Total June July August Septemb October Novembe Decembe January Februar March April May June July August Septemb October
be r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 er 2023 2023
executed IPC 9
Estimated
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities
TELEMETRY
GMRS Niš 2
1. MICROPROCESSOR EQUIPMENT
1.1. ADVANTECH ADAM 6017 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.2. ADVANTECH ADAM 6050 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.3. ADVANTECH ADAM 4570 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 1 1.00 0.00 1.00
7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design
TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS
"Construction of Gas Interconnector Serbia - Bulgaria on the Serbian territory"
Rest to Novembe
Total June July August Septemb October Novembe Decembe January Februar March April May June July August Septemb October
be r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 er 2023 2023
Estimated executed IPC 9
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities
TELEMETRY
7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design
TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS
"Construction of Gas Interconnector Serbia - Bulgaria on the Serbian territory"
Rest to Novembe
Total June July August Septemb October Novembe Decembe January Februar March April May June July August September
be October 2023 r 2023-
executed 2022 2022 2022 er 2022 2022 r 2022 r 2022 2023 y 2023 2023 2023 2023 2023 2023 2023 2023
Estimated executed IPC 9
Price No Title Unit Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Quantities
TELEMETRY
MS Trupale
1. MICROPROCESSOR EQUIPMENT
1.1. ADVANTECH ADAM 6017 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 2 2.00 0.00 2.00
1.2. ADVANTECH ADAM 6050 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 4 8.00 0.00 8.00
1.3. ADVANTECH ADAM 4570 or equivalent, mounting
equipment and associated cables, in all according to the
Equipment Technical Requirements, installation on the facility
according to Detailed Design
pcs 1 1.00 0.00 1.00
7. WORKS
Excavation of trench, placing PE pipe to FF tap, placing 2
cables in PE pipe (30m)
Installation works on the delivered equipment. Placing all
cables according to routes within Detailed design. Complete
and assemble cabinets.
Connection of installed cables in the cabinet. Make connections
in accordance with relevant regulations. Connecting UPS
devices with the cabinet equipment. Execute works in
accordance with Detailed design
TOTAL COST FOR THE REALIZATION OF THE DESIGN PER ONE MRS:
1 MICROPROCESSOR EQUIPMENT
2 NETWORK COMMUNICATION EQUIPMENT
3 EQUIPMENT INSTALLATION CABINET
4 POWER SUPPLY EQUIPMENT
5 METERING, INDICATING, COMMAND AND CONTROL EQUIPMENT
6 INSTALLATION MATERIAL, SWITCHES, CABLES, WORKS AND ACCESSORIES
7 WORKS