Input Data WO PM tahun 2013

(Man Power Hours)


Man power on duty

Total / Year

Total / Year
Estmate Time
Actual Time
Discription Schedule Total / Year Total / Year
Item

Schedule/Year

Qty
Estimate Working
(Man Power x Hours) Schedule
Main Building Hour Actual Working Hour
No. A. Air Conditioning M Q SA A M Q SA A M Q SA A M Q SA A M Q SA A
A. AIR CONDITIONING
AIR HANDLING UNIT
2
1 (MOLD) 1 2 0 2 1 1 0 1 1.5 6 0.0 4.5 1.0 1.5 0 4 3 12 19 0 18 2 3 7.0 23
AIR HANDLING UNIT
2
2 (MOLD) 1 2 0 2 1 1 0 1 1.5 6 0.0 3.5 1.0 1.5 0 4 3 12 19 0 14 2 3 6.0 19
AIR HANDLING UNIT
2
3 (MOLD) 1 2 0 2 1 1 0 1 1.5 6 0.0 8.5 1.0 1.5 0 4 3 12 19 0 34 2 3 11.0 39
AIR HANDLING UNIT
2
4 (MOLD) 1 2 0 2 1 1 0 1 1.5 6 0.0 7.5 1.0 1.5 0 4 3 12 19 0 30 2 3 10.0 35
5 AIR HANDLING UNIT (FOL) 1 2 0 3 0 1 0 1.5 0 6 0.0 5.5 0.0 1.0 2 0 9 0 12 21 0 33 0 2 6.5 35
6 AIR HANDLING UNIT (FOL) 1 2 0 3 0 1 0 1.5 0 6 0.0 5.5 0.0 1.0 2 0 9 0 12 21 0 33 0 2 6.5 35
7 AIR HANDLING UNIT (FOL) 1 2 0 3 0 1 0 1.5 0 6 0.0 5.0 0.0 1.0 2 0 9 0 12 21 0 30 0 2 6.0 32
AIR HANDLING UNIT
2
8 (PLATING) 1 2 8 2 1 1 1 1.5 4 4 8.0 2.0 1.0 0.0 16 6 8 8 38 128 8 2 0 11.0 138
AIR HANDLING UNIT
2
9 (PLATING) 1 2 8 2 1 1 1 1.5 4 4 9.0 2.0 1.0 0.0 16 6 8 8 38 144 8 2 0 12.0 154
AIR HANDLING UNIT
2
10 (OFFICE) 1 2 8 3 0 1 1 1.5 6 7.5 12.5 3.0 1.0 0.0 16 9 0 15 40 200 18 0 0 16.5 218
AIR HANDLING UNIT
2
11 (OFFICE) 1 2 8 3 0 1 1 1.5 6 7.5 12.0 2.0 1.0 0.0 16 9 0 15 40 192 12 0 0 15.0 204
12 AIR HANDLING UNIT (SAW) 1 2 0 3 0 1 0 1 4 7 0.0 3.5 0.0 5.0 2 0 6 0 14 20 0 21 0 10 8.5 31
AIR HANDLING UNIT
2
13 (FLIPCHIP) 1 2 0 2 1 1 0 1.5 2 6 0.0 3.5 1.0 3.0 0 6 4 12 22 0 14 2 6 7.5 22
AIR HANDLING UNIT
2
14 (BACKGRIND) 1 2 0 2 1 1 0 1.5 2 6 0.0 3.5 1.0 3.0 0 6 4 12 22 0 14 2 6 7.5 22
AIR HANDLING UNIT
2
15 (INTERLINK) 1 2 8 3 0 1 1 1.5 0 2 11.5 3.0 0.0 4.0 16 9 0 4 29 184 18 0 8 18.5 210
AIR HANDLING UNIT
2
16 (INTERLINK) 1 2 8 3 0 1 1 1.5 0 2 11.0 2.5 0.0 4.0 16 9 0 4 29 176 15 0 8 17.5 199
AIR HANDLING UNIT
2
17 (INTERLINK) 1 2 8 3 0 1 1 1.5 0 2 10.0 3.0 0.0 4.0 16 9 0 4 29 160 18 0 8 17.0 186
AIR HANDLING UNIT
2
18 (INTERLINK - 2nd Flr) 1 2 0 3 0 1 1 1.5 0 2 0.0 3.0 0.0 4.0 0 9 0 4 13 0 18 0 8 7.0 26
