
5.14.
Electronic corrector with interface. The interface serves as a
communication, protection and power module. EK280 with
FE260 Ethernet port. II 1 G Ex ia IIA T3 Ga (SRPS EN 60079-
11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321).

pcs 2 2.00 0.00 2.00

6. INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES


6.1. Cam switch
pcs 1 2.00 -1.00 2.00
6.2. Switch type protective fuse (230VAC)
pcs 6 8.00 -2.00 8.00
6.3. Switch type protective fuse (24VDC)
pcs 6 4.00 2.00 4.00
6.4. Batten with clampsX1(30 pieces)
kom 1 1.00 0.00 1.00
6.5. Batten with clampsX2 (30 pieces)
kom 1 1.00 0.00 1.00
6.6. Batten with clampsX3 (120 pieces)
kom 1 1.00 0.00 1.00
6.7. Batten with clampsX4 (90 pieces)
kom 1 1.00 0.00 1.00
6.8. Batten with clampsX5 (120 pieces)
kom 1 1.00 0.00 1.00
6.9. Cable PP00 3x2.5mm2
m 50 50.00 0.00 50.00
6.10. Signal cable J-H(St)H 2X2X0.8 mm
m 500 0.00 500.00
6.11. Signal cable J-H(St)H 4X2X0.8 mm
m 500 0.00 500.00
6.12. Cable tray PNK 100/60
m 30 64.00 0.00 64.00
6.13. Galvanized pipes Φ 3/4"
m 60 60.00 0.00 60.00
6.14. Flexible hose Φ 1/2"
m 20 20.00 0.00 20.00
6.15. PE pipes Φ 100 (proposed in Electrical design)
m 50 50.00 0.00 50.00

7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design

Selection of an authorized Contractor and obtaining a positive


First test report. Issue of the Document for the Control of
Installation in explosion hazard areas with Assessment of
correctness.
Testing of equipment and commissioning of equipment. Trial
report. Commissioning of equipment during exploitation.
Obtaining appropriate approvals for commissioning (Ministry
of Internal Affairs of the Republic of Serbia)
lump sum 1 1.00 0.00 1.00

TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS
"Construction of Gas Interconnector Serbia - Bulgaria on the Serbian territory"

Rest to Novembe
Total June July August Septemb October Novembe Decembe January Februar March April May June July August Septemb October
be r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 er 2023 2023
Estimated executed IPC 9
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities

TELECOMUNICATION WORKS AND


PROCUREMENT OF MATERIALS FOR THE
CONSTRUCTION OF THE BI-DIRECTIONAL GAS
PIPELINE MG10 NIŠ - DIMITROVGRAD
(INTERCONNECTOR BULGARIA - SERBIA)

TELEMETRY

PROCUREMENT AND DELIVERY OF MATERIALS


AND EQUIPMENT

GMRS Bela Palanka


1. MICROPROCESSOR EQUIPMENT
1.1. ADVANTECH ADAM 6017 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.2. ADVANTECH ADAM 6050 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.3. ADVANTECH ADAM 4570 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 1 1.00 0.00 1.00

2. NETWORK COMMUNICATION EQUIPMENT


2.1. Network Communication Equipment: Industrial Switch, 8 Eth.
Port, mounting equipment and related cables, in all according to
the Technical conditions for the equipment, installation on the
facility according to Detailed Design
pcs 1 1.00 0.00 1.00
2.2. Network Communication Equipment: Router (2G / 2G
/3G/3.5G/3.75G/4G), CISCO C881G-4G-GA-K9 or equivalent
(in all according to the Technical Requirements for Equipment
and Specification), installation on the facility according to
Detailed Design
pcs 1 1.00 0.00 1.00

