You are on page 1of 4

Project Evaluation Tracking FORM (PET)

B.COM (H) VI Semester (Batch 2021-24)

Name of Student: Other Informations


Roll No:
E-mail Id:
Mobile No:
Course: B.COM (H) VI sem

Project Title

Guide Sign./
Date of Student Max. Marks internal
SN Activity Time Frame (Deadline) Completion Sign. Marks Awarded evaluator's sign
Pre-Project Briefing 01.02.24
(for each section separately)
1 Allocation of Project Topics 01.02.24

2 Mid Term Review and Discussion 26.02.24 5


with Guide

3 Submission of Draft Report to the 15.03.24 5


respective guides.
4 Discussion with guide and the 29.03.24
correction incorporated.
Submission of Final Report (One
5 spiral binded copy) to the respective 08.04.24 10
guide.
6 Viva & Power Point Presentation to
20
the Internal Supervisor.
Total Project Progress 40
Score
Name of Project Guide:
Note:
1. At the 4th stage the Project guides need to first get all the reportd submitted at their end before they begin their meeting with students.
2. The defaulter has to be followed-up by the project guides at each stage of the project.
Project Coord.
Sign.

You might also like