ISO 14000 & OHSAS certification plan

Plan Actual Audit date Holidays Pending as per plan


Dates
Sr.N Responsibilit
Activity Target Status 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
o. y
P
1 Consumptions Water SDK 07.8.17
A
P
2 Consumptions Power SDK 06.08.17
A
P
3 List of Records SDK 20.8.17
A
Environment management P
4 SDK 20.8.17
programme (Cont.Improvement) A
Legal requirement certificates P
5 SDK 16.8.17
A. Water sample A
Legal requirement certificates P
6 SDK 16.8.17
B. Noise Level A
Legal requirement certificates P
7 SDK 16.8.17
C.Ambient Air Quality A
Mahabal Registration for Waste P
8 SDK 07.8.17
disposal A
Legal certificates of organisation P
9 SDK 09.08.17
Concent to operate A
Legal certificates of organisation P
10 SDK 09.8.17
Bhartiy Udyog A
P
11 MRM SDK 26.8.17
A
P
12 Objective setting ASW & SDK 20.8.17
A
P
13 Indentification of Legal requirements SDK & VVP 14.8.17
A
P
14 Legal documents list SDK & VVP 20.8.17
A
SDK & SNC & P
15 Standards list 13.8.17
Akshay A
ISO 14000 & OHSAS certification plan
Plan Actual Audit date Holidays Pending as per plan
Dates
Sr.N Responsibilit
Activity Target Status 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
o. y
P
16 Operational control plan YZG & PROD 20.8.17
A
P
17 Aspect & Impact Register YZG 13.8.17
A
P
18 EMS NC register YZG 14.8.17
A
P
19 EMS corrective action report YZG 15.8.17
A
Pravin P
21 Consumptions Sand 10.08.17
Bhosale A
Pravin P
22 List of Hazardous material 10.8.17
Bhosale A
P
23 Waste to dispatch Ranjangaon Pravin 20.8.17
A

P
24 Vehicle PUC certificates Waghmare 07.8.17
A
Waghmare & P
25 Mock drills 14.8.17
akshay A
P
26 Evacuation feedback Akshay 17.8.17
A
P
27 Training identification register Akshay 12.8.17
A
P
28 Training plan Akshay 14.8.17
A
P
29 Company code of conduct Akshay 14.8.17
A
P
30 HR records Akshay 16.8.17
A
P
31 Near miss records Akshay 14.8.17
A
Disaster management plan & Safety P
32 VVP & Akshay 17.8.17
committee A
Rajendra & P
33 Health & Safety sheet 14.8.17
Prod I/C A
Legal requirement certificates Rajendra / P
34 20.8.17
D. Medical check up Akshay A
ISO 14000 & OHSAS certification plan
Plan Actual Audit date Holidays Pending as per plan
Dates
Sr.N Responsibilit
Activity Target Status 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
o. y
P
35 Plant layout (All safety info., ) Vishal 18.8.17
A
P
36 Green belt area (Layout) Vishal 18.8.17
A
P
37 Display boards Vishal 24.8.17
A
Exhaust chimeny monitoring P
38 AM/SNC 21.8.17
(Internal verification) A
P
39 Sand plant dust leakage monitoring AM/SNC 20.8.17
A
P
40 Power consumption reduction plan AM/SNC 12.8.17
A
P
41 Maint. Waste Disp. Report Not reqd.
A
Electrical wiring in concilled on P
42 AM/SNC 16.8.17
furnace A
P
43 rubber sheet, panel lock AM/SNC 17.8.17
A
Safety instructions Displays, Do's, P
44 AM/SNC 19.8.17
Don'ts A
PUC of Gensts, forklift, Driver P
45 Wadiyar 20.8.17
Liecence A
No open electrical sockets, switches P
46 AM/SNC 11.8.17
etc. A
P
47 Electrical safety & Boards AM/SNC 20.8.17
A
Pipeline with colour codes & P
48 AM/SNC 20.8.17
Directions of flow A
P
49 Bore earthing Permanent AM/SNC 13.8.17
A
P
50 Consumptions Compressed air AM/SNC 14.08.17
A
P
51 Dust Collector maint. Record AM/ SNC 20.8.17
A
P
Calibration status of environmental
52 Damale 20.8.17
monitoring equipment (meters) A

Vehicle maintenace plan P


53 AM/SNC 15.8.17
( Forklift, Crane P.M. plan) A
ISO 14000 & OHSAS certification plan
Plan Actual Audit date Holidays Pending as per plan
Dates

Certification Audit
Sr.N Responsibilit
Activity Target Status 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
o. y
P
54 Issue of all formats VVP 07.8.17
A
P
55 Emergency preparedness plan VVP 20.8.17
A
P
56 Aspect & Impact Training VVP 14.8.17
A
P
57 Quality manual VVP 21.8.17
A
P
58 Procedures manual VVP 21.8.17
A
P
59 HIRA identification VVP & SDK 16.8.17
A
P
60 Whrilpool requirements VVP & SDK 21.8.17
A
P
61 Certification Audit VVP 28.8.17
A
P
62 NC closure VVP 30.8.17
A
P
63 Certification VVP 05.9.17
A
P
20 Internal Audits VVP 24.8.17
A