START OF PROJECT:
KM 66 + 000.00 South
China
Sea Luzon
Philippine
Sea
Mindoro
THIS SITE
Samar
REGION VII
Panay
Leyte
Palawan Cebu
Negros
Bohol
Sulu Sea
Mindanao
END OF PROJECT:
STA. 66 + 490.00
KEY MAP
Cebu
1 VICINITY MAP
tal
rien
A-2 2 SCALE: NTS
sO
Bohol
gro
Ne
INDEX OF SHEETS
MOMPELLER ARGAO-MOALBOAL
ROAD
LANGUB
B GUIWANON
ALAMBIJUD
UBAUD
BULASA
)
OAD
13 STANDARD RCPC LAYING METHODS MABASA
HR
CANSUJE
T
SOU
BINLOD
EBU
USMAD
14 DEMOUNTABLE FIELD OFFICE
(C
VE.
OA
JAMPANG
ALS
CONALUM
BAC
CALAGASAN
15 DPWH STANDARD PROJECT BILLBOARD
ALIO
NAT
PROJECT LENGTH DATA BUTONG CATANG PANADTARAN
JOMGAO
TALAYTAY
LANGTAD
LAPAY
CANBANUA
18 - 19 TRAFFIC MANAGEMENT PLAN- PROPOSED TRAFFIC MANAGEMENT LAYOUT TYPE STATION (LIMITS) LENGTH CANBANTUG
BUG-OT LAMACAN POBLACION
BALA-AS
TULIC
20 - 24 TRAFFIC MANAGEMENT PLAN - ROAD CONSTRUCTION TABLE TIGUIB BOGO
LINED CANAL STA. 66 + 000 TO STA. 66 + 490 931.00M
25 TOPOGRAPHIC PLAN
1220MMØ RCPC TALAGA
VICINITY MAP
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
INDEX OF DRAWINGS ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD PROJECT INFORMATION SHEET ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ LOCATION PLAN A 02
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEY MAP, LOCATION MAP, VICINITY MAP KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490 02 03 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
SUMMARY OF QUANTITIES ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ A 03
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
03 03 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
GENERAL NOTES
CARRIAGE-WAY (ROADS, DRAINAGE AND STRUCTURES)
AS-STAKED SURVEY SHALL BE CONDUCTED BY THE WINNING BIDDER IN
COORDINATION WITH THE IMPLEMENTING OFFICE CONCERNED WHEREIN THE 16. EXCAVATION
RESULTING PLAN AS-STAKED PLAN SHALL BE APPROVED BY THE PROPER WHEN SOIL AT LOWER PORTION OF THE SLOPE IS REQUIRED TO BE REMOVED,
CERTIFICATION AUTHORITIES. BEFORE THE START OF ACTUAL CONSTRUCTION, THE AS- EXCAVATION SHOULD BE DONE AT THE HEAD PORTION FIRST PROGRESSING
STAKED PLAN SHOULD BE SUBMITTED TO THE DISTRICT OFFICE IN ORDER TOWARDS THE BOTTOM IN ORDER TO MAINTAIN THE STABILITY OF LANDSLIDE
This is to certify that the Detailed Engineering Surveys and Designs for the project THAT IMMEDIATE STEPS MAY BE UNDERTAKEN TO CORRECT OR ADJUST AND SLOPE FAILURE AREA.
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM ASSET WHATEVER APPRECIABLE DEVIATION THERE MAY BE FROM THE ORIGINAL
PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF PLAN. 17. UNSUITABLE MATERIALS
DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, N. BACALSO AVE. (CEBU a.) UNSUITABLE MATERIALS BELOW THE SUB GRADE SHALL BE EXCAVATED
SOUTH) - K0066+000 - K0066+490 with Project ID No. _________ had been conducted in 11. RIGHT OF WAY TO A REQUIRED DEPTH & WIDTH AS INDICATED IN THE PLANS OR AS DIRECTED
accordance with the DPWH Standards and Specifications, 2013 edition. ROAD CLASSIFICATION SHALL DICTATES THE RIGHT OF WAY LIMITS. BY THE ENGINEERS, BASED ON THE LABORATORY TEST RESULT BE REPLACED
WITH APPROVED MATERIALS.
12. ROAD CONNECTIONS & PRIVATE ENTRANCES:
This Certification is being issued for all legal intents and purposes. a.) APPROACHES & ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE 18. THICKNESS & WIDTH DETERMINATION
Given this day of , year . CONTRACTOR AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEERS THE THICKNESS & WIDTH OF THE PORTLAND CEMENT CONCRETE PAVEMENT
IN THE SUCH MANNER TO ENSURE SMOOTH CONNECTIONS &RIDING QUALITY. (PCCP) , AND SUBBASE COURSE ARE RECKONED FROM A DESIGN ANALYSIS IN
b.) DESIGN OF THE ROAD WAS BASED ON THE FINAL HIGHWAY LOCATION CONFIRMITY WITH THE PROVISIONS OF DEPARTMENT ORDER NO. 22 SERIES OF
LENARD A. PANUGALINOG SURVEY. 2011.
OIC-Chief, Planning and Design Section c.) WIDENING ON CURVES SHALL BE DETERMINED BY THE ENGINEERS
IN-CHARGE TO SUIT EXISTING FIELD CONDITION. 19. CALCULATIONS OF WORK
1. DESIGN SPECIFICATIONS REFER TO A SEPARATE QUANTITY CALCULATION SHEETS FOR THE DETAILED
ALL WORKS SHALL COMPLY WITH THE DPWH DESIGN GUIDELINES, 13. TREE PLANTING : COMPUTATIONS OF QUANTITIES OF THE ITEMS OF WORK OUTLINED FOR THIS
CRITERIA & STANDARDS (DGCS) OF 2015 VOLUME 4 - HIGHWAY DESIGN AND FOR TREE PLANTING PLEASE REFER TO DEPARTMENT ORDER (D.O.) No. 73 PROJECT.
SPECIAL PROVISIONS / SUPPLEMENTAL SPECIFICATIONS SPECIFICALLY SERIES 2014.
PREPARED FOR THE PROJECT. 20. CONCRETE
14. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION a.) UNLESS OTHERWISE INDICATED ON PLANS, THE CONCRETE CLASS AND
2. PROJECT CONTROLS & REFERENCES a.) ALL WORKS SHALL COMPLY WITH ITEM 101 OF THE STANDARD STRENGTH SHALL BE IN ACCORDANCE WITH THE HIGHWAYS and BRIDGES
a.) HORIZONTAL CONTROL FOR THE PROJECT WITH CORRESPONDING SPECIFICATION FOR HIGHWAYS, BRIDGES AND AIRPORTS EDITION. SPECIFICATIONS.
