(For supplier)
SPI Page 1 of 2
Date : _________________
Supplier’s name
Applicable drg.
No.
Base plate SR.
WBS No.
NO.
Check List
Sr OK / Not
Check Points Remarks
No. Ok
Punch drg no., Supplier ID and base plate Sr no. on pump
1.
mounting pad near to Edge.
Visual & dimension checking as per base plate drg.
2.
Welding run required smooth and uniform beads and free from all
welding defects like ….
a) Weld spatters checked
b) Weld undercut checked
3. c) Weld porosity checked
d) Weld blowhole checked
e) Excess welding checked
SULZER CONFIDENTIAL
Base plate inspection Check List Document No:
(For supplier)
SPI Page 2 of 2
We here by confirmed that items mentioned above have been inspected and are found to be in
accordance with the drawing. We also confirmed that items mentioned above satisfies the requirement
of the specification & purchase order.