BILL OF MATERIALS
MASONRY
QTY UNIT DESCRIPTION OF MATERIALS UNIT COST TOTAL COST
10 pc 12mm Bar 250.00 2,500.00
10 pc 10mm Bar 200.00 2,000.00
1 kg Tie Wire 100.00 100.00
100 pc CHB 5" 21.50 2,150.00
7 bags Portland Cement 250.00 1,750.00
0.75 cbm Sand 1,500.00 1,125.00
0.75 cbm 3/4 Gravel 2,500.00 1,875.00
11,500.00
METAL WORKS
QTY UNIT DESCRIPTION OF MATERIALS UNIT COST TOTAL COST
2 pc Galvanized Tubular 2 x 2 x 6 meters 650.00 1,300.00
25 pc Galvanized Tubular 1 x 2 x 6 meters 450.00 11,250.00
16 pc Cylindrical hinge 1” 50.00 800.00
1 box Welding Rod 500.00 500.00
1 box Cutting Disc 750.00 750.00
1 pc Polycarbonate Solid Sheet 2.0mm 4x17' 5,580.00 5,580.00
20,180.00
PAINTING
QTY UNIT DESCRIPTION OF MATERIALS UNIT COST TOTAL COST
1 bag Skimcoat 600.00 600.00
1 gal. Preppa White Elastomeric Primer White 800.00 800.00
1 gal. Davies Elastomeric Paint 850.00 850.00
1 gal. Boysen Epoxy Primer 1,000.00 1,000.00
1 gal. Boysen QDE 1,000.00 1,000.00
1 bot. Paint Thinner 50.00 50.00
1 lot Brush & Rollers 300.00 300.00
4,600.00
SUB-TOTAL: 36,280.00
LABOS COST: 21,768.00
GRAND TOTAL: 58,048.00
Prepared by:
ARKY GELN B. ALOLOD
ARCHITECT