Professional Documents
Culture Documents
ltm1100 - 2 Hydraulic
ltm1100 - 2 Hydraulic
HYDRAULICS
SUPERSTRUCTURE
C
LTM 11002
GENERAL OUTLAY
E
OPERATING LOGIC
OF PRESSURE STAGES
MAGNET Y11
Y11 Y12 BAR FUNCTION PRESSURE STAGE A
0 0 80 p1
0 0 150 p2
0 1 140 p3
B
a b a b a b
DUE2 130 DB
DB C
0,4 310
DA DUE3 0,8 DA DA
A1 DZ1,2 DUE3 0,8
DUE3 0,8
VB 80
XL
340 270
XL1
T XL1/4.1
T2
X Y2
P2/4.1
P P2
A1 B1 A2 B2 A3 B3 Z E
a T2/4.1
TX/5.1
WR/6.1
T4/7.1
TK1/5.1
L/6.1
TK2/5.1
TR/5.1
H1S/6.4
F
H1H/6.4
WK/6.1
P1/4.1
3 Gez. 20.06.01 lweryd0 IdentNr. = D
LIEBHERR WERK HYDRAULICS 982833408
2 + D2
Ausgabe 27.01.06 lwerof0 EHINGEN ZeichNr. Blatt 3
1 VALVE BLOCK LS 3367970.12.00.001001
Änderung Datum Name Datum Name Copyright (c) von 10
1 2 3 4 5 6 7 8
Y17
a b
A
P 1,2 A 1,2 B T
130 DUE4
DB 1,2
340
A2
DUE1
0,8
S50
XL
XL1/3.8
P B
T2/3.8 MB
T
A B
H2S/6.4
P2/3.8 H2H/6.4
C
P1/3.8
T3/5.3
P3/7.1
P4/5.1
DIESEL ENGINE
PUMP 1 A1 A2 PUMP 2 COOLER DRIVE
E
Y27
180
Ma1 1,5 1,5 Ma2
a
Y31 Y32
TX/3.8
Y TELESCOPIC UNIT A
X M
0,8 0,6
60
0,6 B R
187
A
TR/3.8 B
K2
TK2/3.8
TK1/3.8
K1
A B
A
GRIPPER =A+A
Y40
C
C
NORMAL OPERATION
COUPLING POINT EMERGENCY OPERATION
10 EMERGENCY OPERATION
BAR
A Y38
A3
P
E
P4/4.8
V8 105 A1 NORMAL OPERATION
V7
V2
A3
V6 INTERLOCKING
30 V1 GRIPPER
B INTERLOCKING
TELESC. SECTION
45
V5 100
PST4/6.8 C
A2 T2 T1 INTERLOCKING INTERLOCKING
EMERGENCY OPERATION GRIPPER TELESC. SECTION
T3/4.8
F
T5/7.1
A B C
PST3/4.8 PST1/6.1 NORMAL OPERATION
EMERGENCY OPERATIONEMERGENCY OPERATION EMERGENCY OPERATION
A
0,5 PST5/7.8
LUFFING CYLINDER HOIST GEAR I
WR/3.8 H1S/3.8
Y3
9
B2 BAR
MB
P
B
=
a a B
465 X MB
B
S49 0,3
DD1
MA
A L
400
0,6
WK/3.8 MA
A1 X
L/3.3 C
H1H/3.8
0,5
H2S/4.8
HOIST GEAR II
Y18
9
BAR
E
Y5 Y10
a
A5
MB
P B
PST1/5.3
0,3
T DD1
a
MB MA A
400
0,6 PST4/5.1
MA
a A1 X F
H2H/4.8
PST2/7.8
SLEWING GEAR
A
XL/8.1
PST2/6.8
Y21
Y20
Y66
P B
a b PST5/6.8
A
T
a
a
X P 1,2 A 1,2 B T 13
A9 Y
XL BAR
240 Y109
a
0,6
A P
21
0,4 B T C
29
0,6 22 0,8
A A1
a
MT 1,2
0,8
23
0,5
MP
0,6
0,4 210
MB
E
0,4
220
0,6 210
MA
T P A B a
B B1 0,8
T5/5.3
F
T4/3.3 T6/8.1
P3/4.8 P5/8.1
A
INCLINING CAB
0,8
V
a b a b a b a 2,0 b
120 130
A4
MXL
XL/7.8 C
P5/7.8
P
T6/7.8
T
A1 MA1 B1 A2 MA2 B2 A3 B3 A4 B4
B4/9.1
E
A4/9.1
B3/9.1
A3/9.1
B1/9.1
A1/9.1
A
FOLDING JIB
BALLASTING SLEWING PLATFORM ADJUSTMENT
60 60
BAR BAR
S28 S29 120
S V
S >230 S A B
S26 BAR B
C D 200
M1 M1
220 F
S27
280 280
F KF KF F 60
100 C
BOOM
A B
A
SUPERSTRUCTURE
C
Z
B1/8.8 B
A1/8.8 E
A3/8.8
B3/8.8
F
B4/8.8
A4/8.8
POSTREGULATION 10...+8 mA