AIR HANDLING UNIT
2
19 (INTERLINK - 2nd Flr) 1 2 0 3 0 1 1 1.5 0 2 0.0 3.0 0.0 4.0 0 9 0 4 13 0 18 0 8 7.0 26
BOOSTER AIR COND. FAN
2
20 (FOL PM BAY) 1 2 12 0 0 0 0.5 0 0 0 10.5 0.0 0.0 0.0 12 0 0 0 12 252 0 0 0 10.5 252
21 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 7.5 3.0 0.0 1.0 2 8 6 0 6 20 120 18 0 2 11.5 140
22 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 8.5 3.0 0.0 1.0 2 8 6 0 6 20 136 18 0 2 12.5 156
23 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 7.5 3.0 0.0 1.0 2 8 6 0 6 20 120 18 0 2 11.5 140
24 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 7.5 3.0 0.0 1.0 2 8 6 0 6 20 120 18 0 2 11.5 140
25 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 6.0 3.0 0.0 1.0 2 8 6 0 6 20 96 18 0 2 10.0 116
26 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 8.0 3.0 0.0 1.0 2 8 6 0 6 20 128 18 0 2 12.0 148
27 FAN COIL UNIT (LOCKER) 1 2 8 3 0 1 0.5 1 0 3 9.0 3.0 0.0 1.0 2 8 6 0 6 20 144 18 0 2 13.0 164
28 FAN COIL UNIT (LAUNDRY) 1 2 8 3 0 1 0.5 1 0 3 10.5 3.0 0.0 1.0 2 8 6 0 6 20 168 18 0 2 14.5 188
29 FAN COIL UNIT (CORRIDOR) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 1.0 2 0 6 0 6 12 0 15 0 2 3.5 17
30 FAN COIL UNIT (CORRIDOR) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 1.0 2 0 6 0 6 12 0 15 0 2 3.5 17
31 FAN COIL UNIT (CORRIDOR) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 1.0 2 0 6 0 6 12 0 15 0 2 3.5 17
FAN COIL UNIT (MALE
2
32 PRAYER) 1 2 8 3 0 1 1 1 0 3 5.5 4.5 0.0 1.0 16 6 0 6 28 88 27 0 2 11.0 117
FAN COIL UNIT (MALE
2
33 PRAYER) 1 2 8 3 0 1 1 1 0 3 6.0 4.5 0.0 1.0 16 6 0 6 28 96 27 0 2 11.5 125
FAN COIL UNIT (MALE
2
34 PRAYER) 1 2 8 3 0 1 1 1 0 3 6.0 3.5 0.0 1.0 16 6 0 6 28 96 21 0 2 10.5 119
FAN COIL UNIT (FEMALE
2
35 PRAYER) 1 2 8 3 0 1 1 1 0 3 7.0 3.5 0.0 1.0 16 6 0 6 28 112 21 0 2 11.5 135
FAN COIL UNIT (FEMALE
2
36 PRAYER) 1 2 8 3 0 1 1 1 0 3 7.0 3.5 0.0 1.0 16 6 0 6 28 112 21 0 2 11.5 135
37 FAN COIL UNIT ( IT ) 1 2 8 3 0 1 1 1 0 3 11.5 4.0 0.0 1.5 2 16 6 0 6 28 184 24 0 3 17.0 211
38 FAN COIL UNIT ( IT ) 1 2 8 3 0 1 1 1 0 3 12.5 4.0 0.0 1.5 2 16 6 0 6 28 200 24 0 3 18.0 227
FAN COIL UNIT (SAW
2
39 SINGULATION) 1 2 8 3 0 1 1 1 0 3 10.5 2.0 0.0 2.5 16 6 0 6 28 168 12 0 5 15.0 185