TECHNICAL DESCRIPTIONS ARE AS SHOWN ON THE PLANS VERTICAL b.) RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE
28 DAYS CYLINDER STRENGTH MAX SIZE OF COARSE
CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND REMOVAL OF THEIR HOUSES, FENCES, ELECTRICAL POLES AND OTHER CLASS
MPa Psi AGGREGATES mm (in)
DESCRIPTION ARE AS SHOWN ON THE PLANS. UTILITIES.
b.) ROAD ENG'G SURVEY WAS UNDERTAKEN ON OCTOBER 2022. c.) PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES,WATER A 20.7 3000 38 (1-1/2)
c.) GEOTECHNICAL INVESTIGATIONS AND REPORTS WAS UNDERTAKEN BY QAS MAINLINES, TELEPHONE TRUNK LINES, ETC. THAT MAY OBSTRUCT THE B
16.50 2400.00 50 (2)
OF THE DPWH CEBU 4TH DISTRICT ENGINEERING OFFICE. CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR C
20.70 3000.00 12.7 (1/2)
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE
P 19 (3/4)
3. SURVEY DATA CONTRACTOR NOT TO DAMAGE ANY PORTION OF THE EXISTING PUBLIC 37.70 5000.00
FIELD DATA OF THIS PROJECT IS BASED ON ACTUAL SURVEY CONDUCTED BY UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE ON THE LEAN
9.90 1400.00
THE SURVEY TEAM OF THE DPWH CEBU 4TH DISTRICT ENGINEERING OFFICE. ACCOUNT OF THE CONTRACTOR.
d.) IN PORTIONS WHERE THERE ARE EXISTING DETERIORATED ASPHALT 21. REINFORCING STEEL BARS :
4. SOIL TESTING OVERLAY, THIS SHALL BE SCARIFIED TOTALLY BEFORE PLACING THE a.) REINFORCING STEEL SHALL CONFORM TO AASHTO M31 (ASTM A615),
THE ACTUAL CBR SHALL BE VERIFIED AND VALIDATED PRIOR TO REQUIRED OVERLAY TO ENSURE PROPER BOND. THIS WORK SHALL BE GRADE 40 FOR BARS 16mm AND SMALLER (40 000psi) fy=275.80 Mpa, AND FOR
CONSTRUCTION BY UNDERTAKING AUGER HOLE/TEST PITTING IN CONSIDERED SUBSIDIARY WORK PERTAINING TO CONTRACT PAY ITEMS. BARS GREATER THAN 16mm Ø GRADE 60 (60,000psi) Fy = 414 Mpa
ACCORDANCE WITH THE DESIGN GUIDELINES, CRITERIA AND STANDARDS. e.) ANY REMOVAL OF MISCELLANEOUS STRUCTURES THAT MAY BE REQUIRED
SHALL BE CONSIDERED SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT BAR BENDING, SPLICING AND PLACING
7. DIMENSIONS ITEM. NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK EXCEPT WORK
DIMENSIONS ARE EXPRESSED IN MILLIMETER WHILE DISTANCES AND PERTAINING TO OTHER CONTRACT ITEM. NO DIRECT PAYMENT SHALL BE (i) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL OF SHOP
ELEVATIONS ARE IN TERMS OF METER, UNLESS OTHERWISE MADE FOR THIS WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY IDENTIFIED DRAWINGS INDICATING THE BENDING, CUTTING, SPLICING AND INSTALLATION OF
SPECIFIED. FOR PAYMENT IN BID SCHEDULE. ALL REINFORCING BARS. THE CONTRACTOR SHALL CALCULATE THE EXACT
f.) THE REMOVAL OF HOUSES, FENCES, ELECTRICAL POLES AND OTHER CUTTING LENGTH OF STEEL BARS USING WELL KNOWN FORMULA ( SUCH AS BS
8. STATIONING PUBLIC UTILITIES WILL NOT BE THE RESPONSIBILITY OF THE CONTRACTOR, 8666 : 2005 FOR INSTANCE )
a.) THE ROAD STATIONS & ELEMENTS OF CURVES ARE RELATIVE TO THE THESE SHALL BE REMOVED BY THE RESPECTIVE OWNERS OR BY THE DPWH
ULTIMATE CENTERLINE OF THE ROAD. PRIOR TO THE CONSTRUCTION. PORTIONS OF EXISTING UTILITIES SUCH AS (ii) BARS SHALL BE BENT COLD. BARS PARTIALLY EMBEDDED IN CONCRETE SHALL
b.) EQUATION OF STATIONS WHEN USED (BACK STATION/ AHEAD STATION) POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC. THAT MAY NOT BE FIELD BENT UNLESS PERMITTED BY THE ENGINEER.
ARE PROVIDED AT THE BEGINNING OR END OF THE CURVE AND/OR AT FULL OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY
STATION. THE ENTITY OR OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE (iii) UNLESS APPROVED BY THE ENGINEER. NO SPLICES SHALL BE PERMITTED
c.) THE STATION AT THE BEGINNING OF THE PROJECT WAS ESTABLISHED AND EXERCISED BY THE CONTRACTOR NOT TO DAMAGE ANY PORTION OF THE ON BEAMS AND GIRDERS WHERE CRITICAL BENDING MOMENT OCCURS.
RECKONED FROM THE EXISTING KILOMETER POST & HAS NO RELATION WITH EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF STAGGER SPLICES BETWEEN ADJACENT BARS AT A MINIMUM DISTANCE OF
INTERSECTING ROAD. SHALL BE ON THE ACCOUNT OF THE CONTRACTOR 40-BAR DIAMETER.
d.) STATIONING ARE RECKONED FROM THE KILOMETER POST ALONG
NATIONAL BACALSO AVENUE. 15. HORIZONTAL ALIGNMENT & GRADES 22. STONE / RUBBLE MASONRY
a.) THE HORIZONTAL ALIGNMENT SHOWN IN THESE DRAWINGS FOLLOWS THE STONE FOR RUBBLE / STONE MASONRY SHALL BE OF APPROVED QUALITY,
9. STANDARD DRAWINGS : LONGITUDINAL JOINT OF PCCP. PAVEMENT (WHICH IS DEFINED AS THE DURABLE AND FREE FROM DIRT, OIL OR ANY INJURIES OR DEFECTS WHICH
THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS EXISTING CENTERLINE) WITH MINOR DEVIATION DUE TO MAINLY SOME CAN AFFECT THE PROPER ADHESION OF THE CONCRETE. IT SHALL HAVE A
FOR ROADS AND BRIDGES SHALL BE UTILIZED FOR THE PROJECT UNLESS CONSTRUCTION ERRORS DURING ORIGINAL CONSTRUCTION STAGE. MINOR THICKNESS OF NOT LESS THAN 150mm. AND A LENGTH OF NOT MORE THAN
OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED ADJUSTMENT OF THE HORIZONTAL ALIGNMENT MAY BE MADE AS DIRECTED 300mm. STONES SHALL BEDDED IN CLASS 'B' CONCRETE.
AND APPROVED. BY THE ENGINEER TO SUIT TO THE EXISTING CENTERLINE, PARTICULARLY
FOR THE A.C OVERLAY SECTIONS.
10. STAKE OUT SURVEY & PLAN b.) HORIZONTAL TRANSITIONS FOR ROADWAY TAPERING/ WIDENING SHALL BE
PRIOR TO THE COMMENCEMENT OF THE ACTUAL CONSTRUCTION, AN APPLIED AS SHOWN ON THE PLANS.