3. EQUIPMENT INSTALLATION CABINET


3.1.
Cabinet with wiring and assemblies that are the subject of this
procurement, with installation on the object, in accordance with
the technical conditions for equipment and specification,
installation on the facility according to Detailed Design

pcs 1 1.00 0.00 1.00

4. POWER SUPPLY EQUIPMENT


3.2. Uninterruptible power supply unit - complete set with mounting
and connection, with installation on the object, in all according
to the Technical conditions for equipment and specification,
installation on the object according to Detailed Design

pcs 1 1.00 0.00 1.00

5. METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT


5.1. Inlet pressure transmitter (Pin), set with support and three-way
valve II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012, SRPS
EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 1.00
5.2. Outlet pressure transmitter (Piz), set with support and three-
way valve, II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012,
SRPS EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 1.00
5.3. Working pressure transmitter for both operating branches (Pr1,
Pr2), set with support and three-way valve, II 1 G Ex ia IIA T4
Ga (SRPS EN 60079-11:2012, SRPS EN 60076-14:2015,
SRPS N.S8.321), in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 2 2.00 0.00 2.00
5.4. Inlet temperature transmitter (Tin) with support -II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 1.00
5.5. Outlet temperature transmitter (Tiz) with support- II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 1.00
5.6.
Working temperature transmitter in both operating branches
(Tr1, Tr2) with support, II 1 G Ex ia IIA T4 Ga (SRPS EN
60079-11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321), in
all according to Specifications for equipment and specification,
installation on the facility according to Detailed design

pcs 2 2.00 0.00 2.00


5.7. Differential pressure transmitter on the filter, both operating
branches (Pdif1, Pdif2) set with support and valve, II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321), in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 2 2.00 0.00 2.00
5.8. Gas pressure transmitter in Boiler plant (Pkiz), set with support
and three-way valve, II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-
11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321), in all
according to Specifications for equipment and specification,
installation on the facility according to Detailed design

pcs 1 1.00 0.00 1.00


5.9. Heat operating temperature transmitter in the Boiler plant with
support at entrance and exit from reheating system (Tkul, Tkiz),
II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN
60076-14:2015, SRPS N.S8.321), in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 2 2.00 0.00 2.00
5.10. Safety barriers ZB Z728 P Pepperl+Fuchs or
equivalent. II 3 G Ex ia IIC T4 Gc
pcs 15 14.00 0.00 14.00
5.11. Safety barriers ZB Z710 P Pepperl+Fuchs or equivalent. II 3 G
Ex ia IIC T4 Gc
pcs 15 14.00 0.00 14.00
5.12. Insulation amplifier for digital signalIM1-12Ex-R II 3 G Ex ia
IIC T4 Gc
pcs 15 20.00 0.00 20.00
5.13. Ex boxes in intrinsically safe circuit protection. II 1 G Ex ia IIA
T3 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-14:2015,
SRPS N.S8.321, SRPS N.S8.201, SRPS N.S8.301, SRPS
N.S8.221)
pcs 9 9.00 0.00 9.00
5.14.
Electronic corrector with interface. The interface serves as a
communication, protection and power module. EK280 with
FE260 Ethernet port. II 1 G Ex ia IIA T3 Ga (SRPS EN 60079-
11:2012, SRPS EN 60076-14:2015, SRPS N.S8.321).

pcs 2 2.00 0.00 2.00

6. INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES


6.1. Cam switch
pcs 1 2.00 -1.00 2.00
6.2. Switch type protective fuse (230VAC)
pcs 6 8.00 -2.00 8.00
6.3. Switch type protective fuse (24VDC)
pcs 6 4.00 2.00 4.00
6.4. Batten with clampsX1(30 pieces)
kom 1 1.00 0.00 1.00
6.5. Batten with clampsX2 (30 pieces)
kom 1 1.00 0.00 1.00
6.6. Batten with clampsX3 (120 pieces)
kom 1 1.00 0.00 1.00
6.7. Batten with clampsX4 (90 pieces)
kom 1 1.00 0.00 1.00
6.8. Batten with clampsX5 (120 pieces)
kom 1 1.00 0.00 1.00
6.9. Cable PP00 3x2.5mm2
m 50 50.00 0.00 50.00
6.10. Signal cable J-H(St)H 2X2X0.8 mm
m 500 500.00 0.00 500.00
6.11. Signal cable J-H(St)H 4X2X0.8 mm
m 500 500.00 0.00 500.00
6.12. Cable tray PNK 100/60
m 30 38.00 0.00 38.00
6.13. Galvanized pipes Φ 3/4"
m 60 60.00 0.00 60.00
6.14. Flexible hose Φ 1/2"
m 20 20.00 0.00 20.00
6.15. PE pipes Φ 100 (proposed in Electrical design)
m 50 50.00 0.00 50.00