PACKAGE AC UNIT
2
40 (MEETING) 1 2 0 3 0 1 0 1 0 3 0.0 3.0 0.0 1.0 0 6 0 6 12 0 18 0 2 4.0 20
41 PACKAGE AC UNIT (EDP) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 0.0 2 0 6 0 6 12 0 15 0 0 2.5 15
42 PACKAGE AC UNIT (EDP) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 0.0 2 0 6 0 6 12 0 15 0 0 2.5 15
43 PACKAGE AC UNIT (EDP) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 0.0 2 0 6 0 6 12 0 15 0 0 2.5 15
44 PACKAGE AC UNIT (EDP) 1 2 0 3 0 1 0 1 0 3 0.0 2.5 0.0 0.0 2 0 6 0 6 12 0 15 0 0 2.5 15
PACKAGE AC UNIT (DM
2
45 Store) 1 2 0 3 0 1 0 1 0 4 0.0 4.0 0.0 1.5 0 6 0 8 14 0 24 0 3 5.5 27
PACKAGE AC UNIT (DM
2
46 Store) 1 2 0 3 0 1 0 1 0 4 0.0 4.0 0.0 1.0 0 6 0 8 14 0 24 0 2 5.0 26
47 PACKAGE AC UNIT (HT) 1 2 8 3 0 1 0.5 1 0 4 9.5 5.0 0.0 1.0 2 8 6 0 8 22 152 30 0 2 15.5 184
48 PACKAGE AC UNIT (HT) 1 2 8 3 0 1 0.5 1 0 4 10.0 5.0 0.0 1.0 2 8 6 0 8 22 160 30 0 2 16.0 192
49 PACKAGE AC UNIT (CLINIC) 1 2 8 3 0 1 0.5 1 0 2.5 11.0 5.0 0.0 1.0 2 8 6 0 5 19 176 30 0 2 17.0 208
PACKAGE AC UNIT
2
50 (TRASPORTATION) 1 2 8 3 0 1 0.5 1 0 2.5 4.0 4.0 0.0 1.0 8 6 0 5 19 64 24 0 2 9.0 90
PACKAGE AC UNIT
2
51 (TRASPORTATION) 1 2 8 3 0 1 0.5 1 0 2.5 4.0 4.0 0.0 1.0 8 6 0 5 19 64 24 0 2 9.0 90
PACKAGE AC UNIT (LOBBY
2
52 2) 1 2 8 3 0 1 0.5 1 0 2.5 7.5 6.0 0.0 1.5 8 6 0 5 19 120 36 0 3 15.0 159
PACKAGE AC UNIT (LOBBY
2
53 2) 1 2 8 3 0 1 0.5 1 0 2.5 7.0 3.0 0.0 1.5 8 6 0 5 19 112 18 0 3 11.5 133
PACKAGE AC UNIT
2
54 (PAYROLL) 1 2 0 3 0 1 0 1 0 2.5 0.0 2.0 0.0 2.0 0 6 0 5 11 0 12 0 4 4.0 16
PACKAGE AC UNIT
2
55 THAWING AREA 1 2 0 3 0 1 0 1 0 3 0.0 7.0 0.0 2.0 0 6 0 6 12 0 42 0 4 9.0 46
PACKAGE AC UNIT
2
56 (PLATING) 1 2 0 3 0 1 0.5 1 0 4 3.5 0.0 0.0 0.0 0 6 0 8 14 0 0 0 0 3.5 0
AIR CONDITIONING
2
57 ACCESSORIES & PIPELINES 1 2 12 0 0 0 0.5 0 0 0 16.5 0.0 0.0 0.0 12 0 0 0 12 396 0 0 0 16.5 396
ESD WIRING
EQUIPMENT GROUNDING
ELECTRODE RESISTANCE 2
58 TEST 1 2 0 0 0 1 0 0 0 0 0.0 0.0 0.0 3.0 0 0 0 0 0 0 0 0 6 3.0 6
EQUIPMENT MAIN
GROUNDING CONDUCTOR 2
59 RESISTANCE TEST 1 2 0 3 0 1 0 5 0 0 0.0 6.0 0.0 0.0 0 30 0 0 30 0 36 0 0 6.0 36
FLOOR RESISTANCE
2
60 (ASSEMBLY) 1 2 0 4 0 0 0 0 0 0 0.0 12.0 0.0 0.0 0 0 0 0 0 0 96 0 0 12.0 96

