Professional Documents
Culture Documents
FIT OUT
Recommendation :
To rectify the damages and protect the door and hardware
Proposed by :
Name Date
5. Description / acceptance of treatment (to be completed by technical team)
Prepared by :
Name Date
6. Verification of compliance after treatment
Verified by :
Name Date
FORM:QPD-QMS-SOW003-81-R3
Door Damage Detached Power supply hole cover /
Push bar damage
D1.T10.B1.07