This standard work instruction document provides details for assembling a product, including required materials, operation sequence, inspection steps, safety equipment needed, and sign-off approvals. It lists specific tasks like inserting components, applying labels, and their estimated times. Symbols are defined to indicate visual or manual tasks. Quality checks and safety measures are included.
This standard work instruction document provides details for assembling a product, including required materials, operation sequence, inspection steps, safety equipment needed, and sign-off approvals. It lists specific tasks like inserting components, applying labels, and their estimated times. Symbols are defined to indicate visual or manual tasks. Quality checks and safety measures are included.
This standard work instruction document provides details for assembling a product, including required materials, operation sequence, inspection steps, safety equipment needed, and sign-off approvals. It lists specific tasks like inserting components, applying labels, and their estimated times. Symbols are defined to indicate visual or manual tasks. Quality checks and safety measures are included.
Description Part Number Revision : Mold Number Materials Required Qty Code Description Activity VA Time Video Insert Component V 9,2 Insert LEDs V 30,43 Cover with ESD Tape R 18,22 Get Private Label Decal V 10 Apply Provate Label Decal V 7
Opeation Sequence
Symbols Used in the Operations
Inspection
Work Content
Visual Verification
Required Safety Equipment
Prepared By Date Signatures Process Eng Production Manager