Base plate inspection Check List Document No:

(For supplier)
SPI Page 1 of 2

Date : _________________
Supplier’s name
Applicable drg.
No.
Base plate SR.
WBS No.
NO.

Check List
Sr OK / Not
Check Points Remarks
No. Ok
Punch drg no., Supplier ID and base plate Sr no. on pump
1.
mounting pad near to Edge.
Visual & dimension checking as per base plate drg.
2.
Welding run required smooth and uniform beads and free from all
welding defects like ….
a) Weld spatters checked
b) Weld undercut checked
3. c) Weld porosity checked
d) Weld blowhole checked
e) Excess welding checked

f) Other weld defects


Check visual inspection for aesthetic / Burr / Sharp Corners/
4.
damages.
5. Base plate with all over continuous welding.
Below motor mounting pad welding not required as per drg
6.
instead of that seal welding to be done
Measurement Fillet size as per mentioned in drg. using fillet
7. gauge.

Pitted material not acceptable so ensure during inspection.


8.

9. Tapping connection checked by using GO-NOGO gauge.


Base plate flange is as per B16.5 and Flange serration is free
10.
from any damaged.
Earthing boss face area and flange serration area required
11.
without primer painting.
12. Stainless steel earthing boss should not be painted.

13. Check deck plate for deformation.

SULZER CONFIDENTIAL
Base plate inspection Check List Document No:
(For supplier)
SPI Page 2 of 2

14. Check coplanarity of base plate.


Base plate MTC mandatory for Gr. 70 & Stainless-steel material
15.
and for another grade if applicable.
Check specific requirement as per PO , NDT requirement ( if
16.
applicable)
PWHT requirement Checked: -
a) Base plate MOC is A516 Gr.70 - PWHT mandatory when
base plate length > 4M or Width > 3M or both.
17. b) Base Plate MOC other than A516 Gr.70- PWHT
mandatory when base plate length > 6M or Width > 3M or
both.
c) PWHT requirement whenever mentioned on BOM/PO.

18. Base plate Blasting and Paint report

19. Base plate Dimension report

20. Base plate Coplanarity report


Check loose material with base plate. i.e alignment pad, plate…
21.
etc
22. Rust preventive applied on machining surface.
If Slope Test Applicable: -
23.
Water poured: Water drained:

We here by confirmed that items mentioned above have been inspected and are found to be in
accordance with the drawing. We also confirmed that items mentioned above satisfies the requirement
of the specification & purchase order.

Supplier’s Supervisor Signature

SULZER CONFIDENTIAL