E. FIRE PROTECTION
SYSTEM
61 HOSE REEL PUMP 1 2 0 4 0 0 0 2 0 0 0.0 5.5 0.0 0.0 2 0 16 0 0 16.0 0 44 0 0 5.5 44
62 HOSE REEL PUMP 1 2 0 4 0 0 0 2 0 0 0.0 5.0 0.0 0.0 2 0 16 0 0 16.0 0 40 0 0 5.0 40
63 SPRINKLER PUMP 1 2 0 4 0 0 0 2 0 0 0.0 6.5 0.0 0.0 2 0 16 0 0 16.0 0 52 0 0 6.5 52
64 SPRINKLER PUMP 1 2 0 4 0 0 0 2 0 0 0.0 6.0 0.0 0.0 2 0 16 0 0 16.0 0 48 0 0 6.0 48
65 SPRINKLER JOCKEY PUMP 1 2 0 4 0 0 0 2 0 0 0.0 7.0 0.0 0.0 2 0 16 0 0 16.0 0 56 0 0 7.0 56
FIRE PROTECTION WATER
2
66 TANK 1 2 0 4 0 0 0 0 0 0 0.0 6.5 0.0 0.0 0 0 0 0 0.0 0 52 0 0 6.5 52
FIRE PROTECTION
2
67 ACCESSORIES & PIPELINES 1 2 0 2 2 0 0 4 4 0 0.0 3.5 6.0 0.0 0 16 16 0 32.0 0 14 24 0 9.5 38
FIRE PROTECTING ALARM
2
68 SYSTEM 1 2 0 0 2 0 0 0 2 0 0.0 0.0 3.0 0.0 0 0 8 0 8.0 0 0 12 0 3.0 12