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
GENERAL NOTES 1 ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 04
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490 01 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
GENERAL NOTES ABBREVIATIONS: W = WIDENING OF CURVE
CARRIAGE-WAY (ROADS, DRAINAGE AND STRUCTURES) LEGEND: AZI = AZIMUTH OFL = ORDINARY FLOOD LEVEL
BM = BENCHMARK
23. GROUTED RIP RAP OWL = ORDINARY WATER LEVEL
DIST. = DISTANCE
EACH BOULDER SHALL BE HAND LAID WITH THE LONGEST AXIS TOPOGRAPHY I = INTERSECTION LEVEL
ELEV. = ELEVATION PC = POINT OF CURVATURE
PERPENDICULAR TO THE SLOPE AND IN CLOSE CONTACT WITH THE e = SUPERELEVATION, % PT = POINT OF TANGENCY
ADJOINING BOULDERS SHALL BE COMPLETELY FILLED WITH 1:3 MORTAR. THE BENCH MARK WOODEN/ BAMBOO FENCE ef = MAXIMUM SUPERELEVATION POT = POINT OF TANGENT
OUTSIDE SURFACE OF THE BOULDERS SHALL BE LEFT EXPOSED AND THE PI = POINT OF INTERSECTION RP = REFERENCE POINT
SURFACE OF THE MORTAR SHALL BE SWEPT WITH STIFF BROOM. PIPE CULVERT IRRIGATION CANAL KM = KILOMETER ARROW = ROAD RIGHT OF WAY
D = DEGREE OF CURVE TBM = TEMPORARY BENCH MARK
BOX CULVERT FORESET E = EXTERNAL DISTANCE SHLDR = SHOULDER
24. SIDE DITCHES
R = RADIUS V = DESIGN SPEED
a.) ALL DITCHES SHALL COMPLY WITH THE REQUIRED STANDARDS. T = TANGENT
BRIDGES BAMBOO VPI = VERTICAL POINT OF INTERSECTION
LVC = LENGTH OF VERTICAL CURVE VPC = VERTICAL POINT OF CURVATURE
b.) INVERT ELEVATIONS & EXACT DIMENSIONS OF SIDE DITCHES MAYBE Lc = LENGTH OF CIRCULAR CURVE VPT = VERTICAL POINT OF TANGENCY
ADJUSTED IN THE FIELD AS DIRECTED BY ENGINEER. RIPRAP COCONUT Lo = LENGTH OF TRANSITION RCBC = REINF. CONC. BOX CULVERT
DHWL = DESIGN HIGH WATER LEVEL RCPC = REINF. CONC. PIPE CULVERT
c.) IN SOME CASES, IN ORDER TO SATISFY , DITCH CHANNEL INVERT DIRECTION OF FLOW GEMELINA PCC = POINT OF COMPOUND CURVE PRC = POINT OF REVERSE CURVE
CL = CENTER LINE
ELEVATIONS OF DRAINAGE SLOPE REQUIREMENT, SIDE SLOPES OF DITCHES
MAY BE MODIFIED AS DIRECTED BY THE ENGINEER. CEMETERY ACACIA
NOTE:
15
FOR " Da " ASSUMED ARC = 100m
25. DRAINAGE STRUCTURES:
10
5 CONTOURS TREE
0
FOR " Dc " ASSUMED CHORD = 100m
a.) EXACT LOCATIONS, SLOPES, OUTFALLS & INVERT ELEVATIONS OF ASSUMED " I " IS SUBTENDED BY A 20m ARC
DRAINAGE STRUCTURES SHALL BE CHECKED IN THE FIELD BY THE ENGINEER,
ROCK CB CONTROL BOX
NO HORIZONTAL CURVE IS REQUIRED WHERE THE CENTRAL ANGLE IS LESS
EM
MINOR ADJUSTMENTS MAY BE MADE WITH THE APPROVAL OF THE ENGINEER GUARD RAIL ELECTRIC METER THAN ONE (1) DEGREE ALGEBRAIC DIFFERENCE IS 0.50% OR LESS.
TO SUIT FIELD CONDITIONS.
L
LIGHT POST WM WATER METER
b.) ANY REVISIONS, REMOVAL AND/ OR RELAYING DRAINAGE STRUCTURES AS
DIRECTED BY THE ENGINEERS TO SUIT EXISTING FIELD CONDITIONS SHALL BE FIRE HYDRANT WELL
CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEMS.
NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE H STRUCTURE BUILDING LINED RCPC DRAIN
SPECIFICALLY IDENTIFIED FOR PAYMENT IN THE SCHEDULE.
c.) EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE KM KILOMTER POST RICE FIELD
CONTRACTOR THAT ARE STILL SERVICEABLE SHALL BE TURNED OVER TO THE
GOVERNMENT & SHALL BE DEPOSITED AT A PLACE WITHIN THE PROJECT SITE OUTFALL PROVINCIAL BOUNDERIES
DESIGNATED WITHOUT ANY EXTRA COMPENSATION. EXTREME PRECAUTION
SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE SCHOOL SCHOOL BUILDING CREEK OR RIVER
MATERIALS DURING THE REMOVAL & HANDLING.
WOODEN HOUSE MAXIMUM FLOOD LEVEL
26. ROAD SIGNS AND PAVEMENT MARKINGS
CONCRETE HOUSE CUT SLOPE
a.) ROAD SIGNS SHALL CONFORM WITH THE HIGHWAY SAFETY DESIGN
STANDARD PART 2, ROAD SIGNS AND PAVEMENT MARKINGS MANUAL OF THE CATCH BASIN EMBANKMENT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS, SERIES OF 2012.
b.) REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS TO BE USED IN UTILITY POST ROAD RIGHT OF WAY
THE PROJECT SHALL BE IN ACCORDANCE WITH THE DPWH - DEPARTMENT
ORDER NO. 202, SERIES OF 1992 BEARING THE SUBJECT "USE OF PLAN
REFLECTORIZED THERMOLPASTIC PAVEMENT MARKINGS."
ROAD CENTERLINE ROAD RIGHT OF WAY
27. MISCELLANEOUS STRUCTURES :
POINT OF TANGENCY GUARD RAIL L/R
a.) LOCATION AND LENGTH OF SLOPE PROTECTIONS, GUARDRAIL, STONE
MASONRY, RETAINING WALL AND OTHER STRUCTURES MAY BE ADJUSTED BY ROAD SIGNS SIDE DITCH
THE CONTRACTOR TO SUIT ACTUAL FIELD CONDITIONS WITH THE APPROVAL
OF THE ENGINEER. POINT OF INTERSECTION NEW RCCP INSTALLED
b.) CONSTRUCTION OF SIDE SLOPE SHALL FOLLOW THE STEPS OF
EMBANKMENT CONSTRUCTION METHOD TO AVOID SLIDING OF FILL HIGH EMBANKMENT STONE MASONRY
MATERIALS.
PIPE CULVERTS BRIDGES
c.) SLOPE STAKED SHALL DEPEND ON THE STABILITY OF MATERIALS.
d.) PROVISIONS OF BATAS PAMBANSA BILANG 344 (AN ACT TO ENHANCE THE BOX CULVERTS L:-4.40%
MOBILITY OF DISABLED PERSONS BY REQUIRING CERTAIN BUILDINGS, R:4.40% SUPER-ELEVATION CROWN
INSTITUTIONS, ESTABLISHMENTS AND PUBLIC UTILITIES TO INSTALL PROFILE
FACILITIES AND OTHER DEVICE).
