This document provides a cost estimate for the construction of a door trellis at Camella Homes in Gensan, Philippines. It details materials and labor costs for steel works, including tubing, welding rods, and discs. It also outlines painting works with primers, paints, brushes, and sandpaper. The total estimated cost is $15,836.75 for materials and labor.
This document provides a cost estimate for the construction of a door trellis at Camella Homes in Gensan, Philippines. It details materials and labor costs for steel works, including tubing, welding rods, and discs. It also outlines painting works with primers, paints, brushes, and sandpaper. The total estimated cost is $15,836.75 for materials and labor.
This document provides a cost estimate for the construction of a door trellis at Camella Homes in Gensan, Philippines. It details materials and labor costs for steel works, including tubing, welding rods, and discs. It also outlines painting works with primers, paints, brushes, and sandpaper. The total estimated cost is $15,836.75 for materials and labor.
Location: Phase 2, Blk. 9 Lot 12, Camella Homes Gensan, San Isidro, GSC Subject: Construction of Door Trellis Date: March 9, 2017
Description Qty. Unit Unit Cost Total Cost
I. Steel Works Welding Works 2 x 2 x 1.2mm Square Tube 7.50 lengths 430.50 3,228.75 2 x 2 x 1.5mm Square Tube 3.00 lengths 500.00 1,500.00 2 x 6 x 1.2mm Rectangular Tubing 2.00 lengths 600.00 1,200.00 Welding Rod, 2.5mm 6012 2.00 boxes 150.00 300.00 Cutting Disc, 4" 10.00 pcs. 75.00 750.00 Grinding Disc, 4" 1.00 pc. 85.00 85.00 Subtotal: 7,063.75 II. Painting Works Epoxy Primer Red Oxide, Webber 1.00 gallon 656.00 656.00 Mayon Lacquer Thinner 1.00 gallon 397.00 397.00 White Enamel Paint, Boysen 2.00 gallon 650.00 1,300.00 Paint Brush 2" 2.00 pcs 15.00 30.00 Sandpaper, 120 5.00 pcs 18.00 90.00 Epox Joint Filler 1.00 can 300.00 300.00 Subtotal: 2,773.00
Material Cost: 9,836.75
Labor Cost: 6,000.00
Grand Total: 15,836.75
Prepared by:
Michael Jan de Celis
Project Engineer Project: Camella Homes - Gensan Location: Phase 2, Blk. 9 Lot 12, Camella Homes Gensan, San Isidro, GSC Subject: Construction of Door Trellis Date: March 29, 2017
Description Qty. Unit Unit Cost Total Cost
I. Steel Works Welding Works 2 x 2 x 1.2mm Square Tube 7.50 lengths 430.50 3,228.75 2 x 2 x 1.5mm Square Tube 3.00 lengths 602.00 1,806.00 2 x 4 x 1.5mm Rectangular Tubing 2.00 lengths 871.00 1,742.00 Welding Rod, 2.5mm 6012 1.00 boxes 150.00 150.00 Cutting Disc, 4" pcs. 75.00 0.00 Grinding Disc, 4" pc. 85.00 0.00 Subtotal: 6,926.75 II. Painting Works Epoxy Primer Red Oxide, Webber 1.00 gallon 656.00 620.00 Mayon Lacquer Thinner 1.00 gallon 397.00 400.00 White Enamel Paint, Boysen 1.00 quart 184.75 184.75 Paint Brush 2" 1.00 pcs 27.75 27.75 Sandpaper, 120 3.00 pcs 26.75 80.25 Epoxy Joint Filler 1.00 can 165.00 165.00 Subtotal: 1,477.75 Miscellaneous Transportation and Hauling 1.00 lot 200.00 200.00
Subtotal: 200.00
Material Cost: 8,404.50
Labor Cost: 3,250.00
Grand Total: 11,854.50
Income / Price Difference 3,982.25
Prepared by:
Michael Jan de Celis
Project Engineer Project: Camella Homes - Gensan Location: Phase 2, Blk. 9 Lot 12, Camella Homes Gensan, San Isidro, GSC Subject: Construction of Door Trellis Date: March 9, 2017
Description Qty. Unit
I. Steel Works Welding Works 2 x 2 x 1.2mm Square Tube 7.50 lengths 2 x 2 x 1.5mm Square Tube 3.00 lengths 2 x 6 x 1.2mm Rectangular Tubing 2.00 lengths Welding Rod, 2.5mm 6012 2.00 boxes Cutting Disc, 4" 10.00 pcs. Grinding Disc, 4" 1.00 pc. Subtotal: II. Painting Works Epoxy Primer Red Oxide, Webber 1.00 gallon Mayon Lacquer Thinner 1.00 gallon White Enamel Paint, Boysen 2.00 gallon Paint Brush 2" 2.00 pcs Sandpaper, 120 5.00 pcs Epox Joint Filler 1.00 can Subtotal: