Professional Documents
Culture Documents
This serves as an invitation to our Request forQuotation for the Goods as further
described on this negotiation document intended for THERMA MARINE, INC. (the
"Company") located at THERMA MARINE, INC. Mobile 2, Lawis Santa Ana Nasipit, PH
, 8602 (the "Site").
The award shall be based on the most advantageous offer to the Company and shall be
subject to the terms and conditions of the Company on procurement such as, but not
limited to, the submission/updating of accreditation documents, etc. You may offer
value-added services and suggestions for savings in your quotation.
The Company shall have the right to reject any quotation or parts thereof and to annul
the tendering process and reject all quotations at any time prior to signing a purchase
order or contract without thereby incurring any liability to any bidder and without being
required to give any reason therefor.
Attached to this document is the presentation material to guide you on how to input your
quotation (see slides 31 to 42) directly to the Oracle Fusion portal.
Thank you.
Best Regards,
Beverlie Corowan
Additional Terms and Conditions:The Company, without any liability to the bidder, reserves
the right (for any reason and without the need of an explanation to the bidder) to alter/modify or
terminate this Request for Quotation (RFQ); revise and/or waive any requirement under this
RFQ; accept or reject any bidder; and accept any new/revised bid at any time of the RFQ
process. Supporting documents and technical data sheet (as needed) must be attached to the
quotation including, but not limited to power rating, energy consumption and energy efficiency
ratio for efficiency considerations. e.g. Equipment to be supplied shall comply with the latest
Energy labeling Efficiency and Standard of the Department of Energy (DOE), if applicable.
DOE website: https://www.doe.gov.ph/energy-labelling-efficiency-standards?
ckattempt=1&page=1) This RFQ does not constitute a binding offer or a legally binding
obligation on the part of the Company to accept the bid or any proposal or any grant of exclusive
rights to any of the bidders. This RFQ is subject to the provisions of the Terms and Conditions -
Purchase Order (Rev. 00 / 2021.02.15) and Related Documents.
(This negotiation allows you to submit multiple responses. Mark this as your
primary response or an alternate one.)
This document has important legal consequences. The information contained in this document is proprietary of
Aboitiz Power Corporation - TMI BU. It shall not be used, reproduced, or disclosed to others without the express
and written consent of Aboitiz Power Corporation - TMI BU.
Table of Contents
1 Overview.......................................................................................................................................................................5
1.1 General Information..............................................................................................................................................5
1.2 Schedule................................................................................................................................................................5
1.3 Negotiation Controls.............................................................................................................................................5
1.4 Terms....................................................................................................................................................................5
1.5 Attachments..........................................................................................................................................................5
2 Requirements................................................................................................................................................................6
2.1 Section 1. COMMERCIAL EVAUATION..........................................................................................................6
3 Lines..............................................................................................................................................................................8
3.1 Line Information...................................................................................................................................................8
3.2 Line Details...........................................................................................................................................................9
3.2.1 Line 1..............................................................................................................................................................9
3.2.2 Line 2..............................................................................................................................................................9
3.2.3 Line 3..............................................................................................................................................................9
3.2.4 Line 4............................................................................................................................................................10
3.2.5 Line 5............................................................................................................................................................10
3.2.6 Line 6............................................................................................................................................................10
3.2.7 Line 7............................................................................................................................................................10
3.2.8 Line 8............................................................................................................................................................10
3.2.9 Line 9............................................................................................................................................................11
3.2.10 Line 10........................................................................................................................................................11
3.2.11 Line 11........................................................................................................................................................11
3.2.12 Line 12........................................................................................................................................................11
3.2.13 Line 13........................................................................................................................................................12
3.2.14 Line 14........................................................................................................................................................12
3.2.15 Line 15........................................................................................................................................................12
1 Overview
1.1 General Information
Title Mechanical 140001556
Buyer Beverlie Corowan Outcome Purchase Order
E-Mail beverlie.corowan@aboitiz.
com
1.2 Schedule
Preview Date Open Date 03/20/24 7:22 AM
Close Date 03/25/24 7:15 PM Award Date
Time Zone Hong Kong Time
Lines Settings
Rank Indicator 1,2,3...
Ranking Method Multiattribute scoring
1.4 Terms
2 Requirements
*Response is required
4. Payment Terms?
Weight: 5.00
Note: This is just a reminder for you to change your price into VAT-EX
*6. Warranty Period?
Weight: 5.00
Weight: 5.00
Select one of the following:-
a. YES (Score: 5)
b. NO (Score: 1)
Comments:
3 Lines
Instructions TO SUPPLIERS:
1. INPUT YOUR QUOTATION IN VAT-EX / NON VAT.
2. FOR ALTERNATE OFFER/S, PLEASE INPUT IN "NOTE TO
BUYER" FIELD AND ATTACH A SUPPORTING FILE.
3. IF NO QUOTE, DON'T PUT ANY VALUE IN THE BOX.
4. SPECIFY IN THE ATTACHED OFFER YOUR TAX
CLASSIFICATION (VAT-IN,NON-VAT,VAT-EX).
5. DON'T FORGET TO VALIDATE BY CLICKING ACTIONS >
VALIDATE.