7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design

Selection of an authorized Contractor and obtaining a positive


First test report. Issue of the Document for the Control of
Installation in explosion hazard areas with Assessment of
correctness.
Testing of equipment and commissioning of equipment. Trial
report. Commissioning of equipment during exploitation.
Obtaining appropriate approvals for commissioning (Ministry
of Internal Affairs of the Republic of Serbia)
lump sum 1 1.00 0.00 1.00

TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS
"Construction of Gas Interconnector Serbia - Bulgaria on the Serbian territory"

Rest to Novembe
Total June July August Septemb October Novembe Decembe January Februar March April May June July August September
be October 2023 r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 2023
Estimated executed IPC 9
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities

TELECOMUNICATION WORKS AND


PROCUREMENT OF MATERIALS FOR THE
CONSTRUCTION OF THE BI-DIRECTIONAL GAS
PIPELINE MG10 NIŠ - DIMITROVGRAD
(INTERCONNECTOR BULGARIA - SERBIA)

TELEMETRY

PROCUREMENT AND DELIVERY OF MATERIALS


AND EQUIPMENT

MS Trupale
1. MICROPROCESSOR EQUIPMENT
1.1. ADVANTECH ADAM 6017 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.2. ADVANTECH ADAM 6050 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 4 8.00 0.00 8.00
1.3. ADVANTECH ADAM 4570 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 1 1.00 0.00 1.00

2. NETWORK COMMUNICATION EQUIPMENT


2.1. Network Communication Equipment: Industrial Switch, 8 Eth.
Port, mounting equipment and related cables, in all according to
the Technical conditions for the equipment, installation on the
facility according to Detailed Design
pcs 1 2.00 0.00 2.00
2.2. Network Communication Equipment: Router (2G / 2G
/3G/3.5G/3.75G/4G), CISCO C881G-4G-GA-K9 or equivalent
(in all according to the Technical Requirements for Equipment
and Specification), installation on the facility according to
Detailed Design
pcs 1 1.00 0.00 1.00

3. EQUIPMENT INSTALLATION CABINET


3.1.
Cabinet with wiring and assemblies that are the subject of this
procurement, with installation on the object, in accordance with
the technical conditions for equipment and specification,
installation on the facility according to Detailed Design

pcs 1 1.00 0.00 0.50 0.50

4. POWER SUPPLY EQUIPMENT


3.2. Uninterruptible power supply unit - complete set with mounting
and connection, with installation on the object, in all according
to the Technical conditions for equipment and specification,
installation on the object according to Detailed Design