L.REFRIGERATION / COLD
STORAGE
REFRIGERATION
2
69 UNIT/COLD STORAGE 1 2 0 3 0 1 0 2 0 5 0.0 5.5 0.0 1.0 0 12 0 10 22.0 0 33 0 2 6.5 35
REFRIGERATION
2
70 UNIT/COLD STORAGE 1 2 0 3 0 1 0 2 0 5 0.0 1.5 0.0 0.0 0 12 0 10 22.0 0 9 0 0 1.5 9
REFRIGERATION
2
71 UNIT/COLD STORAGE 1 2 0 3 0 1 0 2 0 5 0.0 7.0 0.0 1.0 0 12 0 10 22.0 0 42 0 2 8.0 44
REFRIGERATION
2
72 ACCESSORIES 1 2 0 3 0 1 0 1 0 2 0.0 8.0 0.0 1.0 0 6 0 4 10.0 0 48 0 2 9.0 50

73 FREEZER 1 1 2 0 4 0 0 0 1 0 0 0.0 6.0 0.0 0.0 2 0 8 0 0 8.0 0 48 0 0 6.0 48


74 FREEZER 2 1 2 0 4 0 0 0 1 0 0 0.0 4.5 0.0 0.0 2 0 8 0 0 8.0 0 36 0 0 4.5 36
75 FREEZER 4 1 2 0 4 0 0 0 1 0 0 0.0 5.0 0.0 0.0 2 0 8 0 0 8.0 0 40 0 0 5.0 40
76 FREEZER 6 1 2 0 4 0 0 0 1 0 0 0.0 2.0 0.0 0.0 2 0 8 0 0 8.0 0 16 0 0 2.0 16
77 FREEZER 7 1 2 0 4 0 0 0 1 0 0 0.0 5.0 0.0 0.0 2 0 8 0 0 8.0 0 40 0 0 5.0 40
78 FREEZER 8 1 2 0 4 0 0 0 1 0 0 0.0 4.5 0.0 0.0 2 0 8 0 0 8.0 0 36 0 0 4.5 36
79 FREEZER 11 1 2 0 4 0 0 0 1 0 0 0.0 4.0 0.0 0.0 2 0 8 0 0 8.0 0 32 0 0 4.0 32
80 FREEZER 12 1 2 0 4 0 0 0 1 0 0 0.0 4.5 0.0 0.0 2 0 8 0 0 8.0 0 36 0 0 4.5 36
81 FREEZER 13 1 2 0 4 0 0 0 1 0 0 0.0 4.5 0.0 0.0 2 0 8 0 0 8.0 0 36 0 0 4.5 36
82 FREEZER 14 1 2 0 4 0 0 0 1 0 0 0.0 4.0 0.0 0.0 2 0 8 0 0 8.0 0 32 0 0 4.0 32
83 FREEZER 15 1 2 0 4 0 0 0 1 0 0 0.0 4.5 0.0 0.0 2 0 8 0 0 8.0 0 36 0 0 4.5 36
84 FREEZER 16 1 2 0 4 0 0 0 1 0 0 0.0 4.0 0.0 0.0 2 0 8 0 0 8.0 0 32 0 0 4.0 32
85 FREEZER 17 1 2 0 4 0 0 0 1 0 0 0.0 7.0 0.0 0.0 2 0 8 0 0 8.0 0 56 0 0 7.0 56

M. SEWAGE

86 SEWAGE PUMP No. 1 A 1 2 0 4 0 0 0 2 0 0 0.0 5.0 0.0 0.0 2 0 16 0 0 16.0 0 40 0 0 5.0 40


87 SEWAGE PUMP No. 2 A 1 2 0 4 0 0 0 2 0 0 0.0 6.5 0.0 0.0 2 0 16 0 0 16.0 0 52 0 0 6.5 52
88 SEWAGE PUMP No. 3 A 1 2 0 4 0 0 0 2 0 0 0.0 3.0 0.0 0.0 2 0 16 0 0 16.0 0 24 0 0 3.0 24
89 SEWAGE PUMP No. 4 A 1 2 0 4 0 0 0 2 0 0 0.0 3.0 0.0 0.0 2 0 16 0 0 16.0 0 24 0 0 3.0 24
90 SEWAGE PUMP No. 5 A 1 2 0 4 0 0 0 2 0 0 0.0 3.5 0.0 0.0 2 0 16 0 0 16.0 0 28 0 0 3.5 28
91 SEWAGE PUMP No. 6 A 1 2 0 4 0 0 0 2 0 0 0.0 6.0 0.0 0.0 2 0 16 0 0 16.0 0 48 0 0 6.0 48
92 SEWAGE PUMP No. 7 A 1 2 0 4 0 0 0 2 0 0 0.0 5.0 0.0 0.0 2 0 16 0 0 16.0 0 40 0 0 5.0 40
93 SEWAGE PUMP No. 8 A 1 2 0 4 0 0 0 2 0 0 0.0 3.5 0.0 0.0 2 0 16 0 0 16.0 0 28 0 0 3.5 28
94 SEWAGE PUMP No. 9 A 1 2 0 4 0 0 0 2 0 0 0.0 3.5 0.0 0.0 2 0 16 0 0 16.0 0 28 0 0 3.5 28
95 SEWAGE PUMP No. 10 A 1 2 0 4 0 0 0 2 0 0 0.0 6.5 0.0 0.0 2 0 16 0 0 16.0 0 52 0 0 6.5 52
96 SEWAGE PUMP No. 11 A 1 2 0 4 0 0 0 2 0 0 0.0 5.0 0.0 0.0 2 0 16 0 0 16.0 0 40 0 0 5.0 40
97 SEWAGE PUMP No. 12 A 1 2 0 4 0 0 0 2 0 0 0.0 6.0 0.0 0.0 2 0 16 0 0 16.0 0 48 0 0 6.0 48

East Wing Building

98 D. ELECTRICAL
ELECTRICAL
2
99 DISTRIBUTION LEVEL 1 1 2 8 3 0 1 1 3 0 10 20.5 2.5 0.0 2.0 16 18 0 20 54.0 328 15 0 4 25.0 347
ELECTRICAL
2
100 DISTRIBUTION LEVEL 2 1 2 0 3 0 1 0 3 0 8 0.0 1.5 0.0 3.0 0 18 0 16 34.0 0 9 0 6 4.5 15
ELECTRICAL
2
101 DISTRIBUTION LEVEL 3 1 2 0 3 0 1 0 6 0 8 0.0 5.0 0.0 1.0 0 36 0 16 52.0 0 30 0 2 6.0 32
ELECTRICAL
2
102 DISTRIBUTION LEVEL 4 1 2 0 3 0 1 0 4 0 6 0.0 3.0 0.0 0.0 0 24 0 12 36.0 0 18 0 0 3.0 18
ELECTRICAL
2
103 DISTRIBUTION LEVEL 5 1 2 0 3 0 1 0 4 0 6 0.0 5.5 0.0 2.0 0 24 0 12 36.0 0 33 0 4 7.5 37

ESD WIRING
EQUIPMENT GROUNDING
ELECTRODE RESISTANCE 2
104 TEST 1 2 0 0 0 1 0 0 0 0 0.0 6.0 0.0 0.0 0 0 0 0 0.0 0 0 0 0 6.0 0
EQUIPMENT MAIN
GROUNDING CONDUCTOR 2
105 RESISTANCE TEST 1 2 0 4 0 0 0 5 0 0 0.0 8.0 0.0 0.0 0 40 0 0 40.0 0 64 0 0 8.0 64
ESD GROUNDING
ELECTRODE RESISTANCE 2
TEST 1 2 0 0 0 1 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0
FLOOR SURFACE
RESISTANCE TO GROUND 2
106 TEST 1 2 0 4 0 0 0 0 0 0 0.0 2.0 0.0 0.0 0 0 0 0 0.0 0 16 0 0 2.0 16
FLOOR SURFACE
RESISTANCE POINT TO 2
107 POINT 1 2 0 4 0 0 0 0 0 0 0.0 2.0 0.0 0.0 0 0 0 0 0.0 0 16 0 0 2.0 16
East Ext. Building

A. AIRCONDITIONING
PACKAGE AIR COND. UNIT
2
108 (CANTEEN) 1 2 8 3 0 1 1 2 0 8 9.0 5.5 0.0 3.0 16 12 0 16 44.0 144 33 0 6 17.5 183
PACKAGE AIR COND. UNIT
2
109 (CANTEEN) 1 2 8 3 0 1 1 2 0 8 10.5 5.5 0.0 4.0 16 12 0 16 44.0 168 33 0 8 20.0 209
PACKAGE AIR COND. UNIT
2
110 (CANTEEN) 1 2 8 3 0 1 1 2 0 8 11.5 7.5 0.0 4.0 16 12 0 16 44.0 184 45 0 8 23.0 237
AIR CONDITIONING
2
111 ACCESSORIES & PIPELINES 1 2 11 0 0 1 4 0 0 6 1.5 0.0 0.0 0.0 88 0 0 12 100.0 33 0 0 0 1.5 33

