23/10/2023 p2 utility recovered water tank level 3 not function 5.00PM 6.00 PM
P1 A line glue pump & cartridge filter area
25/10/2023 - cctv CH 7 to CH 10 ng. 5.00PM 6.00 PM
p1 utility regeneration h2s04 diluting tank - no signal
27/10/2023 level sensor at touch 5.00PM 6.00 PM
2 To collate and submit the following forms to HR on or before 7th of the month.
[ (i) Work Incentive Form ] + [ (ii) Replacement Leave Form ] + [ (iii) Call Back Claim Form ]
3 Payment of Work Incentive and Call Back Claim of past month will be made with the following month's salary.
4 Every Staff is expected to obtain their Superior's written approval to confirm the completion of the respective day's
assignment.
HR-REC-21
Updated : 1 Jan 2019