pcs 1 1.00 0.00 1.00

5. METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT


5.1. Inlet pressure transmitter (Pin), set with support and three-way
valve II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012, SRPS
EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 0.50 0.50
5.2. Outlet pressure transmitter (Piz), set with support and three-
way valve, II 1 G Ex ia IIA T4 Ga (SRPS EN 60079-11:2012,
SRPS EN 60076-14:2015, SRPS N.S8.321) in all according to
Specifications for equipment and specification, installation on
the facility according to Detailed design
pcs 1 1.00 0.00 0.50 0.50
5.3. Inlet temperature transmitter (Tin) with support -II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 0.50 0.50
5.4. Outlet temperature transmitter (Tiz) with support- II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321) in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 1 1.00 0.00 0.50 0.50
5.5. Differential pressure transmitter on the filter, both operating
branches (Pdif1, Pdif2) set with support and valve, II 1 G Ex ia
IIA T4 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-
14:2015, SRPS N.S8.321), in all according to Specifications for
equipment and specification, installation on the facility
according to Detailed design
pcs 5 5.00 0.00 5.00
5.6. Safety barriers ZB Z728 P Pepperl+Fuchs or
equivalent. II 3 G Ex ia IIC T4 Gc
pcs 15 10.00 5.00 5.00 5.00
5.7. Safety barriers ZB Z710 P Pepperl+Fuchs or equivalent. II 3 G
Ex ia IIC T4 Gc
pcs 15 10.00 5.00 5.00 5.00
5.8. Insulation amplifier for digital signalIM1-12Ex-R II 3 G Ex ia
IIC T4 Gc
pcs 25 40.00 0.00 40.00
5.9. Ultrasonic meters - MAIN UNIT - of the different
manufacturer versus CONTROL for each of 5 lines. II 1 G Ex
ia IIA T3 Ga.
pcs 5 0.00 5.00 5.00 (5.00)
5.10. Ultrasonic meters - CONTROL UNIT - of the different
manufacturer versus MAIN for each of 5 lines. II 1 G Ex ia IIA
T3 Ga.
pcs 5 0.00 5.00 5.00 (5.00)
5.11. Flow Computer for monitoring and control of 5 MAIN
ultrasonic meters on 5 lines, same manufacturer as MAIN
meters. Interface
pcs 1 0.00 1.00 1.00 (1.00)
5.12. Flow Computer for monitoring and control of 5 CONTROL
ultrasonic meters on 5 lines, same manufacturer as CONTROL
meters. Interface
pcs 1 0.00 1.00 1.00 (1.00)
5.13. Ex boxes in intrinsically safe circuit protection. II 1 G Ex ia IIA
T3 Ga (SRPS EN 60079-11:2012, SRPS EN 60076-14:2015,
SRPS N.S8.321, SRPS N.S8.201, SRPS N.S8.301, SRPS
N.S8.221)
pcs 40 40.00 0.00 40.00

6. INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES


6.1. Cam switch
pcs 1 2.00 -1.00 1.00 1.00
6.2. Switch type protective fuse (230VAC)
pcs 6 8.00 -2.00 4.00 4.00
6.3. Switch type protective fuse (24VDC)
pcs 6 4.00 2.00 1.00 3.00
6.4. Batten with clampsX1(30 pieces)
kom 1 1.00 0.00 0.50 0.50
6.5. Batten with clampsX2 (30 pieces)
kom 1 1.00 0.00 0.50 0.50
6.6. Batten with clampsX3 (120 pieces)
kom 3 3.00 0.00 1.50 1.50
6.7. Batten with clampsX4 (90 pieces)
kom 1 1.00 0.00 0.50 0.50
6.8. Batten with clampsX5 (120 pieces)
kom 1 1.00 0.00 1.00
6.9. Cable PP00 3x2.5mm2
m 50 50.00 0.00 50.00
6.10. Signal cable J-H(St)H 2X2X0.8 mm
m 600 2,470.00 0.00 2,470.00
6.11. Signal cable J-H(St)H 4X2X0.8 mm
m 600 600.00 0.00 600.00
6.12. Cable tray PNK 100/60
m 30 228.00 0.00 228.00
6.13. Galvanized pipes Φ 3/4"
m 60 60.00 0.00 60.00
6.14. Flexible hose Φ 1/2"
m 20 20.00 0.00 20.00
6.15. PE pipes Φ 100 (proposed in Electrical design)
m 50 50.00 0.00 50.00

7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design

Selection of an authorized Contractor and obtaining a positive


First test report. Issue of the Document for the Control of
Installation in explosion hazard areas with Assessment of
correctness.
Testing of equipment and commissioning of equipment. Trial
report. Commissioning of equipment during exploitation.
Obtaining appropriate approvals for commissioning (Ministry
1
of Internal Affairs of the Republic of Serbia)
lump sum 1 1.00 0.00 1.00

TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS