You are on page 1of 10

Machine Translated by Google

Machine Translated by Google


Machine Translated by Google

1. ÓËÑÛÍ Á¯ÐÒÃÝËÈÉÍ ÃÝÐ×ÈËÃÝÝ


Machine Translated by Google
Machine Translated by Google
Machine Translated by Google

2. ÒÓÑÃÀÉ ÇªÂتªÐªË
Machine Translated by Google
Machine Translated by Google
Machine Translated by Google

IN THE LAST 3 YEARS OF PERMIT APPLICANT


WORKS AND SERVICES PERFORMED

Done
ÿ The name of the work performed Length, km
He Òàéëáàð

Ulaanbaatar city, SHD, Tulkhur


subject to the terms of the handover agreement 1.8 km 2019
1
By car to "Red Well of Ovoot".
road design
From the main road in the direction of Dornogovi
Shivee-Ovoo mine, Shivee-Ovoo 22.0 km 2019
2
auto from the mine to the 22nd intersection
road map budget
Saintsagaan of Dundgov province
3 2.8 km of paved road in the center of Sumy 2.8 2019
road construction drawings and budget
West-Long Arrow Center Green
from the west side of the town 0.6 km 2020
4
It is hard to reach the front of the museum
paved road

Erdenemandal of Arkhangai province


5 1.2 km from the center of Sumatra 1.2 2020
paved road

Dadal sum of Khentii province


6 3.5 km from the center Cement concrete 3.5 km 2020
paved road map budget

Songinohairkhan District 1, 2, 22 3 km 2020


7
road map budget of the committee

Khan-Uul district, 1st district River


Zaisang from Hilss township
8
1 km 2021
map of the road to the street
budget

Exit in the direction of the arrow 1 km 2021


9
road design

Design of 1.8 km road in Bayan-Ulziyit Bagh


10 Village, Orkhon Sum, Darkhan Province 1.8 km 2021

Shar Ders, Bayan-Yelziit Bagh, Orkhon Sum,


11 Darkhan Province, 0.89 km 0.9 km 2021
road design
West-Urt Sum 1st complete
middle school right side hard 2021
12 0.7 km
paved road
Machine Translated by Google

SHD, 34th district, Nairamdal auto


from the road "Aqueduct Management Office"-
13 y's car to the nursing building 0.9 km 2021
road design

West Buren of Selenge province


14 arrow paved road 3 km 2021
design of all works
West-Long arrow to front arrow
15 paved road to the direction 1 km 2021
road design
Tariat sum of Arkhangai province
16 central paved road 2.2 km 2021-2022
blueprint
Khangai sum of Arkhangai province
17 central paved road 1.8 km 2021-2022
blueprint
West side of Sun Bridge Dema
18 car to the north of the hospital 0.6 km 2021-2022
road
Tigers are on the north side of the two markets
19 newly built road / BGD, 20- 1.3 km 2021-2022
Committee's drawing budget
Inside Ger district of Erdenet province 7.0 km 2022
20
road network design
17th district of Chingeltei district 1.5 km 2022
21
road design
Asgat sum center is paved 3.2 km 2022
22
road design
23 Naransum center solid 3.0 km 2022
paved road design
A. of Kharkhorin and Tsetserleg directions
From highway number 0602
It is being built in Batsengel direction
24 Child Tamir from the end of the road 61 km 2022
camp-Batsengel sum
reinforced concrete bridge, Millennium Road
hard to connect with the horizontal axis
paved road design
25 from Arkhangai Erdenebulgan Sum
There is a hard pavement up to Bulgan Sum 31 km 2022
road design
26 Hanbogd village of Mungogov province
The white rock in the white rock is eternal
from the great customs control zone-bitter 31 km 2022
Suhait port direction heavy
load-bearing paved roads
blueprint

You might also like