C. COMPRESS DRY AIR RH/K RH/K RH/K


2 4 8 24 2 4 8 24 2.0 4.0 8.0 24.0
112 AIR COMPRESSOR C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
113 AIR COMPRESSOR C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
114 AIR COMPRESSOR C 1 2
Contracto 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
115 AIR DRYER C 1 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
116 AIR DRYER C 1 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
r

117 AIR DRYER C 1 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0


118 AIR RECEIVER TANK C 1 2 0 3 0 1 0 1 0 2 0.0 3.0 0.0 2.0 2 0 6 0 4 10.0 0 18 0 4 5.0 22
119 AIR RECEIVER TANK C 1 2 0 3 0 1 0 1 0 2 0.0 3.0 0.0 2.0 2 0 6 0 4 10.0 0 18 0 4 5.0 22
COMPRESSED AIR
2
120 ACCESSORIES & PIPELINES 1 2 11 0 0 1 4 0 0 6 17.0 0.0 0.0 2.0 88 0 0 12 100 374 0 0 4 19.0 378

D1. ELECTRICAL
ELECTRICAL
DISTRIBUTION LEVEL 1 2
(20KV) 1 2 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0.0 0
ELECTRICAL
DISTRIBUTION LEVEL 2 2
121 (380V) 1 2 0 3 0 1 0 2 0 6 0.0 1.0 0.0 2.0 0 12 0 12 24.0 0 6 0 4 3.0 10
ELECTRICAL
2
122 DISTRIBUTION LEVEL 3 1 2 0 3 0 1 0 3 0 6 0.0 1.5 0.0 2.0 0 18 0 12 30.0 0 9 0 4 3.5 13
ELECTRICAL
2
123 DISTRIBUTION LEVEL 4 1 2 0 3 0 1 0 4 0 6 0.0 3.0 0.0 0.0 0 24 0 12 36.0 0 18 0 0 3.0 18

D2. ESD WIRING


EQUIPMENT GROUNDING
ELECTRODE RESISTANCE 2
124 TEST 1 0 0 0 1 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0
EQUIPMENT MAIN
GROUNDING CONDUCTOR 2
Inactive

125 RESISTANCE TEST 1 0 4 0 0 0 5 0 0 0.0 0.0 0.0 0.0 0 40 0 0 0 0 0 0 0


ESD GROUNDING
ELECTRODE RESISTANCE 2
126 TEST 1 0 0 0 1 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0
127 FLOOR SURFACE 1 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0 0 0 0 0
RESISTANCE TO GROUND
TEST
FLOOR SURFACE
RESISTANCE POINT TO 2
128 POINT 1 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0

RH/K RH/K RH/K


J. VACUUM 2 4 8 24 2 4 8 24 2.0 4.0 8.0 24.0
129 VACUUM PUMP NO. 1C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
130 VACUUM PUMP NO. 1C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
131 VACUUM PUMP NO. 1C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
132 VACUUM PUMP NO. 1C 1 2 1 1 1 1 0 0 0 0 0.0 0.0 0.0 0.0 2 0 0 0 0 0.0 0 0 0 0 0.0 0
133 VACUUM RECEIVER TANK 1 2 0 0 0 1 0 1 0 2 0.0 0.0 0.0 3.0 2 0 0 0 4 4.0 0 0 0 6 3.0 6
VACUUM ACCESSORIES &
2
134 PIPELINES 1 2 0 4 0 0 4 0 0 6 0.0 3.0 0.0 0.0 0 0 0 0 0.0 0 24 0 0 3.0 24
2400 953.5 9296
1907 4648

Input Data WO PM tahun 2013


Man power on

(Man Power

Total / Year

Total / Year
Discription Schedule/Year Estmate Time Actual Time Total / Year Total / Year
Item

Qty

Schedule
(Man Power x Estimate Working Actual Working
Schedule

Hours)
Main Building Hours) Hour Hour

duty
No. M Q SA A M Q SA A M Q SA A M Q SA A M Q SA A

2400 953.5 9296