Professional Documents
Culture Documents
Level 1: Toilet 2
Male Toilet Corner unit with 1 cubicle, 1 divider, and 1 door
1 set 36,200.00 36,200.00
Width: 0.95m Depth: 1.65m
Level 2: Toilet 3
Male Toilet Enclosed unit with 2 cubicles, 1 divider, and 2 doors
1 set 56,700.00 56,700.00
Width: 1.85m Depth: 1.65m
Page 1 of 5
Date July 31, 2023
Ref. No. JB/Q-23-01017
Female Changing Room Enclosed unit with 3 cubicles, 2 dividers, and 3 doors
1 set 89,000.00 89,000.00
Width: 2.75m Depth: 1.50m
Level 3: Toilet 4
Male Toilet Enclosed unit with 1 cubicle
1 set 22,000.00 22,000.00
Width Opening: 0.90m
Page 2 of 5
Date July 31, 2023
Ref. No. JB/Q-23-01017
Page 3 of 5
Date July 31, 2023
Ref. No. JB/Q-23-01017
Page 4 of 5
Date July 31, 2023
Ref. No. JB/Q-23-01017
ESTIMATED QUANTITY:
Total no. of cubicles: 75 units Total no. of showers: 8 units
Total no. of urinals: 47 sets Total no. of changing rooms: 8 units
Note: The quantity quoted above is based on the plan issued and requested by the buyer.
Any form of changes in specification, sizes and quantity should be charged accordingly.
DELIVERY: 60-75 days upon receipt of P.O./D.P. Note: Price valid until the end of October 2023
TERMS AND CONDITIONS:
1. All prices are subject to change without prior notice.
2. Bonds included
3. Price quoted on this proposal is for daytime installation only from MONDAY to SATURDAY and there will be an additional
cost of 650 pesos per cubicle for night shift installation and SUNDAY.
4. All prices are VAT inclusive.
5. One (1) year warranty for workmanship from the date of completion. Jebsen will not be liable for any damages due to improper
use or accidental damages or any loss of installed items.
6. Two (2) years warranty on the materials from the date of completion.
GENERAL REQUIREMENTS BEFORE INSTALLATION:
a) The client should provide an elevator for the hauling of materials. Electricity and water consumption should be provided by the
buyer.
b) All necessary works must be complete and furnished which includes; wall and floor tiles with grout, ceiling installed, painting
finished, granite for ledges and lavatory, water closet, and urinals installed.
c) Any work permits and other requirements before the installation should be informed ahead of time.
d) Plan for the location at the waterline should be furnished with the approval of the In-Charge Engineer to avoid damages.
In case of wrong information, the client will shoulder damages.
e) All completed installations of panels done by us and damaged by other trades will be charged accordingly.
THANK YOU FOR GIVING US AN OPPORTUNITY TO GIVE YOU OUR PROPOSAL AND WE LOOK
FORWARD TO SERVING YOU.
Prepared by: Checked by: Noted by:
Page 5 of 5