PIPE CULVERTS LENGTH OF VERTICAL CURVE
28. PROJECT TRANSITION
a.) PROPER CONNECTION SHALL BE PROVIDED AT THE END OF BOX CULVERTS POINT OF VERTICAL INTERSECTION
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION METHODOLOGY 2 ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 07
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
04 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
6.70m TOTAL ROAD WIDTH
OUTLET
6
EXISTING AGGREGATE
SUBBASE COURSE EXSITING AGGREGATE
SUBBASE COURSE
5
1.75
1.20 2
1
3.00% 1.50% 1.50% 3.00% 22.280
INLET
SLOPE 2%
3.85 3.85
5 6 7
2 3 4
1
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TYPICAL ROAD CROSS SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD PROPOSED RCPC PLAN ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 08
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
05 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
3.35m 3.35m 3.35m 3.35m
SLOPE 2%
5 6 7
2 3 4
1
PLEASE BE NOTED THAT THE STATIONING ARE SUBJECT TO CHANGES AS PER ACTUAL CONDITION
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TYPICAL ROAD CROSS SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD PROPOSED RCPC PLAN ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 09
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
06 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
NOTES CL
MISCELLANEOUS STRUCTURES: 0
390 50
LINE CANAL WITH COVER
CATCH BASIN WITH MANHOLE 65 30 200 30 65 REINFORCED
1. REINFORCING STEEL SHALL CONFORM CONCRETE COVER
50mm COVER
30
0
TO AASHTO M31 (ASTM A615), GRADE 40 50
FOR BARS 16mm AND SMALLER (40
000psi) fy=275.80 Mpa 4 - Ø12mm
DEFORMED BARS REINFORCED
2. HOOKS AND BENDS CONCRETE COVER
500
100
HOOKS AND BENDS SHALL BE AS
SHOWN IN THE FOLLOWING TABLE 5mm GAP
600
12 150 200 113 113
400
16 175 250 150 138 200
A
Do
100
db
db
COVER
20mm
A
Do
A END HOOK
20mm COVER
390
100
REINFORCED CONCRETE
D
db db
db COVER SECTION
STIRRUP & TIE HOOK STIRRUP TIE
6 LINED CANAL ISOMETRIC VIEW
Do = 6 db for db < 30 D = 4 db for db < 20
B-7 10 SCALE: NTS
Do = 8.7 db for db > 30 D = 6 db for db > 30
C
L
50 500 50
5 GAP 195 195
5 GAP
45
N.G.L.
25x25x3mm ANGLE BAR
100
100mm COVER
400
PLEASE BE NOTED THAT THE STATIONING ARE SUBJECT TO CHANGES AS PER ACTUAL CONDITION
40mm
COVER
100
REINFORCED CONCRETE
LINED CANAL SECTION 5 REINFORCED CONCRETE LINED CANAL DETAIL
B-7 10 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
REINFORCED CONCRETE LINED CANAL DETAIL ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 10
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
07 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
2.00 2.00
B
0.90 0.90
1.114
0.91
0.91
1.114
A A A A
4.00
4.00
4.00
B
B
ISOMETRIC VIEW
ISOMETRIC VIEW
0.70
36MPA CONCRETE STRENGTH
0.70 36MPA CONCRETE STRENGTH
4-16mmØ DEFORMED
4-16mmØ DEFORMED
BARS BOTHWAYS
0.70
BARS BOTHWAYS
MANHOLE COVER
0.90 0.90
0.23 0.15 0.15 0.23 0.15 0.15
0.15 0.15 MANHOLE COVER 0.15 0.15
1.10
1.10
0.60 0.60
910mmØ RCPC
1220mmØ RCPC 910mmØ RCPC
0.20
0.20
1220mmØ RCPC
1.22
1.114
0.91
2.75
2.75
1.114
0.91
1.22
0.79
0.84
0.44
0.30
0.20 0.20
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
REINFORCED CONCRETE CATCH BASIN DETAIL ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 11
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
08 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
PAY LENGTH TOP OF PIPE TO BE
9mm
9mm
3mm
3mm
MARKED "TOP"
ONE LINE OF B
CIRCULAR
W
W
W
3mm 3mm 32mm
REINFORCEMENT 32 mm
P P
I.D.=SIZE OF PIPE
.
I.D
I.D
I.D
C
B
E
3mm 3mm
C 32 mm
P TWO LINES OF CIRCULAR
REINFORCEMENT ONE LINE OF CIRCULAR TWO LINES OF CIRCULAR ONE LINE OF ELLIPTICAL
REINFORCEMENT REINFORCEMENT REINFORCEMENT
3mm
A LONGITUDINAL SECTION
3mm
9mm
9mm
B SECTION C SECTION
5
CONCRETE TONGUE END GROOVE END
t t t 1
COLLAR
c I.D. c D DETAIL OF R.C.P. ENDS
I.D. MACHINE HAND c
MADE MADE
c
c
t
610 64 90 130
t
I.D.
I.D.
910 86 114 150
c
-
1220 110 150
t
t
100
GRAVEL
- BEDDING
1520 127 150
c
STANDARD STRENGTH REINFORCED CONCRETE PIPE CULVERTS EXTRA STRENGTH REINFORCED CONCRETE PIPE CULVERTS
12 300 57 344 363 351 370 44 1 LINE 1.48 51 495 514 502 521 444 1 LINE 1.69 3.355 5.218
15 380 57 344 363 351 370 44 1 LINE 1.90 51 495 514 502 521 4 1 LINE 2.33 3.914 6.060
18 460 64 508 527 514 534 44 1 LINE 2.54 1 LINE 2.12 51 495 514 502 521 44 1 LINE 2.96 4.473 6.709
24 610 76 673 692 680 699 44 1 LINE 3.60 1 LINE 2.75 64 660 680 667 686 44 1 LINE 4.23 1 LINE 3.60 4.473 7.454 76 673 692 680 699 44 1 LINE 5.50 1 LINE 4.23 5.964 8.945
30 760 89 858 857 845 864 51 1 LINE 4.66 1 LINE 3.60 76 825 845 832 851 51 1 LINE 5.92 1 LINE 4.44 5.032 8.573 89 838 857 845 864 51 1 LINE 6.56 1 LINE 5.08 7.454 11.182
MIN = bc/4
df = DEPTH OF FILL
MIN = 41 I.D.
df = be + 15cm FOR PIPES > 760mm Ø ROLLER-COMPACTED EMBANKMENT
df = be + 75cm FOR PIPES > 760mm Ø bc = OUTSIDE DIAMETER OF PIPE
E.G.L.
ROLLER-COMPACTED
bc
bc
df
df
EMBANKMENT
CONCRETE CRADLE BEDDING E.G.L. E.G.L. E.G.L.
STEP 1 - CONSTRUCT COMPACTED STEP 2 - TRENCH THROUGH THIS STEP 3 - COMPLETE EMBANKMENT IN
EMBANKMENT TO AN ELEVATION ABOVE COMPACTED EMBANKMENT AND INSTALL USUAL MANNER.
MIN = bc/10
TOP OF PROPOSED PIPE. PIPE BACKFILL WITH COM-PACTED
MIN =3bc/10
GRANULAR MATERIAL.
E.G.L.
ROLLER-COMPACTED
df
EMBANKMENT
bc
bc
E.G.L. E.G.L. E.G.L.
bc + 10cm
MIN = bc/10
pbc
2cm PER METER OF H WHEN H<5m
STEP 1 - CONSTRUCT COMPACTED STEP 2 - TRENCH THROUGH THIS STEP 3 - FILL REMAINDER OF TRENCH
4cm WHEN H > 5m H=HEIGHT OF
EMBANKMENT TO A TOTAL DEPTH EQUAL COMPACTED EMBANKMENT AND INSTALL WITH BACKFILL PLACED IN LOOSEST
FILL FROM TOP OF CULVERT
TO TWICE THE OUTSIDE DIAMETER OF PIPE BACKFILL WITH COMPACTED POSSIBLE CONDITION.
