BILL OF MATERIALS

Project: Rennovation and Additional Components for New Life Baptist Church
Owner: New Life Baptist Church
Location: Ili sur, San Juan, La Union

ITEM SCOPE/PARTICULARS QUANTITY UNIT UNIT COST PRICE


1 SITE WORKS
1.A DEMOLITION 1 lot 5,000.00 5,000.00
1.B EXCAVATION AND BACKFILLING 1 lot 3,000.00 3,000.00
2 STEEL WORKS
RSB 10mm Ø Grade 33 4,346 pcs. 147.00 638,862.00
RSB 12mm Ø Grade 33 6,790 pcs. 205.00 1,391,950.00
RSB 16mm Ø Grade 33 2,061 pcs. 375.00 772,875.00
RSB 20mm Ø Grade 33 1,502 pcs. 614.00 922,228.00
#16 G.I. TIE WIRE 47 rolls 1,080.00 50,760.00
3 CONCRETE WORKS
CEMENT(50kg) 1,185 bags 220.00 260,700.00
RIVER SAND 66 cu.m 982.00 64,812.00
3/4" CRUSHED GRAVEL 137 cu.m 1,097.00 150,289.00
4 MASONRY WORKS
4" CHB LAYING @ 250 psi 4,300 pcs. 14.00 60,200.00
5 FORMWORKS
4 x 8 x 1/4" PLYWOOD 45 pcs. 325.00 14,625.00
2 x 2 x 6m LUMBER (rough) 250 pcs. 130.00 32,500.00
OTHERS 5,000.00

TOTAL MATERIAL COST 4,372,801.00


LABOR COST 1,093,200.25
TOTAL COST 5,466,001.25