The document provides a cost breakdown for constructing a building with a floor area of 40 x 30 square meters. It estimates the steel structure will cost RM 100,000, piling works including machinery will be RM 35,000, road works for crusher run, binder and wearing courses over 150 square meters will be RM 25,000, electrical work for lighting and cabling will be RM 5,000, and miscellaneous works will be RM 15,000 for a total project cost of RM 180,000.
The document provides a cost breakdown for constructing a building with a floor area of 40 x 30 square meters. It estimates the steel structure will cost RM 100,000, piling works including machinery will be RM 35,000, road works for crusher run, binder and wearing courses over 150 square meters will be RM 25,000, electrical work for lighting and cabling will be RM 5,000, and miscellaneous works will be RM 15,000 for a total project cost of RM 180,000.
The document provides a cost breakdown for constructing a building with a floor area of 40 x 30 square meters. It estimates the steel structure will cost RM 100,000, piling works including machinery will be RM 35,000, road works for crusher run, binder and wearing courses over 150 square meters will be RM 25,000, electrical work for lighting and cabling will be RM 5,000, and miscellaneous works will be RM 15,000 for a total project cost of RM 180,000.
KSTP - 2 MC Road - Safe Corridor Demonstration Project - Bc-Overlay & Road Safety WORKS FROM KAZHAKOOTAM TO ADOOR (0/000 To 12/600 (Bye Pass) and From 25/000 To 93/000)