THE PIPE. GRANULAR MATE-RIALS TO TOP OF PIPE.
E.G.L.
STEP 4 - COMPLETE EMBANKMENT IN
NORMAL MANNER.
CALIFORNIA METHOD B
ORDINARY BEDDINGS
8 STANDARD RCPC LAYING METHODS
B-10 13 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
STANDARD RCPC LAYING METHODS ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ B 13
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
10 10 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
DESCRIPTION UNIT QTY
CONCRETE m³ 1.75
Ø10mm REINFORCED STEEL BAR kg 75.00
GAUGE 26 CORRUGATED ROOFING GAUGE 26 CORRUGATED ROOFING 4" X 4" GOOD LUMBER bd.ft 6.50
WITH ROOF INSULATION WITH ROOF INSULATION
4-2" X 3" GOOD LUMBER SPACED @ 2" X 2" GOOD LUMBER bd.t 20.00
8 - 2" X 3" GOOD LUMBER PURLINS
EVERY 1.20M O.C. 2" X 3" GOOD LUMBER bd.t 21.50
SPACED @ EVERY 500MM O.C.
2" X 2" GOOD LUMBER 4'x8'x21" ORDINARY PLYWOOD pcs. 11
GA 26 CORRUGATED G.I. SHEET m² 9
300
300
PLAIN G.I. SHEET FLASHING, 0.701m Lm 4
INSULATION FOAM Lm 4
2" x 2" GOOD LUMBER
UMBRELLA NAILS/ TEK SCREW/ J-BOLT kg 1.50
2" x 2" GOOD
LUMBER CONCRETE NAILS #4 kg 1
2400
2400
2400
1"
ORDINARY
3300
3300
3000
2" X 2" GOOD LUMBER FRAME kg
COMMON NAILS #4 1
JALOUSIE WINDOW 500X1200 m² 1.20
F.G.L. F.G.L. DOOR LOCKSET set 1
N.G.L.
600
600
600
150
38.0000±0.0000
800
2" x 2" GOOD LUMBER
2400
150
1600 1 -10MM Ø RSB
4-10MM Ø VERTICAL BAsmS
3-10MM Ø STIRRUPS
N.G.L. W1 W1 D1
600
600
PLAN SECTION
150
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DEMOUNTABLE FIELD OFFICE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 14
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
01 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
2440
210
80 210 210 80
50 50
50
DISPLAY AREA
210
50 X 50 HORIZONTAL
COCO LUMBER
DISPLAY AREA
1220
50
FLYWOOD)
50
50 X 75 VERTICAL
COCO LUMBER
50
1000
50
LOCATION:
1220
30 30 30 30 30 30 30
E.G.L.
50
NAME OF CONTRACTOR:
500
50
DATE STARTED:
50
CONTRACT COST:
IMPLEMENTING OFFICE : TYPICAL FRAME ELEVATION FRONT ELEVATION
SOURCES OF FUND:
20
www.dpwh.gov.ph
10
2400
BILLBOARD
2400
COMMISSION ON AUDIT (PROVINCE AND CITY)
DISPLAY AREA
45° Project: Cost: (TARPAULIN ON 2400 X
2400 X 5 MARINE
EDGE OF ROAD Fund Source: PLYWOOD)
Location:
2400
WHITE BACKGROUND
BLACK TEXT 50 X 50 HORIZONTAL
TRAFFIC DIRECTION COCO LUMBER
Implementing Agency:
ROAD
HELVETICA 3"
Development Partner:
BILLBOARD ORIENTATION
2400
Contractor/Supplier:
Brief Description of Project: 50 X 50
WOODEN STAKE
1000
50 X 75 VERTICAL
COCO LUMBER
Project Details:
E.G.L.
Project Date Project Status
500
Target Date of Percentage of As of Cost Incurred Date Remarks
Duration Started Completion Completion to Date
(Date) Completed
HELVETICA 1"
1000 2400
For Particulars or complaints about this project, please contact the Regional Office or Cluster which has audit jurisdiction on this project.
TYPICAL FRAME ELEVATION FRONT ELEVATION
HELVETICA 1" COA Regional Office No./Cluster: _______________________________
Address: ___________________________________________________
Contact No.: _____________________ or Text COA Citizen's Desk at 0915-539-1957
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
STANDARD DPWH PROJECT BILLBOARD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD STANDARD COA PROJECT BILLBOARD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 15
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
02 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
SIGNAGE DESCRIPTION REGULATORY SIGNS
ROAD AND BRIDGE WORK SITE TEMPORARY Size (mm) "PREPARE TO STOP
Line 1 - White 120
SIGNAGE (Width x (T1-18)"
Sign No. Height) Letters/Symbols Background DM
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN - ROAD WORK SITE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD TEMPORARY SIGNAGE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
C 16
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
03 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
SIGNS FOR ROAD CONDITION & HAZARD SIGNS FOR LANE & ROAD CLOSURES
"WET TAR Line 1 - Black 160 FM "ROAD CLOSED T2-4 1800 x 300 Black 140 EN Yellow Reflectorized
(T3-1)" (T2-4)" Type C-1
T3-1 900 x 600 Line 2 - Black 160 FM Yellow Reflectorized
Type B - 2 "LANE STATUS T2-6-1 1200 x 900 Black 600 High Yellow Reflectorized
(T2-6-1 and T2-6-2)" Type A-2
"SPLIPPERY Symbol - Black
(T3-3)" "LANE STATUS T2-6-2 1800 x 900 Black 600 High Yellow Reflectorized
T3-3 900 x 600 Yellow Reflectorized
(T2-6-1 and T2-6-2)" Type 1
Type B - 2
"SOFT EDGES Line 1 - Black 160 DN SIGNS FOR PEDESTRIAN CONTROL
(T3-6)"
T3-6 900 x 600 Line 2- Black 160 DN Yellow Reflectorized "PEDESTRIANS WATCH Line 1 - Black 100 CN
YOUR STEP
Type B - 2 Line 2 - Black 100 CN
(T8-1)"
"ROUGH SURFACE Line 1 - Black 120 EN T8-1 900 x 600 Line 3 - Black 100 CN Yellow Reflectorized
(T3-7)" Type B-2
T3-7 900 x 600 Line 2 - Black 120 DN Yellow Reflectorized
Type B - 2 "PEDESTRIANS "T8-2 "Black 100 CM
(T8-2 L or R)" L or R" 1200 x 300 Arrow 140" Yellow Reflectorized
"LOOSE STONES Symbol - Black
(T3-9)" Type C-2
T3-9 900 x 600 Yellow Reflectorized
"USE OTHER FOOTPATH Line 1 - Black 100 DN
Type B - 2 (T8-3)"
T8-3 900 x 600 Line 2 - Black 100 DN Yellow Reflectorized
"GRAVEL ROAD Line 1 - Black 140 DN
(T3-13)" Type B-2
T3-13 900 x 600 Line 2 - Black 140 DN Yellow Reflectorized
Type B - 2 TEMPORARY HAZARD MARKERS
"LOOSE SURFACE "TEMPORARY HAZARD Chevrons
Line 1 - Black 140 DN
(T3-14)" MARKER
T3-14 900 x 600 Line 2 - Black 140 CM Yellow Reflectorized (T5-5) T5-5 600 x 600 Black 194 wide at 45° Yellow Reflectorized
Type B - 2 " Type B-3
"NO LINES DO NOT Line 1 - Black 140 EM "TEMPORARY HAZARD Chevrons
OVERTAKE MARKER
Line 2 - Black 140 EM
UNLESS SAFE (T5-5) T5-4 1500 x 450 Black 177 wide at 45° Yellow Reflectorized
(T3-12)" T3-12 1500 x 900 Line 3- Black 140 EM Yellow Reflectorized " Type B-1
Type B - 1 Line 4 - Black 140 EM
"TRAFFIC HAZARD Line 1 - Black 160 DM
AHEAD
Line 2 - Black 160 DM
(T1-10)"
T1-10 1200 x 900 Line 3 - Black 160 DM Yellow Reflectorized
Type A-2
"TRUCKS Symbol
ENTERING
T2-25 900 x 600 Black Yellow Reflectorized
(T2-25)"
Type B-2
5 PLASTIC BARRIER
TRAFFIC BOLLARD WITH C-4 17 SCALE: NTS
4 DELINEATORS
C-4 17 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN - ROAD WORK SITE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD TEMPORARY SIGNAGE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 17
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
04 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
NOTES
TRAFFIC MANAGEMENT PLAN
A DISTANCE EXPRESSED IN
1. DIFFERENT TRAFFIC MANAGEMENT LAYOUT
TRAFFIC IN KILOMETERS
SHALL BE USED DEPENDING ON THE SITUATION
APPROACH SPEED OF
10M 10M D 2D
2. STRICT IMPLEMENTATION OF THE TRAFFIC
MANAGEMENT PLAN PROVIDED SHALL BE
DIMENSION "D"
OBSERVED.
PER HOUR
LEGEND:
WIRE MESH
1.20M clearance
PLASTIC BARRICADE Worksite Area
HAZARD MARKERS
TRAFFIC PERSONNEL
TRAFFIC BOLLARDS W/
DELINEATORS
BARRICADE FLASHING
LIGHT
Traffic cones to be
placed 3 to 5 meters Attach/install barricade flasher light
apart. every after 3 traffic cones to improve
visibility particularly at nighttime
2D D
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN- PROPOSED TRAFFIC ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD MANAGEMENT LAYOUT ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
C 18
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
05 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
NOTES
TRAFFIC MANAGEMENT PLAN
A DISTANCE EXPRESSED IN
OBSERVED.
TRAFFIC IN KILOMETERS
METERS EQUAL TO THE
APPROACH SPEED OF
LEGEND:
30M 30M D D D D
WIRE MESH
DIMENSION "D"
PLASTIC BARRICADE
PER HOUR
HAZARD MARKERS
TRAFFIC BOLLARDS W/
DELINEATORS
BARRICADE FLASHING
LIGHT
Traffic cones to be
placed 3 to 5 meters
apart.
D D D D
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN- PROPOSED TRAFFIC ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD MANAGEMENT LAYOUT ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
C 19
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
06 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
8 ROAD CONSTRUCTION TABLE
C-7 20 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN - ROAD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD CONSTRUCTION TABLE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
C 20
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
07 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
9 ROAD CONSTRUCTION TABLE
C-8 21 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN -4 ROAD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD CONSTRUCTION TABLE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 21
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
08 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
10 ROAD CONSTRUCTION TABLE
C-9 22 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN -4 ROAD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD CONSTRUCTION TABLE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 22
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
09 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
11 ROAD CONSTRUCTION TABLE
C-10 23 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN - ROAD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD CONSTRUCTION TABLE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
C 23
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
10 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
12 ROAD CONSTRUCTION TABLE
C-11 24 SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
TRAFFIC MANAGEMENT PLAN -4 ROAD ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD CONSTRUCTION TABLE ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ C 24
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
11 11 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0066+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 490.00 M. ENGINEER I DATE : DATE : DATE : DATE :
N
KM 66+048.36
INSTALL 1-LINE
0.910m Ø x 7m
RCPC CROSS DRAIN
KM 66+180.00
INSTALL 1-LINE
K066 + 490.00
0.910m Ø x 7m
RCPC CROSS DRAIN END OF PROJECT
NORTHING: 1092209.00 m N
KM 66+307.87
INSTALL 1-LINE EASTING: 566330.00 m E
0.910m Ø x 7m KM 66+363.65
RCPC CROSS DRAIN INSTALL 1-LINE
CE = 21 ' 12"
.279 m
RP/BM 2 0.910m Ø x 7m
DISTAN = 285° 05
0
4.0
AZIMUTH
KM 66+490.00
INSTALL 1-LINE
0.910m Ø x 7m
4.00
RCPC CROSS DRAIN
K066 + 000.00
BEGINNING OF PROJECT 37' 11
"
= 18°72.224 m
UTH 6
AZIMANCE =
DIST
6.00
00
6.
0
4.0
7.00
6.00
7.0
0
00
3.
8.00
8.00
8.0
0
RP/BM 1
9.00
RP/BM 1
RP/BM 2
)
2"
5° 05'91m (27
TH = 28 7 .
AZIMTUANCE = 21.2
DIS NO
T
0
6.0
EE .00
00
SH 000
00
8.
7.
TO 66+
CH K0
AT
M
0
9.0
00
8.
0
6.0
00
7.00
8.
P L A N
SCALE: 1:1000 M
15.00
N
ELEV = 8.700
PVI ELEV=9.06 PVI ELEV=8.64
K=6.55m K=17.92m
10.00 LVC=15.11 LVC=27.91
T
12% GRADE: -1
GRADE: 1. .18%
A
5.00
E
L
PROFILE
E
SCALE: H - 1:100 M
V - 1:10 M
0.00
Sta. 65 + 700 Sta. 65 + 800 Sta. 65 + 900 Sta. 66 + 000
SUPER
ELEVATION
DIAGRAM
GRADE ELEV.
4.801
8.981
8.961
5.591
4.904
4.867
4.744
4.698
4.695
8.903
8.979
8.749
8.736
8.286
8.327
7.780
7.232
6.716
6.684
6.145
6.136
5.532
5.135
5.149
7.768
7.277
OGE
FGE
VERTICAL
CURVATURE PVI-1
HORIZONTAL
CURVATURE
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
PLAN AND PROFILE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SUPER ELEVATION DIAGRAM ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY
GRADE ELEVATION
PREPARED:
D 26
VERTICAL AND HORIZONTAL CURVATURE KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
02 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
MATCH TO SHEET NO. (28)
N
K066+400.00
4.00
M
AT
CH
TO 66+
K0
SH 000
EE .00
T
4.00
NO
. (2
6)
K066 + 000.00
BEGINNING OF PROJECT
P L A N
SCALE: 1:1000 M
15.00
N
O
I
10.00
T
A
INSTALL 1- LINE
0.910m Ø x 7m
PROFILE
E
SCALE: H - 1:100 M
V - 1:10 M
0.00
Sta. 66 + 000 Sta. 66 + 100 Sta. 66 + 200 Sta. 66 + 300 Sta. 66 + 400
SUPER
ELEVATION
DIAGRAM
GRADE ELEV.
4.021
4.031
3.891
3.761
3.461
4.630
4.643
4.647
4.588
4.530
4.533
4.477
4.403
4.422
4.417
4.367
4.318
4.312
4.278
4.257
4.208
4.202
4.154
4.146
4.089
4.465
3.940
3.972
3.976
3.913
3.800
3.854
3.823
3.727
3.543
3.642
3.538
3.539
3.468
3.795
OGE
FGE
VERTICAL
CURVATURE PVI-1
HORIZONTAL
CURVATURE
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
PLAN AND PROFILE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SUPER ELEVATION DIAGRAM ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY
GRADE ELEVATION
PREPARED:
D 27
VERTICAL AND HORIZONTAL CURVATURE KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
03 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
N
4.00
K066 + 490.00
END OF PROJECT
P L A N
SCALE: 1:1000 M
15.00
N
O
I
10.00
T
A
ELEV = 3.172
K=104.61m
5.00 LVC=34.06
E
INSTALL 1- LINE
0.910m Ø x 7m
E
0.00
Sta. 66 + 400 Sta. 66 + 500 Sta. 66 + 600 Sta. 66 + 700
SUPER
ELEVATION
DIAGRAM
GRADE ELEV.
3.401
3.461
3.481
3.411
3.514
3.438
3.467
3.476
3.507
3.517
3.548
3.487
3.569
3.582
3.543
3.530
3.506
3.522
3.457
3.348
3.254
3.319
3.174
3.197
3.515
3.555
OGE
FGE
VERTICAL
CURVATURE PVI-1
HORIZONTAL
CURVATURE
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
PLAN AND PROFILE ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SUPER ELEVATION DIAGRAM ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY
GRADE ELEVATION
PREPARED:
D 28
VERTICAL AND HORIZONTAL CURVATURE KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
04 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
ELEV:4.8
OFF:-3.01m L
ELEV:4.6
OFF:7.01m R
ELEV:4.6
OFF:10.00m R
ELEV:4.5
OFF:-3.04m L
OFF:0.00m
ELEV:4.5
ELEV:4.5
OFF:6.25m R
ELEV:4.4
OFF:-6.61m L
ELEV:4.4
OFF:3.41m R
ELEV:4.4
OFF:-10.00m L
ELEV:4.3
OFF:3.01m R
ELEV:4.3
OFF:-6.84m L
ELEV:4.2
OFF:-10.00m L
7 7
OFF:0.00m
ELEV:3.8
6 6
5 5
4 4
3 3
2 2
1 1
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+040.00 Sta. 66+080.00
OGE = 3.807m OGE = 4.465m
FGE = 4.588m FGE = 4.477m
ELEV:4.7
OFF:-3.08m L
OFF:0.00m
ELEV:4.5
ELEV:4.5
OFF:3.67m R
ELEV:4.5
OFF:-3.55m L
ELEV:4.4
OFF:3.44m R
7 7
ELEV:4.2
OFF:-7.66m L
ELEV:4.1
OFF:-10.00m L
OFF:0.00m
ELEV:3.9
ELEV:3.9
OFF:-8.67m L
ELEV:3.9
OFF:-10.00m L
ELEV:3.7
OFF:7.14m R
6 6
5 5
4 4
3 3
2 2
1 1
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+020.00 Sta. 66+060.00
OGE = 3.895m OGE = 4.530m
FGE = 4.643m FGE = 4.533m
ELEV:4.5
OFF:3.34m R
ELEV:4.5
OFF:3.79m R
ELEV:4.4
OFF:6.79m R
ELEV:4.3
OFF:10.00m R
ELEV:4.2
OFF:-7.22m L
7 7
ELEV:4.1
ELEV:4.2
OFF:-10.00m L
OFF:0.00m
OFF:0.00m
ELEV:3.9
ELEV:3.8
OFF:-10.00m L
ELEV:3.6
OFF:7.76m R
ELEV:3.6
OFF:-7.55m L
6 6
5 5
4 4
SLOPE 2%
3 3
5 6 7
4
2 2 1 2 3
1 1
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+000.00 Sta. 66+048.36
OGE = 4.120m OGE = 3.947m
FGE = 4.698m FGE = 4.565m
2 DETAILED CROSS - SECTION
BEGINNING OF PROJECT D-5 29 SCALE: 1:10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS - SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
D 29
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
05 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
ELEV:4.2
ELEV:4.1
OFF:0.00m
OFF:-3.16m L
ELEV:4.2
OFF:7.90m R
ELEV:4.0
OFF:3.24m R
ELEV:3.9
OFF:-8.00m L
OFF:-10.00m L
ELEV:3.9
ELEV:4.3
OFF:-3.08m L
OFF:0.00m
ELEV:4.3
ELEV:4.2
OFF:3.37m R
7 6
ELEV:4.0
OFF:7.14m R
OFF:-10.00m L
ELEV:3.9
ELEV:3.9
OFF:10.00m R
6 5
5 4
4 3
3 2
2 1
1 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+140.00 Sta. 66+200.00
OGE = 4.318m OGE = 4.154m
FGE = 4.312m FGE = 4.146m
ELEV:4.1
ELEV:4.2
OFF:3.19m R
OFF:-4.81m L
ELEV:4.1
OFF:6.31m R
ELEV:4.5
OFF:3.27m R
OFF:0.00m
ELEV:4.4
ELEV:3.4
OFF:-7.96m L
ELEV:3.3
OFF:-10.00m L
ELEV:4.3
OFF:-3.12m L
7 6
OFF:0.00m
ELEV:3.2
ELEV:4.0
OFF:-7.02m L
ELEV:3.9
ELEV:3.9
OFF:-10.00m L
OFF:10.00m R
6 5
5 4
4 3
SLOPE 2%
3 2 6 7
3 4 5
1 2
2 1
1 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+120.00 Sta. 66+180.00
OGE = 4.417m OGE = 3.159m
FGE = 4.367m FGE = 4.202m
OFF:0.00m
ELEV:4.3
ELEV:4.3
OFF:-3.11m L
ELEV:4.2
OFF:3.47m R
ELEV:4.0
OFF:6.90m R
ELEV:3.8
OFF:-7.69m L
OFF:-10.00m L
ELEV:3.7
ELEV:4.4
OFF:-3.05m L
OFF:0.00m
ELEV:4.4
ELEV:4.3
OFF:3.33m R
ELEV:4.2
OFF:-7.38m L
ELEV:4.1
7 6
ELEV:4.1
OFF:-10.00m L
OFF:7.21m R
ELEV:4.0
OFF:10.00m R
6 5
5 4
4 3
3 2
2 1
1 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+100.00 Sta. 66+160.00
OGE = 4.403m OGE = 4.278m
FGE = 4.422m FGE = 4.257m
3 DETAILED CROSS - SECTION
BEGINNING OF PROJECT D-6 30 SCALE: 1:10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS - SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
D 30
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
06 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
ELEV:3.8
OFF:3.53m R
ELEV:3.7
OFF:8.14m R
ELEV:3.7
OFF:10.00m R
ELEV:3.2
OFF:-3.13m L
ELEV:3.1
OFF:0.00m
ELEV:3.9
OFF:-3.20m L
OFF:-10.00m L
ELEV:3.9
OFF:0.00m
ELEV:3.9
ELEV:2.9
OFF:-6.72m L
ELEV:3.8
OFF:3.29m R
ELEV:3.8
OFF:10.00m R
ELEV:3.6
OFF:7.39m R
ELEV:2.6
OFF:-9.90m L
6 5
5 4
4 3
SLOPE 2%
3 2
5 6 7
2 3 4
1
2 1
1 0
0 -1
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+260.00 Sta. 66+307.87
OGE = 3.891m OGE = 3.060m
FGE = 3.972m FGE = 3.831m
ELEV:4.1
OFF:-6.62m L
ELEV:4.0
OFF:-3.14m L
ELEV:4.0
OFF:-10.00m L
OFF:0.00m
ELEV:3.9
ELEV:3.9
ELEV:3.9
OFF:10.00m R
OFF:3.18m R
ELEV:3.8
ELEV:3.8
OFF:8.23m R
OFF:-3.23m L
OFF:0.00m
ELEV:3.8
ELEV:3.8
OFF:3.35m R
ELEV:3.7
OFF:-6.82m L
ELEV:3.6
ELEV:3.6
OFF:10.00m R
OFF:7.48m R
OFF:-10.00m L
ELEV:3.6
6 6
5 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+240.00 Sta. 66+300.00
OGE = 3.940m OGE = 3.800m
FGE = 4.031m FGE = 3.854m
ELEV:4.3
OFF:-6.47m L
ELEV:4.3
OFF:-10.00m L
ELEV:4.2
OFF:10.00m R
ELEV:4.1
OFF:-3.44m L
ELEV:4.0
OFF:7.31m R
OFF:0.00m
ELEV:4.0
OFF:0.00m
ELEV:4.0
ELEV:3.9
OFF:3.03m R
ELEV:3.9
OFF:-3.43m L
ELEV:3.8
ELEV:3.8
OFF:8.01m R
OFF:3.37m R
ELEV:3.8
OFF:10.00m R
ELEV:3.6
OFF:-10.00m L
6 6
5 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+220.00 Sta. 66+280.00
OGE = 4.021m OGE = 3.976m
FGE = 4.089m FGE = 3.913m
4 DETAILED CROSS - SECTION
D-7 31 SCALE: 1:10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS - SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
D 31
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
07 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
ELEV:3.7
OFF:-10.00m L
ELEV:3.5
OFF:-7.35m L
OFF:0.00m
ELEV:3.5
ELEV:3.5
OFF:-3.15m L
ELEV:3.4
OFF:-5.24m L
ELEV:3.3
ELEV:3.3
OFF:-8.48m L
OFF:3.37m R
ELEV:3.3
OFF:-10.00m L
6 6
OFF:0.00m
ELEV:2.9
ELEV:2.8
OFF:3.65m R
ELEV:2.7
OFF:7.90m R
ELEV:2.6
OFF:10.00m R
ELEV:2.4
OFF:7.32m R
5 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+360.00 Sta. 66+400.00
OGE = 2.899m OGE = 3.468m
FGE = 3.642m FGE = 3.461m
OFF:0.00m
ELEV:3.8
ELEV:3.7
OFF:3.39m R
ELEV:3.6
OFF:-3.48m L
ELEV:3.6
OFF:7.08m R
OFF:0.00m
ELEV:3.5
ELEV:3.4
OFF:3.31m R
ELEV:3.4
OFF:-3.59m L
ELEV:3.3
OFF:-10.00m L
ELEV:3.2
OFF:-10.00m L
6 6
ELEV:2.6
OFF:6.39m R
ELEV:2.5
OFF:10.00m R
5 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+340.00 Sta. 66+380.00
OGE = 3.761m OGE = 3.538m
FGE = 3.727m FGE = 3.539m
OFF:0.00m
ELEV:3.8
ELEV:3.7
OFF:-3.28m L
ELEV:3.7
OFF:3.41m R
ELEV:3.5
OFF:10.00m R
ELEV:3.4
OFF:-7.03m L
ELEV:3.4
OFF:-3.23m L
OFF:-10.00m L
ELEV:3.3
ELEV:3.3
OFF:3.05m R
ELEV:3.3
OFF:7.13m R
OFF:0.00m
ELEV:3.3
ELEV:3.3
OFF:-10.00m L
6 6
ELEV:2.5
OFF:10.00m R
5 5
4 4
3 3
SLOPE 2%
2 2
5 6 7
3 4
1 1 1 2
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+320.00 Sta. 66+363.65
OGE = 3.823m OGE = 3.318m
FGE = 3.795m FGE = 3.624m
5 DETAILED CROSS - SECTION
D-8 32 SCALE: 1:10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS - SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
D 32
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
08 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :
ELEV:3.6
OFF:-10.00m L
ELEV:3.5
OFF:-7.80m L
OFF:0.00m
ELEV:3.5
ELEV:3.5
OFF:3.10m R
ELEV:3.4
OFF:-3.44m L
ELEV:3.2
OFF:9.90m R
6
ELEV:2.6
OFF:6.13m R
5
4 8
0
END OF PROJECT
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+460.00
OGE = 3.476m
FGE = 3.507m
ELEV:3.6
OFF:-10.00m L
ELEV:3.6
OFF:3.14m R
OFF:0.00m
ELEV:3.6
ELEV:3.5
OFF:-3.77m L
ELEV:3.5
OFF:-7.74m L
OFF:0.00m
OFF:-10.00m L
ELEV:3.5
ELEV:3.5
ELEV:3.4
OFF:-3.54m L
ELEV:3.4
OFF:3.11m R
ELEV:3.4
OFF:10.00m R
ELEV:3.2
6 6
OFF:10.00m R
ELEV:2.5
OFF:6.14m R
5 5
4 4
3 3
SLOPE 2%
2 2
5 6 7
4
1 1 1 2 3
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+440.00 Sta. 66+490.00
OGE = 3.515m OGE = 3.561m
FGE = 3.467m FGE = 3.560m
ELEV:3.6
OFF:-9.87m L
ELEV:3.6
OFF:3.14m R
ELEV:3.6
OFF:-6.77m L
OFF:0.00m
OFF:0.00m
ELEV:3.5
ELEV:3.5
ELEV:3.5
OFF:-3.15m L
OFF:-10.00m L
ELEV:3.5
ELEV:3.5
L
ELEV:3.4
OFF:-3.25m L
ELEV:3.4
OFF:3.21m R
6 6
OFF:-9.46m
ELEV:3.0
OFF:10.00m R
ELEV:2.9
OFF:8.52m R
5 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
Sta. 66+420.00 Sta. 66+480.00
OGE = 3.514m OGE = 3.517m
FGE = 3.438m FGE = 3.548m
6 DETAILED CROSS - SECTION
D-9 33 SCALE: 1:10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
C.Y. 2023 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS - SECTION ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE No. VII ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD ENGINEER II
SYSTEM ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/
REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY PREPARED:
D 33
KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
CEBU 4TH DISTRICT ENGINEERING OFFICE ROADS, N. BACALSO AVE. (CEBU SOUTH) - K0066+000 - K0066+490
09 09 33
POBLACION DALAGUETE, CEBU
ARGAO, CEBU
K0066+000 - K0061+490
CHARIE Z. BAHENA ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
NET LENGTH = 980 M. ENGINEER I DATE : DATE : DATE : DATE :